Pursuing Large Gold Discoveries in WA s Eastern Goldfields

New Drilling Program Commences at Mutiny s Deflector Deposit

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

For personal use only

For personal use only

For personal use only

For personal use only

High Grade Gold Intercepts at Bangaba

Highlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate

MT PLEASANT AUGER GEOCHEM RESULTS OUTLINE A NEW GOLD ZONE TO THE NORTH-EAST OF FIDELATAS PROSPECT HIGHLIGHTS

For personal use only

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

ASX Announcements & Media Release

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

For personal use only

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE

Ausgold awarded EIS grant for Jinkas deep drilling

Discovering Large new Gold Deposits in the Eastern Goldfields

New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso

BUNDARRA RESOURCE UPDATE

New Zone of High Grade Gold Discovered at Balogo

102 metres strike length averaging 32.62g/t Gold extends overall surface vein sampling to date to 726 metres strike length averaging 24.

Annual General Meeting

ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA

For personal use only

ASX announcement. Mylo-Frontier Pilbara Gold Project acquisition. 27 November Summary

Developing the +1.2Moz Pilbara Gold Project

DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

ROE HILLS COBALT AND GOLD DRILLING ADVANCES

ASX ANNOUNCEMENT 21 MARCH 2011

Disclaimer. Forward-Looking Statements. Competent Person s Statement

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

FIVE RIGS DRILLING AT KARLAWINDA

Exploration Update: RC Drilling Commenced at Lucky Strike

High Grade Gold Drill Results Extend Buccaneer

For personal use only

APOLLO SOUTH AUSTRALIAN EXPLORATION UPDATE

TWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT

Option agreement with Randgold set to commercialise Massigui Gold Project

March 26 th Expansive Exploration Target Defined at Leonora Gold Project

For personal use only

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS

For personal use only

For personal use only

ASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM

For personal use only

Auger Drilling Progress Report - Moktedu Trend Prospect 5km Gold Trend Confirmed Along Strike from 3.5Moz Deposit

EXPLORATION ACTIVITY TO RECOMMENCE AT KOURI GOLD PROJECT IN BURKINA FASO

ASX Announcement. FLEM survey underway at Henrietta Cobalt Nickel Prospect, Tasmania ASX: AX8 HIGHLIGHTS. Market Data. Board and Management.

For personal use only

Chalice, Higginsville Drilling

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project

Auger Drilling Progress Report - Meguet Trend Prospect Multiple Highly Anomalous Gold Discoveries within 8km Mineralised Corridor

For personal use only

Co-O MINE MINERAL RESOURCE UPDATE

» Mineralisation up to 45m wide and open along strike and down dip. Infill and extensional drilling completed. Results awaited.

NEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA

SUMMARY HIGHL. The project is located close to road and gas pipeline infrastructure and a large service centre.

ASX RELEASE ACTIVITY UPDATE SPARGOVILLE PROJECT WA MINING AND EXPLORATION

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project

704,000 OUNCE MIYABI GOLD PROJECT UPDATE

MARKET UPDATE ON URANIUM AND GOLD PROJECTS

For personal use only

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

For personal use only

MINCOR /GOLDEN RIM FIJI JOINT VENTURE SIGNIFICANT NEW EXPLORATION RESULTS

ASX RELEASE / MEDIA RELEASE 2,810 ppb gold in shallow auger samples Four new parallel zones defined up to 1500m in strike

Aurora Tank Gold Drilling Update

New High Grade Lode Discovered at Wagtail South

ASX and Media Release

Drilling Commences at Telfer West Gold Project

For personal use only

EXPLORATION SUCCESS AT COYOTE GOLD MINE

RC drilling begins at Akoko Project marking commencement of 2010/11 exploration field season

Malachite Resources Limited ABN

The Company was admitted to the Official List on 12 November 2010 and its shares commenced trading

For personal use only

EIS sponsored Diamond drilling to commence at Zanex

For personal use only

For personal use only

Drilling Program Commences on Iron Oxide Copper Gold Targets

NEWS RELEASE TSX-V Ticker: SWA 23 April 2013 SWA.WT SARAMA RESOURCES EXTENDS HIGH-GRADE MINERALISATION AT MM PROSPECT IN BURKINA FASO

NEW COBAR-STYLE COPPER DISCOVERY IN NSW

For personal use only

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA

ASX / MEDIA RELEASE 6 MAY MILE SILVER-LEAD-ZINC DISCOVERY; HIGH GRADE SILVER-GOLD IN ROCK CHIPS AT RUBY SILVER

FOCUS MINERALS REPORTS ENCOURAGING FIRST ROUND RESULTS FROM COOLGARDIE NEAR MILL PROGRAMME

Diamond Drilling Extends the Netiana Lodes at Depth

Drilling program commences on Cloncurry and Mount Isa projects

Further Extensions to the Netiana Lodes at Balogo, Burkina Faso

An ASX listed Perth-based gold explorer focused on Ghana in West Africa

For personal use only

For personal use only

SIGNIFICANT GOLD MINERALISATION INTERSECTED AT MANIEMA PROJECT, DRC 21.7m at 3.58g/t Au HIGHLIGHTS

Transcription:

18 April 2018 ASX Announcement DRILLING UNDERWAY AT SLATE DAM GOLD PROJECT HIGHLIGHTS 2nd Phase Drilling Program underway at Slate Dam - 9 RC holes for ~1,000m completed to date Program designed to expand the gold mineralised system discovered in 1 st Phase drilling program at Slate Dam Program includes: o 12 holes to test grade and dimensions of mineralised zones o 8 holes to seek repetitions of mineralised shales to the east o 6 holes will test the 440ppb gold soil anomaly to the north Alteration and structure with stratigraphy visible in drill chips from the current program, with fine grained pyrites evident in shales First assays sent for laboratory analysis drilling to be completed by end of month Stratigraphic drilling program then to commence at nearby Beowulf Gold Project Slate Dam further expanded by acquisition of Exploration Licence in southern area of Project ASX: AAJ Capital Structure 515M Shares on Issue 16M Options on issue Cash $1.4M Board of Directors Non-Executive Chairman Paul Boyatzis Managing Director Peter Schwann Non-Executive Director Mark Elliott Company Secretary Phillip MacLeod Active Gold Projects SLATE DAM PROJECT BEOWULF PROJECT Aruma Resources Limited (ASX: AAJ) is pleased to announce that the second phase of drilling at the Company s 100%-owned Slate Dam Gold Project in the Eastern Goldfields of Western Australia has commenced and is now well underway. Drilling at Slate Dam commenced Wednesday the 11 th of April, and the program has made strong progress. To date, Aruma has completed nine holes for a total of approximately 1,000 metres of Reverse Circulation (RC) drilling, out of a planned program of up to 30 holes for approximately 4,000 metres (with planned drilling depths up to 200 metres). The Company advises that in line with its sediment-hosted gold model at the Slate Dam Project, alteration and structure with stratigraphy are visible in drill chips from the current program, with fine grained pyrites evident in shales. The first assays from completed holes have been sent for laboratory analysis. Results from the drilling at Slate Dam and Beowulf will be reported when they are all received and interpreted. Head Office Level 1, 6 Thelma Street West Perth, WA 6005 T +61 8 9321 0177 F +61 8 9226 3764 E info@arumaresources.com W www.arumaresources.com Postal Address Locked Bag 2000, Nedlands, WA 6909 ABN 77 141 335 364

This phase of drilling at Slate Dam is also expected to be completed by the end of the month. A stratigraphic program will then commence at the nearby Beowulf Gold Project. About the Slate Dam Drilling Program The second phase of drilling at Slate Dam is designed to follow up from the Company s successful maiden drilling program completed in February (ASX announcements, 1 February and 21 February 2018), which resulted in the discovery of a significant new gold system at Slate Dam. The current drill program includes; Completed holes to date are red stars in Figure 1 Extensional holes (blue stars in Figure 1) which will follow up the 20 metre thick trend identified in Aruma s maiden drill program; Repetition holes (green stars in Figure 1) with the aim of discovering stratigraphic repetitions of the gold mineralised system to the east; and Drilling will also target the recently discovered major, 440ppb gold anomaly, located to the north of the Company s previous drilling at Slate Dam (ASX announcement, 15 February 2018). Drilling will seek to extend the dip and strike potential of the major gold shoots identified in the first phase of drilling, and also define higher grade lodes within these shoots (refer Figure 1 for planned drill hole locations). Background to Slate Dam Project Aruma s first phase of drilling at Slate Dam resulted in the definition of two major, tabular 20 metre thick shoots dipping 30 degrees to the west, which host mineralised sediments grading >1g/t Au. These shoots are offset by the East Fault, and both currently extend for approximately 700 metres either side of the East Fault and remain open in all directions. The results of the first phase drilling are significant and have confirmed Aruma s sedimenthosted gold exploration model for Slate Dam. The addition of historic drill results from the Project has further strengthened this model. The intersections and the outcrop assay demonstrate that the shoots will likely be close to surface. This may impact on the testing methods and result in reduced drilling costs in order to delineate significant deposits at the Slate Dam Project. Aruma Resources Limited (ASX: AAJ) www.arumaresources.com ABN 77 141 335 364 2

Figure1. Overview of current drill holes at Slate Dam - the extension drill hole locations may include two or more holes with the currently completed holes in red. Slate Dam Project Area Expanded Aruma is also pleased to advise that it has further expanded the Slate Dam project area with the strategic acquisition of Exploration Licence (EL) E25/526, in the southern region of the Project. The new EL comprises six blocks and covers an area of 19km 2 (See Figure 2). The EL hosts the historic Transville (and Mt Juglah) gold mines, which are reported to have historically produced 970 tonnes of gold ore at 26.7g/t gold for 25.76 kg (1923 1927 (Minedex records 17655 and 17564). The old shafts at Transville are shown Plate 1 below. Aruma Resources Limited (ASX: AAJ) www.arumaresources.com ABN 77 141 335 364 3

The EL was acquired from Rare Earth Contracting Pty Ltd for total consideration of $20,000 and 2 million Aruma shares. Figure 2. Slate Dam Project areas with new lease E25/526 in red and drilling targets at the north end of the project. The Slate Dam Project now covers some 330km 2 of very prospective sediments situated on granite centres. The leases are mostly granted and cover a strategic 330km 2 situated only 40 to 60km from Kalgoorlie. These leases contain over 60km of strike of the prospective beds that host Trojan and Majestic Imperial as shown above. Aruma s exploration program has been designed to locate the mineralisation centres that will exist along these trends and potentially host several major centres capable of supporting mining operations Aruma Resources Limited (ASX: AAJ) www.arumaresources.com ABN 77 141 335 364 4

Plate 1. These are the old shafts at the Transville Mine on E25/526 that produced some 1,000 tonnes at nearly 1 ounce per tonne in the 1920s. ENDS For further information please contact: Peter Schwann Managing Director Aruma Resources Limited Telephone: +61 8 9321 0177 Mobile: +61 417 946 370 Email: info@arumaresources.com James Moses Media and Investor Relations Mandate Corporate Mobile: +61 420 991 574 Email: james@mandatecorporate.com.au Aruma Resources Limited (ASX: AAJ) www.arumaresources.com ABN 77 141 335 364 5

Competent Person s Statement The information in this release that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Peter Schwann who is a Fellow of the AIG and Australasian Institute of Mining and Metallurgy. Mr Schwann is Managing Director and a full time employee of the Company. Mr Schwann has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserve. Mr Schwann consents to the inclusion in the release of the matters based on his information in the form and context in which it appears. All exploration results reported have previously been released to ASX and are available to be viewed on the Company website www.arumaresurces.com.au. The Company confirms it is not aware of any new information that materially affects the information included in the original announcement. The Company confirms that the form and context in which the Competent Person s findings are presented have not been materially modified from the original announcements. Forward Looking Statement Certain statements contained in this document constitute forward looking statements. Such forward-looking statements are based on a number of estimates and assumptions made by the Company and its consultants in light of experience, current conditions and expectations of future developments which the Company believes are appropriate in the current circumstances. These estimates and assumptions while considered reasonable by the Company are subject to known and unknown risks, uncertainties and other factors which may cause the actual results, achievements and performance of the Company to be materially different from the future results and achievements expressed or implied by such forward-looking statements. Forward looking statements include, but are not limited to, statements preceded by words such as planned, expected, projected, estimated, may, scheduled, intends, anticipates, believes, potential, could, nominal, conceptual and similar expressions. There can be no assurance that Aruma plans to develop exploration projects that will proceed with the current expectations. There can be no assurance that Aruma will be able to conform the presence of Mineral Resources or Ore Reserves, that any mineralisation will prove to be economic and will be successfully developed on any of Aruma s mineral properties. Investors are cautioned that forward looking information is no guarantee of future performance and accordingly, investors are cautioned not to place undue reliance on these forward-looking statements. Aruma Resources Limited is a proud supporter and member of the Association of Mining and Exploration Companies, 2018. Aruma Resources Limited (ASX: AAJ) www.arumaresources.com ABN 77 141 335 364 6