RAILWAYS AND FISH: HOW TO PROTECT AND ENHANCE FISH HABITAT VALUES AT STREAM CROSSINGS THROUGH PROJECT DESIGN AND CONSTRUCTION

Similar documents
GENERAL SUMMARY BIG WOOD RIVER GEOMORPHIC ASSESSMENT BLAINE COUNTY, IDAHO

Assessment. Assessment

Why Geomorphology for Fish Passage

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012

Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018

Why Erosion and Sedimention Control is Important: A Fish s Point of View

In-channel coarse sediment trap Best Management Practice

Birch Creek Geomorphic Assessment and Action Plan

HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE

Coarse Sediment Augmentation on Regulated Rivers. Scott McBain McBain & Trush, Inc.

Upper Mississippi River Basin Environmental Management Program Workshop

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N2 Environmentally Sensitive Site Locations Map 81

Perspectives on river restoration science, geomorphic processes, and channel stability

Use of Bioengineering Techniques for Revegetation of Riparian Areas: Colomac Mine Remediation Project, NWT

West Branch of the St. Mary s River Restoration Project 2017 Post Construction Report

Important Copyright Information

Case Study 2: Twenty-mile Creek Rock Fords

Fluvial Driven Alluvial Fans

The River Restoration Centre therrc.co.uk. Understanding Fluvial Processes: supporting River Restoration. Dr Jenny Mant

Session 1 Healthy Streams Stream Hydraulics Natural Channel Design

Addressing the Impact of Road-Stream Crossing Structures on the Movement of Aquatic Organisms

Natural Shoreline Landscapes on Michigan Inland Lakes

Fact sheet: Glacial rivers (all Europe)

Chapter Five. Synopsis

Kootenai River Habitat Restoration Program Update

Stream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation)

The RRC would like to thank the sponsors of the RRC Annual Conference 2015 who support discounted places

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N1 Environmentally Sensitive Site Locations Map 25

How Do Human Impacts and Geomorphological Responses Vary with Spatial Scale in the Streams and Rivers of the Illinois Basin?

EAGLES NEST AND PIASA ISLANDS

Tom Ballestero University of New Hampshire. 1 May 2013

Subcommittee on Sedimentation Draft Sediment Analysis Guidelines for Dam Removal

Instream Erosion Control General

EFFECTS OF RIPARIAN RETENTION (IN WATERSHEDS) ON ALLUVIAL FANS

Appendix F Channel Grade Control Structures

¾À 280. ESS Features Heritage. Points of Access* !( Proposed Access Point. !( Archaeological Water. Major Stream Crossing Abandoned Rail Crossing # #

CR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District

-- Lessons from a successful salmon stream and estuary relocation on Gravina Island

Ms. A. Mormando's Class *

Stream Simulation: A Simple Example

Learning Objectives: I can identify and interpret river flows and directions.

Columbia Estuary Province

Assignment 1. Measuring River Characteristics- Vernon Creek. Applied Fluvial Geomorphology Field Techniques EESc 435

Biosphere Biome Ecosystem Community Population Organism

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Appendix A Flood Damages in 2013

APPENDIX A REACH DECRIPTIONS. Quantico Creek Watershed Assessment April 2011

Upper Drac River restoration project

ODFW AQUATIC INVENTORY PROJECT OREGON PLAN FOR SALMON & WATERSHEDS STREAM RESTORATION HABITAT REPORT

24.0 Mineral Extraction

STREAM RESTORATION AWRA Summer Specialty Conference, GIS and Water Resources IX

Environmental Value. Low Moderate High

New Approaches to Restoring NH s Rivers Natural Channel Design and Dam Removal

Review of Riparian Function Riparian Management Riparian Monitoring

Tom Glass, B.S. Whitman College Sarah Wasssmund, B.S. Humboldt State University Edgar Verdin, B.S. Portland State University Kelsi Lakey, B.S.

Strategies for managing sediment in dams. Iwona Conlan Consultant to IKMP, MRCS

Rock Sizing for Bank Stabilisation

Dolores River Watershed Study

Resource Consent Application Form 14A

Implementing a Project with 319 Funds: The Spring Brook Meander Project. Leslie A. Berns

Technical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth

Fish Passage at Road Crossings

Lower South Fork McKenzie River Floodplain Enhancement Project

Catastrophic Events Impact on Ecosystems

Technical note about the monitoring of hydromorphological restoration/management of the Drava River in Slovenia

Project Proposal. Lyme Brook. Newcastle-under-Lyme. 3 rd July 2015

Griswold Creek August 22, 2013

Four Mile Run Levee Corridor Stream Restoration

Opportunities to Improve Ecological Functions of Floodplains and Reduce Flood Risk along Major Rivers in the Puget Sound Basin

Avoiding Geohazards in the Mid-Atlantic Highlands by Using Natural Stream Principles

NEWS RELEASE UNDER SECTION 404 OF THE CLEAN WATER ACT (33 USC 1344) ACTION NUMBER SPA ABQ

Integrating flood mitigation, sediment management and habitat enhancement on coastal rivers of British Columbia

LOCATIONS OF SELECTED MITIGATION SITES IN JAPAN

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

Overview of Methods. Terrestrial areas that are most important for conservation Conservation

Flood and Stream Restoration

Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion

Rock Sizing for Waterway & Gully Chutes

SusWater WP6 Status desember 2017

Thinking Outside the Box (Culvert) Making difficult decisions for Fish Passage. Dave Stewart Oregon Department of Fish and Wildlife

Best Management Practices for Coldwater Fisheries Enhancement and Restoration

SCOPE OF PRESENTATION STREAM DYNAMICS, CHANNEL RESTORATION PLANS, & SEDIMENT TRANSPORT ANALYSES IN RELATION TO RESTORATION PLANS

Upper Manistee River Instream Fish Habitat Assessment

A GEOMORPHOLOGICAL APPROACH TO RESTORATION OF INCISED RIVERS. David L. Rosgen 1

The SedAlp Project: WP6: INTERACTION WITH STRUCTURES

Improvement of navigation conditions on the Danube (Calarasi-Braila and Lower Danube) - Ecological concerns?

Hydraulics of bendway weirs

Swift Creek Sediment Management Action Plan (SCSMAP)

Terms of Reference for the Comparative Environmental Review (CER) of. Options for the Mactaquac Project, Mactaquac, New Brunswick

Wetland & Floodplain Functional Assessments and Mapping To Protect and Restore Riverine Systems in Vermont. Mike Kline and Laura Lapierre Vermont DEC

Watershed concepts for community environmental planning

Spring Run Spawning Habitat Assessment Sediment Mobility

WELCOME Lake Wabukayne OPEN HOUSE

Restoring Meanders to Straightened Rivers 1.7 Reconnecting remnant meanders

Business. Meteorologic monitoring. Field trip? Reader. Other?

Tom Blackman Project Lead. Mékell Mikell Communications Representative

Conceptual Model of Stream Flow Processes for the Russian River Watershed. Chris Farrar

River Nith restoration, cbec UK Ltd, October 2013 APPENDIX A

Fluvial Geomorphic Guidelines

Geomorphology Studies

Transcription:

RAILWAYS AND FISH: HOW TO PROTECT AND ENHANCE FISH HABITAT VALUES AT STREAM CROSSINGS THROUGH PROJECT DESIGN AND CONSTRUCTION Rail Environment Conference November 2016

AGENDA Objective Background Benefits of Fish-Friendly Design Example Projects Key Messages Questions Kootenay Landing Bridge

OBJECTIVE OF PRESENTATION To show that: Environmental protection, restoration and enhancement can be included in a costeffective manner while achieving design standards for track and crossing operational safety and performance; and Functional and practical design elements can meaningfully benefit fish and fish habitat and also achieve and advance project objectives

BACKGROUND: WHAT S SO SPECIAL ABOUT FISH? In Canada, fish and fish habitat are protected by federal, provincial and in some cases regional governments Primary protection stems from the Fisheries Act, administered by Fisheries and Oceans Canada Species at Risk Act Important component of aquatic and terrestrial ecosystem health Food, cultural and ceremonial importance to First Nations Commercial and recreational value

BACKGROUND: ROUTINE MAINTENANCE ACTIVITIES Work in or around water conducted by railways commonly includes: Erosion protection Bridge upgrades Culvert upgrades Bedload removal

BACKGROUND: POTENTIAL IMPACTS ON FISH AND HABITAT Sedimentation Benthic smothering Loss of channel depth Obstruction or barrier to migration Reduced instream features, such as large wood and boulders Physical harm to fish Channel bed and bank erosion Bank hardening (armouring) Loss or degradation of riparian areas Riparian Area

BACKGROUND: FISH HABITAT 101 Generally consists of aquatic and terrestrial components that contributes to the life history of fish species High value habitats include: Depth and structural complexity Spawning areas with unconsolidated gravels Clean water Variable channel morphology Strong riparian integrity

EXAMPLE SITES Bank erosion protection Flood protection Culvert upgrades

BANK EROSION PROTECTION OTTERTAIL RIVER Dillon Consulting Limited

BANK EROSION PROTECTION OTTERTAIL RIVER

BANK EROSION PROTECTION SOUTH THOMPSON RIVER

BANK EROSION PROTECTION SOUTH THOMPSON RIVER

BANK EROSION PROTECTION SHUSWAP LAKE

CULVERT UPGRADES NED S CREEK

CULVERT UPGRADES NED S CREEK

CULVERT UPGRADES NED S CREEK

CULVERT UPGRADES WHONNOCK CREEK Dillon Consulting Limited Dillon Consulting Limited

CULVERT UPGRADES WHONNOCK CREEK Dillon Consulting Limited Dillon Consulting Limited

CULVERT UPGRADES WHONNOCK CREEK Dillon Consulting Limited Dillon Consulting Limited Dillon Consulting Limited

BENEFITS OF FISH-FRIENDLY DESIGN Ideally instream work should be designed to achieve railway objectives at the same time provide value to fish (and their habitat) and achieve a net benefit to fisheries productivity Benefits to railway include: Reduced erosion potential by lowering stream velocities; Reduced maintenance requirements Improved social license Simplified regulatory processes (restorative mitigation vs. offsetting) Reduced or streamlined project timelines

KEY MESSAGES Healthy, stable aquatic habitat at stream crossings often results in lower maintenance requirements for railways Add channel-spanning rock weirs (Newbury or bendway) to reduce water velocity and scour potential Excavate pool habitat downstream of culverts and weirs Place large wood and boulders in new habitat areas to increase roughness Plant trees and shrubs within the riparian area to improve bank stability and support fish life processes Ensure fish access over the long term

QUESTIONS?