Figure 1: Rainfall Distribution in the visited affected areas (Source of data: IMD)

Similar documents
HYDROLOGICAL AND HYDRODYNAMIC ASSESSMENT OF KEDARNATH FLOOD. N.N.Rai Director, Central Water Commission, India

A Presentation By: Dr. G. M. Dar Centre for Disaster Management & Env. Studies, J&K IMPA, Srinagar

DISATER MANAGEMENT IN LIBRARIES

This report was produced and issued by OCHA Pakistan. It provides an overview of the monsoon flood situation as of 22 July 2015.

Geo-information and Disaster Risk Reduction in the Hindu Kush-Himalayan region

Assessing Hazards and Risk

BUILDING STRUCTURES ON OR NEAR STEEP SLOPES

Hurricane Preparation and Recovery. October 11, 2011 Jon Nance, Chief Engineer, NCDOT

9/13/2011 CHAPTER 9 AND SUBSIDENCE. Case History: La Conchita Landslide. Introduction

Geohazards in the Himalaya GEOL 3000 (3 Credits / 45 class hours)

Georeferencing and Satellite Image Support: Lessons learned, Challenges and Opportunities

CSIR-Central Building Research Institute, Roorkee (UK)

Trip Distribution Model for Flood Disaster Evacuation Operation

GENERAL. CHAPTER 1 BACKGROUND AND PURPOSE OF THE GUIDELINES Background of the Guidelines Purpose of the Guidelines...

Geo-Environmental Study of Kaliasaur Landslide in District Rudraprayag of Garhwal Himalaya, Uttarakhand, India

Prevention Tsunami wall 10m high (breached by the tsunami due to land level falling by 3m)

Final Presentation on Disaster Risk Management in Japan. Through ADRC V. R Programme. Main Findings and Action Plan:

LANDSLIDE HAZARD ZONATION IN AND AROUND KEDARNATH REGION AND ITS VALIDATION BASED ON REAL TIME KEDARNATH DISASTER USING GEOSPATIAL TECHNIQUES

INTRODUCTION. Climate

DIPLOMA IN DISASTER MANAGEMENT. (Non-Semester) (With effect from the academic year )

Geohazards in the Himalaya GEOL 3000 (3 Credits / 45 class hours)

Disaster Management and Spatial Data An Experience of Sri Lanka for Joint project team meeting 2012

Managing Floods at Boscastle. Learning Objective: Examine the benefits of managing floods

APPROACH TO THE SPANISH WATER ORGANISATION IMPROVING FLOOD HAZARD MAPPING, LAWS AND AUTHORITIES COORDINATION

Modeling Great Britain s Flood Defenses. Flood Defense in Great Britain. By Dr. Yizhong Qu

Floods 2014 a wake up call to natural hazards

USING 3D GIS TO ASSESS ENVIRONMENTAL FLOOD HAZARDS IN MINA

ICE STORM! a mini tabletop exercise for home care agencies

Geohazards and disaster risk reduction

Natural Disaster Preparedness for Hydropower Projects in High Mountain Environments

Disaster RISK Management : Bhutanese Scenario

Overview of Early Warning Systems and the role of National Meteorological and Hydrological Services

How to manage risk through integrated geohazard assessment. Prof. John M. Reynolds Reynolds International Ltd, Mold, UK

Proposal Report On Flood Hazards Mapping Project In Xebangfai River

Subject Area: Geography

International Journal of IT, Engineering and Applied Sciences Research (IJIEASR) ISSN: Volume 2, No. 11, November 2013

The Effects of Hydraulic Structures on Streams Prone to Bank Erosion in an Intense Flood Event: A Case Study from Eastern Hokkaido

What Are Disasters? The Rescue Kids Trio!

VULNERABILITY OF WATER SUPPLY TO NATURAL HAZARDS IN JAMAICA

- facilitate the preparation of landslide inventory and landslide hazard zonation maps for the city, - development of precipitation thresholds,

mountain rivers fixed channel boundaries (bedrock banks and bed) high transport capacity low storage input output

Disaster Prevention and Management in Asia: The Context of Human Security and Its Relevance to Infrastructure Planning and Management

Landslide Disaster Management in Sri Lanka and Nichola Oya as a Case study. Group 16 Gamini Jayathissa Udeni Nawagamuwa

THE UTARAKAHND FLOODS OF JUNE 2013 AND THE KEDARNATH TRAGEDY WHAT COULD HAVE HAPPENED?

VISIT MISSISSIPPI GULF COAST CRISIS COMMUNICATION MANUAL 2016

FOREST RESEARCH INSTITUTE, DEHRADUN

water erosion lithosphere Describe the process of erosion and deposition. chemical weathering Dissolving limestone is an example of.

Need of Proper Development in Hilly Urban Areas to Avoid

Monitoring Scour Critical Bridges During Floods For Local Bridge Owners. Presented by

Impact of Cyclone Nargis

1. INTRODUCTION. EXAMPLE OF SECHILIENNE ROCKFALL (France)

IDENTIFICATION OF LANDSLIDE-PRONE AREAS USING REMOTE SENSING TECHNIQUES

Ground motion intensity map of the Tainan earthquake (Central Weather Bureau).

AASHTO Extreme Weather Events Symposium Vermont s Road and Rivers - Managing for the Future

Bhutan Country Report for JPTM 2010 (July, 2010) Department of Disaster Management Ministry of Home & Cultural Affairs Royal Government of Bhutan

Flood Scenario Worksheet

Physical landscapes River landscapes in the UK

Progress Report. Flood Hazard Mapping in Thailand

COMMUNITY EMERGENCY RESPONSE TEAM FLOODS INTRODUCTION

SLOPE PROCESSES, LANDSLIDES, AND SUBSIDENCE

THE STUDY ON 4S TECHNOLOGY IN THE COMMAND OF EARTHQUAKE DISASTER EMERGENCY 1

9/23/2013. Introduction CHAPTER 7 SLOPE PROCESSES, LANDSLIDES, AND SUBSIDENCE. Case History: La Conchita Landslide

CHAPTER 12 NATURAL DISASTERS

Using Operating Experience to Prevent or Mitigate Nuclear Events. What Is, Was and Will Be Available

Investigation, assessment and warning zonation for landslides in the mountainous regions of Vietnam

August 14, James Bolton 312 Perry Lane Lovingston, VA

Republic of Mozambique

SIMPLE GUIDELINES TO MINIMISE EXPOSURE TO EARTHQUAKE-TRIGGERED LANDSLIDES

Summer Safety Campaign

Humanitarian Assistance and Disaster Relief (HADR)

CR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District

Changes to Land 5.7B. landforms: features on the surface of Earth such as mountains, hills, dunes, oceans and rivers

MEDIA RELEASE FOR IMMEDIATE RELEASE March 17, 2014 Preparing for the Spring Thaw

STATUS OF HAZARD MAPS VULNERABILITY ASSESSMENTS AND DIGITAL MAPS

Role of Hydro-Met Services in Disaster Risk Management

Think about the landforms where you live. How do you think they have changed over time? How do you think they will change in the future?

Also, when Cascade volcanoes do erupt, high-speed avalanches of pyroclastic flows

Risk Management Strategy

NGIAs' roles in successful disaster response

Assessing Spatial Vulnerability for Landslide Threat in Hilly Areas of The Nilgiris, Tamil Nadu, India

Landslide lesson plan

3/3/2013. The hydro cycle water returns from the sea. All "toilet to tap." Introduction to Environmental Geology, 5e

Delimiting the Flood Risk Zones in Cuddalore District, Tamil Nadu, India

GIS AND REMOTE SENSING FOR GEOHAZARD ASSESSMENT AND ENVIRONMENTAL IMPACT EVALUATION OF MINING ACTIVITIES AT QUY HOP, NGHE AN, VIETNAM

Hazard Resilience Index (HRI) Earthquakes, Tsunamis, and Volcanoes

USGS scientists with Venezuelan military liaisons.

United States Multi-Hazard Early Warning System

Oklahoma Department of Emergency Managment. Crisis Communications

International Journal of Scientific Research and Reviews

National Public Weather and Warning Services in the Swaziland Meteorological Service Dennis S.Mkhonta /

The Third UN-GGIM-AP Plenary Meeting. Use of Geospatial Information in Disaster and Coordination among NDMA and Relevant Organizations/Stakeholders

Beyond the Book. FOCUS Book

Report on the Damage Survey Caused by Hurricane Katrina (Tentative Report)

Debris flow: categories, characteristics, hazard assessment, mitigation measures. Hariklia D. SKILODIMOU, George D. BATHRELLOS

Safety Issue: Types of weather emergencies and natural. Weather Emergencies

DISASTERS OF SHIMLA: A MULTIDISCIPLINARY APPROACH

Debris Avalanches. Debris avalanche deposits on a volcano in Chile. All of the area in the foreground is buried by a thick debris avalanche.

Atmospheric processes leading to extreme flood events

OIKOS > landslide > mechanism >predisposing causes

THE FIRE AND RESCUE SERVICE S ROLE IN RESPONDING TO FLOODING DAVE RUSSEL ASSISTANT CHIEF FIRE OFFICER

Transcription:

Brief Report on visit to Alaknanda Valley, Uttarakhand Himalaya during 22-24 June 2013 By Surya Parkash, Ph.D. National Institute of Disaster Management, New Delhi A major disaster struck on 16/17 June 2013 in Uttarakhand after heavy (64.5mm - 124.4mm) to very heavy rains (124.5mm 244.4mm) on 16 and 17 June 2013 in several parts of the State (please refer figure 1 below for more information). According to IMD sources, the state had received > 400% rainfall during this period. This abnormally high amount of rain has been attributed to the fusion of westerlies with the monsoonal cloud system. Figure 1: Rainfall Distribution in the visited affected areas (Source of data: IMD) This heavy precipitation resulted into the swelling of rivers, both in the upstream as well as downstream areas. Besides the rain water, a huge quantity of water was probably released from melting of ice and glaciers due to high temperatures during the month of May and June. The water not only filled up

the lakes and rivers that overflowed but also may have caused breaching of moraine dammed lakes in the upper reaches of the valley, particularly during the late evening on 16 June and on the next day i.e. 17 June 2013, killing about several hundred persons, thousands missing and trapping about a hundred thousand pilgrims. Numerous landslides also took place after these heavy rains and toe erosion of the slopes by the high velocity and volume of water loaded with sediments, stones, rocks and sand. The landslides and toe erosion by the river caused breaching of the roads / highways at many places and washed away several bridges (steel girder bridges, beam bridges, suspension/cable bridges). The Alaknanda and its tributary Mandakini occupied their flood ways and started flowing along the old courses where human habitation had come up with passage of time (when the river had abandoned this course and shifted its path to the east side). Thus, the furious river destroyed the buildings and other infrastructure that came in its way. Geomorphological study of the area indicates that the surface slopes consist mostly of glacial, fluvio-glacial, or fluvial materials which are mostly unconsolidated and loose in nature. The drainage studies indicate a migratory / shifting nature of the river systems that causes aggradations on the concave end of the river and degradation / toe erosion on the convex part of the river. Due to morphological setting of the area, the river has high sinuosity and hence, high level of erosive capacity, especially when it is loaded with sediments (the erosive power of river with sediments is almost square of the erosive power without sediments). The area has been denuded to a great extent due to deforestation and tree cutting for road construction, building construction, mining, hydel projects etc. It has also resulted into increased surface flow and rise of river bed due to disposal of debris into the rivers. Geologically, the rocks in this area are found highly deformed, degraded and dissected by structural discontinuities and drainages.

Seismo-tectonically, the area is traversed by several lineaments, faults and thrusts, which are considered to be geodynamically active. The area had suffered an earthquake on 29 March 1999 (M-6.8) which caused loosening of rock masses, ground cracks and landslides etc., besides killing more than a hundred people due to collapse of buildings. Thus, the natural terrain conditions combined with climatic / weather conditions and haphazard human intervention made a conducive environment for such a hazardous process to take place in this valley. The hazard turned into a major disaster when people along with their properties and infrastructure occupied such areas without adequate information, knowledge, awareness and preparedness against the potential disaster. As June is a month for pilgrimage by the Hindus and Sikhs, most of the people prefer to visit the temples at Kedarnath, Badrinath and Hemkund Sahib before the monsoon begins. A huge crowd was present in the valley as tourists, pilgrims and trekkers besides the local population, business-men, tour / lodge / guest house operators etc. When the water in the river started growing, these people could not understand what is likely to happen next. By the time, they realized the event, they were already trapped into it and could not find ways to escape. Thus, a large number of people ran to safety on the uphill sides and many of them even tried to quickly cross the swollen fast flowing river that engulfed them as it appeared in furious mood with lot of big stones and sediments. The river Mandakini changed its course to the west side when the moraine dammed lake at Gandhi Sarovar breached. The sediment loaded river began eroding / dumping whatever came in its way. Most of hotels, shops and guest houses / lodges were located on this side and got washed by the river water, killing many of the people who were present there.

Dr. Surya Parkash, Associate Professor from National Institute of Disaster Management (NIDM), New Delhi was deputed by Executive Director NIDM to visit the affected area during 22-24 June 2013 (3 days including the journey time). The main objective of the visit was to observe the major damages along the national highway from Rishikesh to Chamoli and interact with people (including the victims, responders, relief workers, local people) to learn about the event and its impacts. Dr. SP travelled for almost 1000 km over these 3 days and noticed the ground changes and other impacts after the flash floods and landslides at Devparayag, Srinagar, Rudraprayag and Chamoli districts. The visit was restricted to roadsides due to shortage of time to cover distant areas. It was observed during the field visit, a lot of devastation and damages have also happened on the downstream sides in these areas besides a huge toll of lives in the upper reaches. The roads were found blotted with numerous landslides (both fresh and reactivated ones), cracks and subsidence throughout the highway from Rishikesh to Chamoli. Very few vehicles were plying on these roads except for the ones carrying relief materials. A huge amount of sand was found deposited at Srinagar that blocked the highway which was located close to the river. Besides the highway, the damages were found in the University road, SSB camp, school buildings, temples and bridges. Similarly damages to roads, bridges and buildings were also seen on the upstream side upto Chamoli. Numerous photos were taken to record many of these damages and their condition at that time. One of the significant events that took place during the visit was the reactivation of Shiro Bagar landslide between Srinagar and Rudraprayag. Dr. SP passed the highway at this landslide site at 10:30am on 23 June 2013 along with his team to go to Chamoli and on his return at about 4:30pm on the same day from Chamoli to Srinagar, it was found that the highway at the Shiro Bagar Landslide has been completely breached and do

not exist any more. Therefore, an alternate route was chosen to reach Srinagar on the same day. The alternate route from Khankhra goes via Kafoli and Chhatikhal to Srinagar but it is highly damaged and narrow. Some of the photographs taken during the field trip are given below which depict the damages and losses incurred during the catastrophic event in the village areas. Relief and Rescue Operations were being carried by various agencies including Army, Air Force, ITBP, NDRF, BRO, S&R teams of the State, District Administration, Police, Local community, NGOs etc. in the Kedarghati, Hemkund Sahib, Badrinath and other disaster struck areas. Dr. Surya interacted with the persons engaged in such operation and discussed the issues related to operations and logistic support at the local level to learn about difficulties and problems encountered by the personnel working there. The helicopter operations for relief and rescue were adversely affected by the bad weather conditions in the affected area. The work done by the Army under Operation Surya Hope is laudable and highly appreciable for saving several lives. Besides the rescue with the helicopters, balley bridges, rope bridge, timber bridges and other such quick launch bridges or trolleys etc. were built quickly across the river to help them cross the valley. The surviving victims were provided with food, water, clothes, medicine, shelter and some amount of money through the relief operations. Those persons who were evacuated from the disaster struck areas were sent by helicopter or road conveyances to Dehradun, Haridwar and other down- stream areas. The representatives from various states as well as the family members/relatives/friends of the victims have also arrived at Dehradun to take them back home. The State Emergency Operation Centre at Dehradun issued regular bulletin about the persons rescued, trapped, missing, killed etc. through website, emails and SMS

services. The control rooms were operational in the district headquarters where Additional District Magistrate along with District Project Officer (Disaster Management) and Sub Divisional Magistrate were monitoring and supervising all the relief and rescue works at the district level. Chief Minister of the State, Minister for Disaster Management, Chief Secretary, Principal Secretary (Disaster Management) and Executive Director, Disaster Mitigation and Management Centre were among the main functionaries involved in these operations at the state level. Besides the State Government and Central Government Agencies involved in disaster response, number of VIPs like Union Home Minister Shri Sushil Kumar Shinde, Hon ble Member of NDMA Shri V.K. Duggal, Gujarat Chief Minister Shri Narender K. Modi, Shri Rahul Gandhi and others have also visited the disaster struck area to overview the crisis situation. On behalf of the Central Government, Shri V.K. Duggal, Hon ble Member NDMA was appointed as Nodal Official to coordinate the search and rescue operations being carried out by various agencies. The important issues related to political, administrative, technical, social and environmental perspectives will be discussed later in the documentation report after the detailed studies of the event.

Brief Report on Uttarakhand Disaster (16/17 June 2013) by NIDM, Delhi Photographs depicting damages to highway & hydel project along RishikeshChamoli highway (Photo Courtesy: Dr. Surya Parkash, NIDM)

Brief Report on Uttarakhand Disaster (16/17 June 2013) by NIDM, Delhi Photographs revealing damages to bridges along Rishikesh-Chamoli highway (Photo Courtesy: Dr. Surya Parkash, NIDM)

Brief Report on Uttarakhand Disaster (16/17 June 2013) by NIDM, Delhi Photographs depicting occurrence of landslides and subsidence along Rishikesh-Chamoli highway (Photo Courtesy: Dr. Surya Parkash, NIDM)

Brief Report on Uttarakhand Disaster (16/17 June 2013) by NIDM, Delhi Photographs depicting post-disaster relief and rescue operations (Photo Courtesy: Dr. Surya Parkash, NIDM)

Based on the field observation, it is proposed that the area may be revisited for detailed studies, understanding of the event, damage / loss and needs assessment, documentation and recommendations for rehabilitation, recovery and redevelopment. The following activities may be undertaken by the Institute: Collection of terrestrial, meteorological and anthropogenic data with particular focus on landslides, rainfall and other information relevant to the event Collection of damage/loss and needs assessment data for the affected population and resources including various structures, infrastructure, utilities and services Organize a national level meeting / workshop focusing on Natural Disasters in Uttarakhand State Incidents, Issues and Options for Risk Reduction to gather views and experiences of all stakeholders including victims, responders, local people, experts, field officials, professionals, and academicians etc. Field visit of a multi-disciplinary and cross sectoral team to the affected areas for detailed investigation / studies from different perspectives to put forth practical ideas for reducing such incidents and their impacts as well as helping the affected population in rehabilitation and recovery Prepare a document to highlight the lessons learnt from the catastrophic event and to explain what went right and what went wrong in pre, during and post disaster situations in the affected area

Development of necessary guidelines and action plans for tourist / pilgrimage places, hotels/lodges/guest houses etc., keeping in mind the concentration of people at such locations during the time of disasters Prepare a disaster risk assessment and reduction plan including immediate, short, medium and long term actions, that may be undertaken for integrating DRR with development in future The area may be studied from technical as well as socio-environmental point of view to propose suitable developmental activities and discourage improper constructions. Innovative ideas for amalgamation of state of art technology with the indigenous traditional knowledge and skills for effective community practice