SHEFFIELD RESOURCES LTD

Similar documents
For personal use only

1Mt CONTAINED HM INFERRED RESOURCE AT ELLENGAIL

For personal use only

Coburn Zircon Project

For personal use only

2017 as at 30 June 2017 Project Tonnes HM HM SL OS HM Assemblage Tonnes HM HM SL OS HM Assemblage

MAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL MILLION TONNES

Sheffield Resources (SFX)

BMG SECURES LOW COST OPTION TO ACQUIRE ADVANCED HEAVY MINERAL SANDS PROJECT IN AUSTRALIA

Boonanarring Mineral Sands Project: The next cab off the mineral sands rank?

Disclaimer. Forward-Looking Statements. Competent Person s Statement

For personal use only Heemskirk Tin Project - Tasmania

EXCELLENT FIRST DRILL RESULTS FROM WELD RANGE

Option agreement with Randgold set to commercialise Massigui Gold Project

High-grade Copper and Gold Discovered at Productora

New Drilling Program Commences at Mutiny s Deflector Deposit

The World s Newest Mineral Sands Producer Presentation to TZMI Conference 18 November 2015

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

GOLD MINING IN SENEGAL 1

AGM Geology Presentation. 30th November 2016

2010 RIU Sydney Resources Round-up

Exploration targets identified to increase Browns Range Project s mine life

ASX/MEDIA RELEASE 25 November EMERGENT CONFIRMS MAJOR JORC RESOURCE UPGRADE TO 561Mt FROM PREVIOUS 127Mt AT BEYONDIE IRON PROJECT

High-grade Gold in First Drilling Undertaken at Productora South

ASX Release and Media Announcement 27 September Central Eyre Iron Project 2011 Stage VI Drilling Programme Completion

MAIDEN JORC RESOURCE CONFIRMS SIGNIFICANT COAL DEPOSIT AT MARIOLA COAL PROJECT, POLAND

Bass Metals records further positive drill results & progress at 3 prospects.

P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT

For personal use only

For personal use only

Savannah Resources Plc

ASX Release. 14 th September Corporate Update Divestment of Gold, Copper and Nickel Projects

CENTAURUS EXPANDS JAMBREIRO STUDY WORK AS A RESULT OF EXCELLENT RESULTS IN SOUTH EAST EXTENSION ZONE

Thunderbird The Emerging Force in Mineral Sands. Informa Mineral Sands Conference Presentation March 2017 ASX : SFX

The Manager Companies ASX Limited 20 Bridge Street

QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 31 MARCH 2018

Savannah Resources Plc / Index: AIM / Epic: SAV / Sector: Mining RNS 14 December 2015

African Mining and Exploration plc ( AME or the Company ) AME Secures Entry into World Class Heavy Mineral Sands Province

Thunderbird The Emerging Force in Mineral Sands

For personal use only

EXPLORING FOR COPPER AND GOLD IN CHILE

Merger Presentation April 2009

Ovoot Coking Coal Project (100%)

For personal use only

For personal use only

ASX announcement 16 May 2016

FIVE RIGS DRILLING AT KARLAWINDA

New High Grade Lode Discovered at Wagtail South

World Class Zircon Developments in the Eucla basin

For personal use only

For personal use only

October 2017 Investor Presentation. Moving to the next level: cash-flow, exploration and growth in WA s premier gold districts

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

Acquisition agreement to move to 100% ownership of the Ashford Coking Coal Project

For personal use only

For personal use only

For personal use only

For personal use only

For personal use only

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project

For personal use only

NEW MINERAL SANDS DISCOVERY AT NIGHT TRAIN

DRIVING NICKEL AND COPPER SULPHIDE DISCOVERY ON THE FRASER RANGE

Resourcing a renewable. Corporate Presentation August 2016

MARCH 2012 QUARTERLY REPORT. Highlights. Exploration Activities. Wyloo Iron Ore & Gold Project. Fast Facts

Managing Director s Presentation

FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT

ASX/Media Announcement

Haoma Mining NL DALTONS-MT WEBBER DEPOSIT; UPGRADE TO INDICATED RESOURCE CATEGORY FOR MAIN SOUTHERN ZONE

SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT

Summary Redmoor Tungsten Tin Project Lochinvar Coking Coal Project

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

Boonanarring Mineral Sands Project: The next cab off the mineral sands rank

For personal use only

COMPANY UPDATE MAY 2016

An ASX listed Perth-based gold explorer focused on Ghana in West Africa

KATINGAN RIA COAL RESOURCE UPGRADE

For personal use only

THREE NEW MINERAL SANDS DISCOVERIES IN CANNING BASIN

QUEEN SHEBA - RESOURCE TABLE: AUGUST 2011 RESOURCE CATEGORY. Tonnes Au Ag Cu (000) g/t g/t % GLOBAL RESOURCE TABLE: CONTAINED METAL

Ausgold awarded EIS grant for Jinkas deep drilling

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

For personal use only

Highlights ASX ANNOUNCEMENT 28 JUNE 2017

MAIDEN URANIUM RESOURCE PROOF OF CONCEPT

For personal use only

KINGSTON RESOURCES LIMITED

Significant Copper-Gold JORC Exploration Target

Kalongwe High Grade Copper-Cobalt Project Katanga Province, DRC

24 October Dear Shareholders, 2014 ANNUAL REPORT

Nickel, Gold and Lithium Western Australia. 15 September 2016

Rare Earth project update

Australian Securities Exchange Notice

For personal use only

QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 SEPTEMBER 2017

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

HIGHLY SUCCESSFUL SEISMIC SURVEY DOUBLES SIZE OF DEEP PALAEOVALLEY AT LAKE WELLS POTASH PROJECT

African Energy Resources Limited

HIGHLIGHTS. Drilling intersects wt% recovered DTR concentrate grading 69.8% Fe, including 27 metres in excess of 21% DTR.

For personal use only

Transcription:

SHEFFIELD RESOURCES LTD ASX:SFX RIGHT PLACE, RIGHT TIME RIU EXPLORERS CONFERENCE 21-22 February 2012 The Esplanade Hotel, Fremantle

1 COMPETENT PERSONS & FORWARD LOOKING STATEMENTS COMPETENT PERSONS STATEMENT EXPLORATION RESULTS The information in this presentation that relates to exploration results has been compiled by Bruce McQuitty and David Archer. Each of Mr McQuitty and Mr Archer has consented to the inclusion of this information in this Section of this Web Site in the form and context in which it is included. Mr McQuitty and Mr Archer are geologists with over 20 years experience. Both Mr McQuitty and Mr Archer is a Member of the Australasian Institute of Geoscientists and has the appropriate relevant qualifications, experience, competence and independence to be considered as an Expert and Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves ( JORC Code ). COMPETENT PERSONS STATEMENT RESOURCE ESTIMATES The information in this presentation that relates to resource estimation is based on information compiled under the guidance of John Vann. Mr Vann is a Principal of Quantitative Group and acts as a consultant to the Company. Mr Vann is a Fellow of the Australasian Institute of Mining and Metallurgy and a Fellow of the Australasian Institute of Geoscientists and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and the activity to which they are undertaking to qualify as Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves ( JORC Code ). Mr Vann consents to the inclusion in the report of the matters based on their information in the form and context in which it appears. The information in this presentation that relates to reporting of resource and exploration results is based on information compiled under the guidance of Mark Teakle. Mr Teakle is a consultant to the Company. Mr Teakle is a Member of the Australasian Institute of Geoscientists and the Australasian Institute of Mining and Metallurgy and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and the activity to which they are undertaking to qualify as Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves ( JORC Code ). Mr Teakle consents to the inclusion in the report of the matters based on their information in the form and context in which it appears. FORWARD LOOKING STATEMENTS Some statements in this presentation regarding estimates or future events are forward-looking statements. They involve risk and uncertainties that could cause actual results to differ from estimated results. Forward-looking statements include, but are not limited to, statements concerning the Company s exploration programme, outlook, target sizes and mineralised material estimates. They include statements preceded by words such as expected, planned, target, scheduled, intends, potential, prospective and similar expressions.

INTRODUCTION A rapidly emerging ASX-listed company in resurgent mineral sands sector High quality mineral sands assets secured: Dampier Zircon Project Large, high grade project with world class potential Eneabba Project 1 Nearer term production - moving to feasibility study McCalls Project Large, longer term strategic chloride ilmenite project Large targets to be drilled in 2012 Significant upside potential Strong mineral sands price environment 2 1 Sheffield Resources has not yet reported Mineral Resources at Dampier and any discussion in relation to targets and Mineral Resources is conceptual in nature. There has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource. For further details refer to ASX releases of 17 Jan 2011, 27 Jul 2011 and 8 Nov 2011. 2 Refer to Sheffield s Mineral Resources Tabulation in Appendix 1. Previous releases by Sheffield on 16/8/2011, 25/10/2011, 7/11/2011 and 20/2/2012 fully report the Mineral Resource Estimates for the Yandanooka, Ellengail, West Mine North and McCalls deposits. 2 2

3 CORPORATE SNAPSHOT Capital Structure Shares on Issue 2 58.88m Options on Issue 1 32.8m Market Cap. (at $0.355) 2 Cash (31 December 2011) 2 Debt Enterprise Value $20.9m $2.3m Nil $18.6m 1. The options have a volume weighted exercise price of $0.224 and a volume weighted time to expiry of 1.6 years 2. Pre placement of 33.35 million shares at 30cps to raise $10 million as announced 10 Feb 2012 Board & Management Will Burbury Exec Chairman Bruce McQuitty Managing Director David Archer Technical Director David Boyd Exploration Manager Major Shareholders Directors 26% Top 20 45% 2,000,000 1,800,000 1,600,000 1,400,000 1,200,000 1,000,000 800,000 600,000 400,000 200,000 0 $0.40 $0.35 $0.30 $0.25 $0.20 $0.15 $0.10 $0.05 $0.00 Sheffield is fully funded - 2012 to be a breakthrough year

OVERVIEW 4

MINERAL SANDS MARKETS Zircon Main uses: ceramics, refractory linings Global market ~1.4Mtpa Titanium Feedstocks Rutile: >95% TiO 2, Two Distinct Product Streams Sheffield s projects are geared to Zircon and Chloride TiO 2 markets Both markets are experiencing acute shortage of supply Leucoxene: 85-95% TiO 2, Altered ilmenite: 55-85% TiO 2, Ilmenite <55% TiO 2 Main uses: pigment for paints, plastics, titanium metal Global market ~6.4Mtpa Source: TZMI & Iluka Resources Ltd 5

000 tonnes Zircon MARKETS & PRICING Zircon Supply & Demand (includes induced projects) Pricing Zircon, Rutile, Ilmenite Persistent supply shortage likely in base demand case 3,000 2,500 2,000 1,500 1,000 500 0 1,600 1,400 1,200 1,000 800 600 400 200 0 Zircon, Average Price US$/metric tonne, fob 2005 2006 2007 2008 2009 2010 2011 2012 Rutile, Average Price US$/metric tonne, fob 2005 2006 2007 2008 2009 2010 2011 2012 Iluka analysis - excludes Iluka s enhanced production initiatives Source: Iluka Resources Mineral Sands Briefing Session, ASX release 17 Nov 2011. 200 180 160 140 120 100 80 60 40 20 0 Ilmenite, Average Price US$/metric tonne, fob 2005 2006 2007 2008 2009 2010 2011 2012 Source: Pricing data compiled by Sheffield from various open file sources 6

Price per tonne $US (FOB) 7 OPPORTUNE TIMING ZIRCON & RUTILE PRICES 3,000 The best performing stock on the ASX 100 during 2011 was mineral sands producer Iluka Resources First Resource at Yandanooka 2,500 Acquisition of McCalls HMS Project 2,000 1,500 Eneabba HMS Tenement Applications Acquisition of West Eneabba HMS Projects from Iluka Dampier Tenements Granted 1,000 ASX Listing Zircon Price 500 Rutile Price Dampier Tenement Applications 0 Aug-09 Oct-09 Dec-09 Feb-10 Apr-10 Jun-10 Aug-10 Oct-10 Dec-10 Feb-11 Apr-11 Jun-11 Aug-11 Oct-11 Source: Pricing data compiled by Sheffield from various open file sources

THM (Mt) PEERS - EXPLORERS & MINERS 70.0 18.00% 60.0 50.0 Dampier Zircon Project Exploration Target 1 450 850 Mt @ 5 10% HM 22.5Mt 85Mt THM 16.00% 14.00% 12.00% 40.0 10.00% 30.0 8.00% 20.0 6.00% 4.00% 10.0 2.00% 0.0 Perth Basin (ASX: ILU) McCalls Project (ASX: SFX) Toliara Sands (ASX: WTR) Murray Basin (ASX: ILU) Grande Cote (ASX: MDL 50%) Eucla Basin (ASX: ILU) Coburn (ASX: GUN) Kwale (ASX: BSE) Eneabba Project 2 (ASX: SFX) Cyclone (ASX: DRX) 0.00% Mineral Sands Projects For footnote 1 see Slide 11 For footnote 2 see Appendix 2, Slide 21 Resources data compiled by Sheffield from recent ASX releases 8

MINERAL SANDS PROJECTS 9

RAPID GROWTH STRATEGY Dampier Zircon Project Flagship project Eneabba Project Near term production McCalls Project Longer term project 1 1 2 10

DAMPIER ZIRCON PROJECT Ranks in top tier of undeveloped Zircon projects Exploration Target 1 of 450-850Mt @ 5.0-10.0% HM for 22.5-85Mt THM (Thunderbird Prospect) Mineral assemblage includes 8% Zircon, 2.3% rutile, 6.7% leucoxene and 34.3% ilmenite Located 60km west of Derby port Ex Rio Tinto project, dropped pre mineral sands price rises and during GFC Located on Crown Land (pastoral lease) outside Kimberley Heritage areas 1 Sheffield Resources has not yet reported Mineral Resources for the Dampier project and any discussion in relation to targets and Mineral Resources is conceptual in nature. There has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource. For further details refer to ASX release of 8 Nov 2011. 11

Derby Port, currently undergoing expansion 1 Sheffield Resources has not yet reported Mineral Resources for the Dampier project and any discussion in relation to targets and Mineral Resources is conceptual in nature. There has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource. For further details refer to ASX release of 8 November 2011. 12 DAMPIER ZIRCON PROJECT Exploration Target 1 of 450-850Mt @ 5.0-10.0% HM applies to core only of Thunderbird prospect Based on 8 drill intersections completed by RIO including: 45m @ 9.85% HM from 3m, 27m @ 7.00% HM from 1.5m, & 27m @ 7.92% HM from 9m Drilling and thorium anomaly indicate potential for up to 15km of strike length Further potential: Argo prospect Drilling planned to commence mid-2012: 12,500m air-core drilling ~500 x 800m spacing

DAMPIER ZIRCON PROJECT Mineralisation at the Thunderbird Prospect is very thick with little overburden Dimensions 6 x 5 km, av. width 24.5m 4 of the 8 drill intersections finished in mineralisation Significant potential for extensions at depth High average in situ zircon content of 0.63% from RIO drilling* * See Appendix 5 for information in relation to calculation of zircon content 13

ENEABBA PROJECT Medium sized project 161Mt @ 2.5% HM 1 in resource inventory (3 deposits see Appendix 1 & 2) Near term development and early cash flow potential Scoping studies nearing completion - to assess priorities for development Strategy is to identify sufficient HM in district to support annual production of 150-250Kt HM Substantial additional targets at Durack, Irwin and Drummond Crossing Drilling to continue in 2012 1 Refer to Sheffield s Mineral Resources Tabulation in Appendix 1. Previous releases by Sheffield on 16/8/2011, 25/10/2011 and 7/11/2011 fully report the Mineral Resource Estimates for the Yandanooka, Ellengail and West Mine North deposits. 2 Sheffield Resources has not yet reported Mineral Resources for the Drummond Crossing and Irwin projects and any discussion in relation to targets and Mineral Resources is conceptual in nature. There has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource. For further details refer to ASX releases of 24/1/2012 and 2/2/2012. 14

ENEABBA PROJECT ADVANTAGES OF DUNAL-STYLE DEPOSITS At or near surface minimal overburden Broad deposits allows high mining rate Above water table Zircon-rich mineral assemblage: Yandanooka 11.5% Drummond Crossing 14.9% Yandanooka Durack Drummond Crossing 15

16 ENEABBA PROJECT COMPETITIVE ADVANTAGES Established mineral sands mining district Good quality, high value HM products Mostly broadacre farmland Proximity to roads & rail Open ports Close to Asian markets Available energy sources Abundant groundwater Proximity to SR plants

17 MCCALLS PROJECT Located 110km north of Perth Inferred Resource of 4.4 billion tonnes @ 1.2% HM 1 for 53Mt contained HM 43Mt contained high TiO 2 ilmenite 3.5Mt contained zircon Higher value ilmenite, potentially suitable for chloride route / synthetic rutile processing TZMI forecast a significant long term supply shortage of chloride ilmenite from 2013 which will only be partially filled by new projects currently under investigation Scoping work has commenced Global supply/demand outlook for chloride ilmenite: 2006-2020 (source, TZMI 2012, not to be reproduced without permission) 1 Refer to Sheffield s Mineral Resources Tabulation in Appendix 1. A previous release by Sheffield on 20/02/2012 fully reports the Mineral Resource Estimate for the McCalls deposit.

EXPLORATION & EVALUATION TIMETABLE Project 2012 Q1 2012 Q2 2012 Q3 2012 Q4 HMS Projects Dampier Drilling Resource Est Scoping Eneabba Drilling Prefeasibility Prefeasibility Feasibility McCalls Resource Est & Scoping Drilling Prefeasibility Prefeasibility Other Projects Pilbara Iron Drilling Resource Est Moora Talc Drilling This timetable is indicative only and remains subject to change. Successive stages of evaluation are also dependent on positive outcomes from previous phases of work and other factors. 18

19 SUMMARY A rapidly emerging player in resurgent mineral sands sector Large projects acquired pre significant mineral sands price spike Dampier Zircon Project set to become Company s flagship in 2012 Moving to feasibility on Eneabba Projects targeting near term production Large drilling campaign 1H 2012 designed to increase resource inventory Fully funded - 2012 to be breakthrough year for Sheffield RIGHT PLACE, RIGHT TIME For further information please visit the company s web site: www.sheffieldresources.com.au

APPENDIX 1 RESOURCE INVENTORY Deposit Sheffield s contained Valuable HM (VHM)* Resource inventory (0.9% HM cutoff) Resource Category Zircon ( 000t) Rutile ( 000t) Leuc. ( 000t) Ilmenite ( 000t) Total VHM ( 000t) Yandanooka Indicated 201 117 168 1,072 1,558 Yandanooka Inferred 12 8.5 15 73 108 Ellengail Inferred 92 90 20 658 860 West Mine North Measured 18 33 42 200 293 West Mine North Indicated 71 87 46 506 709 McCalls Inferred 3,491 1,063 2,576 42,911 50,041 Total Measured 18 33 42 200 293 Total Indicated 272 204 214 1,577 2,268 Total Inferred 3,595 1,162 2,611 43,641 51,009 Total All 3,885 1,399 2,867 45,418 53,570 The contained HM tonnages in the above table are derived from Mineral Resource Estimates for the Yandanooka, Ellengail, West Mine North and McCalls deposits, previously fully reported in ASX releases by Sheffield on 16 August 2011, 25 October 2011, 7 November 2011 and 20 February 2012. Appendix 1 summarises the estimated tonnes and grades for these deposits. * Valuable Heavy Minerals are zircon, rutile, leucoxene and ilmenite. Non-valuable trash HM species include iron oxides, garnet, kyanite and staurolite. 20

APPENDIX 2 HMS MINERAL RESOURCE 1 INVENTORY AT 0.9% HM CUT-OFF 20 FEB 2012 ENEABBA PROJECT Deposit Resource Category Material (Mt)* Bulk Density HM % Slimes % Osize % In-situ HM (Mt)* Zircon % Rutile % Leuc. % Ilmenite % Yandanooka Indicated 61.00 2.0 2.8 14.7 9.4 1.72 11.7 6.8 9.8 62.3 Yandanooka Inferred 10.75 1.9 1.1 12.9 9.0 0.12 10.1 7.0 12.5 59.8 Yandanooka Total 71.75 2.0 2.6 14.4 9.3 1.84 11.5 6.9 10.2 61.9 Ellengail Inferred 46.45 2.0 2.2 15.6 2.1 1.040 8.9 8.7 1.9 63.5 Ellengail Total 46.45 2.0 2.2 15.6 2.1 1.040 8.9 8.7 1.9 63.5 West Mine North Measured 6.47 2.0 5.6 14.8 1.2 0.36 4.9 9.1 11.6 54.9 West Mine North Indicated 36.11 1.9 2.3 13.1 2.8 0.84 8.4 10.3 5.4 60.0 West Mine North Total 42.58 1.9 2.8 13.4 2.5 1.21 7.9 10.1 6.4 59.2 Total Measured 6.47 2.0 5.6 14.8 1.2 0.36 4.9 9.1 11.6 54.9 Total Indicated 97.13 2.0 2.6 14.1 6.9 2.56 10.5 8.1 8.2 61.5 Total Inferred 160.81 2.0 2.0 15.1 3.4 1.16 9.1 8.4 3.9 62.8 Total Eneabba Project All 160.81 2.0 2.5 14.5 5.4 4.08 9.8 8.2 6.8 61.7 McCALLS PROJECT Deposit Resource Category Material (Mt)* Bulk Density HM % *Tonnes have been rounded to reflect the relative uncertainty of the estimate. 1 This estimate is classified and reported in a manner compliant with the JORC code and guidelines (JORC, 2004). 2 The Mineral Assemblage is represented as the percentage of the Heavy Mineral (HM) component of the deposit, as determined by QEMSCAN. TiO 2 minerals defined according to the following ranges: Rutile >95% TiO 2 ; Leucoxene 85-95% TiO 2 ; Ilmenite <55-85% TiO 2. Slimes % Osize % In-situ HM (Mt)* McCalls Inferred 4,431 2.3 1.2 26.5 1.4 53 6.6 2.0 4.9 80.8 Zircon % Rutile % Leuc. % Ilmenite % 21

APPENDIX 3 YANDANOOKA Total resource of 71.75 million tonnes @ 2.6% HM 1 for 1.84Mt contained HM comprising: 61Mt @ 2.8% HM (Indicated) 10.75Mt @ 1.1% HM (Inferred) Includes High Grade core of 37.5Mt @ 3.8% HM (Indicated) High value mineral assemblage: 11.5% zircon, 6.9% rutile, 10.2% leucoxene, 61.9% ilmenite At surface, above water table 140km by road or rail to Geraldton Scoping work in progress Further potential at Durack, 25km to south to be drilled Q1 2012 1 Refer to Appendix 1 for Resource Tabulation and to ASX release dated 16 August 2011 22

APPENDIX 3 ELLENGAIL Inferred Resource 1,2 of 46.45 Mt @ 2.2% HM, containing 1.04Mt HM Includes High Grade core of 11.25Mt @ 5.0% HM, containing 560,000t HM (Inferred) High value assemblage: 8.9% zircon, 8.7% rutile, 63.5% ilmenite and 1.9% leucoxene Scoping work in progress 1 Refer to Appendix 1 for Resource Tabulation and ASX release dated 25 October 2011 for full details 2 Iluka Resources Ltd (ASX:ILU) retain a 1.5% royalty 23

24 APPENDIX 3 WEST MINE NORTH Total Resource 1,2 of 42.58Mt @ 2.8% HM for 1.2Mt contained HM comprising: 6.47Mt @ 5.6% HM (Measured) 36.11Mt @ 2.3% HM (Indicated) Includes high-grade core of 10.09Mt @ 7.7% HM (Measured and Indicated) High value mineral assemblage: 7.9% zircon, 10.1% rutile, 59.2% ilmenite and 6.4% leucoxene 3.5km extension of Eneabba West deposit, dredge mined by Iluka/RGC in 1990 s Scoping work in progress 1 Refer to ASX release dated 7 November 2011 for full details 2 Iluka Resources Ltd (ASX:ILU) retain a 1.5% royalty

APPENDIX 3 DRUMMOND CROSSING New discovery in Eneabba field Substantial Exploration Target 1 of 35-75Mt @ 1.5-2.5% HM Rich in zircon & rutile (av. 14.9% zircon, 10.2% rutile) Open along strike to north and south Mineralised from surface - dunal style 1 Sheffield Resources has not yet reported Mineral Resources for the Drummond Crossing project and any discussion in relation to targets and Mineral Resources is conceptual in nature. There has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource. For further details refer to ASX release of 24 January 2012. 25

26 APPENDIX 3 IRWIN Exploration Target 220-340Mt @ 1.2-1.6% HM Valuable mineral assemblage (av. 10% zircon, 7.4% rutile) Low slimes (av. 5.2%) dunal-style mineralisation amenable to dredge mining Adjacent to Tiwest s Dongara deposit Open along strike to north for 10km 1 Sheffield Resources has not yet reported Mineral Resources for the Irwin project and any discussion in relation to targets and Mineral Resources is conceptual in nature. There has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource. For further details refer to ASX release of 2 February 2012.

APPENDIX 4: OTHER PROJECTS PILBARA IRON PROJECT East Pilbara focus Exploration Target 2 of 20-60Mt @ 56-60% Fe outlined at Three Pools 1 st pass drilling returned broad iron intersections from near surface, including: 50m @ 57.5% Fe from 0m (TPRC012) 42m @ 57.6% Fe from 6m (TPRC011) 52m @ 56.9% Fe from 16m (TPRC022 1 Refer to ASX release of 1 December for further details. 2 Sheffield has not yet reported Mineral Resources at the Three Pools project and any discussion in relation to targets and Mineral Resources is conceptual in nature. There has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource. 27

APPENDIX 4: OTHER PROJECTS TALC PROJECT Simple Dig and Deliver commodity, e.g. Three Springs Targeting premium grade talc to gain market penetration Drilling has demonstrated high purity talc at 6 prospects Definition drilling planned 2012 Luzenac s Three Springs mine and new talc beneficiation plant. Source Rio Tinto Minerals media release 16 November 2010 28

APPENDIX 5: DAMPIER ZIRCON PROJECT High average in situ zircon content of 0.63% from RIO drilling* Hosted by deeply weathered Cretaceous sediments Fine grainsize of HM (D 50 62µm) and iron cementation may present some recovery issues, however high zircon content should offset recovery losses 2 1.5 1 0.5 0 In Situ % Zircon SFX *The Dampier in situ zircon content is derived by multiplying the weighted average HM content (7.9%) of 8 RIO drill hole intersections by the average zircon content (8%) of the mineral assemblage. RIO s bulk sample metallurgical testwork indicates the zircon content of the HM assemblage could be higher at 11.7%. Refer to ASX release of 7 September 2001 for further details. Zircon tail Cleaner stage gravity separation of HM on bulk sample from the Argo prospect. Source: Combined Annual Report (C96/2003 Mt Jowlaenga) for the Period 21 July 2007 to 20 July 2008 Rio Tinto Exploration Pty Ltd. The West Mine North in situ zircon content relates to the Measured & Indicated Resource for the high grade strand of 10.09Mt @ 7.7% HM for 779,000t of contained HM (ASX release 7 November 2011). The Ellengail in situ zircon content relates to the Inferred Resource for the high grade core of 11.25Mt @ 5.0% HM for 560,000t contained HM (ASX release 25 October 2011). The Yandanooka in situ zircon content relates to the Indicated Resource for the high grade core of 37.5Mt @ 3.8% HM for 1.41Mt of contained HM (ASX release 16 August 2011). 29