More growth at Wa Gold Project as Julie-Collette resource increases to 410,700 ounces

Similar documents
New zones of mineralisation found close to flagship deposits at Wa Gold Project

24 October Dear Shareholders, 2014 ANNUAL REPORT

New Drilling Program Commences at Mutiny s Deflector Deposit

Highlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate

RC drilling begins at Akoko Project marking commencement of 2010/11 exploration field season

ASX ANNOUNCEMENT 21 MARCH 2011

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project

Co-O MINE MINERAL RESOURCE UPDATE

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

High Grade Gold Drill Results Extend Buccaneer

Haoma Mining NL DALTONS-MT WEBBER DEPOSIT; UPGRADE TO INDICATED RESOURCE CATEGORY FOR MAIN SOUTHERN ZONE

Rock chip sampling confirms high grade quartz vein 500m long and up to 20m wide

For personal use only

Option agreement with Randgold set to commercialise Massigui Gold Project

ASX RELEASE / MEDIA RELEASE 2,810 ppb gold in shallow auger samples Four new parallel zones defined up to 1500m in strike

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS

BUNDARRA RESOURCE UPDATE

FIVE RIGS DRILLING AT KARLAWINDA

For personal use only

Initial Gold Resource at Sissingue Tengrela Project (Ivory Coast)

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

For personal use only

QUEEN SHEBA - RESOURCE TABLE: AUGUST 2011 RESOURCE CATEGORY. Tonnes Au Ag Cu (000) g/t g/t % GLOBAL RESOURCE TABLE: CONTAINED METAL

For personal use only

New area of extensive artisanal gold workings discovered on Wa Project

For personal use only

76,000 Ounce Gold Resource at Akoko North

Developing the +1.2Moz Pilbara Gold Project

Disclaimer. Forward-Looking Statements. Competent Person s Statement

For personal use only

KINGSTON RESOURCES LIMITED

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

704,000 OUNCE MIYABI GOLD PROJECT UPDATE

New High Grade Lode Discovered at Wagtail South

Significant New Gold Discovery along Kandia Trend

HIGHLY SUCCESSFUL SEISMIC SURVEY DOUBLES SIZE OF DEEP PALAEOVALLEY AT LAKE WELLS POTASH PROJECT

For personal use only

EXPLORATION SUCCESS AT COYOTE GOLD MINE

ASX/Media Announcement

TWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT

CANYON TO ACQUIRE TWO GOLD PROJECTS IN BURKINA FASO Highlights

Diamond Drilling Extends the Netiana Lodes at Depth

» Mineralisation up to 45m wide and open along strike and down dip. Infill and extensional drilling completed. Results awaited.

For personal use only

March 26 th Expansive Exploration Target Defined at Leonora Gold Project

Maiden Kandia Gold Resource of 107,500 Ounces

New Zone of High Grade Gold Discovered at Balogo

Ovoot Coking Coal Project (100%)

Auger Drilling Progress Report - Moktedu Trend Prospect 5km Gold Trend Confirmed Along Strike from 3.5Moz Deposit

New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead.

Ausgold awarded EIS grant for Jinkas deep drilling

Castle Minerals Limited ASX: CDT

For personal use only

Investor Presentation Africa Mining & Investment Conference - Sydney March ASX: CDT

ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April

Auger Drilling Progress Report - Meguet Trend Prospect Multiple Highly Anomalous Gold Discoveries within 8km Mineralised Corridor

For personal use only

For personal use only

LATEST RESULTS FROM RC DRILLING

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

Malachite Resources Limited ABN

ASX announcement. Mylo-Frontier Pilbara Gold Project acquisition. 27 November Summary

FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT

High Grade Gold Results from RAB Drilling at the Central Bore Prospect

MARCH 2010 QUARTERLY REPORT

For personal use only

PEAK HILL IRON PROJECT MAIDEN DSO INFERRED MINERAL RESOURCE

High Grade Gold Intercepts at Bangaba

For personal use only

Exploring the Largest Landholding in Ghana Stars in Resources 2011 Series Sydney October 2011

ASX and Media Release

Hann Prospect New Gold Discovery Confirmed

Exploration Update: RC Drilling Commenced at Lucky Strike

Caravel commences major new drilling program at Calingiri copper-molybdenum project 8,500-9,000m of RC drilling planned across multiple targets

For personal use only

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

ASX announcement 16 May 2016

Investor Presentation February A Year of Discovery

For personal use only

More High Grade Gold Intercepts from the Netiana Lodes at Balogo, Burkina Faso

SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT

Drill testing of gold zones at Albury Heath intersect impressive quartz lodes

Maximising Gold Resources in Senegal

EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT

FOCUS MINERALS REPORTS ENCOURAGING FIRST ROUND RESULTS FROM COOLGARDIE NEAR MILL PROGRAMME

For personal use only

ASX Announcement. Bulletin grows resource base and tenement position

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development

ASX Announcements & Media Release

Deep Yellow Revises Resource Estimate at INCA Uranium Deposit in Namibia

For personal use only

P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT

Sepola Project Area in Mali Extended

High-grade Copper and Gold Discovered at Productora

For personal use only

Transcription:

ASX / Media Release ASX Code AZM Friday 10 th September 2010 More growth at Wa Project as Julie-Collette resource increases to 410,700 ounces Further rise expected www.azumahresources.com.au Investment Highlights: 1.2Moz gold JORC Code reported Mineral Resource at Wa Project, NW Ghana 100% of 3,100km 2 licences hosting over 150km of prospective Birimian greenstone belt. Less than 10% explored Feasibility Study underway for multi-pit 1.0Mtpa mining and gravity / CIL operation Large pipeline of drill-ready targets Aggressive multi-rig exploration programs focused on resource inventory increase Board and management team of successful explorers, mining and corporate professionals Issued Capital: 214.40M ord. shares 12.50M unlisted options Directors & Management: Contact: Chairman: Michael Atkins Managing Director: Stephen Stone Non-Executive Director: Geoff M Jones Project Study Manager: Alan Thompson Company Secretary: Dennis Wilkins Stephen Stone Mb: +61 (0) 418 804 564 Tel: +61 (0)8 9486 7911 stone@azumahresources.com.au Julie-Collette resource upgraded by 60,600oz after inclusion of Collette Mineral Resource Julie-Collette mineralisation open in all directions 85% of resource above 70m vertical depth Further resource upgrade for Julie-Collette expected on back of strong drilling results at Julie not included in latest estimation Azumah Resources (ASX:AZM) is pleased to report that Mineral Resources in the Julie-Collette district within its Wa Project in Ghana have increased by 60,600oz to 410,700oz (Tables 1 and 2. Figures, 2 and 3). The latest figure includes drilling results from the Collette deposit but excludes recent strong drilling results from Julie that fall outside of the current resource block model. These are expected to underpin a further resource increase early next year. Azumah Managing Director Stephen Stone said the latest Mineral Resource estimate highlighted the gold endowment of the Julie-Collette region and provides more evidence that the Wa Project is well on track to establish a long term gold operation in Ghana s emerging north west gold province. The Collette Inferred JORC Reported Mineral Resource estimate of 909,000t at 2.07g/t gold (1.0g/t gold cut off) was undertaken by Perth based independent geological consultants, CSA Global Pty Ltd. It was determined to a maximum depth of 120m with 85% of the resource occurring above 70m depth. Mineralisation at Collette occurs within a complex of moderately dipping sheeted quartz veins within a persistent 4km east-west structural corridor hosted by Birimian sediments and remains open at depth and in all other directions. Azumah intends to recommence drilling to expand the resources at Julie and Collette once the current seasonal rains have ceased in early October. Exploration in the area will benefit considerably from recently acquired high resolution aeromagnetic and radiometric survey data. Page 1 of 6

Table 1: Collette Prospect: JORC Reported Mineral Resource Estimate Category Cut-Off (Au g/t) (Au g/t) Contained Ounces Au Inferred >1g/t 909,000 2.07 60,600 Azumah acquired the Julie, Collette and Josephine licences from Crew Corporation ( Crew ) 15 months ago. Following the recent satisfaction of all conditions precedent relating to the transfer of the licences to Azumah, the Company will shortly issue a second tranche of 6.0M new shares to Crew as final payment for the three licences. Contact: Stephen Stone Paul Armstrong Managing Director Read Corporate Tel: +61 (0)418 804564 Tel: +61 (0)419 992 9046 stone@azumahresources.com.au paul@readcorporate.com.au Table 2: Wa Project Summary JORC Reported Mineral Resource Estimates By Prospect Prospect Indicated Inferred Total g/t Contained Ounces g/t Contained Ounces g/t Contained Ounces Kunche 4,900,000 2.0 318,000 3,600,000 1.7 198,000 8,500,000 1.9 516,000 Bepkong 1,040,000 2.5 82,000 1,930,000 2.1 130,000 2,970,000 2.2 212,000 Julie 3,438,000 2.2 246,000 1,489,000 2.2 104,000 4,927,000 2.2 350,100 Collette 909,000 2.1 60,600 909,000 2.1 60,600 Atikpi 350,000 1.4 15,500 350,000 1.4 15,500 Yagha 270,000 1.2 10,800 270,000 1.2 10,800 Total 9,378,000 2.1 646,000 8,548,000 1.9 518,900 17,926,000 2.0 1,165,000 1. Kunche Mineral Resource estimation quoted for blocks with a grade greater than 1.0g/t gold. Refer ASX release September 2006. Estimation completed by Runge Limited (previously Resource Evaluations Ltd) in September 2006. 2. Bepkong, Atikpi and Yagha Mineral Resource estimations quoted for blocks with a grade of greater than 0.8 g/t gold. Estimation completed by CSA Global Pty Ltd in August 2008. 3. Julie Mineral Resource estimate quoted for blocks with a grade greater than 1.0g/t gold. Estimation completed by CSA Global Pty Ltd in March 2010. 4. Collette Mineral Resource estimate quoted for blocks with a grade greater than 1.0g/t gold. Estimation completed by CSA Global Pty Ltd in September 2010. 5. Details of the Bepkong, Atikpi and Yagha Mineral Resource estimations appear in ASX release dated 4 th September 2008. 6. Details of the Julie Mineral Resource estimation appear in ASX release dated 24 th March 2010. 7. Details of the Collette Mineral Resource estimation appear in ASX release dated 10 th September 2010. 8. Differences may apply due to rounding errors Page 2 of 6

Figure 1: Azumah s Extensive Licence Position in Ghana s Emerging North West Province Figure 2: Julie, Collette, Kjersti and Josephine Prospects Page 3 of 6

Figure 3: Collette Prospect Latest RC and Aircore Drilling Intercepts Page 4 of 6

Appendix 1: Collette Resource Estimation Parameters The Collette Mineral Resource estimate has been compiled and prepared by Mr. David Williams (MAusIMM, MAIG) of CSA Global Pty Ltd who is a Competent Person as defined by the Australasian Code for the reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code) 2004 Edition and who consents to the inclusion in this report of the matters based on the information in the form and context in which it appears. The CSA Mineral Resource was estimated within constraining wireframe solids based on a nominal lower cut-off grade of 0.5g/t Au. The resource is quoted from blocks above the specified 1g/t Au cut-off grade. Azumah supplied all geological and sampling data and provided technical and geological support to CSA during the resource modelling process. CSA imported the supplied drillhole data to Datamine Studio 3 software and proceeded with the modelling in the Datamine extended precision environment. 255 RC drillholes were used in the resource estimate for a total length of 17,165m. A further 1,375m of trench samples were used to assist wireframe interpretation, but were not used in the estimation process. Approximately 200 drillholes had incorrect elevations. These were corrected by projecting each drillhole to the topography surface. Wireframe solids were generated based on sectional interpretations provided by CSA and reviewed by Azumah to delineate the zones of gold mineralisation. A nominal lower Au cut-off of 0.5g/t over 2m minimum width was used to define the mineralised envelopes. A total of 41 mineralised zones were defined. Of these, 9 wireframes based on a single drillhole intersection located outside the main mineralised corridor have been excluded from the Mineral Resource estimate. The interpreted mineralised zones consist of extensions to previously modelled zones and newly defined zones based on the new drilling and the nominal 0.5g/t Au cut off. The updated mineralised zones occur over a strike length of 2.5km. Drillhole samples were flagged according to the mineralised zone they were located in based on the wireframes created. 810 samples were selected within the mineralised zones. The number of samples within each domain varied from 2 to 111. Flagged samples were composited to 1m length. A top cut of 21g/t Au was applied to the composited drillhole file, based on a detailed statistical analysis of the data. The wireframe surface supplied by Azumah representing the top of fresh rock did not reflect the depth of fresh rock in the later drilling. A new wireframe was created to represent the top of fresh rock based on the first downhole occurrence of fresh rock in the drillhole file. This surface was then used to flag density in the model values of 2.00, 2.40 and 2.79 were applied respectively to oxide, transitional and fresh rock. Due to the low number of flagged samples in many of the mineralised domains and the large distance between sample locations at opposite ends of the deposit, samples were selected from 9 neighbouring mineralised zones at the eastern end of the deposit which also contained greater than 20 samples. This gave a data set of 444 samples which was used for variography. Variograms were modelled using the data from the subset of mineralised zones described above. A single variogram model was applied to all zones for ordinary kriging. A volume block model was constructed, with coded blocks based on the mineralised wireframes in the same fashion to the drillhole flagging. Blocks were also coded on density based on the fresh rock surface. The block contained parent block sizes of 25m x 5m x 10m (X, Y, Z) with subcells down to 2.5m x 1m x 1m. Ordinary Kriging (OK) was used to estimate grades into the parent blocks for Au with an Inverse distance to the power of 2 (IDS) estimate also used as part of the cross check validations of the OK estimate. Search ellipses were created based on the ranges and orientations derived from the variography with the search ellipse doubled and then tripled for the second and third search passes. A minimum of 8 samples and a maximum of 40 samples were used to estimate the sample grades into each block for the first 2 passes. The minimum number of samples was reduced to 2 for the third search pass. A maximum of 5 samples from any one drill hole were used per block estimate, with cell discretisation of 5 x 1 x 2 (X x Y x Z), and no octant based searching utilised. The results of the grade estimation were validated by means of visual comparison along sections, statistical analysis and trend plots comparing the estimated block grades and the drill hole sampling grades. The resource model was depleted in the vicinity of 605840E to an average depth of 4m based on survey data of artisanal workings, which have since been backfilled. The resulting model depletion amounted to approximately 8,200 tonnes at 2.4g/t Au. Page 5 of 6

The Mineral Resource extends to approximately 120m below surface with approximately 85% of the tonnage to a depth of 70m below surface. The Mineral Resource was classified as Inferred, based on current drill coverage and confidence in geological and grade continuity. Competent Persons Statement The information in this report that relates to Exploration Results is based on information compiled by Mr Stephen Stone. Mr Stone is the Managing Director of Azumah Resources Limited. Mr Stone is a Member of The Australasian Institute of Mining and Metallurgy and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Stone consents to the inclusion in the report of the matters based on information in the form and context in which it appears. The information in this report that relates to in-situ Mineral Resource estimates for Bepkong, Collette, Yagha and Atikpi is based on information compiled by Mr David Williams, an employee of CSA Global Pty Ltd, geological consultants. Mr Williams is the competent person for the Bepkong, Yagha and Atikpi estimates and takes overall responsibility for these. Mr Williams is a Member of The Australasian Institute of Mining and Metallurgy and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Williams consents to the inclusion in the report of the matters based on information in the form and context in which it appears. The information in this report that relates to in-situ Mineral Resource estimate for Julie is based on information compiled by Mr Stephen Hodgson, an employee of CSA Global Pty Ltd, geological consultants. Mr Hodgson is the competent person for the Julie estimate and takes overall responsibility for this. Mr Hodgson is a Member of The Australian Institute of Geoscientists and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Hodgson consents to the inclusion in the report of the matters based on information in the form and context in which it appears. The information in this presentation that relates to Mineral Resources at the Kunche Project is based on a resource estimate that has been audited by Mr Paul Payne, who is a full time employee of Runge Limited. Mr Payne is a Member of The Australasian Institute of Mining and Metallurgy and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Payne consents to the inclusion in the presentation of the matters based on information in the form and context in which it appears. Forward Looking Statement Statements regarding plans with respect to the Company s mineral properties are forward-looking statements. There can be no assurance that the Company s plans for development of its mineral properties will proceed as currently expected. There can also be no assurance that the Company will be able to confirm the presence of additional mineral deposits, that any mineralisation will prove to be economic or that a mine will successfully be developed on any of the Company s mineral properties. All notes pertaining to the Kunche Mineral Resource estimation of September 2006, the Bepkong Mineral Resource estimation of September 2008, the Atikpi and Yagha Mineral Resource estimation of September 2008, the Julie Mineral Resource estimation of March 2010 and the Collette Mineral Resource estimation of September 2010 can be viewed at www.azumahresources.com.au Page 6 of 6