Numerical Simulation on Wind-Induced Responses of Steel Guyed Transmission Tower-Line Coupling Systems

Similar documents
Buffeting research of suspension steel frame for ±500 kv converter station DC filter

Influence Analysis of Transmission Lines Insulator on the Conductor Ice-shedding

Dynamic Simulation on a Broken Test of Conductors

The Wind-Induced Vibration Response for Tower Crane Based on Virtual Excitation Method

FLEXIBILITY METHOD FOR INDETERMINATE FRAMES

Design of Transmission Line System s Full Aero-elastic Model and Analysis of its Dynamic Behavior

The influence of the design methodology in the response of transmission towers to wind loading

span bridge was simulated by the improved WAWS in this paper while only the deck wind field was usually simulated in the former time-domain analysis.

Numerical simulation of an overhead power line section under wind excitation using wind tunnel test results and in-situ measured data

Non-Linear Dynamic Analysis of Guyed Towers to Wind Loading

Finite Element Modelling with Plastic Hinges

Comparison of Structural Models for Seismic Analysis of Multi-Storey Frame Buildings

VIBRATION MEASUREMENT OF TSING MA BRIDGE DECK UNITS DURING ERECTION

Parametric Identification of a Cable-stayed Bridge using Substructure Approach

STUDY ON TRANSMISSION LINE COUPLING SYSTEM S DYNAMIC BEHAVIOR

Equivalent Static Wind Loads of an Asymmetric Building with 3D Coupled Modes

RESILIENT INFRASTRUCTURE June 1 4, 2016

CWR track vibration characteristics varying with the change of supporting condition

Experimental Study and Numerical Simulation on Steel Plate Girders With Deep Section

Multi Linear Elastic and Plastic Link in SAP2000

ON THE REVISION OF WIND-RESISTANT DESIGN MANUAL FOR HIGHWAY BRIDGES

Strand Tension Control in Anchor Span for Suspension Bridge Using Dynamic Balance Theory

ANALYSIS AND EXPERIMENT OF DYNAMIC CHARACTERISTICS OF ELECTRONIC DEVICE CHASSIS

Theory of structure I 2006/2013. Chapter one DETERMINACY & INDETERMINACY OF STRUCTURES

D : SOLID MECHANICS. Q. 1 Q. 9 carry one mark each. Q.1 Find the force (in kn) in the member BH of the truss shown.

3. Stability of built-up members in compression

Vertical acceleration and torsional effects on the dynamic stability and design of C-bent columns

Estimation of the Residual Stiffness of Fire-Damaged Concrete Members

Aerodynamic torsional loads on L-shaped low-rise buildings

A peak factor for non-gaussian response analysis of wind turbine tower

Dynamic behavior of turbine foundation considering full interaction among facility, structure and soil

1330. Comparative study of model updating methods using frequency response function data

Study on Numerical Simulation of Wind Resistance Effect on the Opening Holes Plate Chimney

Analysis on propulsion shafting coupled torsional-longitudinal vibration under different applied loads

Experimental research on the icing progress of insulators at Xuefeng Mountain Natural Icing Test Base

APPENDIX A DEFINITIONS, NOTATIONS, AND SI CONVERSION FACTORS

2 Experimental arrangement The test is carried out in the wind tunnel of TJ-3 atmospheric boundary layer in the State Key Laboratory of Disaster Reduc

INELASTIC RESPONSES OF LONG BRIDGES TO ASYNCHRONOUS SEISMIC INPUTS

FREQUENCIES AND DAMPING RATIOS OF A HIGH RISE BUILDING BASED ON MICROTREMOR MEASUREMENT

PLATE GIRDERS II. Load. Web plate Welds A Longitudinal elevation. Fig. 1 A typical Plate Girder

NON-LINEAR ANALYSIS OF SOIL-PILE-STRUCTURE INTERACTION UNDER SEISMIC LOADS

Influence of residual stresses in the structural behavior of. tubular columns and arches. Nuno Rocha Cima Gomes

Dynamic and buckling analysis of FRP portal frames using a locking-free finite element

The Ultimate Load-Carrying Capacity of a Thin-Walled Shuttle Cylinder Structure with Cracks under Eccentric Compressive Force

Nonlinear static analysis PUSHOVER

A Study on the Tube of Integral Propeller Shaft for the Rear-wheel Drive Automobile Using Carbon Composite Fiber

Advanced aerostatic analysis of long-span suspension bridges *

INELASTIC SEISMIC DISPLACEMENT RESPONSE PREDICTION OF MDOF SYSTEMS BY EQUIVALENT LINEARIZATION

A METHOD OF LOAD INCREMENTS FOR THE DETERMINATION OF SECOND-ORDER LIMIT LOAD AND COLLAPSE SAFETY OF REINFORCED CONCRETE FRAMED STRUCTURES

Design of Beams (Unit - 8)

1439. Numerical simulation of the magnetic field and electromagnetic vibration analysis of the AC permanent-magnet synchronous motor

Experimental investigation on monotonic performance of steel curved knee braces for weld-free beam-to-column connections

Wind Effects on the Forth Replacement Crossing

JEPPIAAR ENGINEERING COLLEGE

NUMERICAL EVALUATION OF THE ROTATIONAL CAPACITY OF STEEL BEAMS AT ELEVATED TEMPERATURES

Lecture-08 Gravity Load Analysis of RC Structures

Ph.D. Preliminary Examination Analysis

Modern techniques for effective wind load distributions on large roofs. John D. Holmes 1)

Chord rotation demand for Effective Catenary Action under Monotonic. Loadings

Calculation for Moment Capacity of Beam-to- Upright Connections of Steel Storage Pallet Racks

Structural Damage Detection Using Time Windowing Technique from Measured Acceleration during Earthquake

Model tests and FE-modelling of dynamic soil-structure interaction

Soil-Structure Interaction in Nonlinear Pushover Analysis of Frame RC Structures: Nonhomogeneous Soil Condition

Chapter Two: Mechanical Properties of materials

Calculation method and control value of static stiffness of tower crane

1618. Dynamic characteristics analysis and optimization for lateral plates of the vibration screen

BI-DIRECTIONAL SEISMIC ANALYSIS AND DESIGN OF BRIDGE STEEL TRUSS PIERS ALLOWING A CONTROLLED ROCKING RESPONSE

Dynamic Analysis Using Response Spectrum Seismic Loading

Mechanics of Materials II. Chapter III. A review of the fundamental formulation of stress, strain, and deflection

Stress Analysis of Tensioning Bolt based on MATLAB

If the number of unknown reaction components are equal to the number of equations, the structure is known as statically determinate.

coh R 1/2 K x = S R 1R 2 (K x) S R 1 (K) S R 2 (K) (3) Davenport (1961) proposed one of the first heuristic root-coherence expressions for longitudina

Study on elevated light rail induced vibration attenuation along the surrounding ground

Analysis of Shear Lag Effect of Box Beam under Dead Load

A correlation-based analysis on wind-induced interference effects between two tall buildings

Fatigue Crack Analysis on the Bracket of Sanding Nozzle of CRH5 EMU Bogie

Strength Study of Spiral Flexure Spring of Stirling Cryocooler

DETERMINATION OF PERFORMANCE POINT IN CAPACITY SPECTRUM METHOD

A numerical parametric study on the plate inclination angle of steel plate shear walls

D DAVID PUBLISHING. Cable-Stay Bridges Investigation of Cable Rupture. 1. Introduction. 2. Basic Conditions. Nguyen Trong Nghia 1 and Vanja Samec 2

Moment redistribution of continuous composite I-girders with high strength steel

PSD Analysis and Optimization of 2500hp Shale Gas Fracturing Truck Chassis Frame

Sabah Shawkat Cabinet of Structural Engineering Walls carrying vertical loads should be designed as columns. Basically walls are designed in

On the Dynamics of Suspension Bridge Decks with Wind-induced Second-order Effects

spectively. Each catwalk consists of 1 ropes with a diameter of 31.5 mm and a safety apparatus consisting of wire mesh, a wooden step, and a hand post

Pushover Seismic Analysis of Bridge Structures

five Mechanics of Materials 1 ARCHITECTURAL STRUCTURES: FORM, BEHAVIOR, AND DESIGN DR. ANNE NICHOLS SUMMER 2017 lecture

Research Article Control of Wind-Induced Vibration of Transmission Tower-Line System by Using a Spring Pendulum

MODULE C: COMPRESSION MEMBERS

NUMERICAL SIMULATION ON THE AERODYNAMIC FORCE OF THE ICED CONDUCTOR FOR DIFFERENT ANGLES OF ATTACK

Design of Steel Structures Prof. Damodar Maity Department of Civil Engineering Indian Institute of Technology, Guwahati

FRAME ANALYSIS. Dr. Izni Syahrizal bin Ibrahim. Faculty of Civil Engineering Universiti Teknologi Malaysia

NUMERICAL INVESTIGATION OF CABLE PARAMETRIC VIBRATIONS

Dynamic analysis of a reinforced concrete shear wall with strain rate effect. Synopsis. Introduction

INFLUENCE OF BOUNDARY CONDITIONS IN MODAL TESTING ON EVALUATED ELASTIC PROPERTIES OF MASS TIMBER PANELS

VIBRATION ENERGY FLOW IN WELDED CONNECTION OF PLATES. 1. Introduction

Non Linear Dynamic Analysis of Cable Structures

COLUMN INTERACTION EFFECT ON PUSH OVER 3D ANALYSIS OF IRREGULAR STRUCTURES

Nonlinear Analysis of Reinforced Concrete Bridges under Earthquakes

Simulation and Experimental Research on Dynamics of Low-Pressure Rotor System in Turbofan Engine

Transcription:

Numerical Simulation on Wind-Induced Responses of Steel Guyed Transmission Tower-Line Coupling Systems *Bai Xiaowei 1), Bai Yongtao ) and Sun Qing 3) 1), ), 3) Department of Civil Engineering, Xi'an Jiaotong University, Xi'an 710049, China ABSTRACT Compared with self-supporting tower, guyed tower has advantages of low steel consumption, constructability and excellent wind-resistant performance, so it has been widely applied in transmission lines. The suspended guys stabilize towers, which have higher flexibility and geometric nonlinearity bringing great difficulties in numerical simulation. Researches on dynamic characteristics of guyed tower is relatively limited, especially when subjected to wind-induced response. A finite element model of guyed towers is built. In the numerical simulation of wind loading, fluctuating wind speed timehistory is assumed to be a stationary Gaussian random process and Davenport spectra is adopted as wind speed spectra. Auto-regressive method is applied to compute the random wind dynamic loads as the input waves. Results of the time history analysis show that torsional deformation of the structure is easy to appear under wind load. The conductor and ground wire have a weakening effect for the wind-induced vibration response of guyed towers. Calculation methods of the wind-induced vibration coefficient in design codes across the country are compared. Finally, a distribution of wind vibration coefficient is recommended for the practical design of guyed towers. 1. INTRODUCTION Transmission tower is a fatal structure to support overhead power lines in electronic industry. There are two major categories of transmission towers based on load bearing mechanisms: self-supporting tower and guyed tower. The self-supporting tower is fixed on the foundation by four tower legs, and the guyed tower uses a spherical hinge bearing to keep stable by the tension of guys. Compared with selfsupporting tower, guyed tower has been widely applied in transmission lines for its advantages of low steel consumption, constructability and excellent wind-resistant performance. The guyed tower usually adopts lattice trusses and guys hierarchically arranged along the height of the tower. Guyed tower has some advantages in economic, constructability and large deformation capacity. For instance, guyed tower 1) Doctoral Student ) Doctor 3) Professor

can save 0%~40% steel less compared with self-supporting tower. Hinge connections adopted between the tower and foundation allow the tower roll in a certain range, which has a larger deformation capacity subjected to impact loads (wind, earthquake, etc.). Pre-stress existing in guys and conductors acting on guy towers induces high level of nonlinearity, which brings difficulties to calculate the forces of guyed tower structures. The guyed tower structure deforms with the swing of the tower and the guys on one side starts to sustain tension force, while the ones on the other side lose tension force. Meanwhile, the stiffness of the whole structure reduces due to the existence of guy and conductor. Thus, the structure have higher flexibility and geometric nonlinearity, which bring great difficulties for simulating wind-induced responses. Currently, a wind-induced vibration coefficient (WVC) multiplied by static wind load is adopted to compute wind vibration of transmission tower line system across the countries. The dynamic effect of structures under wind load includes the wind speed varying with time, spatial correlation, damping characteristics and others. Thus, proposing a reasonable value of WVC is highly correlated to the safety and economics of transmission line structures. Due to the particularity of guyed towers, the value of WVC is not clarified in the current design specifications, while only refers to the value for self-supporting towers. Therefore, it is significant to determine the value of WVC for guyed towers subjected to wind loading. Researches on wind vibration response of transmission towers have been undertaken. Loredo and Davenport (001) proposed the gust response factor to calculate the static equivalent wind load of power transmission line tower system which was adopted by international power and Canada overhead transmission line design guidelines. Some researchers studied the mean velocity profiles changed with the different topography and landform, which has significant influence on dynamic response of transmission tower line system (Savory et al. 001, Takahashi et al. 00). Mayumi et al. (010) combined several identification methods and introduced a new method of estimating aerodynamic damping properties of two transmission towers under conditions of strong winds and the results revealed that the wind speed dependency of the aerodynamic damping property of the coupled tower-andconductors system had wide differing characteristics depending on the vibration mode. Gani et al. (010) made a transient dynamic analyses as a comparison with the simplified static-equivalent approach provided in the current codes and found that the static-equivalent approach may underestimate the possible dynamic response. The wind tunnel tests on an aeroelastic model and analysis of the wind-induced response of model have been conducted. Lin et al. (01) conducted a wind tunnel test of an aeroelastic model of a single transmission line span and support structure subjected to boundary layer and downdraft outflow wind force to examine the difference in structural response to the two different types of wind force. Rao et al. (01) studied different types of premature failures observed during full scale testing of transmission line towers, discussed the importance of redundant member design and compared test results with various code provisions. The effects of coupling between electrical transmission tower and line on windinduced vibrations and the wind load transferring mechanism were investigated by a full aeroelastic model with transmission tower-line system on wind tunnel tests (Xie et al. 013, Liang et al. 015 and Yu et al. 015). Yang et al. (015) calculated design wind

loads for tubular-angle steel cross-arms of transmission towers under skewed wind loading. Mara et al. (013) investigated the inelastic response of a self-supporting lattice transmission tower under different wind events and the result shown that the yield and maximum capacities vary with wind direction. Lou et al. (013) studied windinduced response and wind load factor of transmission tower under terrain B wind field and typhoon wind field through a numerical analysis and found that under the two types of wind fields the average ratio of wind load factor is about 1.5. Wang et al. (014) made a theoretical analysis and comparison on typical International wind load codes of transmission conductors in China, America and British. Fu et al. (015, 016) did research on motion of wind-driven rain and rain load acting on transmission tower and made fragility analysis and estimation of collapse status for transmission tower. Although several researches have been performed on wind vibration responses of transmission tower, there is little studies on the wind vibration responses of guyed towers and the corresponding WVC distribution. In this paper, wind-induced responses of guyed transmission tower-line coupling systems are investigated based on numerical method. First, a nonlinear finite element model (FEM) of guyed tower-line system is built. Then, dynamic characteristics of the guyed tower-line model is analyzed to explore modal properties of the coupling system. Finally, artificial fluctuating wind load generated with the AR method is imposed on the tower-line model, and dynamic analysis is performed to derive the distribution of wind vibration coefficient..finite ELEMENT MODEL OF GUYED TOWER Based on the characteristics of transmission lines, a guyed tower has been designed by Northwest Electric Power Design Institute of China Power Engineering Consulting Group, for which a structural analysis model using the finite element code SAP000 (Wilson 1997) has, conveniently, previously been implemented. This paper has discussed the value of WVC of this type of tower. According to the characteristics of guyed tower, the tower numbers are modelled as truss elements and the foot of tower is modelled as hinge joint. The connection between the tower and the guy is also hinged supported, the same as the connection between the tower and the insulator. For the tower on both sides of the insulator string hang the conductors. Due to the existence of the conductor, longitudinal joint displacement of insulator string is restrained in a certain degree. So in this paper, a longitudinal constraint is imposed to the joint of insulator string. The impact of the weight of the conductor to the tower vibration characteristics has been considered in model analysis and the load is provided by electrical professionals. The model of guyed tower and transmission tower line system are shown in Fig. 1 and Fig. respectively. A cooling method is adopted for the simulation of the guy and the pre-stressed axial force is calculated according to Eq. (1): N EA T (1) Where is the guy line expansion coefficient; E is the guy elasticity modulus; A is the cross-sectional area of the guy; T is the reduction of temperature. The impact of the weight to the guy is not considered in the Eq. (1). Final temperature need to reduce on the basis of the calculation temperature and it can be determined by observing the axial

force of the guy. Fig. 1 Model of single guyed tower Fig. Model of transmission tower-line system The insulator string is also modelled as truss element. Since the insulator string has a great stiffness and there is no bending and axial deformation, the moment of inertia and elastic modulus are magnified 100 times here. The tower uses a variety of materials such as Q40, Q345 and Q35. For steel all elastic modulus are 00 GPa in the calculation and yield strength takes 40 MPa, 345 MPa and 35 MPa respectively. Cable and the insulator string are calculated on elastic material and the related calculation parameters are shown in Table 1 and Table respectively. Table 1 Guy parameter Elasticity modulus /GPa Linear density /N m -1 Coefficient ofthermal expansion -1 /10-5 Crosssectional area /mm Initial tension /kn Design bearing capacity /kn 199.6 75.86 1.17 907.46 87 789.8

Table Insulator string parameter Elasticity modulus /GPa Density /kg m -3 Equivalent diameter /m 0000 500 0. Connection plate and the auxiliary material are not considered in the model. In order to take consider of the influence of quality of this part on structural dynamic characteristics, the mass of the tower structure multiplies by a factor of 1.5 according to the construction drawing. The height direction is for Z axis, the transverse for X axis and longitude for Y axis in this paper. 3. DYNAMIC CHARACTERISTICS ANALYSIS OF GUYED TOWER Modal analysis is known as the modal superposition method of dynamic analysis, providing the basic dynamic performance parameters for structural analysis and judging the structural response qualitatively. At the same time modal analysis is the basis of dynamic analysis and an effective means to check the model. According to the established finite element structural model, modal analysis is carried out on the guyed tower and the top 0 order natural vibration period and vibration mode of the tower have been calculated. Since the transmission tower is a kind of flexible structure and the first few mode shapes have a great effect on the structure,we lists only the first ten order natural vibration period (shown in Table 3) and parts of the vibration mode (shown in Fig. 3) of the single guyed tower here. Table 3 Single guyed steel tower frequency and period Order Frequency/Hz Period/s Modal property 1 0.608 1.646 First order torsional vibration around the z axis 0.945 1.058 First order bending vibration around the y axis 3 1.684 0.594 Swing to x direction 4 1.810 0.55 Swing to y direction 5 1.876 0.533 First order bending vibration around the x axis 6.68 0.441 Tower head bending vibration up and down 7.798 0.357 First order bending vibration around the y axis in tower leg 8 5.334 0.187 Second order bending vibration around the x axis 9 6.690 0.149 High order bending vibration around the x axis 10 6.873 0.145 High order bending vibration around the y axis

(a) First mode shape (b) Second mode shape (c) Third mode shape (d) Forth mode shape Fig. 3 Top four vibration mode of single guyed steel tower According to GB50135-006 (007), first order natural vibration period of tall structures is in (0.007 ~ 0.013) H, where H is the height of the tower. This single guyed tower has a height of 53.5 m, that is to say the natural vibration period is within 0.37 s ~ 0.7 s. The first order natural vibration period is 1.653 s in this paper, greater than the empirical formula. The reason may be that a fixed constraint is generally adopted at the bottom of the traditional structure, but a hinged support for the guyed tower. Conventional high-rising structure design may not be appropriate for the guyed tower, so the wind-induced vibration response analysis of guyed tower is particularly important. From the model analysis, the tower is prone to twisting around the Z axis and transverse vibration also tends to happen, because of a ball hinge existing at bottom of the tower. For the transmission tower line system, the top fifty order vibration period and corresponding mode shape have been calculated. The main natural vibration period and mode shape are listed as shown in Table 4 and Fig.4 respectively. Table 4 Frequency and period of tower-line model Order Frequency/Hz Period/s Modal property 1-13 0.148-0.158 6.75-6.3 Vibration up and down of conductor 14-5 0.178-0.79 5.63-3.59 Vibration up and down of wire

41 0.75 1.33 First order bending vibration around the y axis of 4 1 1 First order bending vibration tower around the y axis of 45 1.549 0.645 Swing to y direction tower of tower 46 1.615 0.619 Swing to x direction of tower (a) Fifteenth mode shape (b) Thirty-sixth mode shape (c) Forty-fifth mode shape Fig. 4 Main mode shapes of transmission line The results show that, the top 13 order mode shapes are the vibration mode of the conductor, the 14 ~ 5 order mode shapes are the vibration mode of the ground wire, the 41 ~ 44 order mode shapes are the first order bending vibration around the y axis of tower, the 45 order mode shape is swing to y direction of tower, and the 46 order mode shape is swing to x direction of tower. Because of the influence of the conductor and the ground wire, the order of the mode shape of transmission tower line system is different from that of the single tower, and the frequency of the same mode shape of transmission tower line system is smaller than that of the single tower. 4. SIMULATION OF WIND LOAD 4.1 Simulation of fluctuating wind The wind velocity can be expressed as the sum of the mean wind speed and the fluctuating wind at any height and moment. The fluctuating wind, as a random load, needs random vibration theory to describe the stochastic process. According to the random vibration theory, the

stochastic process commonly divided into stationary random process and nonstationary random process and the fluctuating wind can be regarded as the former. For wind speed time history simulation method at present there are three kind of methods mainly including linear filtering method, harmonic superposition method and wavelet generating method, in which the linear filtering method is most widely employed. Linear filtering method includes Auto-regressive method (AR) and Autoregressive moving method (ARMA). The ARMA model has high precision, but its theory is complex, while due to small amount of calculation and fast speed, the AR model is widely used to solve random vibration problems. Respecting the above mentioned facts, we have adopted the AR model (Iannuzzi and Spinelli 1987) to simulate the wind speed time history, which then is utilized as the input to guyed tower. Then by comparing the simulation power spectrum and the target power spectrum, it might be possible to verify the availability of the simulation model of the wind speed time history acting on the tower. Power spectral density function, as one of the most important statistical properties, can reflect the energy distribution of fluctuating wind on a frequency domain. One of the most representative is Davenport spectrum based on the measured data: Where 100 f x0 ; 10 V10 0 x S f 4KV10 () f 4 1 x 3 0 V is the average wind speed in Standard height 10 m; K is terrain rough factor; f is fluctuating wind frequency (Hz). 4. Calculation of wind load For the components of guyed tower in any height, the calculation of the wind load can proceed as follows: First, the mean wind speed is calculated according to the mean wind index calculation formula z V ( z) * V 10 10 (3) where V 10 is the average wind speed in Standard height 10 m. Second, the fluctuating zt, is obtained according to AR method. Then the synthetic wind wind speed f speed can be composited according to the following formula Finally, the wind load can be gained as follows: ( z, t) V ( z) z, t (4) f

v ( zt, ) F( t) 1.1 s A (5) s 1600 where A s is the area of the member; s is the shape factor of the member, for which, angle steel is 1.3, conductor and ground wire are 1.1, insulator is 1.0 and guy is 1. according to GB 50545-010 (010). Based on MATLAB, fluctuating wind is simulated by AR model, as shown in Fig. 5. It can be seen that the simulated spectrum agrees well with the target spectrum. Velocity(m/s) PSD(W/Hz) 0 10 0-10 -0 0 50 100 150 00 10 5 10 0 10-5 Simulated Spectrum Target Spectrum Time(s) 10-3 10-10 -1 10 0 10 1 Frequency(Hz) Fig. 5 Fluctuating wind simulation According to the result of the modal analysis in the above section, twist and transverse vibration are more likely to happen for guyed tower. So analysis of the windinduced vibration response of the single guyed tower under 90 wind load (perpendicular to conductor) is mainly carried out and WVC has been calculated. Rayleigh damp is adopted here. The quality damping coefficient and the stiffness damping coefficient can be gained through calculation of modal damping ratio. For the steel structure, the modal damping ratio of 0.0 is implemented (Wilson 1997). Since there are majority of nodes belonging to the tower, applying wind load on each node is not practical. In this paper the tower is divided into ten vertical sections, as shown in Fig.6 and the wind load at each section has been applied at the corner nodes on the top. The wind load applies on the nodes where guys act at six and seven sections. The quality and the wind area of each section are calculated in half of the sum of the two sections adjacent. The quality and wind area of each node on the section are shown in Table 5.

Fig. 6 Hierarchical diagram Table 5 Mass and wind area section Section quality of single area of single shape height/m point/kg point/m factor 10 53.5 7.869 0.58375 1.3 9 50.5 637.431 3.3575 1.3 8 48 1047.155 4.515 1.3 7 4.875 706.993.7715 1.3 6 37.75 494.367.555 1.3 5 7.5 519.339.95 1.3 4 18.5 449.06.575 1.3 3 10.75 366.619.08375 1.3 4.15.988 1.85 1.3 1.075 94.995 0.54 1.3 ( zt, ) Based on wind load formula F( t) 1.1 s A, the wind load time history s 1600 curve acting on each section can be obtained as shown in Fig. 7. v

3 Wind Load(kN).5 1.5 1 0.5 0 0 40 60 80 100 10 140 160 180 00 Time(s) Fig. 7 Wind load time history curve 5. CALCULATION OF WIND-INDUCED VIBRATION COEFFICIENT The composition of wind load can be divided into two parts of the static load and dynamic load according to its properties. Static wind load is an equivalent to a constant load on the structure, while dynamic wind load is a random fluctuating load, which triggers the vibration response of the structure. Under the action of dynamic load, deformation and stress distribution of structure may be magnified. In order to reflect the influence of fluctuating wind load and for the convenience for engineering design, the WVC is used to consider the dynamic effect of wind load. 5.1 Calculation method According to the inertial wind load method, the fluctuating equivalent load of the structure is regarded as inertial force to produce fluctuating displacement, that is P z P z gm z n z (6) d ( ) c( ) ( )( 1) Y ( ) The WVC is given by m( z )( n1 ) Y z ( ) ( z ) 1 g (7) P() z c The essence of the inertial wind load method is, in fact, using the wind vibration coefficient to reflect the relationship between the general equivalent load (the sum of the static load and dynamic load) and the average wind load (static load). Thus the WVC is closely related to the mass distribution and vibration modes of the structure. According to Xu et al. (011), Eq. (7) can be rewritten as gm( z) a ( z) ( z) 1 (8) w A( ) s z 0 z

where mz (), Az () are the lumped mass and wind area respectively at the height of z ; g is the Peak factor, generally between ~.5,implying a value of. here; (z) a is the Acceleration mean square error at the height of z,which can be gained by the time history analysis. The calculation of WVC in ASCE No.74-009 (009) may be determined from the following equations: G t 0.7 1.9E B (9) t where 33 E 4.9 ( ) z 0 1 B t 1 1 0.375 h/ L s where z 0 is the effective height, h is the total tower height; is power law exponent; is surface drag coefficient and Ls is turbulence scale. The calculation of WVC in EN 50341-1-001 (001) can be calculated as follows: G q h z (1.8 / ln ) (10) 0 where h is the height above ground; z 0 is the ground roughness parameter. WVC in DL/T5154-01 (01) can be obtained from the following process. When the height of the tower is not more than 60 m, the wind load adjustment coefficient can be obtained from Table 6 and the whole tower adopts a uniform WVC, when the height of the tower is more than 60m, the value of WVC increases from bottom to top along the tower according to GB50009-01 (01). But its weighted average should be greater than 1.6, otherwise need to be adjusted. Table 6 Wind load adjustment coefficient Tower height H/m 0 30 40 50 60 z single guyed tower 1.0 1.4 1.6 1.7 1.8 other tower 1.0 1.5 1.35 1.5 1.6 Footnote: (1) According to the linear interpolation method to calculate the median; () For the self supporting tower, the value is only for that with the ratio between height

and root in 4 ~6. The WVC in GB50135-006 (007) is the result of further simplification to the Calculation process in GB50009-01 (01) according to the characteristics of the high-rising structure. Due to the width of the structure in the windward is not so large, the height is the only variable in the expression of the WVC: z l ( H),, e x 1 H lx(0) lx( H) lx( z) z 1 1( 1, 0T1 ) (, H) B z (, z) lx(0) lx(0) z lx( H) 1,, e (, H ) H lx(0) lx( H ) lx( z) 1 1( 1, 0T1 ) B z (, H ) z lx(0) lx(0) H l ( H) l ( z) x x 1 1 1, 0T1 1, H,, e,, H lx(0) lx(0) z 1 1 1 (11) Write Eq. (11) as below: 1 z 1 (1) Where is the fluctuation amplifying coefficient; 1 is the fluctuating wind pressure and wind pressure height influence coefficient; is the vibration mode and the structure shape influence coefficient. 5. Calculation result WVC adopts a uniform value along the height according to ASCE No.74-009 (009). The calculation result is shown in Table 7. Table 7 WVC in ASCE No.74-009 h/ft z L 0 s /ft E B t G t 175.5 0.005 7 117.0 0 0.9 0.76 1.18

The result of WVC in EN 50341-1-001 (001) is shown in Tabe 8. The terrain category is Ⅱ and ground roughness parameter z 0 is 0.05 in this code. Table 8 WVC in EN 50341-1-001 h /m z 0 53.5 1.76 50.5 1.77 48 1.77 4.88 1.79 37.75 0.05 1.81 7.5 1.85 18.5 1.9 10.75.03 4.15.30.075.60 G q The calculation result of WVC in GB50135-006 (007) is shown in Table 9. For guyed tower, the ratio between top and bottom width is greater than 1, the value of is calculated with the ratio of 1. Table 9 WVC in GB 50135-006 height 1 53.50 1.00.37 50.50 0.94.30 48.00 0.89.3 4.88 0.80.10 37.75 0.70 1.97.66 0.5 7.5 0.50 1.70 18.5 0.34 1.47 10.75 0.0 1.8 4.15 0.07 1.11.075 0.04 1.05 Based on the linear interpolation method, a uniform WVC is adopted along the whole height according to DL/T5154-01 (01). The value of is 1.735 here. The calculation result of WVC of single guyed tower and transmission tower line system by time history analysis is showen in Table 10 and Table 11.

Table 10 WVC of single tower height/m weight/kg () z /m s s z 0 /N m AZ () z /m note 53.5 7.86 0.7 1.30 1.71 456 0.58 1.19 -- 50.5 637.43 0.54 1.30 1.68 456 3.35 1.3 position of cross 48 1047.15 0.46 1.30 1.65 456 4.51 1.4 arm position of cross arm 4.875 706.99 0.33 1.30 1.59 456.77 1.0 position of guy 37.75 494.36 0.33 1.30 1.53 456.55 1.16 position of guy 7.5 519.33 0.63 1.30 1.38 456.9 1.30 -- 18.5 449.1 0.76 1.30 1.1 456.5 1.41 -- 10.75 366.6 0.65 1.30 1.0 456.08 1.4 -- 4.15.98 0.34 1.30 1.00 456 1.8 1. --.075 94.99 0.1 1.30 1.00 456 0.54 1.14 -- Table 11 WVC of transmission tower line system height/m weight/kg () z /m s s z 0 /N m A () z /m note 53.5 7.86 0.35 1.30 1.71 456 0.58 1.10 -- 50.5 637.43 0.8 1.30 1.68 456 3.35 1.1 position of cross arm 48 1047.15 0.4 1.30 1.65 456 4.51 1.13 position of cross arm 4.875 706.99 0.18 1.30 1.59 456.77 1.11 position of guy 37.75 494.36 0.18 1.30 1.53 456.55 1.09 position of guy 7.5 519.33 0.5 1.30 1.38 456.9 1.5 -- 18.5 449.0 0.58 1.30 1.1 456.5 1.3 -- 10.75 366.61 0.43 1.30 1.0 456.08 1.8 -- 4.15.98 0.17 1.30 1.00 456 1.8 1.11 --.075 94.99 0.10 1.30 1.00 456 0.54 1.07 -- Z The calculation result above studies is shown in Fig. 8. The result indicates that the value in EN 50341-001 and DL/T5154-01 is mare than that of time history analysis and is relatively conservative; the value on one third of the hejight of the tower in GB 50135-006 tends to insecure and the rest is also conservative compared with the result of time history analysis; The value in ASCE No.74-009 is close to that of time history analysis but is uniform and relatively unsafe. Meanwhile, the comparison of WVC between single tower and transmission tower line system is shown in Fig. 9. The result shows that the value of single tower is more than that of transmission tower line system.

Fig. 8 Comparison of WVC Fig. 9 Comparison of WVC From the analysis results of single guyed tower, the change of WVC of guyed tower is relatively uniform along the height, but has mutations in the position of the guys, because the shape of the guyed tower is very different from that of traditional self-supporting tower. Under the restraint of the guy, the WVC is reduced and changes slowly near the position of the guy. In the cross arm where the quality and wind area are constrated, the value of WVC is influenced by guys and becomes tiny, but is more

than that at the top of the tower. The max of WVC appears in the position of 10~0 m, where the wind vibration force is significantly greater than that in other parts of the tower. Thus for guyed tower with reverse size, the WVC has a difference in the current code, which cannot accurately reflect the change of WVC along the height of such structure. The result of time history analysis of transmission tower line system shows WVC of the transmission tower line system is smaller than that of the single tower at the same height. However the same as single tower, max of wind vibration force appears is at one third of tower height below the guy and max of WVC is 1.3. Therefore, the conductor and ground wire have a weakening effect for the wind-induced vibration response of guyed tower and thus WVC that is obtained according to the result of single tower can meet the designing demand. 6. CONCLUSIONS This paper established the guyed tower model by SAP000 and AR method is used to simulate the random wind dynamic loads based on object-oriented programming language. Then the simulation of wind load applied on guyed tower as the input for nonlinear time history analysis and the main conclusions are as follows: The bottom of the guyed tower is inverted cone, which is easy to lead to torsional deformation of the structure along the height direction, so it should be paid attention to increase the torsional stiffness of the bottom of the tower. Besides, more likely transversal first order bending vibration appears for the guyed tower. In addition, due to the coupling effect between the conductor and the tower, frequency of the same mode is reduced and period is increased. The time history analysis result of transmission line shows that the conductor and ground wire have a weakening effect for the wind-induced vibration response of guyed tower and the value of WVC is reduced. So it is realistic to adopt the transmission line model for analysis. The WVC has been calculated and the value of design has been recommended in this paper. Using time history analysis method to evaluate the wind resistance of guyed tower can yet be regarded as a relatively accurate method. ACKNOWLEDGMENTS The research described in this paper was financially supported by a Project of of Northwest Electric Power Design Institute of China Power Engineering Consulting Group (No. DT-T0-011) and Natural Science Foundation of China (51508459). REFRENCES ASCE Manuals and reports on engineering practice No.74 (009), Guidelines for electrical transmission line structural loading ASCE No.74-009, ASCE. British standard (001), Overhead electrical lines exceeding AC 45 kv-part 1: General requirements-common specifications BSEN 50341-1-001, SFS-EN. Fu, X., Li, H.N. and Yi, T.H. (015), Research on motion of wind-driven rain and rain

load acting on transmission tower, Journal of Wind Engineering and Industrial Aerodynamics, 139, 7-36. Fu, X., Li, H.N. and Li, G. (016), Fragility analysis and estimation of collapse status for transmission tower subjected to wind and rain loads Structural Safety, 58, 1-10. Gani, F. and Légeron, F. (010), Dynamic response of transmission lines guyed towers under wind loading, Canadian Journal of Civil Engineering, 37(3), 450-465. Iannuzzi, A. and Spinelli, P. (1987), Artificial wind generation and structural response, Journal of structural engineering, 113(1), 38-398. Loredo-Souza, A.M. and Davenport, A.G. (001), A novel approach for wind tunnel modeling of transmission lines, Journal of Wind Engineering and Industrial Aerodynamic, 89(11), 1017-109. Lin, W.E., Savory, E., McIntyre, R.P., Vandelaar, C.S. and King, J.P.C. (01), The response of an overhead electrical power transmission line to two types of wind forcing, Journal of wind engineering and industrial aerodynamics, 100(1), 58-69. Liang, S.G., Zou, L.H., Wang, D.H. and Cao, H. (015), Investigation on wind tunnel tests of a full aeroelastic model of electrical transmission tower-line system, Engineering Structures, 85, 63-7. Lou, W.J., Xia, L., Jiang, Y., Jin, X.H. and Wang, Z.H. (013), Wind-induced response and wind load factor of transmission tower under terrain B wind field and typhoon wind field, Journal of Vibration and Shock, 3(6), 13-17. Mara, T.G. and Hong, H.P. (013), Effect of wind direction on the response and capacity surface of a transmission tower, Engineering structures, 57, 493-501. Ministry of Construction of PRC, (010), Code for designing of 110~750kV overhead transmission line GB50545-010, China Planning Press, Beijing. Ministry of Construction of PRC, (007), Code for design of high-rising structures GB50135-006, China Planning Press, Beijing. Ministry of Construction of PRC, (01), Loading code for design of building structures GB50009-01, China Construction Industry Press, Beijing. PRC Power System Trade Norm, (01), Technical Regulation of design for tower and pole structures of overhead transmission line DL/T5154-01, China Construction Industry Press, Beijing. Rao, N.P., Knight, G.M.S., Mohan, S.J. and Lakshmanan, N. (01), Studies on failure of transmission line towers in testing, Engineering structures, 35, 55-70. Savory, E., Parke, G.A.R., Zeinoddin, i.m., Toy, N. and Disney, P. (001), Modelling of tornado and microburst-induced wind loading and failure of a lattice transmission tower, Engineering Structures, 3(4), 365-375. Takahashi, T., Ohtsu, T., Yassin, M. F., Kato, S. and Murakami, S. (00), Turbulence characteristics of wind over a hill with a rough surface, Journal of Wind Engineering and Industrial Aerodynamics, 90(1), 1697-1706. Takeuchi, M., Maeda, J. and Ishida, N. (010), Aerodynamic damping properties of two transmission towers estimated by combining several identification methods, Journal of Wind Engineering and Industrial Aerodynamics, 98(1), 87-880. Wang, D.H., Wu, H.Y. and Liang, S.G. (014), Theoretical analysis and comparison on typical international wind load codes of transmission conductors, Proceedings of the CSEE, 34(36), 014. Wilson, E.(1997), SAP000: integrated finite element analysis and designing of

structures, Computers and Structures, Berkeley, California, USA. Xie, Q., Li, J.G., Yan, C.Y. and Zhou, Y. (013), Wind tunnel test on wind load transferring mechanism in the 1 000 kv UHV transmission tower-line system, Proceedings of the CSEE, 33(1), 109-116. Xu, M.M., He, H.B. and H, M.C. (011), Simulation analysis on wind vibration coefficient for transmission towers, HUNAN ELECTRIC POWER, 31(3), 8-10. Yu, D.K., Li, Z.L., Shi, J.H., Yan, Z.T. and Xiao, Z.Z. (015), Wind tunnel test on wind- Induced response of ±800 kv DC cross-rope suspension tower-line, Proceedings of the CSEE, 35(4), 1009-1013. Yang, F.L., Yang, J.B., Niu, H.W. and Zhang, H.J. (015), Design wind loads for tubular-angle steel cross-arms of transmission towers under skewed wind loading, Journal of Wind Engineering and Industrial Aerodynamics, 140, 10-18.