PRACTICAL AND LOGISTIC ASPECTS OF THE ALIGNMENT OF THE LEP COLLIDER

Similar documents
MAINTENANCE OF THE GEOMETRY OF LEP IMPROVEMENT & OPTIMIZATION OF THE VERTICAL AND RADIAL SMOOTHING

SURVEY AND ALIGNMENT FOR THE SYNCHROTRON LIGHT SOURCE ELETTRA

Situation Analysis and Stability Evaluation of Large Electron Positron Collider in CERN* Abstract

THE ALIGNMENT OF THE LHC DURING THE SHUT-DOWN D. Missiaen, CERN, Geneva, Switzerland. Fiducialisation

METROLOGY AND SURVEYING AT CERN : RECENT NEWS AND FACTS

PREPARING THE SPS COMPLEX ALIGNMENT FOR FUTURE LHC RUNS

Status Report on Survey and Alignment Efforts at DESY

Survey & Alignment of Pohang Light Source

POSITIONING THE SPRING-8 MAGNETS WITH THE LASER TRACKER

Status Report on the Survey and Alignment efforts at DESY

THE LASER TRACKER : A MAJOR TOOL FOR THE METROLOGY OF THE LHC

A NEW STANDARD METHOD FOR THE SURVEYING AND ALIGNMENT OF BEAMLINE FACILITIES AT GSI

Status Report Relativistic Heavy Ion Collider

A PRELIMINARY ALIGNMENT PLAN FOR RIA AT MSU

THE SPEAR3 UPGRADE PROJECT AT SLAC *

BEPCII Pre-alignment and Hold Level Adjustment. Accelerator Center of IHEP Xiaolong Wang

SPEAR3 Alignment Chapter For Nuclear Instrumentation and Methods in Physics Research, Section A June 25, 2004

Status report on the Survey and Alignment of the accelerators at CERN

3-D METROLOGY APPLIED TO SUPERCONDUCTING DIPOLE MAGNETS FOR LHC

Status Report on the Survey and Alignment Activities at Fermilab

GEODETIC MEASUREMENTS FOR THE HERA PROTON RING, THE NEW EXPERIMENTS AND THE TESLA TEST FACILITY - A STATUS REPORT

Survey and Alignment at the Advanced Light Source

PERFORMANCE OF WIRE POSITION SENSORS IN A RADIATION ENVIRONMENT. CERN, Geneva, Switzerland

Fine Alignment of the ATF Damping Ring

THE ACTIVE PREALIGNMENT OF THE CLIC COMPONENTS H. MAINAUD DURAND, T. TOUZE CERN

Alignment-Aspects for the HERA-Experiments ZEUS and H1

Site Surveying Procedures for Construction and the Built Environment

Geodetic Survey and Component Alignment of the Combined Heavy Ion Synchrotron SIS and the Experimental Storage Cooler Ring ESR

STATUS REPORT ON THE GEODETIC AND ALIGNMENT EFFORTS FOR THE NUMI PROJECT AT FERMILAB

THE SPEAR3 UPGRADE PROJECT AT SLAC * Abstract

The Alignment Concept For The Fermilab Recycler Ring Using Permanent Magnets

Lattice Cell/Girder Assembly

ilearnalignment Alignment Training Subjects

Long Term Site Movements at the ESRF

(a) (b) Fig. 1 - The LEP/LHC tunnel map and (b) the CERN accelerator system.

LONG-TERM VARIATION OF THE MAGNET ALIGNMENT IN SPRING8 STORAGE RING

MAGNET INSTALLATION AND ALIGNMENT FOR THE FUJI TEST BEAM LINE AT KEKB

Magnet Buildability Review report : C-Beta Magnets

A beam line for schools

ALIGNMENT OF THE MSGC BARREL SUPPORT STRUCTURE

Instrument Calibration at the ESRF

Review of Accelerator Alignment

2 Closed Orbit Distortions A dipole kick j at position j produces a closed orbit displacement u i at position i given by q i j u i = 2 sin Q cos(j i ;

Analysis of KEK-ATF Optics and Coupling Using Orbit Response Matrix Analysis 1

STATUS REPORT ON STORAGE RING REALIGNMENT AT SLRI

Why Does the LEP Tunnel Move the Way it Moves

HE-LHC Optics Development

ALIGNMENT RESULT FOR MAGNET UNITS OF THE SPRING-8 STORAGE RING

CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH BEAM-BASED ALIGNMENT IN CTF3 TEST BEAM LINE

Accelerators. Lecture V. Oliver Brüning. school/lecture5

LHC operation in 2015 and prospects for the future

Physics 736. Experimental Methods in Nuclear-, Particle-, and Astrophysics. - Accelerator Techniques: Introduction and History -

The CLIC active prealignment studies H. MAINAUD DURAND, T. TOUZE CERN

Optimized Annular Triode Ion Pump for Experimental Areas in the LHC

Distance Determination between the MINOS Detectors for TOF Measurements. Dr. Virgil Bocean Alignment & Metrology Department Fermilab

INSTRUMENTATION AND SURVEY NETWORKS AT THE ESRF

Read the following BEFORE getting started:

APPLICATIONS OF HYDROSTATIC LEVELING IN CIVIL ENGINEERING

Leveling. 3.1 Definitions

Longitudinal Dynamics

Survey and Alignment of the Fermilab Electron Cooling System

CIV : THEODOLITE ADJUSTMENT

Care should be taken to give an appropriate number of significant figures in the final answers to calculations.

ALIGNMENT OF THE SPARC LINEAR ACCELERATOR. M. Esposito, M. Paris, F. Sgamma, S. Tomassini, M. Troiani, (INFN LNF) Abstract

Betatron Matching and Dispersion Matching

RF System Calibration Using Beam Orbits at LEP

The LHC Collider. STOA lecture, Brussels, 27 th November 2012 Steve Myers Director of Accelerators and Technology, CERN

Alignment of the Dipole Magnets in the Cornell Electron-Positron Storage Ring

Auto collimator. Introduction. Objectives: Apparatus: Theory:

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland. Commissioning of the CMS Detector

LEP 2 Energy Calibration and the Spectrometer

COPYRIGHTED MATERIAL INTRODUCTION CHAPTER 1

Optimization of the SIS100 Lattice and a Dedicated Collimation System for Ionisation Losses

Blanco Primary Mirror Radial Support Repair

Thanks to all Contributors

Surveying Prof. Bharat Lohani Department of Civil Engineering Indian Institute of Technology, Kanpur

LHC Luminosity and Energy Upgrade

Introduction to accelerators for teachers (Korean program) Mariusz Sapiński CERN, Beams Department August 9 th, 2012

Alpha-energies of different sources with Multi Channel Analyzer (Item No.: P )

TECHNIQUES USED IN THE ALIGNMENT OF TJNAF S ACCELERATORS AND EXPERIMENTAL HALLS*

Србија DETERMINING TEMPERATURE DEPENDENCE OF COLLIMATION ERROR OF DIGITAL LEVEL LEICA DNA 03. Jelena GUČEVIĆ, Siniša DELČEV, Vukan OGRIZOVIĆ

FY04 Luminosity Plan. SAG Meeting September 22, 2003 Dave McGinnis

D. Brandt, CERN. CAS Frascati 2008 Accelerators for Newcomers D. Brandt 1

OVERVIEW OF THE LHEC DESIGN STUDY AT CERN

CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CTF3 DRIVE BEAM INJECTOR OPTIMISATION

Temperature Tests on Modern Magnetometers

LHC accelerator status and prospects. Frédérick Bordry Higgs Hunting nd September Paris

Tunnel Surveys for New CERN Particle Accelerators

The Alignment of BEPCII RING

ACCURACY OF WALL STATION SURVEYS

A Method for Greatly Reduced Edge Effects and Crosstalk in CCT Magnets

The LHC: the energy, cooling, and operation. Susmita Jyotishmati

Analysis and Evaluation of the CERN Reference Systems

Electric Field Mapping

Student Name: SE13-17 U1/2

Beam diagnostics: Alignment of the beam to prevent for activation. Accelerator physics: using these sensitive particle detectors.

Linear Collider Collaboration Tech Notes

Particles and Universe: Particle accelerators

Why do we accelerate particles?

Paper Reference. Friday 9 June 2006 Morning Time: 1 hour 15 minutes

Transcription:

201 PRACTICAL AND LOGISTIC ASPECTS OF THE ALIGNMENT OF THE LEP COLLIDER Michel HUBLIN CERN - European Organization for Nuclear Research 1211 Geneva 23 - Switzerland Abstract The metrology and geodesy of the 27 km accelerator was completed between 1981 and 1989 with a maximum section of 40 surveyors, technicians and helpers. Geodetically, the main difficulties in obtaining millimetric precisions were due to meteorological factors i.e. the evaporation with occurs in the Geneva Basin. The accuracies were achieved by a reduced team, through time and patience, working both day and night using the Terrameter. In the metrology, the obstacles to be overcome in order to obtain the required decimillimetric accuracies were that of the installation schedule, air draughts and humidity in the tunnel. Many teams often working in shifts used micro-computers, commercial instruments and devices developed by CERN in order to overcome the difficulties which were experienced. 1. INTRODUCTION With reference to the seminars Applied Geodesy for Particle Accelerators as part of the CERN Accelerator School (C.A.S.) held in April 1986 and to the International Workshop on Accelerator Alignment held at SLAC in July 1989 [11] most of the methods and instruments used in the alignment of LEP have been presented. The related topics were the geodesy [1, 2, 3], the underground geodesy [4], the metrology of LEP [5, 6, 7, 9] and the calculations used for these applications [8, 10]. This paper focuses on the following items : - the organization and the schedule of the personnel in order to satisfy the time and space constraints of the project; - the rate of work done with the instrumentation chosen; - some of the results obtained.

202

203 2. THE SURVEY AND ALIGNMENT PROCESS 2.1. THE SURFACE REFERENCE NETWORKS The Geodetic Network (Figure 1) The role of the geodetic network was to ensure the perfect positioning of the LEP with regard to its injectors PS and SPS. It consists of eight main points situated on raised parts of the site in order to allow for intervisibility of those eight points; the nine pillars situated around the shafts were the references for the civil engineering work and then for the metrology [1]. During the summer of 1986, the 17 pillars were measured with the Terrametre. As with previous years, measurement of distances greater than 10 km was difficult because of the evaporation which occurs in the Geneva basin. In order to obtain a standard deviation of 1.2 mm on the 63 residuals, it was necessary for the team to make numerous measurements during the night. The geodetic network was completely measured three times and the error ellipses for the coordinates were at maximum 1.4 mm. The Levelling Network (Figure 2) lgl was measured at the nodes, to allow the calculation of the normal corrections for different sections of the network. An evaluation of the geoid meant that the ellipsoidal heights in the local reference system could be determined [2, 11]. The total length of the network is almost 90 km. The closing error of the outer circuit (length = 37 km, with 720 height differences) was 2.1 mm. heights. The standard error was almost 1 mm on the altitudes and 5 mm on the ellipsoidal Table 1 gives details about the instruments used for the measurement of the surface reference networks. The Transfer of Coordinates down the Shafts The transfer was performed in far from ideal conditions i.e. during the installation of pipes down the shafts as well as construction equipment present on the surface. Two types of instrument were used : - a WILD ZL zenithal telescope, and - a KERN E2 theodolite. The mean difference between the two types of measurement made by the instruments was 0.5 mm. 2.2. UNDERGROUND NETWORKS The Marking of the Standard Interval between Consecutive Quadrupoles There were 800 plumb points (in total) from the tripods with 800 x 3 = 2400 nail points (Figures 3 and 4). This allowed for the installation of the electrical cables, alimentation bars and water pipes. All these marks were put in place from the pillars of the polygonal

204

205 Figures 3 & 4 : The floor marking

206 network, which was used as the reference for the civil engineering work and was remeasured before using. The Metrological Reference Network This network was necessary to allow the alignment of the quadrupoles. This important step will be described later. The Ground References of the Girders The ground marks were placed at either end of the vacuum chamber passing through the quadrupole, sextupole and dipole connection of each girder (Figure 4). Their purpose being to enable the feet of the girder to be set down, with the aid of plumb lines from the ends of the vacuum chamber, and also to act as a reference to make the holes for the feet of the dipoles. This was done by teams of three people using the metrological reference network already measured and calculated (Table 1). 2.3. ALIGNMENT OF THE MAGNETIC AND DETECTION ELEMENTS The Alignment and Smoothing of the 800 Quadrupoles and the Alignment of the 3300 Dipoles The two subjects above will be discussed in more detail further on. The Alignment of the 400 Special Elements This concerns the accelerating cavities, the electrostatic separators, the collimators and some of the elements which are installed in the straight sections at the bottom of the shafts. These elements were aligned using the quadrupoles which had already been aligned as references in order to ensure the homogeneity of the collider. The work was carried out by a unit of eight people using a Kevlar offset measurement device, a Wild NA 2 level and an Epson PX4 for data capture. Some of the elements had very precise alignment tolerances, for example, the accelerating cavities and the low beta quadrupoles. The r.m.s. for the low beta quadrupoles was 0.08 mm but the working conditions did not allow us to reach this accuracy. 3. REFERENCE NETWORK FOR THE METROLOGY At the beginning of the project, we would have rather preferred to use the centring sockets of the quadrupoles as the references for the metrology. This was in fact not realistic, due to the tight schedule of the project. It was therefore decided to create a mobile reference network. The real reference network was made up of a series of three marks, which each have a conical head (Figure 4). Each set of three is glued to the ground and a level plane is ensured by using a gauge. This was done by teams of two helpers. The measurements were made by using plug-in tripods of which the feet were placed in the set of three conical heads. About 100 of these tripods were made and the supports of the reference socket were calibrated in the laboratory at CERN, in order to ensure the interchangeability of the tripods to within 0.1 mm (1 cr). 3.1. ORGANISATION OF THE TEAMS At the beginning of the installation, the plug-in tripods were installed during working hours, i.e. while the laying of the electric cables, water pipes, etc., was taking place.

207 Due to damage to both the tripods and the reference marks, it became necessary to organize teams of about 15 people who could work at the weekends. In order to allow for distance measurement, angle measurement and vertical height differences (between the tripod and floor marks) the tripods were screwed into the ground marks at the beginning of the Friday afternoon. In order to minimize the draught during the Kevlar measurements, plastic curtains were also set up. All the equipment was then left in place for the following Sunday, this allowed for good measurement because the tunnel was free. The procedures meant that the instruments remained at environmental temperature but had the draw-back that there was risk of theft taking place. Table 2 gives details of the equipment used, number of personnel and rate of work for each activity performed. 3.2. THE RESULTS Good results were achieved by the teams being able to work without interference during the offset measurement and levelling. Some problems were however experienced with the life of the chargeable batteries for the micro-computers and also due to the Kevlar wire breaking. The standard deviations of the compensated residuals of the measures for the line of tripods (approximately l00), which connects the reference pillars at the bottom of two consecutive shafts were : - Distances (invar wire) : 0.09 mm - Distances (Mekometer) : 0.20 mm - Offsets (kevlar wire) : 0.09 mm Figure 5 is the histogram of the mean differences in height between corresponding tripods in the levelling loop. 4. ALIGNMENT AND SMOOTHING OF THE QUADRUPOLES 4.1. ORGANISATION OF THE TEAMS The number of staff members with experience of the accelerator metrology was limited to four people, this meant that 36 contractors, stagiaires (probationers), and helpers were engaged. The teams were then organized, and because of the repeatitiveness of the two operations, i.e. aligning quadrupoles and dipoles, more freedom was given to the teams to motivate themselves to organize their work more efficiently. Delays accumulated due to civil engineering problems led to the project leaders creating a much shorter installation programme, the CRASH Programme, which had three main points of attack. This was to take place in the second half of 1988. All these reasons led to the creation of three teams of ten people, each one having three engineering stagiaires, three technical stagiaires or contractors, four helpers and one of the staff-members. The work was done in two shifts, 7h to 13h30 and 13h30 to 20h., in a continuous working day with the same equipment. The work patterns of the two teams were as follows : 1) only alignment of quadrupoles 2) alignment and smoothing of quadrupoles 3) only smoothing of quadrupoles 4) alignment of dipoles

208-25 -24. -23-22 -21-20 -19-18 -17-16 -15-14 -13-12 -11-10 -9-8 -7-6 -5-4 -3-2 -1 0 3 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Mean: 0 mm/loo Standard deviation : 10 mm/loo Number of points : 762 Number of points not in the histogram : 13 Figure 5 : Histogram of the mean differences in height between corresponding tripods

209 4.2. RUNNING OF OPERATIONS The total equipment used is described in table 2. The so called crayfish device whose task was to set down the girders of the quadrupoles did not have the precise movement required. The positional error was about 20-30 mm. It was therefore necessary to create a machine which could perform the transfer. The hydraulic device so called dab because of the small height it worked within (10 cm) solved the problem but meant the procedure was slower than with only using the jacks. Another problem known in the alignment of large accelerators is due to disregard of the civil engineering tolerances. If there are errors in the construction of the tunnel, these follow through into the alignment of the elements. Delays are introduced if the tunnel floor has to be dug out further or if it is necessary to wedge the feet of the quadrupoles. In order to avoid this, there are two solutions : - to correct the civil engineering errors at the time, though this can delay the schedule, - a mechanical team equipped with a revolving laser to detect the errors and correct them as they arise. The second solution was chosen in our case, but delays were again introduced because some mistakes were made with the corrections applied. The importance of the installation schedules must be stressed, there were a lot of companies involved in the programme. Even though the schedule was well organized, problems were still created for the survey teams because of the movement and transport of material by electrical trucks and the monorail in the tunnel. Some of the trucks collided with and disaligned the quadrupoles (l counted about twelve). Electrical power-cuts due to the installation of electrical cables, etc., also slowed down the process. 4.3. THE SMOOTHING MEASUREMENTS In order to achieve the required accuracies on the quadrupole alignment (dr = dh = 0.1 mm, dt = 0.1 mrad), once a section of twenty quadrupoles had been measured, the team began to smooth the relative positions. This was done using six radial measurements (taken by the écartomètre in conjunction with the Kevlar wire) and treated by the programme written for the SPS [8]. The height differences between quadrupoles were measured with an automatic level, transformed into six pseudo-vertical observations, and then treated by the smoothing program. The small displacements which were required as a result of the calculations were then performed with the jacks on the girders. The rare cases where millimetric displacements were needed were due to mistakes in the positioning of the tripods. Figure 6 is an extract from about 31 m of graphical interpretation representing the positions of the 800 quadrupoles after smoothing.

210

211 5. ALIGNMENT OF THE DIPOLES This was done by the three groups of ten people mentioned in the preceding section. Alignment gauges were used to place the 3300 dipoles due to the fact that they were not equipped with the two reference marks. The alignment took place by means of two sets of equipment, each consisting of a commercial laser and a sphere (developed by the CERN Magnet Group) [12], which had two directional photoreceptive cells. The equipment worked interactively with a computer developed by the Survey Group at CERN. The sought precisions (dr = dh = 0.3 mm, dt = 0.1 mrad) were achieved even though the conditions were not ideal (as explained earlier); in particular, the laser beam was interrupted due to draughts caused by the speed of the monorail as it passed. This meant that the calibration of the lasers and spheres had to be redone. Another inconvenience, though minor, was the length of the extension cable between the equipment. 6. CONCLUSION AND ACKNOWLEDGEMENTS Thirteen years passed between the installation of the SPS Synchrotron and the LEP Collider on the same site. LEP has a length four times that of the SPS, with the same required precisions in the alignment of the elements. This meant that there was an increase in the manworking hours, but we were able to profit from the automatization of the instrumentation. Topographical and vegetational obstacles (580 hours of tree chopping and trimming!) made the creation of the geodetical network more difficult. The Terrametre, from Terra Technology, allowed us to achieve good results. This was possible because the Terrametre has the ability to eliminate per part the nightmare of the modern geodesist - knowing the refractive index. During the metrology the length of the reference wire for the offset measurements extended from the 96 m of the SPS to 120 m in the LEP. This was possible because the nylon wire was replaced by that of Kevlar. The excellent KERN Mekometer ME5000 EDM allowed for redundancy in distance measurements. The essential difference in the data capture for the references (tripods) and alignment of the elements in the LEP was to be the automatic capture and interactive processing of the data with micro computers. This eliminated data errors but did not reduce the work of the men. We also found it was necessary to ensure that the equipment was of the highest standards, i.e. durable and not susceptible to variations in humidity. I have highlighted throughout this conclusion the large amount of work undertaken by the personnel. I would therefore like to take this opportunity to thank those people (which number about sixty) for whom it would be impossible to name here, for bringing their experience or youth during the geodesy and metrology of the project. Special thanks will go to my colleagues, Pierre Cuvet, Andre Froton, Andre Mathieu, Jacques Schmitt, for their large personal input. Thank you to Lindsay Mason for help with the translation and Sylviane Beauquis and Jean Brüderlein for the typing and presentation of this paper.

212 BIBLIOGRAPHY CERN ACCELERATOR SCHOOL : Applied geodesy for particle accelerators, CERN, Geneva, Switzerland, 14-18.4.1986, Proceedings CERN 87-01 (1987) : [1] [2] [3] [4] [5] [6] [7] [8] [9] [10] GERVAISE J., OLSFORS J. : The LEP trilateration network GURTNER W. & BURKI B. : Deviation of the vertical BEUTLER G. : Comparison between Tetrameter and GPS results - and how to get there FISCHER J.C., HAYOTTE M., MAYOUD M., TROUCHE G. : Underground geodesy HUBLIN M. : Computer aided geodesy for LEP installation (I) - LEP installation procedure COOSEMANS W. : Computer aided Geodesy for LEP installation (II) - Instrumentation QUESNEL J.P. : Applied metrology for LEP (II) - Data logging and management of geodetic measurements with a database. MAYOUD M. : Applied metrology for LEP (I) - Computing and analysis methods LASSEUR C. : Metrology for experiments ILIFFE J. : Three-dimensional adjustments in a local reference system [11] [12] MAYOUD M. : Geodetic Metrology of particle accelerators and physics equipment, Paper presented at the first international workshop on Accelerator Alignment, SLAC, Stanford, July 31 - August 2, 1989 HENRICHSEN K.: Optical alignment methods applied to the LEP magnet measurements, paper presented in this workshop (see proceedings)

213

214