Evaluation of Mineral Resource risk at a high grade underground gold mine

Similar documents
Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April

New Drilling Program Commences at Mutiny s Deflector Deposit

EXPLORATION SUCCESS AT COYOTE GOLD MINE

Co-O MINE MINERAL RESOURCE UPDATE

MARCH 2010 QUARTERLY REPORT

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

Prospect Resources completes rehabilitation and mine construction at the Prestwood Gold Mine - moving into production mode

ASX ANNOUNCEMENT 21 MARCH 2011

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead.

For personal use only

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

ASX announcement 16 May 2016

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

Option agreement with Randgold set to commercialise Massigui Gold Project

ASX/Media Announcement

For personal use only

For personal use only

Contents 1 Introduction 2 Statistical Tools and Concepts

T Boli Gold Mine Exploration Update

For personal use only

Initial Gold Resource at Sissingue Tengrela Project (Ivory Coast)

Practical long-term planning in narrow vein mines a case study

MINERAL RESOURCE AND ORE RESERVE UPDATE PAMPALO GOLD MINE

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

For personal use only

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS

Mountain Maid Gold System Displays Major Size Potential

Sept 20, 2012 TSX Venture Exchange Tier 1 Trading Symbol: OK

Maiden Kandia Gold Resource of 107,500 Ounces

More growth at Wa Gold Project as Julie-Collette resource increases to 410,700 ounces

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

Annual Report Amended Additional Information

Summary Report Mineral Resource and Ore Reserve Update. Laiva Gold Deposit

An ASX listed Perth-based gold explorer focused on Ghana in West Africa

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE

LATEST RESULTS FROM RC DRILLING

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DRILL RESULTS AND UPDATED RESOURCE FROM BLACKWATER HIGH-GRADE GOLD PROJECT

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012

For personal use only

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

Market Release October

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

ASX Release 29 November 2017

Classification Tonnage (t) Grade Au (g/t) Grade Ag (g/t)

Further High Grade Gold Mineralisation Intersected in Bonanza Zones at Mt Kare Gold/Silver Deposit PNG

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

FIRST RESULTS FROM RC DRILLING AT KONONGO

Geostatistical Determination of Production Uncertainty: Application to Pogo Gold Project

76,000 Ounce Gold Resource at Akoko North

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development

High Grade Gold Drill Results Extend Buccaneer

D N HARLEY MANAGING DIRECTOR Attachment: Amended Consultant Report on MG 14 Mineral Resource Estimation.

For personal use only

Case study: How Leapfrog Geo helped improve geological understanding at Edna May Gold Mine, Western Australia

For personal use only

For personal use only

The Manager Companies ASX Limited 20 Bridge Street

Diamond Drilling to Commence in Axiom s Quang Tri Tenement, Vietnam

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

For personal use only

Sotkamo Silver Ag-Zn-Pb-Au Deposit: Mineral Resource Estimate Update

Drill testing of gold zones at Albury Heath intersect impressive quartz lodes

For personal use only

For personal use only

P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT

Kalman Mineral Resource Update

BUNDARRA RESOURCE UPDATE

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA

NEW DISCOVERIES AT THE RED OCTOBER MINE

News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY

For personal use only

- 2 - TABLE 1. INDICATED AND INFERRED GOLD AND SILVER RESOURCES. All Indicated

ST BARBARA LIMITED RESOURCE REPORT Transvaal Gold Deposit, Southern Cross. Robert Williams Runge Limited / Scott Dunham

Statement by Managing Director, Precious Metals Investment Limited, Charles Straw

Figure 1: Coarse Visible Gold in Pan (combined from multiple drill holes; staple = 1 cm length)

MEDIA RELEASE OCEANAGOLD REPORTS ADDITIONAL HIGH-GRADE DRILL RESULTS AT WAIHI IN NEW ZEALAND

KINGSTON RESOURCES LIMITED

Tricks to Creating a Resource Block Model. St John s, Newfoundland and Labrador November 4, 2015

For personal use only

MASSAWA GOLD PROJECT. 2.6 Moz 30 % TOTAL RESERVES RANDGOLD RESOURCES

Portia Gold Mine Update

ASX and Media Release

For personal use only

For personal use only

NEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

Radial basis functions and kriging a gold case study

Introduction to Geology and Geometallurgy

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project

For personal use only

The Konongo Gold Project, Ghana: An Example of How Geology Makes All the Difference to a Resource Estimate

Bass Metals records further positive drill results & progress at 3 prospects.

For personal use only

ASX / MEDIA RELEASE 6 MAY MILE SILVER-LEAD-ZINC DISCOVERY; HIGH GRADE SILVER-GOLD IN ROCK CHIPS AT RUBY SILVER

FIVE RIGS DRILLING AT KARLAWINDA

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

MANTLE MINING CORPORATION LIMITED

Transcription:

Evaluation of Mineral Resource risk at a high grade underground gold mine Presented by: Aaron Meakin Manager Corporate Services CSA Global 21 August 2015

Project Background Beaconsfield Gold Mine, Tasmania 240,000 tpa underground mining operation Orogenic lode gold deposit (quartz ankerite reef) Multiple mining headings / methods Free and refractory gold (60:40) Gravity / bacterial oxidation circuits Mine constrained

Project Geology Tasmania Reef Mineralisation Characteristics Mechanical characteristics of the host rocks governed development of the fault which contained the reef Laminated textures suggested episodic crack seal vein growth Width of reef 0 to 8 m (average 2.2 m) Grade of reef 0 to 300 g/t Au (average 20 g/t) Majority of gold is less than 100 microns in size 2 Moz on a single structure

Project Geology Geology Plan

Project Geological Issues Significant unexpected grade and width variation on a month by month basis which caused financial volatility Achieved production targets but ounces often weren t realised Led to understandable frustration Triggered a review of data, geology and estimation techniques

Mineral Resources Review Data Face Sampling Data Continuous chip sampling at chest height 1.5 m from the floor of underground drives every 2.2 m Horizontal development allows face sampling to be completed every 13 m vertically Faces washed with survey control for location QC data supports quality

Mineral Resources Review Data Diamond Drilling Data Nominal diamond drill pattern (NQ) of approximately 25 m E by 50 m RL Slight low bias compared with face sampling data but probably due to coarse spacing QC data supports quality

Mineral Resources Review Geology Broad Characteristics Large relatively continuous reef Local structural complexity difficult to predict prior to mining Potential for structural intersections to enhance grades Geological controls well understood

Mineral Resources Review Modelling Summary of Techniques Industry standard software Wireframe modelling robust ID2 / OK interpolation with top cutting MIK also used No majors issues detected

Mineral Resources Review Findings Summary of Findings Data quality OK Geology well understood No material issues with modelling / estimation found All methods smooth the data and none were able to reproduce the inherent variability of the deposit A decision was then made to quantify Mineral Resource uncertainty through conditional simulation techniques

Estimation versus Simulation Estimation Block scale Single estimate Smooths sample data Point scale Simulation Many realisations Reproduces sample histogram and variogram Enables uncertainty assessment

Conditional Simulation Background Conditional simulation is the process of building numerous equally probable realisations of a particular variable The difference in these images provides a measure of uncertainty of unsampled values in space Nearby data and previously simulated values used Realisations are conditional in that each realisation honours data values and variography A range of outcomes for any given variable and location (or block) can then be determined

Conditional Simulation Case Study Step 1 Set domains and complete variography Step 2 Compile raw data into domain coded nodes file Step 3 Run simulations (100) node path varies between each simulation to give different results Step 4 Block averaging required to get block results

Conditional Simulation Case Study Domaining Long Section

Conditional Simulation Case Study Au Variography

Conditional Simulation Case Study Au Simulation Long Section

Conditional Simulation Case Study Thickness Simulation Long Section

Conditional Simulation Case Study Conclusions Significant difference between Au realisations, particularly at depth Reasonable difference between thickness realisations, particularly at depth At distances > 10 m from data points, significant differences existed between realisations How do we use this data to communicate resource uncertainty to stakeholders? What mitigation strategies are available?

Conditional Simulation Case Study Application of Results Probabilistic cash flow models (communicate impact of resource uncertainty on profit) Drill pattern risk assessment (risk versus cost)

Cash Flow Model Case Study Probabilistic Cash Flow Model Spreadsheet constructed using @Risk software Width and grade simulation data imported and probability distributions fitted to data (per mining area per month for annual schedule) Operating Cost (normal), exchange rate (uniform) and gold price (uniform) distributions defined based on historical volatility Monte Carlo simulation (2000 scenarios) employed to randomly sample each distribution to achieve a profit range result Variables ranked by impact

Cash Flow Model Case Study 12 Month Schedule (Long Section)

Cash Flow Model Case Study Single Stope Au Distribution for One Month

Cash Flow Model Case Study Conclusions Grade is king the most influential variable in every month in determining profit Periods of loss over short term inevitable Highlights importance of understanding Mineral Resource uncertainty when assessing project economics

Drill Pattern Case Study Method A single realisation was re resampled at various grids representing a range of sampling strategies (100 simulations run for each) 25 m by 50 m (pre mining pattern) 25 m by 25 m 12 m by 12 m 2 m by 13 m (nominal post mining pattern) 12 month mine schedule interrogated against each to assess uncertainty (monthly and annual)

Drill Pattern Case Study Results

Drill Pattern Case Study Results There is little merit in closing from the nominal exploration drill spacing of 25 m by 50 m to 25 m by 25 m A regular 12 m by 12 m grid performs better than the actual face sample and exploration drilling data combination A point of diminishing returns has been reached once the sample grid achieves the levels represented by the actual production face sampling Cost and risk reduction trade off can be assessed. Drilling pattern required to achieve a given confidence level can be determined.

Mineral Resources from Exploration Targets JORC Mineral Resource Classification Definitions Measured Geological evidence is sufficient to confirm geological and grade continuity between points of observation Indicated Geological evidence is sufficient to assume geological and grade continuity between points of observation Inferred Geological evidence is sufficient to imply but not verify geological and grade continuity Geological continuity geometric continuity of mineralisation (governs tonnage estimates) Grade continuity continuity of grades within the zone of mineralisation

Mineral Resources from Exploration Targets Case Study Geological Learnings Vein style deposits come and go due to vein pinching and / or reef offsets 25 m x 50 m pattern may not be sufficient to assume geological continuity and therefore report Indicated Mineral Resources Grade control (minimise ore loss and dilution) labour intensive. Profile control (development) critical to control stope dilution, communication with operators critical to track ore / waste movement, regular block model updates required to honour new data and reconciliation with production data to improve model and enable meaningful mine planning.

Mineral Resources from Exploration Targets Case Study Grade Learnings Grade is generally the most important variable in driving project economics Vein style deposits often display a medium to high nugget component and significant short range variability Estimating grades >5 to 10 m may be difficult 25 m x 50 m pattern may not be sufficient to assume grade continuity and therefore report Indicated Mineral Resources

Mineral Resources from Exploration Targets JORC Classification Thoughts Measured Mineral Resources generally not based on drilling alone Indicated Mineral Resources may be based on drilling alone for moderate / high nugget vein deposits Judgement call will further drilling materially change the model? Inferred Mineral Resources may be based on drilling alone but multiple intersections still required to assess geological and grade continuity Judgement call is there enough data to imply continuity?

Mineral Resources from Exploration Targets Vein style Mineral Resource estimation Toolbox Collect high quality data with adequate QC data Diamond preferable to RC to enable detailed assessment of the characteristics of the mineralisation Critically review geological and grade continuity Undertake bulk sampling (if possible) Pepper a window of the deposit with drill holes to test geological and grade continuity at the local level Classification decisions ultimately heavily reliant on judgement of Competent Person Seek peer review Ensure transparency through documentation, discuss material issues and demonstrate competence

Thank You For more information please contact: Aaron Meakin Manager Corporate/ Principal Resource Geologist ameakin@csaglobal.com