REVISED ECONOMIC AND FINANCIAL ANALYSIS

Similar documents
PROJECT ECONOMIC ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS

The World Bank Second Ho Chi Minh City Environmental Sanitation Project (P127978)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING LK WATER SUPPLY AND SANITATION IMPROVEMENT PROJECT APPROVED ON JUNE 24, 2015

RETA 6422: Mainstreaming Environment for Poverty Reduction Category 2 Subproject

Public Disclosure Copy

BRITISH VIRGIN ISLANDS SECTORAL GROSS DOMESTIC PRODUCT MARKET PRICES (current prices) (US$M)

Implementation Status & Results Chad Urban Development Project (P072030)

CITY OF PORT ST. LUCIE UTILITY SYSTEMS DEPARTMENT

Subject: Note on spatial issues in Urban South Africa From: Alain Bertaud Date: Oct 7, A. Spatial issues

ECONOMIC AND FINANCIAL ANALYSIS

CITY OF PORT ST. LUCIE UTILITY SYSTEMS DEPARTMENT

REVISED UPDATED PREPARED DIRECT SAFETY ENHANCEMENT COST ALLOCATION TESTIMONY OF GARY LENART SAN DIEGO GAS & ELECTRIC COMPANY AND

ASSETS 175, , , , , ,936, ,210, ,210, , , , (5,975.00) 330.

Implementation Status & Results Mozambique Cities and Climate Change (P123201)

The TransPacific agreement A good thing for VietNam?

The World Bank BiH Floods Emergency Recovery Project (P151157)

GASB 34. Basic Financial Statements M D & A

Texas Tech University Health Sciences Center (739) Statement of Net Position August 31, 2017 and 2016

PROJECT PROFILE ON THE ESTABLISHMENT OF RECREATIONAL CENTER

BROOMFIELD COLORADO...

SUBPART MULTIYEAR CONTRACTING (Revised December 19, 2006)

Implementation Status & Results Ghana GH:Sustainable Rural Water & Sanit Serv (P120026)

Lakeland Court MHP Norton Rd Lakeland, FL 33809

Sunshine City 47-Sp MHP

Implementation Status & Results Vietnam Danang Sustainable City Development Project (SCDP) (P123384)

Lakeway MUD - General Fund Balance Sheet March 31, 2012 ASSETS 167, , , , ,737.62

FINAL PROJECT PLAN TAX INCREMENT DISTRICT #66 MORNINGSTAR. Prepared by the

CITY OF FLORENCE, SC Monthly Financial Report August 2013

The Talking Farm Treasurer's Report and Financial Statements (for internal use only) June 30, 2016

Contents. Ipswich City Council Ipswich Adopted Infrastructure Charges Resolution (No. 1) Page

The World Bank GH-GAMA Sanitation and Water Project (P119063)

Seq No: 8 ARCHIVED on 21-May-2018 ISR30720 Created by: Raghava Neti on 04-Dec-2017 Modified by: Raghava Neti on 08-May-2018

METEOROLOGICAL SERVICE DELIVERY Mozambique Model

The World Bank Third National Urban Water Sector Reform Project (P123513)

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. PROPOSED OPERATING BUDGET... 3

Environmental Analysis, Chapter 4 Consequences, and Mitigation

ODISHA BUDGET ( ) AT A GLANCE

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2016 BUDGET ANALYSIS... 2 III. FINAL OPERATING BUDGET FUND

TABLE OF CONTENTS. Page. Statistical Bulletin, June 2011 INTRODUCTORY NOTES SUMMARISED ACCOUNTS OF THE BANKING SYSTEM

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. PROPOSED OPERATING BUDGET... 4

Implementation Status & Results Belize Municipal Development (P111928)

ODISHA BUDGET ( ) AT A GLANCE

Madison City Schools Budget. FY 2018 Proposed Budget 2nd Public Hearing August 31,

SEWER FUND BUDGET BYLAW

CONSUMERS ENERGY COMPANY

Finance Department. Denton City Council Department Presentation

The World Bank Tamil Nadu Sustainable Urban Development Program (P150395)

Bishkek City Development Agency. Urban Planning Bishkek

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Implementation Status & Results Chad Urban Development Project (P072030)

Disclosures - IFFCO TOKIO General Insurance Co. Ltd. for the period 1st April, st December, 2018 S.No. Form No Description

,000, ,000, ,000, , , , Property Taxes - Prior

REGULATORY INFORMATION REPORT FOR THE QUARTER : 4th

BANGALORE METROPOLITAN TRANSPORT CORPORATION

City of Scottsbluff, Nebraska Monday, July 16, 2018 Regular Meeting

Department Mission: Mandated Services: Department Overview: Successes and Challenges:

Lakeway MUD - General Fund. Balance Sheet March 31, 2014 ASSETS

Hanmer Springs Thermal Pools and Spa - Group Activity Summary

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. FINAL OPERATING BUDGET... 3

Measuring Disaster Risk for Urban areas in Asia-Pacific

The World Bank Tamil Nadu Sustainable Urban Development Program (P150395)

Statement of indicative wholesale water charges and charges scheme

2017 BLAWNOX PROPOSED BUDGET

FLORIDA DEPARTMENT OF EDUCATION SUPERINTENDENT S ANNUAL FINANCIAL REPORT (ESE 145) DISTRICT SCHOOL BOARD OF SANTA ROSA COUNTY

Implementation Status & Results Jamaica Rural Economic Development Initiative (P105122)

Country Operations Business Plan. Project Number: May Indonesia

Adopted Budget Presented for Board Approval June 21, 2017

The World Bank Indonesia National Slum Upgrading Project (P154782)

Financing Urban Transport. UNESCAP-SUTI Event

FINANCIAL STATEMENTS OF THE COMPANY

POLICY: FI/PL/03 Issued on August 5, Fee Policy for GEF Partner Agencies

Zambia Strengthening Climate Resilience (PPCR Phase II) (P127254)

The School District of Sarasota County, FL. Fund Types Governmental Balance Sheet Account

Total 37, ,234.77

$1.0600/$100 (proposed rate for maintenance and operations) School Debt Service Tax Approved by Local Voters

Engineer's Report. Main Street Business Area. Festoon Lighting and Sidewalk Cleaning Assessment District (Fiscal Year )

INTEGRATING CLIMATE VULNERABILITY & RISK ASSESSMENT INTO URBAN SPATIAL PLANNING PROCESS

Stop TB workshop on grant negotiation and implementation. The workplan and budget: from proposal to implementation. Geneva, December

RESOLUTION NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF SUPERVISORS OF THE CORKSCREW FARMS COMMUNITY DEVELOPMENT DISTRICT:

International Guidelines on Access to Basic Services for All

The World Bank Cities and Climate Change (P123201)

The World Bank Telangana Rural Inclusive Growth Project (P143608)

MACRO-PRUDENTIAL RULES AND REGULATION (2015): DISCLOSURE REQUIREMENTS ANNEXURE I: FORMAT FOR ANNUAL DISCLOSURES DRUK PNB BANK LTD.

The World Bank Guilin Integrated Environment Management (P133017)

Testimony. Before the Subcommittee on Environment, Energy, and Natural Resources, Committee on Government Operations House of Representatives

Economic Benefit Study on Value of Spatial Information Australian Experience

CITY OF FLORENCE, SC Monthly Financial Report January 2017

Implementation Status & Results Congo, Republic of Rep. of Congo - Water, Electricity & Urban Development SIL (LEN) (P106975)

Summary of All Units Change In Net Position For the Four Months Ending Tuesday, July 31, Annual Budget

The Agriculture Investment and Market Development Project (P143417)

City of Scottsbluff, Nebraska Monday, December 4, 2017 Regular Meeting

USE OF RADIOMETRICS IN SOIL SURVEY

Implementation Status & Results Benin BN-National Community Driven Development Project (P081484)

The World Bank Decentralized Community Driven Services Project (P117764)

2018 City Budget - General and Water Works.irp :26 PM CITY OF CROSBYTON PAGE: 1 BUDGET LISTING AS OF: APRIL 30TH, GENERAL FUND

Sustainable tourism in for Sustaibale Danang

The World Bank IN Maharashtra Rural Water Supply and Sanitation Program (P126325)

Implementation Status & Results Brazil BR APL Integrated Water Management In Metropolitan Sao Paulo (P006553)

Public Disclosure Copy

Transcription:

REVISED ECONOMIC AND FINANCIAL ANALYSIS 1. The Project supports the government goals to provide adequate sanitation to 100% of the population and eradicate open defecation through the development of sewerage systems in four cities in Indonesia. 2. The investments are expected to reduce the incident of diarrhea and gastroenteritis, dengue, typhoid, and skin diseases, which are among the major sanitation-related illness prevalent in the four project cities. The economic impacts of these diseases in terms of health care costs and productivity losses are significant. 1 Incidence of these diseases and pollution of surface and underground water are expected to increase with increasing population and urbanization without proper collection, treatment, and disposal or wastewater. 3. The provision of an off-site sewerage system is part of each city s sanitation strategy and wastewater master plan. A. Economic Analysis 1. Basic Approach and Methodology 4. The basic approach and methodology for economic analysis of subprojects are similar with those applied during the appraisal, and are in accordance with the Guidelines for the Economic Analysis of Projects of the Asian Development Bank (ADB) and related ADB manuals. 2 The following adjusting factors, which affected by inflation from year 2012, were applied: (i) the economic internal rates of return (EIRR) and economic net present value (ENPV) were computed from the benefit-cost streams and comparing economic cost of capital (EOCC) of 12%, (ii) the beneficiary population considered in the evaluation included both the on-site and off-site users. 5. Economic benefits, which were quantified include (i) health care cost saving from reduced incidence of disease, (ii) productivity savings or avoided loss of finance, (iii) avoided costs of septic tank desludging and/or construction, and (iv) averted costs of accessing polluted water for drinking and other domestic uses. The unquantified benefits, which may improve the feasibility of subprojects include the following: (i) health costs and productivity savings from reduced incidence of diseases other than diarrhea, typhoid, dengue and skin diseases, (ii) value of sludge, which is a by-product of wastewater treatment process either as in-filling materials, soil conditioner or agricultural fertilizer, (iii) increased productivity and value of agricultural/fish catch due to reduced water pollution, (iv) increased value of lands that were previously made unusable or were rendered marginally productive because of pollution caused by poor sanitation, and (v) impact of improved wastewater management and reduced pollution on local tourism and economy. 6. Economic costs are derived from financial estimates of investments and operation and maintenance costs net of taxes, duties, and price contingencies. 1 World Bank. 2008. Economic Impacts of Sanitation in Indonesia. Washington, DC. 2 ADB. Year. Guidelines for the Economic Analysis of Projects. Manila.

7. Economic analysis was prepared for the base case. Sensitivity tests were carried out to determine the impact of changes in key variable (e.g. investments, operation and maintenance cost, and benefits) on subproject viability. 2. Costs and Benefits 8. Economic costs include investments for sewer networks, treatment plants, land, resettlements, consulting services, and project implementation support. They are derived from the financial estimates after adjustments following the described methodology. Economic benefits are estimated using the assumptions in the following paragraphs. a. Jambi Sewerage System 9. The number of users is 11,000 connections for the off-site system (including the community-based systems) and 42,432 for the on-site systems (desludging/septage). 10. The following ENPV and EIRR were computed based on the total households projected in 2016: Table 1: Economic Internal Rates of Return and Economic Net Present Value (All Scenarios), Jambi Subproject NPV discounted @12% NPV EIRR 1. Base Case 213,834.9 17.5% 2. 10% increase in investments 169,863.0 16.0% 3. 10% increase in incremental O&M costs 211,740.3 17.4% 4. 10% reduction in heath cost savings 189,355.8 16.9% 5. 10% reduction in total benefits 146,385.0 15.8% 6. Combination of 2,3 and 4 (worst case) 100,318.6 14.4% 7. One-year delay in project benefits 214,834.9 17.5% EIRR=economic internal rates of return, NPV=net present value 11. At current projections, the results suggest that the project is feasible as the EIRR values are higher than 12% in all scenario hypotheses. b. Makassar Sewerage System 12. The number of users is 12,000 connections for the off-site system (including the community-based systems) and 36,312 for the on-site systems (desludging/septage). 13. The following ENPV and EIRR were computed based on the total households projected in 2016:

Table 2: Economic Internal Rates of Return and Economic Net Present Value (All Scenarios), Makassar Subproject NPV discounted @12% NPV EIRR 1. Base Case 84,139.8 13.2% 2. 10% increase in investments 29,888.4 11.9% 3. 10% increase in incremental O&M costs 82,450.9 13.1% 4. 10% reduction in heath cost savings 78,521.5 13.1% 5. 10% reduction in total benefits 20,421.4 11.7% 6. Combination of 1,2 and 5 (worst case) -35,518.9 10.5% 7. One-year delay in project benefits 9,745.3 11.7% EIRR=economic internal rates of return, NPV=net present value 14. The projections suggest that the project is feasible in the base case scenario. It remains feasible in the scenario when incremental operation and maintenance costs are increased by 10% as well as in the scenario when the health cost savings are reduced by 10%. However, the EIRR value becomes below 12% (11.9%) in the scenarios when the investment costs are increased by 10%; 111.7% when the total benefits are reduced by 10% ; and 10.5% in the combination of c. Palembang Sewerage System 15. The number of users is 12,000 connections for the off-site system and 50,000 for the onsite systems (desludging/septage). 16. The following ENPV and EIRR were computed based on the total households projected in 2016: Table 3: Economic Internal Rates of Return and Economic Net Present Value (All Scenarios), Palembang Subproject NPV discounted @12% NPV EIRR 1. Base Case 49,408.0 13.1% 2. 10% increase in investments -10,292.4 11.8% 3. 10% increase in incremental O&M costs 47,029.2 13.0% 4. 10% reduction in heath cost savings 34,104.2 12.8% 5. 10% reduction in total benefits -16,852.1 11.6% 6. Combination of 2,3 and 4 (worst case) -78,931.3 10.4% 7. One-year delay in project benefits -20,369.3 11.6% EIRR=economic internal rates of return, NPV=net present value d. Pekan Baru Sewerage System 17. The number of users is 11,000 connections for the off-site system (including the community-based system) and 42,987 for the on-site systems (desludging/septage).

18. The following ENPV and EIRR were computed based on the total households projected in 2016: B. Financial Analysis Table 4: Economic Internal Rates of Return and Economic Net Present Value (All Scenarios), Pekan Baru Subproject NPV discounted @12% NPV EIRR 1. Base Case 193,002.8 16.7% 2. 10% increase in investments 142,689.9 15.2% 3. 10% increase in incremental O&M costs 191,096.3 16.7% 4. 10% reduction in heath cost savings 184,766.9 16.5% 5. 10% reduction in total benefits 122,055.2 15.0% 6. Combination of 2,3 and 4 (worst case) 69,835.9 13.6% 7. One-year delay in project benefits 117,764.2 14.6% EIRR=economic internal rates of return, NPV=net present value 19. The financial analysis was prepared for the four subprojects in accordance with the Financial Management and Analysis of Projects of the Asian Development Bank (ADB). 3 The analysis covers the investments for each subproject in the cities of Jambi, Makassar, Palembang and Pekan Baru. 20. The objectives of the financial analysis are to asses: (i) the viability of the proposed investment and amount of cost recovery, (ii) the affordability of the proposed wastewater tariff to target beneficiaries, and (iii) the sustainability of future operations of the wastewater treatment and collection systems. 1. Methodology and Assumptions 21. The key financial and technical assumptions used in the financial projections are as follows: (i) price level; constant cost at March 2015 prices, (ii) domestic cost escalation 5.1% at 2016, 4.9% at 2017, and 4.6% 2018 and onwards, (iii) the sewer user tariff with a 5% annual adjustment. 22. The district services delivery body (BLUD) is the preferred wastewater system operator for Jambi, Makassar and Pekan Baru. The Unit Pelaksana Teknis Daerah (UPTD) for wastewater management was established to handle the preparatory, implementation and operating activities pending the creation of BLUD. The SDO for Palembang will be PDAM Tirta Musi Palembang (Perusahaan Daerah Air Minum, water supply utility), a city owned enterprise operating the city water supply system. 23. The total development costs for the subprojects are based on the costs presented for the technical study with additional price contingencies to allow for the timing of implementation. The 3 ADB. 2005. Financial Management and Analysis of Projects. Manila.

wastewater systems aim to provide an effective wastewater treatment and collection service up to 2025. The plans involve the development of wastewater treatment plants including septage treatment units; construction of a wastewater collection system comprising trunk and main sewers, laterals, and interceptors, installation of service connections; construction of community-based sewerage systems, acquisition of land and involuntary resettlements, and land preparations. 24. The works are scheduled to start implementation by the second half of 2017 and targeted for completion in 2020 with the fill operation of the systems in 2025 (installment of all property connections). All acquisition of land and detailed engineering designs are targeted to be completed by 2016. Details of the costs for each city are presented in Table 5. Table 5: Detailed Costs by City ($million) Item Jambi Makassar Palembang Pekan Baru Investment Costs 1 Land acquisition, resettlement 2.7 2.9 2.1 2.8 and land preparation 2 Civil Works 52.85 68.75 73.8 60.3 3 Consulting Services 4.29 5.59 5.47 4.29 Recurrent Cost 1 Project Management 0.57 0.58 0.58 0.58 2 Taxes and Duties 2.21 3.15 4.86 2.96 Total 62.6175 80.9675 86.8075 70.9275 Source: Asian Development Bank 2. Operation and Maintenance 25. The subprojects are new systems. The SDOs are likewise new entities. For Palembang anew department will be created under the PDAM to take charge of wastewater system operation. The technical engineers estimated the O&M expenses based on the capacity of the whole system. Included in the O&M costs are personnel costs, chemicals for disinfections and dewatering of sludge, septage receival, sluduge disposal, power cost, and provisions for repairs and escalated to current prices for inclusion in the financial statements. Constant annual O&M costs range from $0.28 million for Jambi to $0.491 million for Palembang. 3. Cost Recovery 26. The proposed wastewater fee structure is based on classifying consumers as (i) on-site wastewater management fees, (ii) residential sewer use fees, and (iii) commercial and industrial sewer use and effluent discharge fees. The fee classification is to improve revenues because commercial and industrial connections will charged a higher rate than domestic or residential connections. For Palembang, the PDAM will collect the fee as a surcharge on the water bill. For the other three subprojects, monthly wastewater fees will be collected from households and commercial establishments connected to the system by the SDO through community leaders. 27. Implementation of the fee structure is expected in 2025 when operation commences. The sewer use tariff recommended per CDTA study with a 5% annual adjustment was adopted in the evaluation. The sewer use tariffs in the initial year of operation (2020) are shown below:

Table 6: Estimated Tariffs Monthly Tariff Domestic Commercial On-Site Users $ 1.48 3.69 1.11 Rp 20,000 50,000 15,000 Sources: TA 8666-INO: MSMIP CDTA Report 28. The forecast of operations will connect sewer connections up to 2025. As shown below, after tapping of 1,000 pilot connections by the beginning of 2020, there will be equal annual growth in connections, terminating by 2025. This is the main difference in the PPTA study where accelerated growth was projected and design connections were attained in three-four years. 1. Jambi Subproject 29. Considering that the tariff established was based on the cost recovery of operating costs (excluding administrative costs), it is expected that the project will have a negative financial internal rate of return (FIRR) of -4.3%. The forecast of operations showed the following results: Table 7: Projected Income Statement, Jambi Subproject 2020 2021 2022 2023 2024 2025 Operating Revenues Sewer use Fees 0.48 0.63 0.75 0.78 0.81 0.85 Domestic - On-Site 0.02 0.12 0.19 0.19 0.2 0.21 Domestic - Off-Site 0.45 0.47 0.49 0.52 0.54 0.56 Commercial 0.01 0.04 0.07 0.07 0.07 0.08 Other Operating Revenues 0.02 0.09 0.07 0.08 0.08 0.09 Total Revenues 0.50 0.72 0.82 0.86 0.89 0.94 Operating Expenses Payroll 0.26 0.27 0.28 0.29 0.31 0.32 Power Cost 0.06 0.06 0.06 0.07 0.07 0.07 Chemicals 0.01 0.01 0.01 0.01 0.01 0.01 Maintenance 0.12 0.13 0.13 0.14 0.15 0.15 Other O&M 0.03 0.03 0.04 0.04 0.04 0.04 Tax 0.00 0.00 0.00 0.00 0.00 0.00 Bad debts 0.00 0.00 0.00 0.00 0.00 0.00 Total Operating Expenses 0.48 0.5 0.52 0.55 0.58 0.59 Net Income (loss) before depreciation 0.02 0.22 0.30 0.31 0.31 0.35 Depreciation -2.29-2.60-2.60-2.60-2.60-2.60 Net Operating Income (loss) -2.27-2.38-2.30-2.29-2.29-2.25 Less: Interest Expenses 0.00 0.00 0.00 0.00 0.00 0.00 Foreign Exchange Loss 0.00 0.00 0.00 0.00 Net Income (Loss) -2.27-2.38-2.30-2.29-2.29-2.25 Source: ADB estimate

2. Makassar Subproject 30. Considering that the tariff established was based on the cost recovery of operating costs (excluding administrative costs), it is expected that the project will have a negative financial internal rate of return (FIRR) of -4.8%. The forecast of operations showed the following results: Table 8: Projected Income Statement, Makassar Subproject 2020 2021 2022 2023 2024 2029 Operating Revenues Sewer use Fees 0.45 0.54 0.64 0.73 0.83 1.14 Domestic - On-Site 0.01 0.04 0.07 0.10 0.13 0.20 Domestic - Off-Site 0.43 0.45 0.47 0.49 0.51 0.64 Commercial 0.01 0.05 0.10 0.14 0.19 0.30 Other Operating Revenues 0.13 0.26 0.26 0.07 0.08 0.11 Total Revenues 0.58 0.80 0.90 0.80 0.91 1.25 Operating Expenses Payroll 0.28 0.29 0.31 0.32 0.33 0.41 Power Cost 0.11 0.11 0.12 0.12 0.13 0.16 Chemicals 0.01 0.01 0.01 0.01 0.01 0.02 Maintenance 0.10 0.11 0.11 0.12 0.12 0.15 Other O&M 0.05 0.05 0.05 0.05 0.06 0.07 Tax 0.00 0.00 0.00 0.00 0.00 0.00 Bad debts 0.00 0.00 0.00 0.00 0.00 0.00 Total Operating Expenses 0.55 0.57 0.6 0.62 0.65 0.81 Net Income (loss) before depreciation 0.03 0.23 0.30 0.18 0.26 0.44 Depreciation -2.36-3.10-3.34-3.34-3.34-3.34 Net Operating Income (loss) -2.33-2.87-3.04-3.16-3.08-2.90 Less: Interest Expenses 0.00 0.00 0.00 0.00 0.00 0.00 Foreign Exchange Loss 0.00 0.00 0.00 0.00 Net Income (Loss) -2.33-2.87-3.04-3.16-3.08-2.90 Source: ADB estimate 3. Palembang Subproject 31. Considering that the tariff established was based on the cost recovery of operating costs (excluding administrative costs), it is expected that the project will have a negative financial internal rate of return (FIRR) of -5.6%. The forecast of operations showed the following results:

Table 8: Projected Income Statement, Palembang Subproject 2020 2021 2022 2023 2024 2029 Operating Revenues Sewer use Fees 0.45 0.53 0.6 0.69 0.78 1.03 Domestic - On-Site 0.03 0.06 0.1 0.16 0.21 0.30 Domestic - Off-Site 0.42 0.45 0.47 0.49 0.51 0.64 Commercial 0.00 0.02 0.03 0.04 0.06 0.09 Other Operating Revenues 0.01 0.02 0.02 0.07 0.07 0.10 Total Revenues 0.46 0.55 0.62 0.76 0.85 1.13 Operating Expenses Payroll 0.27 0.28 0.29 0.31 0.33 0.4 Power Cost 0.14 0.15 0.15 0.16 0.17 0.21 Chemicals 0.01 0.01 0.01 0.01 0.01 0.02 Maintenance 0.10 0.11 0.11 0.12 0.12 0.15 Other O&M 0.05 0.05 0.05 0.05 0.06 0.07 Tax 0.00 0.00 0.00 0.00 0.00 0.00 Bad debts 0.00 0.00 0.00 0.00 0.00 0.00 Total Operating Expenses 0.57 0.6 0.61 0.65 0.69 0.85 Net Income (loss) before depreciation -0.11-0.05 0.01 0.11 0.16 0.28 Depreciation -3.38-4.76-5.16-5.16-5.16-5.16 Net Operating Income (loss) -3.49-4.81-5.15-5.05-5.00-4.88 Less: Interest Expenses 0.00 0.00 0.00 0.00 0.00 0.00 Foreign Exchange Loss 0.00 0.00 0.00 0.00 Net Income (Loss) -3.49-4.81-5.15-5.05-5.00-4.88 Source: ADB estimate 4. Pekan Baru Subproject 32. Considering that the tariff established was based on the cost recovery of operating costs (excluding administrative costs), it is expected that the project will have a negative financial internal rate of return (FIRR) of -4.8%. The forecast of operations showed the following results:

Table 9: Projected Income Statement, Pekan Baru Subproject 2020 2021 2022 2023 2024 2025 2029 Operating Revenues Sewer use Fees 0.58 0.66 0.75 0.7 0.97 1.00 1.19 Domestic - On-Site 0.01 0.06 0.11 0.17 0.24 0.24 0.29 Domestic - Off-Site 0.56 0.58 0.61 0.49 0.67 0.7 0.83 Commercial 0.01 0.02 0.03 0.04 0.06 0.06 0.07 Other Operating Revenues 0.02 0.02 0.02 0.10 0.10 0.10 0.12 Total Revenues 0.60 0.68 0.77 0.80 1.07 1.10 1.30 Operating Expenses Payroll 0.27 0.28 0.29 0.31 0.32 0.34 0.40 Power Cost 0.04 0.04 0.04 0.04 0.05 0.05 0.06 Chemicals 0.01 0.01 0.01 0.01 0.01 0.02 0.02 Maintenance 0.12 0.13 0.13 0.14 0.15 0.15 0.18 Other O&M 0.03 0.03 0.04 0.04 0.04 0.05 0.05 Tax 0.00 0.00 0.00 0.00 0.00 0.00 0.70 Bad debts 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Operating Expenses 0.47 0.49 0.51 0.54 0.57 0.61 0.70 Net Income (loss) before depreciation 0.13 0.19 0.26 0.26 0.50 0.49 0.60 Depreciation -2.67-2.96-3.06-3.06-3.06-3.06 3.06 Net Operating Income (loss) -2.54-2.77-2.80-2.80-2.56-2.57-2.45 Less: Interest Expenses 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Foreign Exchange Loss 0.00 0.00 0.00 0.00 0.00 Net Income (Loss) -2.54-2.77-2.80-2.80-2.56-2.57-2.45 C. Project Financial Sustainability and Implementation Risks 33. City revenues and expenditures were projected using historical trends and best estimates of local units. The surplus projected in the short term is assumed to be available for some of the investments required for improved urban sanitation services. Surplus income can be used by the Palembang government to finance the public service organization, which the city government will be required to provide to the SDO responsible for sanitation (including O&M and periodic major capital expenditures). 34. The SDOs in Jambi, Makassar, and Pekan Baru are revenue-generating agencies, but the amount of revenue they receive and their expenditures are not linked. The agencies annual proposed budgets are not dependent on the revenue they will generate, but are based on the city government s allocation and/or priority to the various city agencies. 35. Funding of the capital investment and annual O&M for environmental sanitation comes from the city government annual budget. Based on the annual budget ceiling, environmental agencies prepare their annual program and the budget required, which is then consolidated into the city budget.

D. Financial Projection for Service Delivery Organizations 36. The financial sustainability of the subprojects depends on the financial performance of the SDOs as operating entities. The SDOs financial performance is projected to determine their overall financial condition until the full system operation in 2025. 37. Selected financial ratios and performance indicators are used to analyze the results of the operations and project viability. In addition, risks are associated with the financial aspects of the project which should be carefully considered and addressed to ensure sustainability of the project and the SDO as an entity: (i) uncertainty in the implementation of service fee increases, (ii) uncertainty on the provision of an SDO, as required for O&M, (iii) insufficient subsidies, and (iv) inefficiency of the collection system. 38. The projected income statement shows that the proposed monthly wastewater fees can adequately cover O&M costs. However, net operating losses will be incurred until for the first 2 years prior to complete house connection implementation within the since the wastewater tariffs not being sufficient to cover the full depreciation cost of the sewerage system, a noncash cost. 39. The attainment of financial adequacy for the SDOs will require that service fee are periodically raised to keep pace with inflation. The financial sustainability of the SDOs largely depends therefore on government s positive action on SDO service fee increase applications. If service fees are not periodically increased to keep pace with inflation, the government must ensure the provision of a public service organization type of funding support to the SDOs. Hence, these factors should be properly addressed to mitigate the enumerated risks.