African Barrick Gold plc (the Company or ABG ) Drilling Success Leads to Significant Resource Expansion at Nyanzaga

Similar documents
African Barrick Gold plc (the Company or ABG ) Final Condition for Acquisition of Aviva Mining Kenya Ltd Satisfied

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE

Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project

New Drilling Program Commences at Mutiny s Deflector Deposit

ASX ANNOUNCEMENT 21 MARCH 2011

Table 1 Updated Mineral Resource Tabulation for the Vertikalny Deposits of the Mangazeisky Property. Contained Metal Ag (koz)

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

NEWS RELEASE. Helio Announces Updated Mineral Resource Estimate at SMP Gold Project, Tanzania.

V Sample from C.O.D vein 15 metres southwest of V

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

Acacia Mining plc LSE:ACA. ( Acacia or the Company ) Maiden high-grade Resource declared at West Kenya Project

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

For personal use only

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

Probe Metals Continues to Expand Gold Zones At Val-d Or East

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project.

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

MINERAL RESERVE AND MINERAL RESOURCE STATEMENT PROVEN AND PROBABLE MINERAL RESERVES

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

Form F3 MATERIAL CHANGE REPORT

Replacement: Material Increase to Tuzon Resource

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

MARCH 2012 QUARTERLY REPORT. Highlights. Exploration Activities. Wyloo Iron Ore & Gold Project. Fast Facts

IAMGOLD REPORTS HIGH-GRADE DRILL INTERSECTIONS FROM ITS 2017 DRILLING PROGRAM ON THE DIAKHA DEPOSIT, SIRIBAYA PROJECT IN MALI

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

Prophecy: Pacamayo, Paca North and El Abra Return Anomalous Silver, Zinc, Lead and Antimony Assay Results

704,000 OUNCE MIYABI GOLD PROJECT UPDATE

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

EXPLOR INTERSECTS MULTIPLE COPPER ZONES GRADES UP TO 3.65% CU OVER 5.35 METERS ON THE CHESTER COPPER PROPERTY

Table 1: Mineral Resources at Costerfield, Inclusive of Mineral Reserves as of December 1, 2018 and December 31, 2017.

GoviEx completes acquisition of African Energy s Zambian uranium assets

PRESS RELEASE. Banro Increases Oxide and Free-milling Ounces of Gold by 45%

MINERAL RESERVE AND MINERAL RESOURCE STATEMENT

INFILL DRILLING EXPANDS MINERALIZATION IN HIGH-GRADE GOLD-COPPER CORE AT SOUTHWEST DISCOVERY ZONE TURQUOISE HILL PROJECT, MONGOLIA

Drill testing of gold zones at Albury Heath intersect impressive quartz lodes

Toronto, Canada March 4, 2013

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

Mineral Resource Estimate Comparison at 3 g/t Au cut-off

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION

Fortuna Updates Reserves and Resources

GOLD REACH (GRV) ANNOUNCES A 141% INCREASE IN INDICATED AND 91% INCREASE IN INFERRED RESOURCES AT SEEL

For personal use only

ASANKO GOLD ANNOUNCES ENCOURAGING INITIAL DRILL RESULTS FROM NEW EXPLORATION TARGET

Mineral reserves and resources

Bass Metals records further positive drill results & progress at 3 prospects.

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

Fission s Initial Resource Totals at PLS: 79.6M lbs Indicated and 25.9M lbs Inferred

ASX announcement 16 May 2016

555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M June 13, 2017 SBB NR SBB TSX

Fission Increases Indicated Resource; Doubles Inferred Resource

Sept 20, 2012 TSX Venture Exchange Tier 1 Trading Symbol: OK

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DRILL RESULTS AND UPDATED RESOURCE FROM BLACKWATER HIGH-GRADE GOLD PROJECT

ATLANTIC GOLD ANNOUNCES MINERAL RESOURCE ESTIMATES FOR FIFTEEN MILE STREAM AND COCHRANE HILL DEPOSITS, NOVA SCOTIA

Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

Goldplay President and CEO Marcio Fonseca commented

Asiamet Drilling Further Extends BKM Mineralisation

La Negra Ag Diatreme Breccia Pipe Promontorio IV Concession, Sonora, MX

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

News Release. Infill Drilling Program

Northern Dynasty Minerals Ltd.

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

NEWS RELEASE August 10, 2017

Xtra-Gold Announces Initial NI Resource Estimate at its Kibi Gold Project in Ghana, West Africa

Ausgold awarded EIS grant for Jinkas deep drilling

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

Surface Trenching Highlights. Santos Target. To (m) Width (m) Au (g/t) Comment. (m) Santos (1)-includes internal dilution

EXPLORATION NEWS RELEASE MAGISTRAL DISTRICT: MORE GROWTH, MORE GOLD, MORE SILVER

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

COKAL ANNOUNCES POSITIVE RESULTS FROM SCOPING STUDY OF UNDERGROUND MINING AT BBM COAL PROJECT INDONESIA

LUNA GOLD INCREASES MEASURED AND INDICATED RESOURCES TO 3.63 MILLION OUNCES AND INFERRED RESOURCES TO 1.04 MILLION OUNCES AT AURIZONA

Ulysses: Genesis of a significant new underground gold mine near Leonora, WA. Michael Fowler, Managing Director. 22 February 2018

Orezone s Bomboré Gold Project Reaches World Class Size

News Release TSX:RMX NYSE AMEX:RBY November 29, 2010

Transcription:

27 th January 2012 African Barrick Gold plc (the Company or ABG ) Drilling Success Leads to Significant Resource Expansion at Nyanzaga 3.5Moz Au Indicated and 0.6Moz Au Inferred ABG is pleased to announce a significant uplift to the previously declared Mineral Resource estimate for the Tusker deposit at the Nyanzaga Project. This increases our confidence that the project, which comprises the Tusker and Kilimani deposits, has the potential to be our next mine in Tanzania. The updated in-pit resource is in excess of 4Moz Au, consisting of 3,481Koz at 1.47g/t Au Indicated and 598Koz at 2.05g/t Au Inferred. This represents a fourfold increase on the previously declared resource of 313Koz Indicated and 650Koz Inferred, and is another highly encouraging step in the Company s overall strategy of realising the potential of its existing portfolio of high quality assets. Since acquiring 100% of the Nyanzaga Project in May 2010, ABG has undertaken an extensive step-out and infill drilling programme at both the Tusker and Kilimani deposits with the aim of extending mineralisation on the northern, western and southern domains of the project. A total of 91,537 metres have been drilled at the project since May 2010, representing an investment of $21.7 million. This highly successful programme has extended the known gold mineralisation and delineated additional resources closer to surface. The drilling has also identified the potential for further higher grade resource extensions at depth and as a result we are initiating preliminary studies to assess the potential for underground mining. Further exploration is scheduled to commence later in the current quarter with the objective of defining the resources at depth at Tusker. At the same time, the scoping study for the project continues, with the current work programme focusing on detailed geotechnical and metallurgical drilling and modelling across the potential Tusker pit area, infrastructure trade-off studies, environmental and social baseline studies and licensing for the project. It is estimated that the scoping study will be completed by late Q1 or early Q2 2012. We will provide a further update on the Nyanzaga Project as part of our 2011 preliminary results in February and aim to communicate the initial resource for the Kilimani deposit at that point, which could further add to the overall potential of the project. Commenting on the expanded Mineral Resource at Nyanzaga, CEO Greg Hawkins said: This confirmation of the potential scale of the Nyanzaga project represents an extremely important step in the development of ABG as one of the leading gold companies in Africa and underpins our confidence in the future growth potential of the Company. We already operate three of the continent s foremost gold mines and this is evidence of the potential for Nyanzaga to be a fourth.

The following table details the in-pit Mineral Resources, which have been developed and are reported in accordance with Canadian National Instrument 43-101. Table 1: Mineral Resource Estimation for the Tusker Deposit Indicated Inferred Tonnes (Mt) Au (g/t) Ounces (Moz) Tonnes (Mt) Au (g/t) Ounces (Moz) Oxide 2.59 1.47 0.122 Transitional 0.84 1.51 0.041 Sulphide 70.45 1.47 3.318 9.06 2.05 0.598 Total 73.88 1.47 3.481 9.06 2.05 0.598 (1) ABG owns 100% of the prospecting licences encompassing the Tusker resource area through wholly owned Tanzanian subsidiaries (2) Estimated at a 0.4g/t Au cut-off (3) Base case gold price of $1,400 per ounce and an estimated recovery of 86% (4) Totals may not add due to rounding (5) Mineral resources that are not mineral reserves have not demonstrated economic viability (6) See Note to mineral resource estimates at the end of this release for information on the calculation of mineral resources estimates and definitions. The following table provides a breakdown of the in-pit Mineral Resources at varying cut-off grades. Table 2: Mineral Resource Estimation for the Tusker Deposit Indicated Inferred Cut-off (g/t) Tonnes (Mt) Au (g/t) Ounces (Moz) Tonnes (Mt) Au (g/t) Ounces (Moz) 0.40 73.88 1.47 3.48 9.06 2.05 0.60 0.75 57.81 1.70 3.16 6.29 2.50 0.51 1.00 43.02 1.98 2.74 4.97 2.93 0.47 1.50 24.33 2.57 2.01 3.24 3.84 0.40 2.00 14.20 3.17 1.45 2.59 4.38 0.36 2.50 8.44 3.82 1.04 2.03 4.98 0.32 3.00 5.64 4.36 0.79 1.54 5.70 0.28 (1) ABG owns 100% of the prospecting licences encompassing the Tusker resource area through wholly owned Tanzanian subsidiaries (2) Base case gold price of $1,400 per ounce and an estimated recovery of 86% (3) Totals may not add due to rounding (4) Mineral resources that are not mineral reserves have not demonstrated economic viability (5) See Note to mineral resource estimates at the end of this release for information on the calculation of mineral resources estimates and definitions. About the Nyanzaga Project The Nyanzaga Project is located within the Sengerema District, Mwanza region, approximately 35km northeast of the Bulyanhulu mine and is comprised of the Tusker and Kilimani deposits and numerous regional exploration prospects. Nyanzaga lies on the northeastern flank of the Sukumaland Archaean Greenstone Belt consisting of a granite-greenstone terrain. The Nyanzian greenstone system consists mainly of mafic volcanic rocks and immature sediments typical of greenstone belts of the central Congo Craton. The rocks are divided into a lower and upper series. Lower series primarily basalt, andesite and dacite pillow lavas. Sediments include banded iron formations, re-crystallised chert, shale and some conglomerate. Upper series felsic lavas, tuffs, ferruginous cherts and banded iron formations.

The greenstones are generally metamorphosed to greenschist facies and they are folded about steeply dipping axial planes. The interpreted geological sequence appears largely consistent down dip and along strike. Host lithologies for gold mineralisation in the Tusker deposit are predominantly chert and sandstone units of the upper series of the Nyanzian, associated with stockwork quartz, and quartz-carbonate vein arrays. Mineralised veins appear to have no preferred orientation with late stage silica veining and breccias assaying higher than average gold grades for the bulk of the deposit. The Tusker mineralised system displays extensive and strong carbonate alteration that extends well beyond the gold mineralisation, with silica-carbonate-pyrite-pyrrhotite-arsenopyrite alteration associated with zones of gold mineralisation. Figure 1 below shows the drill hole location plan for the Tusker-Kilimani deposits, and Figure 2 shows a typical east-west cross section through the Tusker deposit. Of the 91,537 metres drilled since May 2010 the 2011 programme represented 65,247 metres. Higher grade gold mineralisation has been intersected at depths greater than 600 metres, and the work programme for 2012 will include further drilling to review the economic potential for these deeper zones. Figure 1: Nyanzaga Project, Tusker drill location plan with optimised open pit showing location of cross section and long section

Figure 2: Nyanzaga Project, Tusker Deposit Cross Section 2,480mN Figure 3 below shows a typical north-south long section through the Tusker deposit, with the grade distribution in the main zone detailed. The exploration programme for 2011 focused on exploring the area of the deposit 250 to 500 metres below surface as well as potential higher gold grade areas near surface. This programme has been highly successful and has identified significant mineralisation in the zones targeted, enabling the expanded pit shell to be delineated with an in-pit resource in excess of 4Moz Au.

Figure 3: Nyanzaga Project, Tusker Resource - Long Section showing grade distribution in the Main Zone Conference call details A conference call will be held for analysts and investors on Friday 27 January 2012 at 09:00 London time with the dial in details below. A short presentation on the Nyanzaga project will be available on our website ahead of the call: www.africanbarrickgold.com Participant dial-in numbers: +44 (0) 20 3003 2666 (UK) / 1 866 966 5335 (US) Password: ABG Replay dial-in number: +44 (0) 20 8196 1998 (UK) / 1 866 583 1035 (US toll free) Access pin: 5567860

ENQUIRIES For further information contact: African Barrick Gold plc +44 (0)207 129 7150 Andrew Wray, Head of Corporate Development & Investor Relations Giles Blackham, Investor Relations Manager Finsbury +44 (0)20 7251 3801 Charles Chichester About ABG ABG is Tanzania s largest gold producer and one of the five largest gold producers in Africa. We have four producing mines, all located in northwest Tanzania, and several exploration projects at various stages of development. With a high-quality asset base, solid growth opportunities and a clear strategy, we have the objective of increasing our existing production to one million ounces per year by 2014. We aim to achieve this by: driving operating efficiencies to optimise production from our existing asset base; growing through near mine expansion and development of advanced-stage projects; and organic greenfield growth and acquisitions in Africa. Maintaining our licence to operate through acting responsibly in relation to our people, the environment and the communities in which we operate is central to achieving our objectives. ABG is a UK public company with its headquarters in London. We are listed on the Main Market of the London Stock Exchange under the symbol ABG and have a secondary listing on the Dar es Salaam Stock Exchange. Historically and prior to our initial public offering (IPO), our operations comprised the Tanzanian gold mining business of Barrick Gold Corporation (Barrick), our majority shareholder. ABG reports in US dollars in accordance with IFRS as adopted by the European Union, unless otherwise stated in this report. Note on estimation techniques A block model was created in the Surpac software to estimate grades and define classification of the resource. Block size were defined as 10x10x5 meters, utilising a nominal 0.4g/t cut-off hard boundary. Domains were defined based on the interpreted lithological units of the deposit. The Ordinary Kriging algorithm was used to estimate gold into each of the blocks after which the blocks were classified into Indicated and Inferred. In order to constrain the resource estimate, a conceptual pit shell was developed using Datamine software to identify those parts of the block model that have reasonable prospects for eventual economic extraction. Parameters used in Whittle optimisation were: US$3.17 per tonne mining cost; US$1400 per oz gold price; 86% process recovery; US$12.00 per tonne process cost; overall slope angle of 48.

Note to mineral resource estimates Information in this announcement relating to Mineral Resources is based on resource block models compiled by Patrick Adams, who is a Qualified Person for Cube Consulting Proprietary Limited. Mineral resources estimates contained in this announcement have been calculated in accordance with National Instrument 43-101 as required by Canadian securities regulatory authorities. Canadian Institute of Mining, Metallurgy and Petroleum (CIM) definitions were followed for the mineral resources estimates. Calculations have been reviewed, verified (including estimation methodology, sampling, analytical and test data) and compiled by ABG personnel under the supervision of ABG Qualified Person: Richard Adofo, Corporate Manager, Geology. However, the figures stated are estimates and no assurances can be given that the indicated quantities of metal will be produced. Mineral Resources have been calculated using an assumed long-term average gold price of US$ 1400 per ounce. Resource estimates can change and tend to be influenced mostly by new information pertaining to the understanding of the deposit and secondly the conversion to ore reserves. In addition, estimates of inferred mineral resources may not form the basis of an economic analysis and it cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Therefore, investors are cautioned not to assume that all or any part of an inferred mineral resource exists, that it can be economically or legally mined, or that it will ever be upgraded to a higher category. Likewise, investors are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be upgraded into mineral reserves. An inferred mineral resource is that part of a mineral resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. An indicated mineral resource is that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters, to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably assumed. Forward-looking statements This announcement is for information purposes only and does not constitute an invitation or offer to underwrite, subscribe for or otherwise acquire or dispose of any securities of ABG in any jurisdiction. This announcement includes forward-looking statements that express or imply expectations of future events or results. Forward-looking statements are statements that are not historical facts. These statements include, without limitation, financial projections and estimates and their underlying assumptions, statements regarding plans, objectives and expectations with respect to future production, operations, costs, products and services, and statements regarding future performance. Forward-looking statements are generally identified by the words plans, expects, anticipates, believes, intends, estimates and other similar expressions. All forward-looking statements involve a number of risks, uncertainties and other factors, many of which are beyond the control of ABG, which could cause actual results and developments to differ materially from those expressed in, or implied by, the forward-looking statements. Factors that could cause or contribute to differences between the actual results, performance and achievements of ABG include, but are not limited to,

political, economic and business conditions, industry trends, competition, fluctuations in the spot and forward price of gold or certain other commodity prices, changes in regulation, currency fluctuations (including the US dollar, South African rand and Tanzanian shilling exchange rates), ABG s ability to successfully integrate future acquisitions, ABG s ability to recover its reserves or develop new reserves, including its ability to convert its resources into reserves and its mineral potential into resources or reserves, and to timely and successfully process its mineral reserves, risk of trespass, theft and vandalism, changes in its business strategy as well as risks and hazards associated with the business of mineral exploration, development, mining and production. Although ABG s management believes that the expectations reflected in such forward-looking statements are reasonable, ABG cannot give assurances that such statements will prove to be correct. Accordingly, investors should not place reliance on forward looking statements in this announcement. Any forward-looking statements in this announcement only reflect information available at the time of preparation. Subject to the requirements of the Disclosure and Transparency Rules and the Listing Rules or applicable law, ABG explicitly disclaims any obligation or undertaking publicly to release the result of any revisions to any forward-looking statements in this announcement that may occur due to any change in ABG s expectations or to reflect events or circumstances after the date of this announcement. Nothing in this announcement should be construed as a profit forecast or estimate.