The Stability of Flood Defenses on Permeable Soils: The London Avenue Canal Failures in New Orleans

Similar documents
PART 4 HURRICANE KATRINA STRIKES NEW ORLEANS AUGUST 2005

CHAPTER FIVE: THE LOWER MISSISSIPPI REGION AND PLAQUEMINES PARISH

CHAPTER SEVEN: THE NEW ORLEANS EAST PROTECTED AREA

Three-Dimensional Seepage Effects at Three New Orleans Levee Breaches During Hurricane Katrina

US Army Corps of Engineers BUILDING STRONG

OSCILLATIONS OF SEMI-ENCLOSED WATER BODY INDUCED BY HURRICANES. Yuan-Hung Paul Tan 1 and Jiin-Jen Lee 1

Greater New Orleans Hurricane and Storm Damage Risk Reduction System 101

Report on the Damage Survey Caused by Hurricane Katrina (Tentative Report)

Hurricane KATRINA Lessons Learned for Managing Risk

Fil Failure Analysis of fthe Breached Levee System at the 17th Street Canal, New Orleans

Hurricanes and Storm Surge : Before coming to lab, visit the following web site:

PROBABILISTIC DESIGN METHOD OF LEVEE AND FLOODWALL HEIGHTS FOR THE HURRICANE PROTECTION SYSTEM IN THE NEW ORLEANS AREA

SCOUR CHARACTERIZATION DUE TO WATER FREE FALL

New Orleans Levee System Performance during Hurricane Katrina: London Avenue and Orleans Canal South

The probabilistic optimisation of the revetment on the dikes along the Frisian coast

Background and Purpose of Meeting. River Towers Meeting. Flood Risk Management Study Alternatives Overview

Instructor : Dr. Jehad Hamad. Chapter (7)

Modeling Great Britain s Flood Defenses. Flood Defense in Great Britain. By Dr. Yizhong Qu

Appendix 15 Computational Methodology

Improvements to Southeast Louisiana s floodwalls and pump stations since Katrina: the Hurricane and Storm Damage Risk Reduction System (HSDRRS)

Benchmarking of Hydrodynamic Models for Development of a Coupled Storm Surge Hazard-Infrastructure Modeling Method to improve Inundation Forecasting

IMPORTANCE OF GEOLOGIC CHARACTERIZATION FOR LEVEE FOUNDATION AND BORROW MATERIALS AS STUDIED AT THE INDIAN GRAVES LEVEE DISTRICT, ADAMS COUNTY, IL

Smart Flood Risk Management Solutions

Construction complete on all HSDRRS projects across storm evacuation routes

Risk Analysis of a Protected Hurricane-Prone Region. I: Model Development

Lessons Learned from Analysis of the New Orleans Hurricane Protection System

Expert Report. Robert Glenn Bea, Ph.D., P.E.

Appendix 9 Risk Methodology

Geotechnical Reconnaissance of the Mississippi River Delta Flood-protection System After Hurricane Katrina

Erosion and Deposition

Lab 12 Coastal Geology

PART 5 MECHANISMS OF GROUND SETTLEMENT IN GREATER NEW ORLEANS

Looking after Lyme Regis

Armstrong Case Judgement and Findings of Fact.PDF

Physical landscapes River landscapes in the UK

ICOLD Bulletin 164 on internal erosion of dams, dikes and levees and their foundations

Pirai river (Bolivia)

HORIZONTAL TRANSLATIONAL FAILURES OF LEVEES DUE TO WATER FILLED GAPS

Important Concepts. Earthquake hazards can be categorized as:

A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA

Appendix 10 Reliability Modeling

Appendix A STORM SURGE AND WAVE HEIGHT ANALYSIS

MODELLING CATASTROPHIC COASTAL FLOOD RISKS AROUND THE WORLD

Probabilistic design of levee and floodwall heights for the Hurricane Protection System in the New Orleans area

Hurricane Tracks. Isaac versus previous storms Impacts and solutions. ( Continue by clicking on the slide bar to the right)

Changes to Land 5.7B. landforms: features on the surface of Earth such as mountains, hills, dunes, oceans and rivers

FAILURE MECHANISMS OF SEA DIKES- INVENTORY AND SENSITIVITY ANALYSIS

Think about the landforms where you live. How do you think they have changed over time? How do you think they will change in the future?

Hurricane Katrina. Learning Objective: -Analyse the causes, effects and responses of a tropical storm

Reliability analysis of the Caldicot Levels flood defence system by using Dutch reliability methods for flood defences. Flooding of Caldicot Levels

Levee reliability analyses for various flood return periods a case study in southern Taiwan

*** ***! " " ) * % )!( & ' % # $. 0 1 %./ +, - 7 : %8% 9 ) 7 / ( * 7 : %8% 9 < ;14. " > /' ;-,=. / ١

Coastal and Hydraulics Laboratory

Run 028 (Note: error in UKC at start of exercise due incorrect tide input then corrected ok.)

Attachment 3: Fragility Curve Determinations DRAFT

FLOOD RISK OF REGIONAL FLOOD DEFENCES

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX A PRELIMINARY FLOODWALL DESIGN

Proceedings of the 6 th International Conference on the Application of Physical Modelling in Coastal and Port Engineering and Science (Coastlab16)

Draft for Discussion 11/11/2016

Structural evaluation of multifunctional flood defenses using generic element types

CHAPTER SIX: THE ST. BERNARD AND LOWER NINTH WARD PROTECTED AREA

Levee leaks reported to S&WB a year ago Lakeview residents' complaints fell between the cracks

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

Geotechnical Challenges New Orleans USACE

The Pontchartrain Maurepas Surge Consortium (LPMSC) Lake Sloshing Effect Preliminary Findings

Earth Science Chapter 6 Section 2 Review

SHORELINE PROTECTION & RESTORATION PROGRAM

THE NEW STORM SURGE MODULE IN AIR S U.S. HURRICANE MODEL

PART 4 GEOLOGIC SETTING AND FOUNDATION CONDITIONS IN NEW ORLEANS

Erosion Information Paper - Barrow, Alaska Current as of September 14, 2007

SEGMENTED BREAKWATERS AND THEIR USE IN COASTAL LOUISIANA

3/8/17. #20 - Landslides: Mitigation and Case Histories. Questions for Thought. Questions for Thought

Hurricane Matthew Threats and Impacts Briefing for Eastern NC

Local Flood Hazards. Click here for Real-time River Information

Changes in Texas Ecoregions Copy the questions and answers

What Are Disasters? The Rescue Kids Trio!

Pre-Disaster Natural Hazard Mitigation Plan Guilford, Connecticut History of Hazard Mitigation Planning Authority Disaster Mitigation Act of 2000 (ame

Hurricanes 1. Thunderclouds. cool, dry air falls. warm, moist air rises

GEOL 1121 Earth Processes and Environments

Floods Lecture #21 20

Superstorm Sandy Willis Re s post-event field damage survey preliminary report

Application #: TEXT

Modeling Nearshore Waves for Hurricane Katrina

DUNE EROSION NEAR SEA WALLS: MODEL-DATA COMPARISON

Coastal Litigation in the Context of Science Literacy

Weathering, Erosion, and Deposition

Developed in Consultation with Florida Educators

Appendix G.18 Hatch Report Pacific NorthWest LNG Lelu Island LNG Potential Impacts of the Marine Structures on the Hydrodynamics and Sedimentation

Civil Engineering Department College of Engineering

::~... ~ S,. -,,"-,if"'-;:':[;: :

Damage of Sewage Plant by Tsunami

Innovated Technological Trends in Highways. Flood Modelling & Evaluation of Impacts on Infrastructure

Programmatic Approaches to Assessing and Mitigating Risk to Pipelines from Natural Forces

Overflow Pattern and the Formation of Scoured Region by the Tsunami Propagated in River Channels in Great East Japan Earthquake

Hurricanes. Cause: a low pressure storm system over warm ocean water. Effect: potential massive widespread destruction and flooding.

Phases of Disaster Response. John Yeaw, Gavin Vanstone, Haochen Wu, Jordan Tyler

Weathering and Erosion

Lecture 15: Subsidence

Chapter 7 Permeability and Seepage

14 Geotechnical Hazards

Transcription:

Missouri University of Science and Technology Scholars' Mine International Conference on Case Histories in Geotechnical Engineering (2008) - Sixth International Conference on Case Histories in Geotechnical Engineering Aug 11th - Aug 16th The Stability of Flood Defenses on Permeable Soils: The London Avenue Canal Failures in New Orleans W. Kanning Delft University of Technology, Delft, The Netherlands S. Van Baars Delft University of Technology, Delft, The Netherlands J. K. Vrijling Delft University of Technology, Delft, The Netherlands Follow this and additional works at: http://scholarsmine.mst.edu/icchge Part of the Geotechnical Engineering Commons Recommended Citation Kanning, W.; Baars, S. Van; and Vrijling, J. K., "The Stability of Flood Defenses on Permeable Soils: The London Avenue Canal Failures in New Orleans" (2008). International Conference on Case Histories in Geotechnical Engineering. 56. http://scholarsmine.mst.edu/icchge/6icchge/session02/56 This Article - Conference proceedings is brought to you for free and open access by Scholars' Mine. It has been accepted for inclusion in International Conference on Case Histories in Geotechnical Engineering by an authorized administrator of Scholars' Mine. This work is protected by U. S. Copyright Law. Unauthorized use including reproduction for redistribution requires the permission of the copyright holder. For more information, please contact scholarsmine@mst.edu.

THE STABILITY OF FLOOD DEFENSES ON PERMEABLE SOILS: THE LONDON AVENUE CANAL FAILURES IN NEW ORLEANS. W. Kanning S. Van Baars & J.K.Vrijling Delft University of Technology Delft University of Technology Delft, the Netherlands Delft, the Netherlands ABSTRACT The two failures of the London Avenue Canal floodwalls contributed largely to the flooding of central New Orleans due to hurricane Katrina. In this paper, both failures are analyzed and compared to each other since the flood defenses are both located on permeable soils. Photo s observation and calculations are used for the analysis. Both failures are caused by the permeable sand layer below the floodwall that allowed high pore water pressures to develop below the floodwall. However, the south breach seems to be caused by the piping failure mechanism and the north breach by loss of stability. At the South breach, the impermeable top layer was thicker than at the North breach, increasing the stability. The North beach was less vulnerable for piping and the lack of stability caused a large breach. The London Avenue Canal failures are a clear yet tragic example of the failure of flood defenses on permeable soils. The failures show that multiple failure mechanism may occur and since there are many flood defenses on permeable soils world wide, the lessons from Katrina can be used to prevent future catastrophes. INTRODUCTION In this paper it is investigated how the two floodwalls along the London Avenue Canal failed during the hurricane Katrina disaster in 2005. Photographic evidence, local observations and methods from the Netherlands are used to derive the possible causes of failure. The word levee (or floodwall) is used when discussing the New Orleans situation, while dyke is used when discussing the Dutch earthen flood defenses. Katrina in New Orleans The flood disaster in New Orleans in August and September 2005 due to Hurricane Katrina showed once again the vulnerability of low lying areas to floods. Hurricane Katrina closely passed New Orleans, causing the flood defense system to breach on many locations. The severe effects shocked the world, with over 700 direct casualties, more than 100 billion US$ damage and an enormous social disruption. Hurricane Katrina approached New Orleans from the south on August 28 th, 2005, passing the city on the eastern side. The hurricane gained full force above the Gulf of Mexico. It caused the water levels on the coast to rise due to wind set up. The counter clockwise rotation of the hurricane magnified the wind set up near New Orleans. Besides, the high wind speeds of more than 250 km/hour resulted in a severe wave attack on the coast. The high water levels in Lake Borgne progressed into the city through shipping canals that connect the Mississippi River with the Gulf of Mexico and Lake Pontchartrain. As the hurricane passes the city, the winds on Lake Pontchartrain start to blow from the north, resulting in high water levels due to wind set-up on the north side of New Orleans (Kanning et al, 2007) Lake Pontchartrain III. London Avenue Canal Fig. 1. Levee breaches in New Orleans after Katrina Lake Borgne A range of failure mechanisms was observed during hurricane Katrina. In general, three groups of failure mechanisms may be distinguished (see Fig. 1): I. Erosion of the flood defenses along Lake Borgne. These flood defenses mainly consisted of earthen embankments and were destroyed for many kilometers because the flood defenses were not high and strong enough to withstand the water levels and waves. II. Failure of flood walls and scour around transitions. The high water levels in Lake Borgne progressed into the II. I Paper No. 2.72 1

shipping canals that connect the Mississippi with Lake Pontchartrain and the Gulf of Mexico. The floodwalls were not high enough or the transitions between soils and solid structures were not strong enough and erosion due to overtopping caused several failures. III. Geotechnical failure of floodwalls along two of the three dewatering canals. The wind induced high water levels along the south shore of Lake Pontchartrain progressed into the dewatering canals that enter the city. Although the water levels did not reach the design level, the floodwalls along these canals failed at three locations (two at London Avenue Canal and one at 17 th Street Canal). This study focuses on the two London Avenue Canal failures. Dykes - Overflow - Wave overtopping - Sliding inner slope - Horizontal sliding - Sliding outer slope - Micro-instability - Piping - Erosion outer slope - Erosion foreshore - Settlement - Drifting ice - Ship Collision Dunes - Erosion - Erosion foreshore - Sliding inner slope Hydraulic structures - Strength/stability of structure - Strength/stability of foundation - Strength/stability of transition - Non closure of structure The piping failure mechanism (Fig. 2 and Fig. 3) receives a lot of attention in the Netherlands nowadays because it was assessed to be the most dominant failure mechanism in a recent risk assessment. Netherlands and Flood Defenses The Netherlands are famous for the long history with flood defense systems. The flood defense principles in the Netherlands are used in this paper to analyze the London Avenue Canal failures. In response to numerous disasters, the construction of the current extensive flood defense system started less than a century ago. Firstly, following serious dyke breaching and flooding around the Southern Sea in 1912, it was decided that this inner sea be closed off, which was done by constructing the IJsselmeer Dam in 1933. Similarly, after the catastrophic flood disaster of 1953 in Zeeland it was decided to close off the islands in the southwest of the country from the sea. This was done by building 11 large dams and storm surge barriers, the construction of which was completed in 1997. Although the Dutch flood defense system has improved over the years, there were still serious dyke problems with high water in the rivers in 1988, 1993 and 1995, leading, in 1993, to 250,000 people being evacuated. And in 2006, only 44% of the 2875 km Dutch dykes, dams and dunes met the dyke regulations set by the Ministry of Public Works, Transportation and Water Management. The IJsselmeer dam, among other defenses, does not meet the specified regulations. These regulations are based on the different type of failure mechanisms. According the regulations each dyke, dune or hydraulic structure has to be checked for each of the failure mechanisms. Failure Mechanisms In the Netherlands, the design and safety assessment of dykes is based on a list of failure mechanisms. In general, the following failure mechanisms of dykes can be distinguished (TAW, 1998): Fig. 2. Piping behind a dyke, next to the ditch Fig. 3. Emergency measures for the piping mechanism (ENW, 2006) Piping A dyke fails due to piping in case the soil particles below the dyke are washed out due to excessive seepage. An example is shown in Fig. 4 for an earthen dyke with a clay blanket on top of a sand layer. Failures due to piping not only occurred in the Netherlands in the past, but also in Germany (Kolb, 1964). Four stages are defined: In the first stage, water pressures develop below the inside clay blanket. In the second stage, the clay blanket is cracked due to excessive pore pressures and sand boils start to develop. In the third phase, a canal develops below the dyke. In the fourth stage, this canal progressively Paper No. 2.72 2

increases until an open connection between the outside water and the inside is formed. The open connection can finally cause the dyke to collapse due to subsidence and cracking of the dyke s body. water and a large section of floodwall sled inland, see Fig. 6. Uplift however, was not the main reason for this failure. Horizontal stability under uplift conditions is a problem in the Netherlands as well. A river dyke failed due to this mechanism in the past (near Streefkerk), one real scale experiment was carried out to study the mechanism (near Bergambacht) and even a special addition to slope stability software was developed. Fig. 4. Piping in case of an earthen dyke (TAW, 2002) Studies of the development of a pipe below a glass plate show that the pipe is not a single pipe, but a series of meandering pipes, creating new branches and closing some old ones, but progressively growing in length until it has reached the other side in case of high loading, see Fig. 5. Fig. 6. 17 th Street Canal failure in New Orleans due to hurricane Katrina (ILIT, 2006) THE LONDON AVENUE CANAL Location Fig. 5. Development of pipes in an experimental setting The reliability of a dyke with respect to piping can be assessed with the methods of Bligh and Lane or with the more advanced method of Sellmeijer (Sellmeijer, 1988; TAW, 2002). Sellmeijer takes into account the most influences and is used for the assessment of dykes in the Netherlands. According to Sellmeijer, a critical water level h p is defined: γ p hp = αcl 1 (0.68 0.1ln c) tanθ > 0 γ w Where α includes limited thickness of sand layer, c incorporates the erosion resistance of the sand layer, L is the leakage length, γ p is the density of the grain particle, γ w is the density of the water and θ is the rolling friction angle. Piping occurs in a corrected load H is higher than h p. H is the water level minus 0.3 D (D is the layer thickness). For more information is referred to (TAW, 2002) (1) The London Avenue Canal is located in the center of New Orleans. The canal was constructed for the dewatering of the central New Orleans area. Due to compaction of the subsoil following the dewatering of the former marsh, the area is situated below Mean Sea Level (MSL). Hence, all rain that falls has to be pumped out. A drainage system was constructed that drains all excess water by means of a pump station that is located at the south end of the canal. The north end of the canal has a curved shape to prevent waves from entering. The canal used to be in open connection with Lake Pontchartrain, but a closure structure with pumps is constructed which will be closed in case of high water, reducing the length of the overall flood defense system. Stability Floodwall instability proved to be a problem during hurricane Katrina in the nearby 17 th Street Canal (IPET, 2006). The weak soils were not able to resist the pressure induced by the Paper No. 2.72 3

North breach South breach The London Avenue Canal Floodwalls The floodwalls of the London Avenue canal are all from the I- wall type: A concrete wall on top of a steel sheet pile. The walls are constructed differently from the design. The walls are designed with an elevation of NGVD + 4.2 m and a tip elevation of the sheet pile ranging from NGVD -6.1 m to -13.4 m. At the location of the breaches, the design sheet pile tip elevations are NGVD 6.1 m while opposite of the North breach, the elevation is NGVD -10.7 m (Burk & Associates, 1986). The design water level is 0.6 m below the top of the floodwall. The walls are constructed however with an elevation of NGVD + 4.4 m and a tip elevation of the sheet pile ranging from NGVD -3.6 m to -8.7 m. A study shows considerable changes in time of the different vertical datum. In this study, the NAVD88 (2004.65) reference is used, denoted with NAVD. This is approximately 0.46 m lower than the NGVD datum and 0.06 m above local mean sea level (IPET, 2006A, pp II-93, 94) Fig. 7. The London Avenue Canal (based on earth.google.com) Geology New Orleans is located in the Mississippi Delta. The Mississippi river formed the area in the course of many centuries and created typical delta geology that consist of natural levee deposits, organic soils, clay layers and sand layers. The Pleistocene layers are found at a depth of 15 to 30 meters. The upper Holocene layers are characterized by highly compressible, low strength materials and beach sand deposits. The London Avenue Canal is located in an area that used to be a swamp and that was drained to create residential area. Organic, weak soils are found near the soil surface, see Fig. 8. Below the organic soils, clay and sand layers are found. Especially the highly permeable sand layers are important. These are beach sands or barrier island deposits. At the location of the breaches, the as-built sheet pile tip elevations are NGVD 4.9 m while opposite of the North breach, the elevation is NGVD - 8.7 m (USACE, 1994). The floodwalls have a height of NAVD + 3.9 m. (IPET, 2006A p II-94). The canal floor is approximately 5.5 to 5.8 m below sea level (Team Louisiana, 2006 p 99). The canal depths are maintained with dredging. Water Levels The most important parameter for failure is the water level. There are hardly observations of the water levels during hurricane Katrina. Most water levels in literature are based on model results. These models have been calibrated with the available observations. The nearest observation-based hydrograph is near the entrance of the 17 th Street Canal (approximately 4.7 km away from the London Avenue Canal entrance), see Fig. 9, where a maximum water level of NAVD +3.3 m is recorded. Interpolation by IPET based on high water marks results in a water level in the London Avenue Canal of approximately NAVD +3.5 m (IPET, 2006A, p. IV-31). Fig. 9 shows the peak between 6 and 11 ft only lasts for about 6 hours. The floodwalls not necessarily failed at the maximum water level. According to IPET, the water level at the South breach was approximately between NAVD +2.2 m and +2.5 m (IPET, 2006A, p. V-39) and the water level at the North breach was approximately between NAVD +2.5 m and +2.9 m (IPET, 2006A p. V-40). Since time dependent processes may be involved, the complete hydrograph has to be taken into account. Fig. 8. Geology of the London Avenue Canal (Nelson, 2006) Paper No. 2.72 4

Fig. 9. Observed water levels at the 17 th Street Canal (IPET, 2006A pp IV-30) Other indications give additional information about the water levels: No scour behind the floodwalls is observed (unlike floodwall along the Inner Harbor Navigation Channel), indicating the water levels remained below the top of the floodwall The Robert E. Lee Boulevard Bridge, next to the north breach, is lower than the adjacent floodwalls, creating a gap in the system of flood defenses. The two breaches are both on the same canal. This indicated the South breach probably failed first: In case the north breach would have failed first, the water level at the South breach would have dropped since its supply would have to pass the north breach. Vice versa is not necessarily true since water levels at the north breach experience less influence of the south breach because a gradient of the water level will develop in a relatively small canal. The thick layer of sand at the South breach indicates the water flowed in for a significant amount of time. Fig. 10. Initial repairs on the South breach (source: IPET, 2006A) Fig. 11. The South breach after initial repairs (source: W. Kanning) THE SOUTH BREACH OF THE LONDON AVENUE CANAL The south breach is located on the east side of the London Avenue Canal near Mirabeau Avenue. The floodwall supposedly failed between 07.00 and 08.00 am on August 29 th, 2007. The water level was approximately NAVD + 2.5 m which is well below the top of the floodwall (NAVD +3.9 m) and below the design level (NAVD +3.3 m). Fig. 12. Sand layer in vicinity of the London Avenue Canal south breach (source: W. Kanning) Forensic Evidence Fig. 10 and Fig. 11 show that (in contradiction to the North breach) the I-walls did not fall over, but sank down. The breach is relatively small and consists only of a few elements. The pictures indicate that first a large amount of sand washed from below the floodwall through piping underneath the I-wall which made it possible for the I-walls to sink down in the liquefied sand layer. Fig. 13. Sand layer covering the patio of a house in the vicinity of the London Avenue canal south breach (source: J.K. Vrijling) Paper No. 2.72 5

Cross Section The cross section of Fig. 14 is based on literature (IPET, 2006B) and personal surveying. This cross section serves as the basis for the computations in the next sections. The ILIT study divides the swamp/marsh layer into two layers which together have the same thickness as depicted below. The beach sand layer is also divided into two layers in this study (ILIT, 2006, pp. 8-119). The height of the floodwall is NAVD +3.9 m; the depth of the sheet pile is NAVD -5.3 m below sea level (IPET, 2006B pv-9-30). The thickness of the inland blanket that consists of marsh deposits is approximately 3.6 m. effective vertical stresses are 0, which means no shear stresses can develop. Hence, all kind of possible failure planes may develop. Piping Different methods to asses the vulnerability for piping are used in this study. The impermeable layer on top of the sand layer should have been cracked (due to uplift). In the previous section was shown that critical water levels for uplift were lower than the occurring water levels. Since not all parameters are known, the results should be regarded as rough estimates. The methods of Bligh, Lane and Sellmeijer all indicate the structure is sensitive to piping, see Table 1. In this table, h max is the maximum occurred water level and h critical is the critical water level for piping. The leakage length is estimated to 23 m; the coefficient of Bligh is 15 m and the coefficient of Lane 7 m. For Sellmeijer, the rolling friction angle is 43 degrees, d 50 is 0.23 mm and the permeability is 4*10-4 m/s. For other coefficients is referred to TAW (1999). As can be seen in Fig. 9, the water levels are a few hours above critical water levels. Table 1: Piping sensitivity London Avenue Canal South breach Fig. 14. Cross section London Avenue Canal South breach based on (IPET, 2006B) and own measurements. Measures in meters; reference according to NAVD88 Stability analysis In case of a levee and a blanket on top of permeable layer, an uplift situation occurs. To determine the effect of hydraulic pressures, the uplift criterion is analyzed. The vertical stress due to the blanket is: σ = h γ = 3.6 m 15.7 kn/m = 56.5 kn/m v blanket blanket 3 2 Where σ v is vertical stress, γ blanker is the density of the blanket material and h blanket is the thickness of the blanket. The corresponding critical water level h (assuming no entrance resistance) is: (2) 2 56.5 kn/m h = σ v / γ water = = 5.7 m (3) 3 10 kn/m This corresponds to a water level at NAVD -4.7 + 5.7 = NAVD + 1.0 m. This is far below the occurring water level of approximately NAVD +2.5 m at failure (see section 2.4). The peak water level only last for several hours but the very permeable sand layer enables a rapid increase in pore water pressure. Since there is uplift of the inland blanket, the Assessment method h max (m) h critical (m) Sensitive Bligh 4.6 1.5 (2.4)* Yes Lane 4.6 1.6 Yes Sellmeijer 4.6 3.2 (4.3)* Yes *Corrected for vertical leakage length Conclusion South Breach The photos, local observations and calculations indicate the floodwall failed due to the piping mechanism. The calculations indicate that both stability and piping were critical for the London Avenue Canal south breach. The excess pore water pressure in the sand layer was relieved due to cracks in the blanket. These cracks caused the first sand boils. Why the piping mechanism occurred exactly here, and not at any adjacent location is probably because of spatial variation and local discontinuities (e.g. swimming pools, trees). THE NORTH BREACH OF THE LONDON AVENUE CANAL The North breach of the London Avenue Canal is located on the west side of the Canal near the Robert E. Lee boulevard bridge. An analysis of the Army Corps of Engineers shows that the floodwall failed at a water level of NAVD + 2.7 m (IPET, 2006A p IV-173) which is well below the top of the floodwall and even below design level. Paper No. 2.72 6

Forensic Evidence Fig. 15 shows the North breach of the London Avenue canal. A large part of the I-wall has been pushed inland leaving a large breach. The breach consists of 2 parts: a part of tumbled segments and a gap without segments. This indicated the floodwall first deformed over the full length, before the gap developed (since the pressure was relieved from the tumbled part). Fig. 16, Fig. 17 and Fig. 18 show the elevation of the ground behind the embankment, including the elevation of a playhouse. This heave is a clear sign of an uplift failure mechanism. Besides, sand boils have been found here (IPET, 2006A). Fig. 18. The playhouse after the breach (source: IPET, 2006A p V-41) Fig. 19 shows holes behind the floodwall opposite of the breach which are likely caused by piping, the particles have been washed out and a hole remains. The floodwall did not fail here because the sheet pile was longer than on the opposite site. Fig. 20 shows the only part of the floodwall where the concrete notably breached: at the connection between the tumbled wall and the surviving wall. Fig. 20 indicates that the soil failed and not the structure (i.e. concrete wall and sheet pile). Only at the connection between the tumbled floodwall and the surviving floodwall, cracks in the concrete I wall are observed. Fig. 15. The London Avenue Canal North breach (IPET, 2006A) Fig. 16. Elevated playhouse due to uplift (ILIT, 2006 pp 8-131) Fig. 19. Piping holes at the protected side of the floodwall opposite the breach of the London Avenue Canal North breach (source: IPET, 2006A) Fig. 17. The playhouse before the breach (source: IPET, 2006A pv-41) Fig. 20. Cracked concrete floodwall at the London Avenue Canal north breach (source: J.K. Vrijling) Paper No. 2.72 7

Cross Section The cross section of Fig. 21 is based on literature (IPET, 2006) and own measurements. The height of the floodwall is NAVD +3.9 m; the depth of the sheet pile is NAVD -5.4 m (IPET, 2006B p V-9-2). The thickness of the inland blanket that consists of marsh deposits is approximately 2.8 m. 2 85.0 kn/m h = σ v / γ water = = 8.5 m (7) 3 10 kn/m The corresponding critical water level is NAVD -4.4 + 8.5 =NAVD + 4.1 m which is above the water levels that occurred. Piping The methods of Bligh, Lane indicate the structure is sensitive to piping, see Table 2. The method of Sellmeijer shows less sensitivity for piping, mainly because of the low permeability of the sand. The leakage length is estimated to 24 m; the coefficient of Bligh is 15 m and the coefficient of Lane 7 m. For Sellmeijer, the rolling friction angle is 43 degrees, d 50 is 0.23 mm and the permeability is 6*10-5 m/s. For other coefficients is referred to TAW (1999). Since not all parameters are known, the outcomes should be treated carefully. Fig. 21. Cross section London Avenue Canal North Breach Stability Analysis Similar the South breach, the uplift criterion is analyzed. The vertical stress due to the blanket is: σ = h γ = 2.75 m 16.5 kn/m = 45.3 kn/m v blanket blanket 3 2 The corresponding critical water level difference (assuming no entrance resistance) is: (4) 2 45.3 kn/m h = σ v / γ water = = 4.5 m (5) 3 10 kn/m This correspond to a water level at NAVD -4.4 + 4.5 = NAVD + 0.1 m. This is far below the occurring water level of approximately NAVD + 2.5 to + 2.8 at failure (see section 2.4). Even below the floodwall the effective stresses and so the strength reduce to zero at rather low water levels. This low critical water level also explains why residents complained about wet gardens along the London Avenue Canal. The peak water level only last for several hours but the very permeable sand result in a rapid increase in water levels. Since there is uplift of the inland blanket, the effective vertical stresses are 0, which means no shear stresses can develop. Hence, all kind of possible failure planes may develop. The embankment on top of the swamp marsh layer results in a vertical stress on top of the sand below the embankment of: v 3 2 ( 2.75 m 2.4 m) 16.5 kn/m 85.0 kn/m σ = + = (6) Table 2: Piping sensitivity London Avenue Canal North breach Assessment method H max (m) H critical (m) Sensitive Bligh 5.2 1.5 (2.4)* Yes Lane 5.2 1.6 Yes Sellmeijer 5.2 5.6 (6.7)* Yes *Corrected for vertical leakage length Conclusion North Breach Forensic evidence and observations indicates the floodwalls failed due to stability problems caused by a combination of the large water pressure on the wall and the large excess pore pressure in the subsoil. This is confirmed by the stability calculations. The different piping assessment methods are not consistent whether the structure was sensitive for piping or not. The floodwall may failed at this location because of the presence of a extra weak peat layer. SIMILARITIES AND DIFFERENCES The two failure mechanisms of the floodwalls look different, but are both based on the same fundamental principle: The pore pressure in the sand layer reached the total vertical stresses, reducing the effective stresses and the strength to zero, causing the floodwall to sink down due to piping (South breach) or fall sideways (North breach). Due to the zero effective stresses, all kind of deformations and failure mechanisms are possible. The similarity of both failures is the high excess pore pressure in the sand layer, leading to uplift forces on inland blanket and floodwall instabilities. The difference is the effect it had on the final way of failing. The North floodwall tumbled over, but the South floodwall did not tumble over, because the thicker Paper No. 2.72 8

clay layer in South seems to have prevented the I-wall to tumble by giving more passive resistance. The floodwall only sank down because piping had washed away the sand below This outcome of the calculations have changed the question: why did the uplift and instability in the North breach and the uplift and piping in South breach happen? to why aren t there more failures?. Is this because these two failures reduced the load on the rest of the floodwall? Probably it was, since the inundation of the area behind reduced the water levels in the canals and thus the load on the floodwalls. Furthermore, the effective stresses increased and therefore increased the strength of the subsoil. CONCLUSIONS There are several failure mechanisms that can cause a floodwall on permeable soils to fail. The London Avenue Canal breaches are a clear case study to investigate how the different mechanisms can contribute. Both breaches occurred due to high excess pores pressures in the sand below the flood defenses. It was concluded that the North breach occurred due to a lack of stability and the South breach occurred due to piping. This result is of importance for all other flood defenses on permeable soils, although is should never be forgotten that other failure mechanisms can contribute as well. The failures show that multiple failure mechanism may occur and since there are many flood defenses on permeable soils, the lessons from Katrina may be used to prevent future catastrophes world wide. In the Netherlands it is commonly thought that piping is mainly a problem during long lasting loads, hence during flood waves on rivers that last for days or weeks. The idea is that it takes quite some time for pore water pressures to build up and for the sand particles to be removed. The main attention for piping is therefore on river dykes. However, the London Avenue Canal South breach revealed that piping can occur very rapidly for specific conditions (uncovered permeably layers with small entrance resistance) as well. Besides, the London Avenue Canal North breach once again emphasized the importance of the stability under uplift mechanism. ILIT Independent Levee Investigation Team [2006]. Investigation of the Performance of the New Orleans Flood Protection Systems in Hurricane Katrina on August 29, 2005. Published at http://www.ce.berkeley.edu/~new_orleans/ IPET Interagency Performance Evaluation Taskforce [2006A]. Performance Evaluation of the New Orleans and Southeast Louisiana Hurricane Protection System. Published at https://ipet.wes.army.mil IPET Interagency Performance Evaluation Taskforce (2006B). Performance Evaluation of the New Orleans and Southeast Louisiana Hurricane Protection System VolV Appendix 1-10. Published at https://ipet.wes.army.mil Kanning, W., Van Baars, S., Van Gelder, P.H.A.J.M., Vrijling, J.K. [2007). Lessons from New Orleans for the design and maintenance of flood defence systems. Proc. ESREL 2007 Kolb, A. [1962]. Sturmflut 17. Februar 1962 - morphologie der deich- und flurbeschadiungen zwischen moorburg und cranz, University of Hamburg Nelson, S.A. [2006]. Personal images, http://www.tulane.edu/~sanelson/katrina/katrina_images.htm Sellmeijer, J.B. [1988]. On the mechanism of piping under impervious structures, PhD thesis Delft University of Technology TAW - Technical Advisory Committee on Water defenses. [1998]. Fundamentals on Water defences, published on http://www.tawinfo.nl/asp/uk.asp?documentid=112. TAW - Technical Advisory Committee on Water defenses [2002]. Technical Report on Sand Boils (Piping), published on http://www.tawinfo.nl/asp/uk.asp?documentid=112. Team Louisiana [2006]. The Failure of the New Orleans Levee System during Hurricane Katrina. Published at http://www.publichealth.hurricane.lsu.edu/teamla.htm USACE [1994). London Ave. Canal Parallel protection As-builts. Published at https://ipet.wes.army.mil. REFERENCES Burk & Associates, Inc [1986]. London Avenue Canal Floodwalls and Levees General Design Memorandum. Publishes at https://ipet.wes.army.mil ENW Expertise Network Water defenses [2006]. Infostroom. Published at http://www.tawinfo.nl/upload/enwinfostroom2digitaal.pdf FLORIS - Flood Risk and Safety in the Netherlands [2005]. Floris study - Full report. Published at www.projectvnk.nl Paper No. 2.72 9