NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)

Similar documents
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)

Portable Changeable Message Sign (PCMS) Speed Study

I-10 East at Redd closes for 24 hours this Sunday, Feb 11. Then, I-10 West at Resler closes for 27 hours on Feb 25

Appendixx C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014

INTRODUCTION PURPOSE DATA COLLECTION

Table of Contents Introduction... 4 Study Area... 5

3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS

MAY 5, Noise Barrier Presentation SE Quadrant Noyes Street and Lincoln Street NOISE BARRIER ABUTTER MEETING. Tech Environmental, Inc.

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD

April 10, Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213

Market Street PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management

Uses of Travel Demand Models Beyond the MTP. Janie Temple Transportation Planning and Programming Division

Expanding the GSATS Model Area into

JEP John E. Jack Pflum, P.E. Consulting Engineering 7541 Hosbrook Road, Cincinnati, OH Telephone:

December 2017 MCTRA 249 TOLLWAY COMPREHENSIVE TRAFFIC & REVENUE STUDY. Submitted by:

Preliminary Hydraulic Report

Appendix C Final Methods and Assumptions for Forecasting Traffic Volumes

APPENDIX IV MODELLING

VHD Daily Totals. Population 14.5% change. VMT Daily Totals Suffolk 24-hour VMT. 49.3% change. 14.4% change VMT

RECORD OF MEETING. Region Five Development Commission

Public Open House Meeting Thursday, February 22, Broken Arrow to Tulsa Mass Transit Feasibility Study

III. FORECASTED GROWTH

Focused Traffic Analysis for the One Lincoln Park Project

National Rural ITS Conference 2006

NATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents

Katrina. Katrina... 2/27/2009 4

Tier 2 Final Environmental Assessment I-66 Transportation Technical Report. Appendix E. Travel Demand Forecasting Model Validation Memorandum

Prepared for. 3D/International, Inc West Loop South, Suite 400 Houston, Texas November 2006

VIRGINIA S I-77 VARIABLE SPEED LIMIT SYSTEM FOR LOW VISIBILITY CONDITIONS

I-95/I-85 INTERCHANGE ROADWAY SAFETY ASSESSMENT

S.170 th Street Micro-Simulation Seattle-Tacoma International Airport Port of Seattle/Aviation Planning

REQUEST FOR EXPRESSION OF INTEREST RETAIL OPPORTUNITIES GEORGE R. BROWN CONVENTION CENTER GREATER HOUSTON PARTNERSHIP BUILDING HOUSTON, TEXAS

TRAFFIC IMPACT STUDY. Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) For

Xiaoguang Wang, Assistant Professor, Department of Geography, Central Michigan University Chao Liu,

FINAL Traffic Report for the Proposed Golden Valley Road and Newhall Ranch Road Projects in the City of Santa Clarita, California May 5, 2005

CVS Derwood. Local Area Transportation Review

PROPOSED PROJECT. Section PROJECT DESCRIPTION

Existing road transport network of the National Capital Region was examined for the existing connectivity, mobility and accessibility in the study.

Standard Highway Sign Border Specifications

Study Overview. the nassau hub study. The Nassau Hub

Parking Regulations Dundas Street West, from Bathurst Street to Dovercourt Road

Metro SafeTrack Impact on Individual Travel Behavior & Regional Traffic Conditions. 1. Introduction. 2. Focus of this Volume & Issue

HALFF 16196? TRAFFIC MANAGEMENT PLAN. Richardson ISD Aikin Elementary School Dallas, Texas North Bowser Road Richardson, Texas 75081

City of Grand Island Tuesday, August 14, 2018 Council Session

[Leveraging & Improving Neighborhood Connections] Area E Cedar Creek

Hillsborough County MPO Transit Study. Technical Team August 23, 2007

WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project

Traffic Impact Study

MnDOT Method for Calculating Measures of Effectiveness (MOE) From CORSIM Model Output

APPENDIX I: Traffic Forecasting Model and Assumptions

EVALUATION OF SAFETY PERFORMANCES ON FREEWAY DIVERGE AREA AND FREEWAY EXIT RAMPS. Transportation Seminar February 16 th, 2009

Information for File MVP RMM

US 169/I-70 North Loop Planning & Environmental Linkages Study

Best Practices and Techniques for Clearing Intersection Layouts

Welcome to the Business Owner Task Force. Selma Stockstill SouthGate Constructors Public Information Manager

A CASE STUDY ON EDUCATING ENGINEERING STUDENTS ON THE CHALLENGES OF URBANIZED AT-GRADE INTERSECTIONS

BENBROOK ECONOMIC DEVELOPMENT CORPORATION COME GROW WITH US.

Cumulative Count Curve and Queueing Analysis

OXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN

Snow and Ice Control POLICY NO. P-01/2015. CITY OF AIRDRIE Snow and Ice Control Policy

Appendix I: Traffic Study

TRANSPORTATION IMPACT STUDY WHEELER STREET CLOSURE

TRANSPORTATION AND TRAFFIC ANALYSIS REPORT

Organized Chain-Up and VSL

SECTION 7 RAMP TERMINAL SIGNS

GIS ANALYSIS METHODOLOGY

6 th Line Municipal Class Environmental Assessment

2014 UTP Public Meeting July 18, 2013

Modeling Driver Behavior During Merge Maneuvers

The Sunland Park flyover ramp is set to close the week of March 19 until early summer

2015 Grand Forks East Grand Forks TDM

East Bay BRT. Planning for Bus Rapid Transit

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM REGIONALLY SIGNIFICANT TRANSPORTATION IMPROVEMENTS

Effectiveness of Experimental Transverse- Bar Pavement Marking as Speed-Reduction Treatment on Freeway Curves

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10

1 h. Page 1 of 12 FINAL EXAM FORMULAS. Stopping Sight Distance. (2 ) N st U Where N=sample size s=standard deviation t=z value for confidence level

The Highline Development Traffic Impact Study

Flood Scenario Worksheet

Appendix B.1 EMME Model Calibration Memo

SURVEYING AND MAPPING, INC. COORDINATE DATA SHEET JOB: CITY OF DECATUR CLIENT: CITY OF DECATUR SAM JOB#:

November 16, Metropolitan Washington Council of Governments National Capital Region Transportation Planning Board

Information for File # MMJ; Trunk Highway (TH) 7 / Louisiana Ave. Interchange Project

Mapping Accessibility Over Time

GRB QUICK REFERENCE: Contact Information.

FY 2010 Continuing i Planning Program Product Report. Local Transportation and Traffic Data. Wood-Washington-Wirt Interstate Planning Commission

Final City of Colusa STREETS & ROADWAYS MASTER PLAN. October J Street Suite 390 Sacramento, CA 95814

PLAZA MEXICO RESIDENCES

CEE 320 Midterm Examination (50 minutes)

CONTINUING PLANNING PROGRAM LOCAL TRANSPORTATION AND TRAFFIC DATA PRODUCT REPORT [OH Corridors]

Appendix C Traffic Study

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

Empirical Relation between Stochastic Capacities and Capacities Obtained from the Speed-Flow Diagram

TRAINING ANNOUNCEMENT. Office of Homeland Security COURSE MGT-310

WOODRUFF ROAD CORRIDOR ORIGIN-DESTINATION ANALYSIS

MEMORANDUM. The study area of the analysis was discussed with City staff and includes the following intersections:

HSIP FUNDING APPLICATION

Freeway Work Zone Lane Capacity

E 2320 = 0, to 3-decimals, find the average change in

Prepared for: San Diego Association Of Governments 401 B Street, Suite 800 San Diego, California 92101

TRAFFIC STUDY FOR THE GAFFEY POOL PROJECT LOS ANGELES, CALIFORNIA CITY OF LOS ANGELES, BUREAU OF ENGINEERING OCTOBER 2013 PREPARED FOR PREPARED BY

Transcription:

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) Planning for a Mega Project in a Metropolitan Area TxDOT Short Course October 13, 2015

RECOMMENDED ALTERNATIVES Environmental Impact Statement (EIS) Project Divided into 3 Segments Segment 1: Beltway 8 to I-610 (9 mi) Segment 2: I-610 to I-10 (3 mi) Segment 3: Downtown Loop System (12.3 mi) One Proposed Recommended Alternative per segment = single corridor end to end (24 mi total) 2

NEED AND PURPOSE FOR PROPOSED PROJECT Need for Proposed Project Population and employment increases Existing and future I-45 traffic Current design standards and improved safety Efficient traffic movement, including during evacuation events Top 100 Congested Roadway Segments Purpose of Proposed Project 11 Manage congestion Enhance safety Improve mobility and operational efficiency All NHHIP Segments are in Top 30 Most Congested Roadways in Texas Segments 2 and 3 in Top 10 3 9 27 16 23 6 3

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 1 Segment 1 Features New Roadway Capacity Add four (4) MaX lanes (HOV+Express) Add one (1) frontage road lane in each direction Add full-width shoulders Add bike/pedestrian features along frontage roads Between Beltway 8 and Airline Drive ROW required on west side of I-45 Between Airline Drive and I-610 ROW required on east side of I-45 4

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 1 5

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 1 MaX Lanes MaX Lanes 6

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 2 Segment 2 Features New Roadway Capacity Add four (4) MaX lanes (HOV+Express) Add full-width shoulders Add bike/pedestrian features along frontage roads Between I-610 and Cavalcade St. Mainlanes are elevated Frontage roads are at grade Approx. 10 to 80 feet of additional ROW Between Cavalcade St. and Quitman St. Mainlanes are depressed Frontage roads are at grade No new ROW except at intersections 7

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 2 View of Proposed Improvements near North Main St. 8

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 2 View of Proposed Improvements near North Main St. with Potential Green Space MaX Lanes MaX Lanes 9

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 2 Proposed Improvements near North Main St. POTENTIAL GREEN SPACE 10

GREEN SPACE EXAMPLE: EXPOSITION / COMMERCE DALLAS DEPRESSED SECTION SOUTH OF PATTON STREET 11

GREEN SPACE EXAMPLE: KLYDE WARREN PARK DALLAS 12

GREEN SPACE EXAMPLE: KLYDE WARREN PARK DALLAS 13

Segment 3 Features Realign I-45 to be parallel with I-10 and US 59/I-69* Depress US 59/I-69* from Spur 527 to Downtown Add I-10 Express Lanes from I-45 to US 59/I-69* Remove existing I-45 Pierce Elevated Improved Access to/from Downtown Improved Hardy Toll Road Access Improved SH 288 Lanes Access *Per Minute Order 114231 dated March 26, 2015, the Texas Transportation Commission designated US 59 within the project limits as I-69. 14

Downtown Connectors replace existing Pierce Elevated Realign I-10 New I-10 Express Lanes Realign US 59 / I-69 PRELIMINARY- SUBJECT TO CHANGE Remove Pierce Elevated Connectors 15

16

MaX Lanes 17

18

19

20

21

22

23

24

MaX Lanes 25

26

27

MaX Lanes 28

Current Configuration and Operations Area for the GRB 29

Current Configuration and Operations Area for the GRB GRB Existing GRB Ramp (Access to Outer Halls) US 59/I-69 Elevated Access to Inner Halls (inside TxDOT ROW) 30

Artist s Sketch of Potential Green Space near the GRB Convention Center NOTE: Green space option is conceptual only and would require separate development and funding. MINUTE MAID PARK GRB OPERATIONS AREA 31

Proposed Improvements behind GRB EXIST GRB RAMP GRB OPERATIONS AREA POTENTIAL GREEN SPACE RECONFIGURED GRB OPERATIONS AREA TO SERVICE INNER HALLS 32

Looking North from Capital Street US 59 Elevated Section (current) George R. Brown Existing Convention Center Minute Maid Park Minute Maid Park Artist s Rendering 33

SEGMENT 3 DOWNTOWN TRAFFIC ANALYSIS RESULTS Proposed Recommended Alternative Compared to the No-Build Alternative (AM Peak) Reduction in Delay Increase in Systemwide Speed Increase in Downtown Access 20% 35% 24+ MPH 15% The improvements in the Proposed Recommended Alternative result in a systemwide speed increase that directly improves the flow on all surrounding freeways - a significant, positive improvement to the region s air quality. 34

Contact Info 35

ADJOURN 36