Grant All-Detail Report 2013 Cost Share Base Grant

Similar documents
Grant All-Detail Report 2012 Cost Share Base Grant

Grant All-Detail Report Community Partners 2014

Native Buffer Cost Share - Ramsey (SWCD)

**Temporary Erosion Control**

Materials. Use materials meeting the following.

APPENDIX B WORKSHEETS & EXHIBITS

Woodford County Erosion Prevention Plan and Permit. Application #

Little Swan Lake. Dam Inspection & Siltation Study Prepared By: William Klingner, P.E., CFM October 28, 2018

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

TPDES: Soil, Erosion and Sedimentation Methods

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

What Is Water Erosion? Aren t they the same thing? What Is Sediment? What Is Sedimentation? How can Sediment Yields be Minimized?

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

CR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District

Template for Sediment and Erosion Control Plan General Instructions

Application of an Enhanced, Fine-Scale SWAT Model to Target Land Management Practices for Maximizing Pollutant Reduction and Conservation Benefits

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Lower Sunrise River Gully Stabilization Inventory

Overview of fluvial and geotechnical processes for TMDL assessment

Stone Outlet Sediment Trap

Fluvial Driven Alluvial Fans

Sediment Control Log (SCL)

Rapid Assessment of Stream Conditions Along Length (RASCAL) Protocol

APPENDIX A: EROSION & SEDIMENT CONTROL FORMS

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

December 11, 2006 File:

Culvert and Pipe Phasing

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012

The Yellow River Initiative: The Birth of a System Approach to Challenges Facing the Everglades of the North

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1.

Sustainable Methods for Reducing Shoreline Erosion

Sediment and Erosion Control Techniques on Stream Restoration Projects

LOGAN

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

Countermeasure Calculations and Design

Implementing a Project with 319 Funds: The Spring Brook Meander Project. Leslie A. Berns

Erosion and Sedimentation Basics

Local Conditions-NE Minnesota

Garner State Park Pavilion Preservation Study

NEWS RELEASE UNDER SECTION 404 OF THE CLEAN WATER ACT (33 USC 1344) ACTION NUMBER SPA ABQ

Science EOG Review: Landforms

David Coffman, M.S. & Becky Griffith, Ph.D. July 31, 2013

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013

Natural Shoreline Landscapes on Michigan Inland Lakes

TENNESSEE EROSION & SEDIMENT CONTROL HANDBOOK

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

Chris Lenhart, John Nieber, Ann Lewandowski, Jason Ulrich TOOLS AND STRATEGIES FOR REDUCING CHANNEL EROSION IN MINNESOTA

Spreadsheet Tools for Quantifying the Costs and Benefits of Two-Stage Channels

C. STUDENT FIELD DATA SHEETS

Patrick Baskfield. Scott Matteson. Minnesota Pollution Control Agency. Minnesota State University Water Resource Center

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

Soils in Minnesota Calcareous Fens

Chesapeake Bay Remote Sensing Pilot Executive Briefing

Delaware Bay Dikes Repair and Prevention Project Preliminary Design for New Castle Dikes

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

Aquifer an underground zone or layer of sand, gravel, or porous rock that is saturated with water.

Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018

Chapter 4 French Broad River Subbasin Including the: French Broad River, Little Ivy Creek (River), Ivy Creek, California Creek and Bull Creek

United States Department of the Interior NATIONAL PARK SERVICE Northeast Region

Island Design. UMRS EMP Regional Workshop. Presentation for the

STORMWATER MANAGEMENT REPORT

HYDROGEOLOGIC EVALUATION of REDUCED ISOLATION DISTANCE from WELL to WASTEWATER PIPING


NORTHUMBERLAND COUNTY, PA

CONSTRUCTION EXIT SEDIMENT BARRIER

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2

ONE ROCK DAM ORD. capture more sediment. The original ORD becomes the splash apron for the new layer. STEP 4: When ORD fills in, add a new layer

Standards for Soil Erosion and Sediment Control in New Jersey May 2012

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N2 Environmentally Sensitive Site Locations Map 81

Erosion and Deposition

APPENDIX B HYDROLOGY

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

4.0 WRIGHT PATMAN LAKE YIELD SCENARIOS

HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE

Texas Statewide Mesonet Network (TexMesonet) Dr. Kantave Greene 11/15/17

How does erosion happen?

Land and Water Summative Assessment. Name Date

Woodstock, Route 26 Stream Relocation Project

Monitoring of suspended sediment concentration in discharge from regulated lakes in glacial deposits

Data Collection and GIS Applications

MEMORANDUM FOR SWG

STRUCTURAL STABILITY ASSESSMENT

Learning Objectives: I can identify and interpret river flows and directions.

January 16, Re: Soo Line Dump Site 2018 Annual Soil Cover Inspection. Dear Mr. Nichols:

Roger Andy Gaines, Research Civil Engineer, PhD, P.E.

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610)

BANK EROSION AND HISTORICAL MORPHOLOGY STUDY OF THE MIDDLE KASKASKIA RIVER. Building Strong

Issues within the Sub-Watershed: Thief River

Illinois State Water Survey Division

Day 3 Weathering and Erosion.notebook. October 02, Section 7.2. Erosion and Deposition. Objectives

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N1 Environmentally Sensitive Site Locations Map 25

Limitation to qualitative stability indicators. the real world is a continuum, not a dichotomy ~ 100 % 30 % ~ 100 % ~ 40 %

DICKINSON COUNTY IOWA DICKINSON COUNTY EMERGENCY MANAGEMENT COMMISSION IOWA GREAT LAKES NO WAKE POLICY

Watershed Conservation Management Planning Using the Integrated Field & Channel Technology of AnnAGNPS & CONCEPTS

Stream Discharge and the Water Budget

Maggie Payne Jim Turenne

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

Transcription:

Grant All-Detail Report 2013 Cost Share Base Grant Grant Title - 2013 Cost Share Base Grant - Todd (SWCD) Grant ID - C13-2864 Organization - Todd SWCD Grant Awarded Amount $21,573.00 Grant Execution Date Required Match Amount $5,393.25 Grant 1/1/2020 Required Match % 25% Grant Day To Day Contact Budget Summary Budgeted Spent Balance Remaining Total Grant Amount $20,668.05 $15,365.89 $5,302.16 Total Match Amount $17,808.89 $16,215.45 $1,593.44 Total Other s $0.00 $0.00 $0.00 Total $38,476.94 $31,581.34 $6,895.60 Budget Details Last Activity Name Activity Source Type Source Budgeted Spent Transaction Date Brezinka Well Sealing Groundwater Current 2013 cost share base grant - $150.00 $150.00 8/6/2013 N todd (swcd) $150.00 $150.00 8/6/2013 Y Brezinka Well Sealing Groundwater Landowner Contributions Matching Report created on:1/21/14 Page 1 of 12

Activity Name Culbertson Shoreline Buffer Digmann Shoreline & Streambank Digmann Shoreline & Streambank FY13 CS Technicial Assistance and Administration Last Activity Source Type Source Budgeted Spent Transaction Date Agricultural Current 2013 cost share base grant - $0.00 N s todd (swcd) $6,930.00 $6,930.00 9/12/2013 N Streambank or Shoreline Protection Streambank or Shoreline Protection Technical/Engi neering Assistance Agricultural s Agricultural s Agricultural s Agricultural s Current Landowner Current Hagedorn Replacements Current Hagedorn Replacements Landowner Harvey Sediment s Current Harvey Sediment s Landowner Johnstone Shelterbelt Wind Erosion Current Johnstone Shelterbelt Wind Erosion Landowner Kellogg Riparian Herbaceous Agricultural Current Cover s Kellogg Riparian Herbaceous Agricultural Landowner Cover s Krause Well Sealing Groundwater Current Krause Well Sealing Groundwater Landowner Salber 2" Well Sealing Groundwater Current 2013 cost share base grant - todd (swcd) Contributions 2013 Cost Share Base Grant - Todd (SWCD) 2013 Cost Share Base Grant - Todd (SWCD) Contribuations 2013 Cost Share Base Grant - Todd (SWCD) Contribuations 2013 Cost Share Base Grant - Todd (SWCD) Contributions 2013 Cost Share Base Grant - Todd (SWCD) Contribuations 2013 Cost Share Base Grant - Todd (SWCD) Contribuations 2013 cost share base grant - todd (swcd) $2,310.00 $2,310.00 9/12/2013 Y $4,314.60 $3,073.19 12/12/2013 N $183.00 N $184.19 Y $0.00 N $0.00 Y $419.70 $419.70 6/13/2013 N $419.70 $419.70 6/13/2013 Y $3,702.75 N $1,234.25 Y $200.00 $200.00 12/12/2013 N $265.00 $265.00 12/12/2013 Y $157.50 $157.50 6/13/2013 N Report created on:1/21/14 Page 2 of 12 Matching

Last Activity Name Activity Source Type Source Budgeted Spent Transaction Date Salber 2" Well Sealing Groundwater Landowner $157.50 $157.50 6/13/2013 Y Contribuations Salber 4" Well Sealing Groundwater Current 2013 cost share base grant - $507.50 $507.50 6/13/2013 N todd (swcd) Salber 4" Well Sealing Groundwater Landowner FY13 Base Landowner $507.50 $507.50 6/13/2013 Y Contribuations Williamson Water & Sediment Agricultural Current 2013 cost share base grant - $3,928.00 $3,928.00 12/12/2013 N s todd (swcd) Williamson Water & Sediment Agricultural Federal Federal $6,464.81 $6,464.81 12/12/2013 Y s s Williamson Water & Sediment Agricultural Landowner FY13 Base Landowner $5,940.94 $5,940.94 12/12/2013 Y s Contribuations Zagaros Well Sealing Agricultural Current 2013 cost share base grant - $175.00 N s todd (swcd) Zagaros Well Sealing $175.00 Y Agricultural s Landowner Contribuations Matching Activity Details Summary Activity Details Total Action Count Total Activity Mapped Size / Unit 638 - Water and Sediment Control 1 1 3 COUNT 638 - Water and Sediment Control 1 0 1500 COUNT 351 - Well Decommissioning 3 1 0.16 LINEAR FEET 351 - Well Decommissioning 1 1 0.25 LINEAR FEET 638 - Water and Sediment Control 1 0 0.02 AC 380 - Windbreak/Shelterbelt Establishment 1 2 1.3 LINEAR FEET 638 - Water and Sediment Control 1 0 1328 LINEAR FEET 342 - Critical Area Planting 1 0 0.08 AC 350 - Sediment 1 0 6 COUNT 580 - Streambank and Shoreline Protection 1 1 0.033 AC Report created on:1/21/14 Page 3 of 12

Activity Details Total Action Count Total Activity Mapped Size / Unit 638 - Water and Sediment Control 1 0 187 COUNT Indicators Summary Indicator Name Total Value Unit SOIL (EST. SAVINGS) 85.97 TONS/YR SEDIMENT (TSS) 74.71 TONS/YR PHOSPHORUS (EST. REDUCTION) 94.86 LBS/YR Grant Activity Grant Activity - Brezinka Well Sealing Brezinka Well Sealing GROUNDWATER Tue Aug 06 00:00:00 CDT 2013 Activity Action - Well Sealing 351 - Well Decommissioning Count of Activities 1 Sealing of a sand point well Proposed Size / Units 0.16 LINEAR FEET Lifespan 10 Years Actual Size/Units 0.16 LINEAR FEET Installed Date 10-Jul-13 Report created on:1/21/14 Page 4 of 12

Grant Activity - Culbertson Shoreline Buffer Frank Culbertson AGRICULTURAL PRACTICES This project has been canceled per landowner's request. Grant Activity - Digmann Shoreline & Streambank Digmann Shoreline & Streambank This contract had an amendment for additional funds. STREAMBANK OR SHORELINE PROTECTION Activity Action - Shoreline Stabilization 580 - Streambank and Shoreline Protection Count of Activities 1 Shoreline was stabilized with a combination of cedar revetments and rock riprap to allow for boat lift removal. Slope area of 1450 SF was planted with native vegetation. Proposed Size / Units 0.033 AC Lifespan 15 Years Actual Size/Units 0.033 AC Installed Date 28-Aug-13 Final Indicator for Shoreline Stabilization Indicator Name SOIL (EST. SAVINGS) Value 6.97 Indicator Subcategory/Units WATER POLLUTION (REDUCTION ESTIMATES) TONS/YR Calculation Tool BWSR CALC (STREAM & DITCH STABILIZATION) Waterbody Big Swan Final Indicator for Shoreline Stabilization Indicator Name PHOSPHORUS (EST. REDUCTION) Value 6.86 Indicator Subcategory/Units WATER POLLUTION (REDUCTION ESTIMATES) LBS/YR Calculation Tool BWSR CALC (STREAM & DITCH Report created on:1/21/14 Page 5 of 12

Waterbody Big Swan Final Indicator for Shoreline Stabilization STABILIZATION) Indicator Name SEDIMENT (TSS) Value 7.71 Indicator Subcategory/Units WATER POLLUTION (REDUCTION ESTIMATES) TONS/YR Calculation Tool BWSR CALC (STREAM & DITCH STABILIZATION) Waterbody Big Swan Grant Activity - FY13 CS Technicial Assistance and Administration These funds will be utilized for technicial assistance on projects that use the 2013 State Cost Share funds. Todd County Soil & Water predicts they will utilize approx. $4,314.60 for Technicial Assistance and Administration. TECHNICAL/ENGINEERING ASSISTANCE 1-13: Johnstone-Shelterbelt $104.93; 3-13 Salber-Well Sealing $39.38; 4-13 Salber-Well Sealing $126.88; 7-13 George Brezinka-Well Sealing $37.50 Grant Activity - Hagedorn Replacements Hagedorn Replacements AGRICULTURAL PRACTICES Report created on:1/21/14 Page 6 of 12

Grant Activity - Harvey Sediment s Harvey Sediment s Landowner cancelled contract AGRICULTURAL PRACTICES Grant Activity - Johnstone Shelterbelt Row 1: 145 Lilac Row 2: 50 Silver Maple Row 3: 60 Norway Pine Row 4: 60 Norway Spruce Row 5: 60 White Spruce WIND EROSION 14-May-13 Thu May 16 00:00:00 CDT 2013 This windbreak consisted of 5 rows shrubs, hardwoods and conifers a total of 335, planted in 570 foot long rows, by the landowner. Planting included 1.3 acres of site prep. Activity Action - Shelterbelt 380 - Windbreak/Shelterbelt Establishment Count of Activities 1 Proposed Size / Units 1.3 LINEAR FEET Lifespan 10 Years Actual Size/Units 1.3 LINEAR FEET Installed Date 16-May-13 Report created on:1/21/14 Page 7 of 12

Grant Activity - Kellogg Riparian Herbaceous Cover Kellogg Riparian Herbaceous Cover AGRICULTURAL PRACTICES Grant Activity - Krause Well Sealing Krause Well Sealing GROUNDWATER Activity Action - Well Sealing 351 - Well Decommissioning Count of Activities 1 Sealed an abandoned well Proposed Size / Units 0.16 LINEAR FEET Lifespan 10 Years Actual Size/Units 0.16 LINEAR FEET Installed Date 6-Nov-13 Grant Activity - Salber 2" Well Sealing Salber 2" Well Sealing GROUNDWATER Report created on:1/21/14 Page 8 of 12

Activity Action - Well Sealing 351 - Well Decommissioning Count of Activities 1 2" Well Sealing Proposed Size / Units 0.16 LINEAR FEET Lifespan 10 Years Actual Size/Units 0.16 LINEAR FEET Installed Date 7-May-13 Grant Activity - Salber 4" Well Sealing Salber 4" Well Sealing GROUNDWATER Activity Action - Well Sealing 351 - Well Decommissioning Count of Activities 1 4" Well Sealing Proposed Size / Units 0.25 LINEAR FEET Lifespan 10 Years Actual Size/Units 0.25 LINEAR FEET Installed Date Grant Activity - Williamson Water & Sediment Williamson Water & Sediment AGRICULTURAL PRACTICES 16-Jul-13 Fri Nov 15 00:00:00 CST 2013 This project consisted of (3) sediment basins, 1,328 ft. of subsurface tile with intakes and outlets,.8 ac. of critical area seeding,.2 ac. of mulching, 194 ft. of silt fence (2) rock rip rap lined outlets and 1,500 sq. ft. of erosion control blanket. Report created on:1/21/14 Page 9 of 12

Activity Action - Sediment s 350 - Sediment Count of Activities 7 Eliminate this 6 count activity Proposed Size / Units 6 COUNT Lifespan 10 Years Actual Size/Units 6 COUNT Installed Date 15-Nov-13 Final Indicator for Sediment s Indicator Name SOIL (EST. SAVINGS) Value 79 Indicator Subcategory/Units WATER POLLUTION (REDUCTION ESTIMATES) TONS/YR Calculation Tool BWSR CALC (SHEET AND RILL) Waterbody Osakis Lake Final Indicator for Sediment s Indicator Name SEDIMENT (TSS) Value 67 Indicator Subcategory/Units WATER POLLUTION (REDUCTION ESTIMATES) TONS/YR Calculation Tool BWSR CALC (SHEET AND RILL) Waterbody Osakis Lake Final Indicator for Sediment s Indicator Name PHOSPHORUS (EST. REDUCTION) Value 88 Indicator Subcategory/Units WATER POLLUTION (REDUCTION ESTIMATES) LBS/YR Calculation Tool BWSR CALC (SHEET AND RILL) Waterbody Osakis Lake Activity Action - Sediment basins with tile, intakes and outlets 638 - Water and Sediment Control Count of Activities 7 Proposed Size / Units 3 COUNT Lifespan 10 Years Actual Size/Units 3 COUNT Installed Date 15-Nov-13 Activity Action - Williamson critical area seeding 342 - Critical Area Planting Count of Activities 7 basin dikes top and side slopes and two areas of critical area seeding. Proposed Size / Units 0.07 AC Lifespan 10 Years Actual Size/Units 0.08 AC Installed Date 15-Nov-13 Report created on:1/21/14 Page 10 of 12

Activity Action - Williamson tile 638 - Water and Sediment Control Subsurface tile for sediment basins outlet Count of Activities 7 Proposed Size / Units 1350 LINEAR FEET Lifespan 10 Years Actual Size/Units 1328 LINEAR FEET Installed Date 15-Nov-13 Activity Action - Williamson mulching 638 - Water and Sediment Control Mulching for dike tops and side slopes, anchored. Count of Activities 7 Proposed Size / Units 0.02 AC Lifespan 10 Years Actual Size/Units 0.02 AC Installed Date 15-Nov-13 Activity Action - Williamson lined outlet 638 - Water and Sediment Control 2 rip rap rock lined outlets Count of Activities 7 Proposed Size / Units 172 COUNT Lifespan 10 Years Actual Size/Units 187 COUNT Installed Date 15-Nov-13 Activity Action - Williamson erosion control blanket 638 - Water and Sediment Control Erosion control blanket for the NE. outlet. Count of Activities 7 Proposed Size / Units 1200 COUNT Lifespan 10 Years Actual Size/Units 1500 COUNT Installed Date 15-Nov-13 Report created on:1/21/14 Page 11 of 12

Grant Activity - Zagaros Well Sealing Zagaros Well Sealing AGRICULTURAL PRACTICES Grant Attachments Document Name Document Type grant_app_general-added.rpt Grant 2013 Cost Share Base Grant - Todd (SWCD) Report created on:1/21/14 Page 12 of 12