Presented at The AusIMM Bulletin International Uranium Conference 2013, Darwin, June 2013

Similar documents
GoviEx completes acquisition of African Energy s Zambian uranium assets

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April

Deep Yellow Revises Resource Estimate at INCA Uranium Deposit in Namibia

Fission Increases Indicated Resource; Doubles Inferred Resource

New Drilling Program Commences at Mutiny s Deflector Deposit

Radial basis functions and kriging a gold case study

Alligator Energy Uranium Projects. 6 September 18 NT RESOURCES WEEK Greg Hall, CEO

Goldplay President and CEO Marcio Fonseca commented

AGM Presentation 6 November 2012

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

ASX ANNOUNCEMENT 21 MARCH 2011

TSXV: GXU Part of the Nuclear Energy Solution July 2016

ASX ANNOUNCEMENT. High grade uranium mineralisation confirmed at the Minindi prospect

AGM Presentation 12 November 2013

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

Axiom Announces First Energy Project Eden Vale Sedimentary Uranium

Encouraging drill results from Paroo Range

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012

Fission s Initial Resource Totals at PLS: 79.6M lbs Indicated and 25.9M lbs Inferred

ASX announcement 16 May 2016

Annual Report Amended Additional Information

YANFOLILA EXPLORATION 2018

Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project

Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project.

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

Table 1 Updated Mineral Resource Tabulation for the Vertikalny Deposits of the Mangazeisky Property. Contained Metal Ag (koz)

Mountain Maid Gold System Displays Major Size Potential

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

INFILL DRILLING EXPANDS MINERALIZATION IN HIGH-GRADE GOLD-COPPER CORE AT SOUTHWEST DISCOVERY ZONE TURQUOISE HILL PROJECT, MONGOLIA

IVANHOE COMMENCES RESOURCE DELINEATION DRILLING AT NARIIN SUKHAIT COAL PROJECT IN MONGOLIA S SOUTH GOBI

Highlights from the four holes announced in this news release include:

News Release. Infill Drilling Program

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

CANDENTE UPDATES CAÑARIACO NORTE MINERAL RESOURCE ESTIMATE

EXPLORATION NEWS RELEASE MAGISTRAL DISTRICT: MORE GROWTH, MORE GOLD, MORE SILVER

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

For personal use only

Mineral reserves and resources

SPOT MARKET URANIUM OXIDE FIRMS TO US$49.25 POUND

For personal use only

Drilling program commences on Cloncurry and Mount Isa projects

ASX Code: ORN Compelling Nickel-Copper Targets Defined at Fraser Range Project

Our Services. What We Do. How We Can Help. Contact us today: January (0)

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

MARCH 2012 QUARTERLY REPORT. Highlights. Exploration Activities. Wyloo Iron Ore & Gold Project. Fast Facts

For personal use only

Form F3 MATERIAL CHANGE REPORT

Asiamet Drilling Further Extends BKM Mineralisation

27 March 2018 TSX-V: AZR AZARGA METALS INCREASES INFERRED RESOURCE FOR UNKUR WITH UPDATED MINERAL RESOURCE ESTIMATE

La Negra Ag Diatreme Breccia Pipe Promontorio IV Concession, Sonora, MX

ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA

IAMGOLD REPORTS HIGH-GRADE DRILL INTERSECTIONS FROM ITS 2017 DRILLING PROGRAM ON THE DIAKHA DEPOSIT, SIRIBAYA PROJECT IN MALI

SESE MEASURED RESOURCE EXCEEDS 650MT COAL

Sept 20, 2012 TSX Venture Exchange Tier 1 Trading Symbol: OK

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

Evaluation of Mineral Resource risk at a high grade underground gold mine

FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7)

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

Ausgold awarded EIS grant for Jinkas deep drilling

Castle Minerals Limited ASX: CDT

Mineral reserves and resources

Orezone s Bomboré Gold Project Reaches World Class Size

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

Portia Gold Mine Update

Summary Report Mineral Resource and Ore Reserve Update. Laiva Gold Deposit

MAIDEN URANIUM RESOURCE PROOF OF CONCEPT

AUC.V PRESS RELEASE NO. 01/06

NEWS RELEASE. Helio Announces Updated Mineral Resource Estimate at SMP Gold Project, Tanzania.

Altynalmas Gold s new upgraded and confirmed Bakyrchik East Mineral Resource Gold deposit boosts total gold resources at Kyzyl Project in Kazakhstan

GOLDPLAY OUTLINES FIVE NEW EXPLORATION TARGETS AT THE SAN MARCIAL PROJECT IN MEXICO

Rare Earth project update

SDH18-59, SDH18-62, SDH18-63

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

U3O8 Corp. reports results of infill drilling at Aricheng C in the Kurupung Project, Guyana

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

FURTHER EXPANSION OF GOLD DISCOVERY AT COLUMBUS PROJECT REPORTED BY IRELAND INC.

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DRILL RESULTS AND UPDATED RESOURCE FROM BLACKWATER HIGH-GRADE GOLD PROJECT

15 Mineral Resources (Item 19)

ASANKO GOLD ANNOUNCES ENCOURAGING INITIAL DRILL RESULTS FROM NEW EXPLORATION TARGET

ASX Announcement. New economic gold results confirm Dave East as an exciting new discovery. Highlights. 4 July 2011

Azerbaijan International Mining Company Limited

For personal use only

ASX ANNOUNCEMENT. Spectacular radiometric results at Mad Gap Project and East Kimberley Joint Venture

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

Highlights. 9 November 2018 DRILLING UPDATE - SORBY HILLS Pb-Ag-Zn PROJECT CORPORATE DIRECTORY

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

For personal use only

GOLDEN MINERALS DISCOVERS ADDITIONAL HIGH GRADE VEINS AT SANTA MARIA RESULTS UP TO 1.88 g/t Au and 648 g/t Ag

Altynalmas Gold announces a 50% increase in Indicated Mineral Resources at the Kyzyl Gold Project in Kazakhstan

Caravel commences major new drilling program at Calingiri copper-molybdenum project 8,500-9,000m of RC drilling planned across multiple targets

Marathon Announces Discovery of New High-Grade Gold Zone in Marathon Area and Sprite Zone Drilling Results, Valentine Lake Gold Camp

URANIUM GEOLOGY NIGER, WEST AFRICA

DRIVING NICKEL AND COPPER SULPHIDE DISCOVERY ON THE FRASER RANGE

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

KATINGAN RIA COAL RESOURCE UPGRADE

Mineral reserves and resources

IVANHOE S EXPLORATION TEAM AWARDED THE THAYER LINDSLEY INTERNATIONAL DISCOVERY AWARD BY PDAC FOR DISCOVERY OF THE HUGO DUMMETT DEPOSIT IN MONGOLIA.

AGM Geology Presentation. 30th November 2016

Transcription:

The Miriam case: A new type of uranium deposit within the Carboniferous sandstonehosted Uranium Mineralisation of the Arlit Agadez province, Tim Mersoi Basin, Niger Henri Sanguinetti, Exploration Manager, GoviEx Niger SA Tiemogo Mahaman, Chief Geologist, GoviEx Niger SA Ibrahim Awouami, Project Manager, GoviEx Niger SA Daniel Guibal, Corporate Consultant, SRK Consulting (Aus) Robert Bowell, Corporate Consultant, (Geochemistry) Peter Gleeson, Principal Consultant, SRK Consulting (UK) Presented at The AusIMM Bulletin International Uranium Conference 2013, Darwin, 11-12 June 2013

Disclaimers and Cautionary Statements This presentation includes certain forward-looking statements. All statements other than statements of historical facts, are forward looking statements that involve various risks and uncertainties. There can be no assurances that such statements will prove accurate and actual results and future events could differ materially from those anticipated in such statements. Such information contained herein represents management s best judgment as of the date hereof based on information currently available. The company does not assume the obligation to update any forward-looking statement. Information contained in this presentation regarding Areva and its mines and mineral projects in Niger has been derived from publicly available information. The company does not assume any responsibility or liability for the accuracy of any such information. Disclosure of a scientific or technical nature in this presentation relating to GoviEx s mineral properties was prepared by, or under the supervision of, Mr Henri Sanguinetti, GoviEx s Head of Exploration and a qualified person as defined in NI 43-101. 2

Summary GoviEx Niger SA GoviEx is a private exploration and development company with 10 tenements totaling approximately 5,000 km² of exploration ground in Niger, the world s sixth largest uranium producer. As of August 2012, GoviEx s properties contained more than 121 million pounds of NI 43-101-compliant uranium resources. GoviEx s technical team has completed more than 550,000 m of drilling and radiometric logging on its tenements. This presentation is focused on some of the exploration and development results of the 2010-Q1 2013 exploration drilling program which led to the discovery of new uranium mineralisation in the Tim Mersoi Basin. The mineralisation is hosted either within the Guezouman (Mad1 South, Miriam) or within the Madaouela formation, which represents a transitional term between the reduced sediments of the Carboniferous period, and the continental red beds of the Permian era. 3

Key development points 2010-2011: NI 43-101 Technical Report on Resources and Preliminary Economic Assessment of Madaouela 1, conducted by SRK Consulting, processing tests SGS, Canada All main objectives of 2011- Q1 2013 Increase Inferred Resource and run active exploration drilling on the permits MAD2-MAD3 and MAD1, east of Madaouela Flexure Development works to transfer Inferred Resource into Indicated Resource (100 m infill drilling) on MAD1 permit on the western flank of the Madaouela flexure 2012-Q1 2013 : Preparation of a PFS based on nearly 530,000 m development drilling (SRK supervision, Mintek lab (South Africa), Legeni) at Madaouela. 4

Madaouela & Anou Mélé tenements 5

Lithostratigraphic position of main uraniferous deposits in Tim Mersoi Basin JURASSIC PERMIAN CARBONIFEROUS 6

From Marianne-Marilyn to Miriam Marianne Marilyn complete 50 m grid Madaouela South drilling on a 100 m grid (Inferred Resource) with the idea to link a suspected redox band Miriam partly drilled at centre 50 m grid 7

Carpet-like deposits Plan view of structural domains relative to the Leapfrog 0.025 ppm U grade shell for Marianne-Marilynn All Madaouela deposits are carpet-like deposits, U mineralisation in coarse- to medium-grained Guez sandstone at unconformity contact with reducing Talak marine to deltaic claystone 8

The Miriam case The Miriam deposit was discovered at the 400 m-200 m grids while drilling the interpreted redox halo which supported all known deposits in the Madaouela region. GNSA geologists had suggested that at a certain stage it should be possible to encounter redox front of the Akouta model, on the basis of redox observations on MSNE and first exploration results on the sector called Mad South. At the 400 m grid, no rich intersections were recorded, but the scintillometric logs, and chips colours clearly mimic the possibility for a local redox front, albeit at low grade. At the 200 m grid, the mineralisation at cut-off 200 ppm showed interesting continuities, an average depth lower than 100 m and some rich intercepts suggesting the possibility of a low grade open pittable deposit 9

The Miriam case Drilling continued at centre 200 m and local 100 m grid. The geological global potential did not vary, although the mineable mineralisation, developed at 100 m grid was smaller than the original contour. In March 2012, the situation was as follows: Completion of 100 m grid 3D Geological model based on sequential stratigraphic control, and guided by the two main stratigraphic surfaces: the base of the Guezouman sandstones and the TM paleohorizontal level of the Tchinezogue 3D estimation carried out by SRK (UC) Pit optimisation (SRK) defined a project which was too small to justify its integration within the planned PFS which focused on UG mining. 10

Resource August 2012 Cut-off 0.4 kg/t eu or 0.47 kg/t eu3o8 NI 43-101-complaint procedures and computations implemented for data acquisition, validation and resource estimates. 11

12

13

The Miriam case September 2012 Grade and spatial distribution of impacts at 200 m to 100 m grid were not acceptable for UG mining Pit optimisation failed at 100 m grid But: Mineralisation related to reduced bottom sets of interpreted sedimentary units Presence of a vertical redox front confirmed, which needed to be sampled and correctly delineated Possible discrete structural control, although no faults are observed. 14

Plan view of stratigraphic formlines and structures interpreted at Miriam (relative to ASTER and QuickBird imagery) No surface marking of the structures controlling the mineralisation 15

Miriam faults shown relative to topography with QuickBird drape and Leapfrog 400 ppm U grade shell 16

The Miriam case Q4 2012-2013 In these conditions, the following conclusions were reached: That we were dealing with a real orebody of a new type That the geological model based on planar stratigraphic control could not reflect the complexity of the deposit That the only possible solution was to extend drilling at a 50 m grid, with local centred 50 m cell if necessary That vertical and inclined core drilling were needed for modeling, ore sampling and geotechnical assessment. 17

October coring to sample redox front CORE HOLE FROM TO Th (m) GxTh (m*eu ) G (eu ) MSNE4817_5 87.6 112.8 25.2 65.7 2.61 MSNE4818_5 92 97.6 5.6 5.56 0.99 MSNE4818_5 98.6 109.4 10.8 23.38 2.16 MSNE4819_5 79.2 84.2 5 8.61 1.72 MSNE4819_5 84.8 97.4 12.6 22.64 1.8 MSNE4819_5 102.6 103.6 1 1.03 1.03 MSNE4820_5 73.8 93.2 19.4 53.86 2.78 MSNE4821_5 68.2 74.8 6.6 38.53 5.84 MSNE4821_5 77.2 86.4 9.2 9.4 1.02 18

Geological Model Step 1 Sectional model: seam contours of mineralisation based on: Sequential interpretation core strati model Resistivity and gamma logs Rock chips description and redox interpretations. Stratigraphic surfaces: Basal reducing contact Guez/Talak Top reducing surface of TM paleohorizontal unit (within Blue Grey of Tchinezogue). 19

TM paleohorizontal surface Interpreted pseudo seams Guez basal surface 20

Combining sequences and mineralisation (intervals at eu 200, 400 and 1,000 ppm) The rich zones are related to the intersection of discrete expansion faulting with favorable sedimentology units, resulting in the Christmas tree aspect of the high grade zones 21

22

Geological Model Step 2 Vertical coalescent mineralisation: related to a redox front associated with discrete structures: Trends defined using isopach of cumulated Mineralised Thickness (Th) and Accumulation (Grade*Th) Plots of main joints and faults recorded on core holes (vertical and inclined) using acoustic and televiewer survey Geotechnical logs on oriented cores 23

Drilling situation 31 January 2013 24

25

26

27

28

29

30

31

32

33

34

35

36

Miriam: 3D Estimation (SRK D Guibal) Data: Drilling density varying from 100 m x 100 m to 30 m x 30 m (50 m grid centres) 803 drillholes 20 cm composites flagged based on interpretation of mineralisation by GoviEx and remodelled in 3D by SRK using Leapfrog 3D (P Gleeson) 2 grade shells: 400 ppm eu (high-grade corridors) 200 ppm eu (background mineralisation) The JORC Classified Resources are defined at a 400 ppm eu cut-off (approximately 0.047% eu3o8 - selective mining unit (SMU) of 5 m x 5 m x 0.4 m is assumed) 37

Variography HG Domain eu variability requires Gaussian transformation and back-transformation Short-range structure predominant Some longer range structures, N310, but less than 100 m 38

Variography LG Domain eu variability requires Gaussian transformation and back-transformation Short-range structures predominant Some longer range structures, N310 up to 250 m (less variability than HG Domain) 39

Block Kriging Frequencies teneur 1 slope Nb Samples: 0.0 25457 0.5 1.0 Minimum: 0.0000 Maximum: 0.8432 0.100 Mean: 0.5009 Std. Dev.: 0.2173 0.100 0.075 0.075 0.050 0.050 0.025 0.025 0.000 0.000 0.0 0.5 1.0 teneur 1 slope Frequencies 25 m x 25 m x 0.4 m blocks rotated by 47 to align with the data grid Ordinary Kriging Anisotropic Neighbourhood ( 150 m x 5 m x 75) Up to 32 data per kriging Top-cuts (10 kg/t eu in HG, 5kg/t eu in LG domain for data >2 m away from a block) 25457 (HG) and 85499 (LG) blocks are estimated Kriging quality reasonable as seen from the regression slope Significant smoothing effect 40

Estimation method: Uniform Conditioning 25 m x 25 m x 0.4 m blocks are the smallest blocks which can be estimated with a reasonable quality because of the drilling density and the variography (high nugget effect) In Open Pit mining, high selectivity assumption based on radiometric grade control: SMU 5 m x 5 m x 0.4 m Classical Uniform Conditioning estimation Classification: Ordinary kriging works reasonably well, and the current drilling density makes the interpretation of the continuity of the mineralisation and its modelling reasonable Based on similar deposits nearby, a 25 m spacing is considered sufficient to define Measured Resources. ed Resources 41

Localised Uniform Conditioning A limitation of the traditional UC method is that the pit geometry is dictated by the large blocks 25 m x 25 m To assist pit definition, it is possible to localise the results of the UC (this procedure is essentially an ad hoc technique to facilitate pit optimisation) Procedure (after Marat Abzalov): Define a 5 m x 5 m x 0.4 m BM coincident with the original UC panels BM Perform an OK of eu within this BM using the same parameters as the one used for the OK performed prior to UC Within each 25 m x 25 m panel, rank the SMUs by increasing value of this OK Assign a grade to the ranked SMUs in the panel (defined by the gradetonnage curve of the SMUs, as estimated by UC. 42

Resources March 2013 (SRK) MIRIAM Classification Tons (Mt) Grade (kg/t eu 3 O 8 ) eu 3 O 8 (t) eu 3 O 8 (Mlb) Marianne/Marilyn Indicated 12.09 1.58 19,145 42.21 Inferred 3.05 1.40 4,285 9.45 Miriam (Open Pit option) Measured 9.62 1.08 10,397 22.92 Indicated 2.68 0.79 2,112 4.66 Inferred 0.58 1.33 773 1.70 MSNE Indicated 5.05 1.61 8,111 17.88 Inferred 0.10 1.34 131 0.29 MARYVONNE Indicated 1.23 1.79 2,195 4.84 Inferred 0.42 1.66 703 1.55 MSCE Inferred 0.72 1.81 1,308 2.88 MSEE Inferred 1.45 1.64 2,373 5.23 LA BANANE Indicated 1.57 1.64 2,589 5.71 Inferred 1.15 1.18 1,358 2.99 Total Measured 9.62 1.08 10,397 22.92 Total Indicated 22.63 1.51 34,153 75.30 Total Inferred 7.47 1.46 10,931 24.10 Cut-off 0.4 kg/t eu or 0.47 kg/t eu3o8 43

Deposit Cut-Off Uranium Metal Uranium Oxide (Mt) eu (kg/t) eu (t) U 3 O 8 (kg/t) U 3 O 8 (t) U 3 O 8 (Mlb) Miriam 0.41 6.4 0.98 6300 1.16 7,400 16,38 Cut-off 0.41 kg/t eu Open Pit Mineral Reserves are reported within a designed pit shell at a cut-off grade of 0.41 kg/t eu. Cut-off grades are based on a price of USD70 per pound of U 3 O 8 (USD181.98/kg eu) and uranium recoveries of 84.4%, without considering revenues from other metals. Note Mineral Reserves are based on both Measured and Indicated Resources. 44

Thank you 45