DETAILED REPORT OF CONTRACTOR FOR THIRD PROGRESS MEETING. NEWCASTLE, NOVEMBER 2001.

Similar documents
Impact of Large Landslides in the Mountain Environment: Identification and Mitigation of Risk

Consiglio Nazionale delle Ricerche Istituto di Ricerca per la Protezione Idrogeologica

Surface Processes Focus on Mass Wasting (Chapter 10)

International Journal of Modern Trends in Engineering and Research e-issn No.: , Date: April, 2016

Debris flow: categories, characteristics, hazard assessment, mitigation measures. Hariklia D. SKILODIMOU, George D. BATHRELLOS

Contribution to the Mountain-Risks project of the Rock Mechanics Laboratory of the Swiss Federal Institute of Technology of Lausanne

SPATIAL MODELS FOR THE DEFINITION OF LANDSLIDE SUSCEPTIBILITY AND LANDSLIDE HAZARD. J.L. Zêzere Centre of Geographical Studies University of Lisbon

GG101 Lecture 22: Mass Wasting. Soil, debris, sediment, and broken rock is called regolith.

Haiti and Dominican Republic Flash Flood Initial Planning Meeting

Module/Unit: Landforms Grade Level: Fifth

Earth Science Chapter 9. Day 6 - Finish Capillary Action Lab - Quiz over Notes - Review Worksheets over Sections 9.2 and 9.3

THE IMPACT OF THE INSPIRE DIRECTIVE ON GEOLOGIC DATA MODELS OF GEOLOGICAL SURVEYS. THE IGME (SPAIN) CASE

INTRODUCTION. Climate

Gateway Trail Project

Considerations on debris-flow hazard analysis, risk assessment and management.

Interfacing with the industry needs euro geotecnica, s.a.

GEOG 1010A. Come to the PASS workshop with your mock exam complete. During the workshop you can work with other students to review your work.

Consiglio Nazionale delle Ricerche Istituto di Ricerca per la Protezione Idrogeologica

Erosion Surface Water. moving, transporting, and depositing sediment.

1999 Landslide at Avalanche Pass. Interpretation and Extrapolation of Geologic Data. Mary Blackwell and Andrew Duling

August 31, 2006 Embankment Failure Debris Flow at the Cascades Development Haywood County, North Carolina. Introduction. Findings

Lessons learnt using GIS to map geological hazards following the Christchurch earthquake

3.12 Geology and Topography Affected Environment

Integrated and Multi-Hazard Disaster Management

Preparing Landslide Inventory Maps using Virtual Globes

GLG598 Surface Processes and Landform Evolution K. Whipple Fall 2012 VERDE RIVER: FLOW MECHANICS, ROUGHNESS, AND SHEAR STRESS

A Joint European GIS Under Construction: The 1:5 Million International Geological Map of Europe and Adjacent Areas (IGME 5000)

The Impact of Earthquake Induced Landslides on the Terrain Predicted by Means of Landslides Susceptibility Maps. The Case of the Lefkada Island.

DAMOCLES PROJECT WORK

The SedAlp Project: WP6: INTERACTION WITH STRUCTURES

Laboratory Exercise #4 Geologic Surface Processes in Dry Lands

Edexcel GCSE Geography Controlled Assessment Exemplar 2014 Example Task Question: The channel characteristics of a river change along its course.

Special edition paper

Geomorphology and Landslide Hazard Models

Natural hazards in Glenorchy Summary Report May 2010

WP2: Advanced forecasting models and tools to anticipate W&C event induced impacts

Regional assessment of debris flow impacts on transport infrastructures

APPROACH TO THE SPANISH WATER ORGANISATION IMPROVING FLOOD HAZARD MAPPING, LAWS AND AUTHORITIES COORDINATION

Submarine Debris flow Project Proposal to Force August 2018/v1.02

3D Slope Stability Analysis for Slope Failure Probability in Sangun mountainous, Fukuoka Prefecture, Japan

Follow this and additional works at:

The Combination of Geospatial Data with Statistical Data for SDG Indicators

Figure 8-21 Distribution of Lava Flow for the Model

Flooding in Western North Carolina: Some Spatial, Hydrologic, and Seasonal Characteristics CAUTION!! Outline. Basic Flood Facts.

Mass Wasting. Mass Wasting. Earth s s External Processes

Bell Ringer. Are soil and dirt the same material? In your explanation be sure to talk about plants.

LANDSLIDES DAMS INDUCED BY DEBRIS FLOWS IN QUEBRADA DEL TORO (PROVINCE OF SALTA, ARGENTINA)

CENSUS MAPPING WITH GIS IN NAMIBIA. BY Mrs. Ottilie Mwazi Central Bureau of Statistics Tel: October 2007

Running Water Earth - Chapter 16 Stan Hatfield Southwestern Illinois College

Vermont Stream Geomorphic Assessment. Appendix E. River Corridor Delineation Process. VT Agency of Natural Resources. April, E0 - April, 2004

Regional Centre for Mapping of Resources for Development (RCMRD), Nairobi, Kenya

京都大学防災研究所年報第 54 号 B 平成 23 年 6 月 Annuals of Disas. Prev. Res. Inst., Kyoto Univ., No. 54 B, 2011 Possible Scenarios for Rjecina River Catchment on the

GEOMORPHIC CHANGES OF A LANDSLIDE DAM BY OVERTOPPING EROSION

To: URGWOM Technical Team Members Date: March 30, 2017 Subject: Notes of March 9, 2017 URGWOM Technical Team Meeting

2014 Summer Training Courses on Slope Land Disaster Reduction Hydrotech Research Institute, National Taiwan University, Taiwan August 04-15, 2014

What do you need for a Marathon?

Haydar Hussin (1), Roxana Ciurean (2), Paola Reichenbach (1), Cees van Westen (3), Gianluca Marcato (4), Simone Frigerio (4), V. Juliette Cortes (4)

Lab Final Review 4/16/18

PROANA A USEFUL SOFTWARE FOR TERRAIN ANALYSIS AND GEOENVIRONMENTAL APPLICATIONS STUDY CASE ON THE GEODYNAMIC EVOLUTION OF ARGOLIS PENINSULA, GREECE.

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013

Copernicus Academy. Roles and responsibilities of the Copernicus Academy. user uptake. Focus Data uptake, capacity building and skills development

Contents. 1.Introduction

Progress Report: Sentinel Asia Success Story in the Philippines

CT Science Standard 4.3 Erosion Water has a major role in shaping the earth s surface. Trail Guides

The sketch map of field investigations in Wenchuan earthquake hit region, Chengdu City.

School of Earth & Environmental Sciences

Need of Proper Development in Hilly Urban Areas to Avoid

EU GeoCapacity. Assessing European Capacity for Geological Storage of Carbon Dioxide. Thomas Vangkilde-Pedersen, GEUS

Pinyol, Jordi González, Marta Oller, Pere Corominas, Jordi Martínez, Pere

Feasibility Study: GEOSCIENTIFIC KNOWLEDGE AND SKILLS OF AFRICAN GEOLOGICAL SURVEYS. WP 3 - Gap analysis of geoscientific mapping

BASIS FOR RIVER RESTORATION PROJECT

9/23/2013. Introduction CHAPTER 7 SLOPE PROCESSES, LANDSLIDES, AND SUBSIDENCE. Case History: La Conchita Landslide

SESSION 6: FLUVIAL LANDFORMS

The Palfai Drought Index (PaDI) Expansion of applicability of Hungarian PAI for South East Europe (SEE) region Summary

9/13/2011 CHAPTER 9 AND SUBSIDENCE. Case History: La Conchita Landslide. Introduction

Making a Climograph: GLOBE Data Explorations

Desertification Hazard Zonation by Means of ICD Method in Kouhdasht Watershed

1. INTRODUCTION. EXAMPLE OF SECHILIENNE ROCKFALL (France)

MISSION DEBRIEFING: Teacher Guide

Seismic microzonation of the Accumoli municipality (Rieti, Italy) after the August 24 th earthquake: preliminary considerations.

The Safeland Project General Overview and Monitoring Technology Development

Sediment production in Tuni lake catchment due to climate change

Response on Interactive comment by Anonymous Referee #1

Project Name: Income Generation Project 4 Pouk District, Siem Reap Province Implementing Partner: Farmer Livelihood Development (FLD)

EFFECT OF TWO SUCCESIVE CHECK DAMS ON DEBRIS FLOW DEPOSITION

Dawood Public School Secondary Section Class VII

World History: Grade 9 Lesson 3: Unit 0.2 The Personality of Earth s Surface

by ELISHA S. TIKASINGH

CHAPTER 6, PRELIMINARY SITE INVESTIGATION CONTENTS

CHARACTERISTICS OF RAIN INFILTRATION IN SOIL LAYERS ON THE HILLSLOPE BEHIND IMPORTANT CULTURAL ASSET

Effect of land use/land cover changes on runoff in a river basin: a case study

C o p e r n i c u s E m e r g e n c y M a n a g e m e n t S e r v i c e f o r e c a s t i n g f l o o d s

Internationales Symposion INTERPRAEVENT 2004 RIVA / TRIENT

Fundamentals of THE PHYSICAL ENVIRONMENT. David Briggs, Peter Smithson, Kenneth Addison and Ken Atkinson

Horizontal Interoperability among National Geoportals of ES, FR, PT & AD

Center of valley versus Thalweg: Revisiting the Israel Jordan Aravah Boundary Dispute

*Anne Carter Witt Matt Heller

Landslides & Debris Flows

Example Task Question : The channel characteristics of a river change along its course.

Monte Rosa east face and Belvedere Glacier:

Transcription:

DETAILED REPORT OF CONTRACTOR FOR THIRD PROGRESS MEETING. NEWCASTLE, NOVEMBER 2001. PERIOD: MAY OCTOBER 2001 Assistant Contractor: Instituto Geológico y Minero de España (IGME) Responsible Scientist: Santiago Ríos Aragüés Address: Fernando el Católico 59, 4ºC. 50006 Zaragoza. Spain Telephone: ++ 976555153 ++ 976555282 Fax: ++ 976553358 Email: s.rios@igme.es or zaragoza@igme.es Summary of main work carried out during the reporting period (May October 2001) Geomorphologic cartography at 1/25.000 scale finished. 188 debrisflows have been mapped. Digitising the geological cartography at 1/25.000 scale. Visit to the field (Benasque Valley) with the Padova team in September to ultimate the selection of one of the proposed catchments and planing to get the necessary data to run their model. Sahún catchment has been selected. Detailed topographic study on Sahún fan in order to get cross sections and the longitudinal profile of the stream through the fan. Survey to the Sahún village inhabitants about episodes triggered after heavy rain or snowfall. Studying the developed by Padova partners, MODDS (Muskingum One Dimensional Debrisflow Simulation) requirements.

Section 1: Objectives of the Reporting Period Finishing the geomorphologic cartography and the memory describing the study area. The cartography has already been finished. Regional analysis of debrisflows and rockfalls applying the Milan and IPE methodology, in order to obtain probabilistic maps of these phenomena in our study area. Selection of one catchment with alluvial fan to make more detailed studies and apply the Padova team model. Section 2: Scientific/Technical Progress Made in Different Work Packages According to the Planned Time Schedule Mainly through some important project meetings (Zaragoza and Padova), we have known some characteristics of the methodologies followed by other principals contractors (University or Newcastle (CO1), University of Milan-Bicocca (CR2), University of Padova (CR4) and their necessities to develop the models that will applied the end-users. As potential end-user we are interested in contributing to try to apply some regional model to our study area for predicting debris flows and also rock falls and some local models for applying the University of Padova s one. WP1: 188 debrisflows have been mapped, most of them located on screes and debris cones. The memory of the cartography is being carried out, describing the processes and deposits in the study area.

WP2: To carry out the statistical analysis of debrisflows, the IPE team has provided us vegetation and land use maps of our study area. Also we want to discuss the requirements to apply the regional analysis of rockfalls developed by Milan team. WP3: With the Padova team we have visited the Benasque field and chosen a small basin with alluvial fan in the Benasque Valley (Sahún catchment) to apply their MODDS. A detailed topographic study has been done to obtain the first required inputs. WP5: Some corrections have been done in the DAMOCLES web site.

WP1 WP2 WP3 WP5 GANTT CHART May June July August Sept Oct Dedication in month* MEMBER OF IGME TEAM Year 1 Year 2 (may-oct 2001) Planned Dedication Real Dedication Planned Dedication Real Dedication Santiago Ríos 1,35 3,05 0,39 1,35 Antonio Barnolas 0,8 0,30 0,23 Enrique Acosta - 8-6 * I have not the planned details for each work IGME EXPENDITURE IN Year 1 Year 2 (may-oct 2001) EUROS Planned Real Planned Real Personal Costs 8.291 2.591 1.542 Overhead Costs 11.443 3.576 2.182 Travel and Subsistence costs 5.602 2.800 1.691 Total Expenditure 15.336 28.999 8.967 5.415 Section 3: Milestones and Deliverables Obtained Section 4: Deviations from the Work Plan and/or Time Schedule and Their Impact on the Project Our main target is to become end-user of the deliverables of the Project. For that we are interested in applying the methodologies for estimating regional hazards of rapid slope failures mainly debris flows and rock-falls. For doing that our coordination with IPE and Milan teams is very convenient and we think that there will not be interference with the general course of the Project. The same is about the local model of the Padova team. Section 5: Coordination of Information Between Partners and Communication Activities The main coordination has been done with the Padova team and with the IPE team.

Organised meetings, conference attendance, joint fieldwork, cooperation with other projects... Section 6: Difficulties Encountered at Management and Coordination Level and Proposed/Applied Solutions No dificults in manegement and coordination has been found. Section 7: Plan and Objectives for the Next Period 1. Finishing the Memory describing the processes and deposits in the study area. Survey to the inhabitants of Benasque valley abount main processes ocurred. 2. Digitising the cartographis infromation of geology, vegetation, land use and others, and adecuation at 1:25.000 scale 3. Detail description, according to the forms of the Project, of the debris flows caracteristics. 4. Statistic analysis of debrisflows according to the Milan and IPE partners methodology in order to get probabilistic maps of debrisflows. 5. Statistic analysis of rockfalls according to the Milan partners methodology in order to get probabilistic maps of debrisflows. 6. Trying to run the MODDS in Sahún catchment. 1 2 3 4 5 6 1 er cuatrimestre 2º cuatrimestre 3º cuatrimestre 4º cuatrimestre

Section 8: Publications No publications has been made Section 9: References