VRE System Map Source: VRE 2014

Similar documents
Hillsborough County MPO Transit Study. Technical Team August 23, 2007

T h e C S E T I P r o j e c t

Prospect City Limits/Project Study Area. County Boundary

Forecasts for the Reston/Dulles Rail Corridor and Route 28 Corridor 2010 to 2050

2040 MTP and CTP Socioeconomic Data

East Bay BRT. Planning for Bus Rapid Transit

Public Transit Accessibility vs. Employment: A Comparative Assessment of Counties/Cities in Northern Virginia

Public Open House Meeting Thursday, February 22, Broken Arrow to Tulsa Mass Transit Feasibility Study

MPOs SB 375 LAFCOs SCAG Practices/Experiences And Future Collaborations with LAFCOs

The World Bank Ho Chi Minh City Green Transport Development (P126507)

Trade Patterns, Production networks, and Trade and employment in the Asia-US region

GIS Analysis of Crenshaw/LAX Line

III. FORECASTED GROWTH

Creative Office / R&D Space

Analyzing the Market Share of Commuter Rail Stations using LEHD Data

Status Report: Ongoing review of O-D cellular data for the TPB modeled area

P a g e 5 1 of R e p o r t P B 4 / 0 9

Expanding the GSATS Model Area into

Champaign-Urbana 1998 Annual Weather Summary

Applications of GIS in Electrical Power System. Dr. Baqer AL-Ramadan Abdulrahman Al-Sakkaf

Study Overview. the nassau hub study. The Nassau Hub

RETA 6422: Mainstreaming Environment for Poverty Reduction Category 2 Subproject

THE FUTURE OF FORECASTING AT METROPOLITAN COUNCIL. CTS Research Conference May 23, 2012

Public Disclosure Copy. Implementation Status & Results Report CN Yunnan Honghe Prefecture Diannan Center Urban Transport (P101525)

Technical Memorandum #2 Future Conditions

Mapping Accessibility Over Time

Regional Growth Strategy Work Session Growth Management Policy Board

California Urban Infill Trip Generation Study. Jim Daisa, P.E.

APPENDIX V VALLEYWIDE REPORT

The 3V Approach. Transforming the Urban Space through Transit Oriented Development. Gerald Ollivier Transport Cluster Leader World Bank Hub Singapore

TOOLS FOR RISK MANAGEMENT Related to climate change

TRANSPORTATION MODELING

Public Transportation Infrastructure Study (PTIS) - 2 nd Technical Advisory Committee Meeting

Frequently Asked Questions

How GIS based Visualizations Support Land Use and Transportation Modeling

Weather forecasts and warnings: Support for Impact based decision making

Integrating Origin and Destination (OD) Study into GIS in Support of LIRR Services and Network Improvements

King City URA 6D Concept Plan

HORIZON 2030: Land Use & Transportation November 2005

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Implementation Status & Results China China: Anhui Medium Cities Urban Transport Project (P111421)

Local Economic Activity Around Rapid Transit Stations

3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS

why is a national or regional context important?

São Paulo Metropolis and Macrometropolis - territories and dynamics of a recent urban transition

Internet GIS Sites. 2 OakMapper webgis Application

Population and Employment Forecast

Population Research Center (PRC) Oregon Population Forecast Program

Coordinated Transit and Land Use Planning in the Region of Waterloo

The Role of Transitways in Our Region s Economic Competitiveness. The 23rd CTS Annual Research Conference St. Paul, MN May 23, 2012

ITEM 11 Information June 20, Visualize 2045: Update to the Equity Emphasis Areas. None

FHWA Peer Exchange Meeting on Transportation Systems Management during Inclement Weather

Assessing spatial distribution and variability of destinations in inner-city Sydney from travel diary and smartphone location data

The effects of impact fees on urban form and congestion in Florida

Assessing the Employment Agglomeration and Social Accessibility Impacts of High Speed Rail in Eastern Australia: Sydney-Canberra-Melbourne Corridor

Figure 8.2a Variation of suburban character, transit access and pedestrian accessibility by TAZ label in the study area

Employment Decentralization and Commuting in U.S. Metropolitan Areas. Symposium on the Work of Leon Moses

Tier 2 Final Environmental Assessment I-66 Transportation Technical Report. Appendix E. Travel Demand Forecasting Model Validation Memorandum

Final Report. COMET Partner's Project. University of Texas at San Antonio

Evaluating access to jobs via transit from disparate neighborhoods

Implementation Status & Results Vietnam Danang Sustainable City Development Project (SCDP) (P123384)

Cities and Climate Change (P123201)

High Speed / Commuter Rail Suitability Analysis For Central And Southern Arizona

Regional Growth Strategy Regional TOD Advisory Committee

TRAVEL DEMAND MODEL. Chapter 6

Northwest Construction Consumer Council

Construction Project Data Management

APPENDIX PHASE 1 GREEN INFRASTRUCTURE FRAMEWORK

StanCOG Transportation Model Program. General Summary

The World Bank China: Qinghai Xining Urban Transport Project (P127867)

CLAREMONT MASTER PLAN 2017: LAND USE COMMUNITY INPUT

PLS-CADD DRAWING N IC TR EC EL L RA IVE ) R U AT H R ER 0. IDT FO P 9-1 W T OO -1 0 D EN C 0 E M ER C 3 FIN SE W SE DE EA PO /4 O 1 AY D E ) (N W AN N

Applications of GIS and Urban Modelling for Environmental Policy. Overview

The Census, Urbanized Areas, and Your MPO/RPO

Impressive Growth & Relaxed Elegance.

A Method for Mapping Settlement Area Boundaries in the Greater Golden Horseshoe

Risk-based land use and spatial planning

From PCGIAP to UN GGIM AP: A Regional Perspective on GGIM

MACo Briefing General Assembly of Maryland

Monmouth County Adam Nassr (Partner: Brian Berkowitz, Ocean County)

FHWA Planning Data Resources: Census Data Planning Products (CTPP) HEPGIS Interactive Mapping Portal

Snow Response in an Urban Setting

The World Bank Cities and Climate Change (P123201)

The CRP stresses a number of factors that point to both our changing demographics and our future opportunities with recommendations for:

Regional Performance Measures

Attachment 3. Updating UBC s Regional Context Statement. University of British Columbia CONSIDERATION MEMORANDUM OF CONSULTATION INPUT

Regional Performance Measures

What s next for the Port Waterfront?

Appendixx C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014

Applications/Users for Improved S2S Forecasts

Hurricane Preparation and Recovery. October 11, 2011 Jon Nance, Chief Engineer, NCDOT

Information for File MVP RMM

Mountain View County Gravel Road Maintenance Costs Therese Morris GIS Coordinator March 1, 2012

Background of Project

DCHC MPO. Socioeconomic Data (SE Data) Guide Totals. Purpose. Actions. Use of Guide Totals. Partial Counties and Map. Population Guide Totals

Final City of Colusa STREETS & ROADWAYS MASTER PLAN. October J Street Suite 390 Sacramento, CA 95814

DOWNTOWN SILVER SPRING PURPLE LINE [COMING SOON] KEFA CA SAFEWAY BB&T MANDALAY RESTAURAN AND CAFE MIX BAR AND GRILLE ADDI S ABABA RESTAURANT

Metrolinx Transit Accessibility/Connectivity Toolkit

03 August 2016 l Public Meeting LONG-RANGE VISIONING STUDY

UDOT Weather Program Traffic Operations Center

Transcription:

V System ap Source: V 2014

T IS TH STU? STU AA P In August 20, V initiated a two-year planning and design study for an 11-mile extension of the anassas Line from the City of anassas through Gainesville to the Haymarket area in Prince illiam County. The study will: etermine a preferred route, schedule, and station locations. Identify any potential impacts on the surrounding community and natural resources. Conduct preliminary engineering for new stations and infrastructure. ngage local residents and stakeholders to provide input. POJCT SCHUL 20 2016 20 2018 2019 2020 2021 2022 Planning JUL AUG SP OCT V 2023 2024 PL GT VOLV! Project Activities nvironmental Preliminary esign Current Study Final esign Construction ore information about the study, including upto-date plans, meetings, and how to provide input may be found at: V.OG/GHX Start Up Find us on Facebook and Twitter: Contingent upon orfolk Southern approval and funding availability. #VGHX Project Phase POJCT VPT POJCT IPLTATIO VU SVIC V.OG/GHX /VGHX @VGHX #VGHX

Study Area Source: GIS ata Prince illiam County 20

xisting Service - 20 (16 daily V trains) Loudoun County Fairfax County 50 608 50 245 55 2 28 anassas Park anassas Prince illiam County Fauquier County road un / Airport 0 2.5 5 iles = ider origin colorcoded by station Source: V/COG Travel emand odel

Haymarket Terminus -2040 (22 daily V trains) 50 Loudoun County Fairfax County 50 608 245 55 Haymarket Gainesville Innovation / Sudley anassas Park 2 anassas Prince illiam County 28 Fauquier County 0 2.5 5 iles = ider origin colorcoded by station Source: V/COG Travel emand odel

Corridor Population and mployment Growth The ural Crescent acts as an urban growth boundary focusing development into the study corridor. PAGL L U FA IF C AX O CO UT U T U FA IF C AX O CO UT U T I X FO 44 G O xisting anassas Line FAIFAX CT U IV S IT GO L VATIO/L LV L VIL KS C S IS PK U F I S K SV I IL STGS OA U/AIPOT 95 PC I SO JACK LAK Source : COG ound 8.4 Cooperative Forecasts, Prince illiam County, VA GIS 20 5,000-10,000 OV L C HI S FI U 2,000-5,000 PC I CT S PAK S PK 1,000-2,000 FAUQUI CT LI I SO JACK LAK < 1,000 > 10,000 495 mployment ensity (y TAZ) U F I S L L GT O S A U CL I GL KI K VA U CT > 10,000 o. of Jobs/Square ile S FI U L Proposed V GHX Alignment L C P STGS A SS 5,000-10,000 PK CT VI OKSH I L 2,000-5,000 PC I O A CT VI L CO P U CL I J A S O A K SV I PAGL L V LS I S I OV L C HI S A GO L GL KI K IL L T CT VI LV Potential Station Area 1,000-2,000 S PK Population ensity (y TAZ) < 1,000 I K SV I GVI 2 iles o. of Persons/Square ile C P S PAK S L TH V I IL LI 1 U CL I J A U CL I O A S A GO 0 S ISO V LS I CT VI U FA IF C AX O CO UT U T GL KI K L L L GT O L VIL KS IS H THC OT ISO PAGL L VATIO/L LV KT L U F I S P COC U IL T L O HT O HT CATP K SV I CATP ISO J A L T GO L GL KI K IL L T V LS I U IV S IT CO P PK A SS STGS PC I SO JACK LAK O OKSH I L OV L C HI CK O A S L GVI G S L VAL T A PL S S PAK L 44 LI 2040 mployment 138,900 jobs G GU SP H FO IS ural Crescent H OC TI I X LV L L GT O L VIL KS T C T L IL C C UI UQ FA U IV S IT L A F AT P VATIO/L HO P S +56,200 jobs (+68%) 2 iles LV L S FI U 1 CO P PK 0 A SS OA U/AIPOT U F I S CK O A L O I P COC U IL T L TH V 2 iles PK SO JACK LAK S FI U OA U/AIPOT 1 L T C T L IL C C UI UQ FA H THC OT C P STGS L P KT OKSH I L L 0 PC I L G S PAK L VAL T A PL FO 44 OV L C HI PK S I X GVI S I H G GU SP H OC TI ural Crescent C P S A F AT LI 2040 Population 280,000 people L S I I +79,000 people (+39%) IS LV TH V TH V L VIL KS S A LV L L GT O L VATIO/L L O HT O HT H OA U/AIPOT HO P S O A A SS S ISO J A O U IV S IT CATP U FA IF C AX O CO UT U T CATP PAGL L L T V LS I OKSH I L G 44 FO CK O A I X L VAL T A PL GVI L CO P THC OT L S KT T C T L IL C C UI UQ FA LV G GU SP 2 iles P T C T L IL C C UI UQ FA L P COC U IL T L L P H THC OT L 1 S KT ural Crescent H 0 H OC TI P COC U IL T L 20 mployment 82,800 jobs L A F AT S L VAL T A PL H G GU SP H OC TI ural Crescent HO P A F AT 20 Population 201,000 people L CK O A HO P ote: Population and employment totals are within 5-miles of extension. Some figures may not add up due to rounding. Source: COG ound 8.3 and 8.4 Land Use Forecast

Summary of Preliminary Costs Alternatives aily Trains Annual Operating Cost (2016$) Capital Cost* (2016$) xisting Service 16 $ -- 1. road un Terminus 22 $36 $300 2. xtension & road un 22 $48 $550-$650 3. xtension 22 $45 $550-$650 4. xtension + Off-Peak Shuttle 36 $72 $570-$680 ALX: Alexandria Station; U: road un/airport Station; : Haymarket Station; SS: anassas Station; : Union Station *Capital Cost: Includes rolling stock and train storage & maintenance facility; low range assumes construction of 1 additional track (2 tracks total) + full 100 right-of-way (O); high range assumes construction of 2 additional tracks (3 tracks total) + full 100 O

Station Sites for etailed Analysis Source: GIS ata Prince illiam County 20 raft June 2016

ard Sites for etailed Analysis Source: GIS ata Prince illiam County 20 raft June 2016