LHC upgrade based on a high intensity high energy injector chain

Similar documents
Plans for the LHC Luminosity Upgrade Summary of the CARE-HHHAPD-LUMI-05 workshop

LHC Luminosity and Energy Upgrade

LHC Upgrade (accelerator)

Operational Experience with HERA

LHC Upgrade Plan and Ideas - scenarios & constraints from the machine side

HL-LHC: parameter space, constraints & possible options

UPGRADE ISSUES FOR THE CERN ACCELERATOR COMPLEX

International Scientific Spring 2010, March 1-6, 1. R. Garoby. slhc

SC magnets for Future HEHIHB Colliders

LIS section meeting. PS2 design status. Y. Papaphilippou. April 30 th, 2007

The Luminosity Upgrade at RHIC. G. Robert-Demolaize, Brookhaven National Laboratory

On-axis injection into small dynamic aperture

LHC Status and CERN s future plans. Lyn Evans

Transverse dynamics Selected topics. Erik Adli, University of Oslo, August 2016, v2.21

Plans for 2016 and Run 2

TUNE SPREAD STUDIES AT INJECTION ENERGIES FOR THE CERN PROTON SYNCHROTRON BOOSTER

SLS at the Paul Scherrer Institute (PSI), Villigen, Switzerland

Overview of LHC Accelerator

LHC operation in 2015 and prospects for the future

Conceptual design of an accumulator ring for the Diamond II upgrade

A Luminosity Leveling Method for LHC Luminosity Upgrade using an Early Separation Scheme

OVERVIEW OF THE LHEC DESIGN STUDY AT CERN

First propositions of a lattice for the future upgrade of SOLEIL. A. Nadji On behalf of the Accelerators and Engineering Division

Luminosity for the 100 TeV collider

FY04 Luminosity Plan. SAG Meeting September 22, 2003 Dave McGinnis

We acknowledge the support of the European Community-Research Infrastructure Activity under the FP6 "Structuring the European Research Area"

2008 JINST 3 S Main machine layout and performance. Chapter Performance goals

The TESLA Dogbone Damping Ring

Practical Lattice Design

LHC accelerator status and prospects. Frédérick Bordry Higgs Hunting nd September Paris

Beam. RF antenna. RF cable

Run2 Problem List (Bold-faced items are those the BP Department can work on) October 4, 2002

Possible Uses of Rapid Switching Devices and Induction RF for an LHC Upgrade

OTHER MEANS TO INCREASE THE SPS 25 ns PERFORMANCE TRANSVERSE PLANE

Introduction to particle accelerators

Compressor Lattice Design for SPL Beam

SPPC Study and R&D Planning. Jingyu Tang for the SPPC study group IAS Program for High Energy Physics January 18-21, 2016, HKUST

CERN & the High Energy Frontier

Accelerators. Lecture V. Oliver Brüning. school/lecture5

BEAM TESTS OF THE LHC TRANSVERSE FEEDBACK SYSTEM

III. CesrTA Configuration and Optics for Ultra-Low Emittance David Rice Cornell Laboratory for Accelerator-Based Sciences and Education

Large Hadron Collider at CERN

Run II Status and Prospects

1.5-GeV FFAG Accelerator as Injector to the BNL-AGS

The Large Hadron Collider Lyndon Evans CERN

Status of the LIU project and progress on space charge studies

EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics. LHC Accelerator R&D and Upgrade Scenarios. Francesco Ruggiero

Challenges and Plans for the Proton Injectors *

ACHIEVABLE SPACE-CHARGE TUNE SHIFT WITH LONG LIFETIME IN THE CERN PS & SPS

REPORT OF THE HIGH INTENSITY PROTONS WORKING GROUP

CEPC Linac Injector. HEP Jan, Cai Meng, Guoxi Pei, Jingru Zhang, Xiaoping Li, Dou Wang, Shilun Pei, Jie Gao, Yunlong Chi

LHC Commissioning in 2008

Lattice Design and Performance for PEP-X Light Source

Accelerator Physics. Accelerator Development

LHC status & 2009/2010 operations. Mike Lamont

Beam-Beam DA Simulations for HL-LHC

Measurement and Compensation of Betatron Resonances at the CERN PS Booster Synchrotron

Beam Dynamics. D. Brandt, CERN. CAS Bruges June 2009 Beam Dynamics D. Brandt 1

Status and Outlook of the LHC

The Superconducting SIS100 Synchrotron for High Intensity Proton and Heavy Ion Beams

Space Charge Studies on the ISIS Ring

Lattice Design for the Taiwan Photon Source (TPS) at NSRRC

The LHC: the energy, cooling, and operation. Susmita Jyotishmati

Current and Future Developments in Accelerator Facilities. Jordan Nash, Imperial College London

Electron cloud effects for PS2, SPS(+) and LHC

Short Introduction to CLIC and CTF3, Technologies for Future Linear Colliders

Commissioning of the LHC collimation system S. Redaelli, R. Assmann, C. Bracco, M. Jonker and G. Robert-Demolaize CERN, AB department

PBL SCENARIO ON ACCELERATORS: SUMMARY

Why are particle accelerators so inefficient?

Tools of Particle Physics I Accelerators

Gianluigi Arduini CERN - Beams Dept. - Accelerator & Beam Physics Group

Statusreport. Status of the GSI accelerators for FRS operation. Jens Stadlmann (FAIR Synchrotrons)

D. Brandt, CERN. CAS Frascati 2008 Accelerators for Newcomers D. Brandt 1

slhc-project-report-0034

ERL FACILITY AT CERN FOR APPLICATIONS

Much of this material comes from lectures given by Philippe Lebrun (head of CERN's Accelerator Technology Department), at SUSSP, Aug

Longitudinal Top-up Injection for Small Aperture Storage Rings

USING TEVATRON MAGNETS FOR HE-LHC OR NEW RING IN LHC TUNNEL*

Plans for ions in the injector complex D.Manglunki with the help of I-LHC and LIU-PT teams

Physics 610. Adv Particle Physics. April 7, 2014

The Electron-Ion Collider

LHC. Construction Understanding first the commissioning. Prospects for

PBL (Problem-Based Learning) scenario for Accelerator Physics Mats Lindroos and E. Métral (CERN, Switzerland) Lund University, Sweden, March 19-23,

TLEP White Paper : Executive Summary

Optimization of the SIS100 Lattice and a Dedicated Collimation System for Ionisation Losses

ULTIMATE LHC BEAM. G. Arduini, CERN, Geneva, Switzerland

ELIC: A High Luminosity And Efficient Spin Manipulation Electron-Light Ion Collider Based At CEBAF

Putting it all together

STATUS OF BEPC AND PLAN OF BEPCII

LHC commissioning. 22nd June Mike Lamont LHC commissioning - CMS 1

(a) (b) Fig. 1 - The LEP/LHC tunnel map and (b) the CERN accelerator system.

ELECTRON COOLING OF PB54+ IONS IN LEIR

Marcos Dracos IPHC-IN2P3/CNRS Strasbourg. 2 December 2008 M. Dracos, BENE 1

Low Energy RHIC electron Cooling (LEReC)

Superconducting Magnets for Future Electron-Ion Collider. Yuhong Zhang Thomas Jefferson National Accelerator Facility, USA

LHC Beam Operations: Past, Present and Future

The CERN Accelerator School holds courses in all of the member states of CERN. 2013, Erice, Italy

6 Bunch Compressor and Transfer to Main Linac

The FAIR Accelerator Facility

The Large Hadron electron Collider (LHeC) at the LHC

Transcription:

LHC upgrade based on a high intensity high energy injector chain Walter Scandale CERN AT department PAF n. 6 CERN, 15 September 2005

luminosity and energy upgrade Phase 2: steps to reach maximum performance with major hardware changes: equip the SPS with SC magnets, upgrade transfer lines to LHC and the injector chain, to inject into the LHC at 1 TeV ( super-sps option) beam luminosity should increase first step in view of an LHC energy upgrade for a given mechanic and dynamic apertures at injection, this option can double the beam intensity (at constant beam-beam parameter ΔQ bb N b /ε n ) increasing the LHC peak luminosity by nearly a factor two, in conjunction with long range beam-beam compensation schemes LHC energy swing is reduced by a factor 2, hence the SC transient phenomena should be smaller and the turnaround time to fill LHC should decrease interesting alternative cheap, compact low-field booster rings in the LHC tunnel install in LHC new dipoles with a operational field of 15 T considered a reasonable target for 2015 2020 beam energy around 12.5 TeV luminosity should increase with beam energy major upgrade in several LHC hardware components 31 August 2005 - LHC-LUMI 05 W.Scandale, LHC upgrade based on high intensity high energy injector chain 2

scenarios for upgrading the injector chain up to 160 MeV: LINAC 4 up to 2.2 GeV: the SPL (or a super-bps) See CARE-HIPPI up to 25 GeV: a fully refurbished PS The superconducting way: up to 150 GeV: a refurbished SPS up to 1 TeV: a SC super SPS SC transfer lines to LHC The normal conducting way: Up to 450 GeV: a refurbished SPS See and CARE-NED A 1 TeV booster ring in the LHC tunnel may also be considered Easy magnets (super-ferric technology?) Difficult to cross the experimental area (a bypass needed?) 31 August 2005 - LHC-LUMI 05 W.Scandale, LHC upgrade based on high intensity high energy injector chain 3

basic assumptions PS extraction energy 25 GeV PS bunch population 2 10 11 within 3.5 µm emittance, and 4 10 11 within 7 µm, PS bunch separation 12.5 ns (or 10 ns, if the impact on RF system should be minimised) To evenly spread the energy swing from 25 to 1000 GeV, we need two rings: the first ring should reach 150 GeV and the second 1 TeV As an alternative the first ring can reach 100 GeV and the second 1000 GeV luminosity upgrade should mostly come from: shorter turnaround time in filling the LHC increased circulating intensity and bunch population 31 August 2005 - LHC-LUMI 05 W.Scandale, LHC upgrade based on high intensity high energy injector chain 4

shortening the turnaround time injecting in LHC 1 TeV protons reduces the dynamic effects of persistent currents i.e.: persistent current decay during the injection flat bottom snap-back at the beginning of the ramp decrease the turn-around time and hence increases the integrated luminosity 1+ T + T T run run turnaround τ = e L L ( t) = L τ 0 e t τ L T run (optimum) L T run with τ L Ldt 0 τ gas = 85 h and L τ T run + T turnaround + τ x IBS = 106 h (nom) 40 h (high-l) L 0 L 0 [cm -2 s -1 ] τ L [h] T turnaround 200 runs L dt [fb -1 ] gain 10 34 15 10 14.6 66 1.0 10 34 15 5 10.8 85 1.3 10 35 6.1 10 8.5 434 6.6 10 35 6.1 5 6.5 608 9.2 31 August 2005 - LHC-LUMI 05 W.Scandale, LHC upgrade based on high intensity high energy injector chain 5 [h] T run [h]

increasing the circulating intensity injecting in LHC more intense proton beams with constant brightness, within the same physical aperture will increase the peak luminosity proportionally to the proton intensity L γδq πε f 2 n rep bb r 2 p β * 1+ θ cσ s 2σ * 2 d sep σ θ c ε n γβ * at the beam-beam limit, peak luminosity L is proportional normalized emittance = γε (we propose doubling N and ε n, keeping constant ε n /N). an increased injection energy (Super-SPS) allows a larger normalized emittance ε n in the same physical aperture, thus more intensity and more luminosity at the beam-beam limit. the transverse beam size at 7 TeV would be larger and the relative beam-beam separation correspondingly lower: long range b-b effects have to be compensated. 31 August 2005 - LHC-LUMI 05 W.Scandale, LHC upgrade based on high intensity high energy injector chain 6

B 3 s pulsed SC magnets for the super-sps tentative cycle 1 s 3 s 3 s with the present SPS dipole packing factor, at 1 TeV we need SC dipole with B peak 4.5 T to reduce dynamic effects of persistent current, the energy swing should not exceeds 10 the optimal injection energy is of about 100 150 GeV a repetition rate of 10 s should halve the LHC filling time t SPS beam size: repetition rate 10s normalized emittance: ε* = 23.5 µm (2 factor is related to the higher bunch intensity) peak-beta: ß max 100 m (assuming the same focussing structure of the present SPS) rms beam size at injection: σ 150GeV 2.2 mm σ 1000GeV 0.8 mm SPS aperture peak closed orbit: CO max = 5 mm dispersive beam size Dδ = 12 mm (assuming D = 4 m, δ bucket = 310-3 ) betatron beam size 6σ 150GeV = 12 mm and 6σ 1000GeV = 5 mm separatrix size for slow extraction 20 mm clearance of 6 mm inner coil aperture 70 100 mm adding in quadrature the betatron and the dispersive beam size and linearly the closed orbit, the separatrix size, and the clearance one will need a radial aperture of at least 29 mm at injection and 44 mm at top energy. 31 August 2005 - LHC-LUMI 05 W.Scandale, LHC upgrade based on high intensity high energy injector chain 7

pulsed SC magnets for the super-sps B tentative cycle 4 5 T 1 s 3 s 3 s 3 s 1.17 1.50 Ts -1 the technological challenge can be modulated: B max = 4 T, db/dt = 1.17 Ts -1 is rather easy, prototypes with close performance already exist, no major R & D required B max = 5 T, db/dt = 1.5 Ts -1 is rather difficult, no prototype exist, a major R & D is requested a SC dipole for the SPS may produce 70 W/m peak (35 W/m effective 140 kw for the SPS, equivalent to the cryogenic power of the LHC!) a rather arbitrary guess for tolerable beam loss is of about 10 12 px1000gev/10s = 15 kw by dedicated R&D magnet losses should be lowered to 10 W/m peak (5 W/m effective 20 kw ), comparable to tolerable beam loss power 31 August 2005 - LHC-LUMI 05 W.Scandale, LHC upgrade based on high intensity high energy injector chain 8

present SPS supercycle for filling LHC PS cycle duration: 3.6 s SPS ramp rate: 78 GeV/s 31 August 2005 - LHC-LUMI 05 W.Scandale, LHC upgrade based on high intensity high energy injector chain 9

interleaved SPS & super-sps cycles 1200 energy [GeV] 1000 800 600 400 200 0 super-sps sps 0 2.7 5.4 8.1 10.8 13.5 16.2 18.9 21.6 24.3 27 PSB 0.9 s rep-rate PS 2.7 s rep-rate time [s] SPS E inj = 26 GeV E ext =150 GeV 10.8 s rep-rate 51.67 GeV/s ramp-rate 3 PS-batches/cycle Super-SPS E inj = 150 GeV B = 0.675 T E ext =1000 GeV B = 4.5 T 10.8 s rep-rate 166.67 GeV/s ramp-rate db/dt = 0.75 T/s 3 PS-batches/cycle 31 August 2005 - LHC-LUMI 05 W.Scandale, LHC upgrade based on high intensity high energy injector chain 10

test beam cycle for the super-sps 1200 energy [GeV] 1000 800 600 400 200 0 0 2.7 5.4 8.1 10.8 13.5 16.2 18.9 21.6 24.3 27 time [s] Super-SPS E inj = 150 GeV B = 0.675 T E ext =1000 GeV B = 4.5 T 10.8 s rep-rate 200 GeV/s ramp-rate db/dt = 0.9 T/s 3 PS-batches/cycle flat-top 2 s 31 August 2005 - LHC-LUMI 05 W.Scandale, LHC upgrade based on high intensity high energy injector chain 11

open items 1. evaluate all consequences of higher intensity operation 2. installation staging in the SPS tunnel, minimising the duration of the shutdown 3. lattice design also considering the partial use the present SPS ring 4. refined estimate of the magnet aperture 5. slow extraction design at 1 TeV within the space available 6. optimal extraction & injection channels (kickers and septa operating on more energetic particles within serious space occupancy constraints) 7. estimate of the expected loss 8. design of SC transfer lines to the LHC 9. optimal design for the SC magnets for the super-sps: nominal parameters should be proposed and a road map for the requested R & D presented. 10. cryogenic system: solution should be investigated for the needs and the installation of cryogenics in the SPS tunnel. 11. RF systems: the optimal choice of the RF parameter is not yet available. foreseeing other uses of the super-sps 1. scenario to fill the whole super-sps ring 2. upper value of the circulating intensity 3. optimal cycle duration 4. optimal bunch distance 31 August 2005 - LHC-LUMI 05 W.Scandale, LHC upgrade based on high intensity high energy injector chain 12

concluding remarks the expected factors for the LHC luminosity upgrade are factor 2 from new low-beta insertions with ß*=0.25 m factor 2.3 from nominal to ultimate bunch intensity (1.7x10 11 p) with an upgraded injector we expect a farther increase in luminosity of factor 2 if we can double the number of bunches factor 2 from a twice larger bunch intensity factor 1.4 from a shorter LHC turnaround time ensuring L=10 35 cm -2 s -1 and a gain of about 9 in Ldt R & D is required on optics, beam control, machine protection high gradient high aperture SC quadrupoles and RF SC fast ramping magnets 31 August 2005 - LHC-LUMI 05 W.Scandale, LHC upgrade based on high intensity high energy injector chain 13

turnaround time Status of Hera (Bieler), RHIC (Calaga), Tevatron (Sen) The definition of the turnaround time is not universal Hera -> high weight to long duration faults RHIC -> availability of the collider differs from filling/running time Tevatron -> bias due to the long duration of pbar production With some caution the can infer that doubling the injector energy on can reduce from 10 to 7 h the LHC turnaround time 31 August 2005 - LHC-LUMI 05 W.Scandale, LHC upgrade based on high intensity high energy injector chain 14

Decay and snapback in main LHC dipoles vs. injection current 6 5 Integral normalized sextupole in MB3348 during injection (relative to start of injection) B 1 =1.4T b3 (units @ 17mm) 4 3 2 1 0 B 1 =0.54T B 1 =1.2T field decay B 1 =2.1T -1-400 -200 0 200 400 600 800 1000 1200 1400 1600 time (s) Injection @ 0.45 TeV (760A) Injection @ 1 TeV (1690A) Normalized Normalized B3 B3 decay: decay: reduction reduction of of a a factor factor 2.6 2.6 from from 0.45 0.45 TeV TeV to to 11 TeV TeV injection injection 31 August 2005 - LHC-LUMI 05 W.Scandale, LHC upgrade based on high intensity high energy injector chain 15

Optimal timing of the upgrade Open discussion For IR triplet Ordinary maintenance may impose unexpected replacement Replacing the triplet in a programmed manner may take up to 2 y (1 for the hardware replacement, one for the re-commissioning New performance should be worth recovering quickly this time loss For the injector Staging the change is mandatory This may push for a solution not optimal (respect to a green field approach) However approach a la FNAL is appealing ( linac up to 8 GeV, super-ps up to 80 GeV, super-sps up to 1 TeV) 31 August 2005 - LHC-LUMI 05 W.Scandale, LHC upgrade based on high intensity high energy injector chain 16

High intensity Talk of Elena S. + open discussion Linac, BPS and PS Can sustain up to 2 10 11 ppp and above (times 4?) SPS Limited to 1.5 10 11 Studies of the limitations are crucial. They require appropriate resources 31 August 2005 - LHC-LUMI 05 W.Scandale, LHC upgrade based on high intensity high energy injector chain 17

Block coil magnets for the super-sps Talk of Peter McI. Bocks are parallel to the field as much as possible Large reduction of the thermal loss Very interesting for a fast cycling super-sps and probably also for a super-ps 31 August 2005 - LHC-LUMI 05 W.Scandale, LHC upgrade based on high intensity high energy injector chain 18

Brainstorming in common motivations super PS present PS in a bad shape: 20 MCHF investment required for new magnets and generatrix and other Reliable operation in the LHC injector chain Tentative design based on the existence of LINAC 4 and on a 0.9 s BPS cycle same size as the present PS (within 10 %) E inj = 1.4 Gev T cycle 2.7 s T ramp = 1.2 s -> 3T/s Swing = 30 Close to gamma_tr E peak = 60 GeV Flavor physics has close requirements Beam power 0.5 MW Critical issues to be ready in 2012 (if possible Linac 4 available in 2011) low loss cable, (start early in 2006) magnet, (start in 2007 aiming at a test model by 2008) RF design, Lattice design (start to be decided on resouce availability) 31 August 2005 - LHC-LUMI 05 W.Scandale, LHC upgrade based on high intensity high energy injector chain 19

High priority issue RF studies Investigate SPS limitations Establish scaling rules Propose solution for ultinate intensity and beyond Additional resources for Data analysis Simulations Experiments (PS should provide bunches with ultimate intensity and beyond) 31 August 2005 - LHC-LUMI 05 W.Scandale, LHC upgrade based on high intensity high energy injector chain 20

High intensity G. Franchetti o Space charge detuning in a bunch o Periodic crossing of a resonance o Locking on a resonance and trapping (similar e.g. to island trapping) o Expect bunch length reduction and triangular shape of the bunch o Comparison bunched and coasting beam with the same space charge tune spread o Lifetime of the coasting beam is larger than that of the bunched beam since there is no synchrotron movement providing periodic crossing of a resonance. o Are the distribution similar? o Possible solution is to flatten the bunch. o Possibility of benchmarking with simulations. o Preliminary simulations seem to show that if you stop the synchrotron motion you do not see any more an emittance blow-up 31 August 2005 - LHC-LUMI 05 W.Scandale, LHC upgrade based on high intensity high energy injector chain 21

RHIC magnets D. Tommasini o RHIC type dipole GSI001. 4 T/s and max field 4 T. o Might be not trivial to go to higher field. o 3T/s 120 J/cycle 3 s cycle ~ 40 W AC losses o Temperature margin due to losses is not large o 2006 R&D goals could be: Specify and procure one billet of filament size 3 microns, Cu matrix. this wire could be sufficient to build a magnet with performance close to those required for the Super PS. Explore CuMn (more resistive) matrix Explore high interstrand resistance vs. core (stability, long term behaviour). Specifications on the field quality 31 August 2005 - LHC-LUMI 05 W.Scandale, LHC upgrade based on high intensity high energy injector chain 22

RF cost estimate for different bunch spacing 12.5 ns 1.7x10^11 p/bunch double n of bunches PS More 80 MHz cavities twice more volts 2 MCHF SPS 160-240 MHz system (power and cavities) Ions would it be possible? 75 MCHF LHC 160-240 MHz cavities 2 x 3 MV (power + cavities) 10 MCHF 10 15 ns 1.7x10^11 p/bunch 2.5 n of bunches PS More 80 MHz cavities twice more volts 5 MCHF SPS More power for 200 MHz system 20 MCHF For all the upgrades: need to upgrade transverse feedback in the SPS/LHC Need new BPM electronics (5 MCHF) in the LHC 31 August 2005 - LHC-LUMI 05 W.Scandale, LHC upgrade based on high intensity high energy injector chain 23

Decay and snapback in main LHC dipoles vs. injection current 6 5 Integral normalized sextupole in MB3348 during injection (relative to start of injection) B 1 =1.4T b3 (units @ 17mm) 4 3 2 1 0 B 1 =0.54T B 1 =1.2T field decay B 1 =2.1T -1-400 -200 0 200 400 600 800 1000 1200 1400 1600 time (s) Injection @ 0.45 TeV (760A) Injection @ 1 TeV (1690A) Normalized Normalized B3 B3 decay: decay: reduction reduction of of a a factor factor 2.6 2.6 from from 0.45 0.45 TeV TeV to to 11 TeV TeV injection injection 31 August 2005 - LHC-LUMI 05 W.Scandale, LHC upgrade based on high intensity high energy injector chain 24