Gold Exploration Update

Similar documents
ASX Announcement. 28 January Drill results indicate large Porphyry Copper Gold System at Peenam

Paydirt Gold Conference Presentation

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

CRATER MOUNTAIN MAJOR MULTIPLE MINERALISATION EVENTS POTENTIAL ASSOCIATED WITH PORPHYRY SYSTEM NOW IDENTIFIED

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

Auger Drilling Progress Report - Moktedu Trend Prospect 5km Gold Trend Confirmed Along Strike from 3.5Moz Deposit

For personal use only

GEOPHYSICAL SURVEYING COMMENCES AT ESK TROUGH

GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT,

New Drilling Program Commences at Mutiny s Deflector Deposit

ASX ANNOUNCEMENT 21 MARCH 2011

Auger Drilling Progress Report - Meguet Trend Prospect Multiple Highly Anomalous Gold Discoveries within 8km Mineralised Corridor

Drilling program commences on Cloncurry and Mount Isa projects

704,000 OUNCE MIYABI GOLD PROJECT UPDATE

For personal use only

ASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM

Queensland Mining Corporation Limited

FIRST 2 DRILL HOLES AT NAKRU-2 PROSPECT BOTH INTERSECT SIGNIFICANT HIGHER GRADE COPPER MINERALISATION

For personal use only

High-grade Copper and Gold Discovered at Productora

ASX Announcement NAKRU DRILLING AND TRENCHING INTERSECTS 11 METRES AT 2.84 G/T GOLD AND 28.4 METRES AT 1.1% COPPER

Drilling Program Commences on Iron Oxide Copper Gold Targets

Mt Cannindah IP Data Reprocessing & 3D Geological Modelling Identifies Potential Resource Extensions

For personal use only

DRILLING COMMENCES AT ESK TROUGH

ASX Announcement. New economic gold results confirm Dave East as an exciting new discovery. Highlights. 4 July 2011

Axiom Nightflower Drilling Progress and IP Survey Results, North Queensland

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project

ASX announcement. Mylo-Frontier Pilbara Gold Project acquisition. 27 November Summary

ASX ANNOUNCEMENT Date: 03 October 2018 Number: 604/031018

DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT

SIGNIFICANT GOLD MINERALISATION INTERSECTED AT MANIEMA PROJECT, DRC 21.7m at 3.58g/t Au HIGHLIGHTS

FIVE RIGS DRILLING AT KARLAWINDA

For personal use only

For personal use only

Drilling Commences at Telfer West Gold Project

For personal use only

For personal use only

ASX RELEASE / MEDIA RELEASE 2,810 ppb gold in shallow auger samples Four new parallel zones defined up to 1500m in strike

High-grade Gold in First Drilling Undertaken at Productora South

For personal use only

For personal use only

MINCOR /GOLDEN RIM FIJI JOINT VENTURE SIGNIFICANT NEW EXPLORATION RESULTS

Hampton Hill Mining NL

ASX Announcements & Media Release

SIMUKU DRILLING TO OVER 1000 METRES DEMONSTRATES SIGNIFICANTLY INCREASED TONNAGE POTENTIAL OF THE INFERRED RESOURCE

MAJOR EXPLORATION PROGRAMME TO COMMENCE AT ROSEBY

Hann Prospect New Gold Discovery Confirmed

Encouraging drill results from Paroo Range

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development

High Grade Gold Drill Results Extend Buccaneer

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

Co-O MINE MINERAL RESOURCE UPDATE

Diamond Drilling to Commence in Axiom s Quang Tri Tenement, Vietnam

High Grade Gold Intercepts at Bangaba

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE

The Manager Companies ASX Limited 20 Bridge Street

Significant New Mineralised Zone Paroo Range (RGU:100%)

Ovoot Coking Coal Project (100%)

RC drilling begins at Akoko Project marking commencement of 2010/11 exploration field season

For personal use only

Acquisition agreement to move to 100% ownership of the Ashford Coking Coal Project

ASX Release. 16 December 2010 LIMITED. EXPLORATION UPDATE Highlights

AGM Presentation 6 November 2012

For personal use only

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

MANTLE MINING CORPORATION LIMITED

Prospect Resources Signs Mining Agreement over Bucks Reef Gold Mine.

For personal use only

NEW COBAR-STYLE COPPER DISCOVERY IN NSW

For personal use only

Victory plans gravity survey for Bonaparte after encouraging rock-chip results

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project

Resource Diamond Drilling Commences at Productora. Strong results continue from Productora central area drilling

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April.

For personal use only

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

For personal use only

For personal use only

SPL 1452 NAMOLI & WAINIVAU GOLD AND COPPER PROSPECTS

Aurora Tank Gold Drilling Update

For personal use only

Market Release October

ASX/Media Announcement 14 July 2010

ASX ANNOUNCEMENT 19 NOVEMBER 2015 SIGNIFICANT GOLD PROSPECT CONFIRMED AT APOLLO S SA GOLD PROJECT NEAR CHALLENGER

For personal use only

For personal use only

Highlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate

Northern Mining Limited 2012 Annual General Meeting Presentation

For personal use only

Helix Resources Limited A.C.N Incorporated in Western Australia

New zones of mineralisation found close to flagship deposits at Wa Gold Project

LOS CALATOS DRILLING RESULTS TD2 TARGET

For personal use only

New Zone of High Grade Gold Discovered at Balogo

For personal use only

Transcription:

ASX Announcement 26 October 2009 Gold Exploration Update The Directors of D Aguilar Gold Limited (ASX Code: DGR) are pleased to provide the following update on the Rannes and Clermont gold exploration Projects held by its subsidiary Central Minerals Pty Ltd. Rannes Project Area Drilling has resumed at Rannes Central. Four holes have been completed at Porcupine, and the rig will shortly move to Double Scoop and Crunchie. Significant new gold targets have emerged at Police Camp Creek, approximately 12 kilometres south of Rannes Central. The surface gold values are similar to the main prospects at Central. Best gold and molybdenum soil and rock sample results are from an area some 200m southeast of the Brother Prospect previously drilled by Queensland Metals Limited in the early 1990 s (see Figures 1, 2 and 3). Figure 1: Location of Police Camp Creek, south of Rannes Central

RHYOLITE INTRUSIVES LIMIT OF SOIL SURVEY SOILS > 100 PPB AU SOILS > 3 PPB AU SOILS > 40 PPB AU SOILS > 10 PPB AU PREVIOUS DRILLING ( BROTHER ) THRUST FAULT 3.3 G/T AU 1.3 G/T AU 0.85 G/T AU 2.1 G/T AU FAULT ZONE CARBONATE SEDIMENTS POLICE CAMP CREEK STATUS SEPT. 09 RADIOMETRIC BASE 0 500 1,000 N metres PERMIAN VOLCANICS NOT YET ROCK SAMPLED LIMIT OF SOIL SURVEY THRUST FAULT Figure 2: Initial Police Camp Creek Soil Geochemistry and Rock Sampling silver dominant in upper levels gold dominant in lower levels Figure 3: Schematic Model of Rannes Project Mineralisation Showing gold and silver zonation (not to scale)

Detailed work over the Crackling Rosie prospect (see Figures 1 and 4) has demonstrated that the gold (silver molybdenum) is hosted by a brecciated silicified limestone identical to Crunchie in appearance. The ground magnetics imagery indicates that the demagnetised gold bearing structure dips north easterly. No previous holes appear to have tested it. One hole (PD2) intersected 16m @ 2.3 g/t Au through the breccia outcropping south of the demagnetised target. UNALTERED LIMY SEDIMENTS GOLD MINERALISED CRACKLIN ROSIE DRILLING TARGET - LATE 2009 BASED ON PREVIOUS DRILLING AND RECENT GEOCHEMISTRY AND GEOLOGY AREA PREVIOUSLY DRILLED ASSUMING A SOUTHWESTERLY DIP N SILICIEOUS BRECCIAS > 40 PPB AU IN SOILS PD2 > 10 PPB AU IN SOILS 16M @ 2.3 G/T AU ON A GROUND MAGNETICS BASE GROUND MAGNETICS AND PD2 SUGGEST A NORTHEASTERLY DIP > 3 PPB AU IN SOILS DEMAGNETISED STRUCTURE 0 100 200 metres ALLUVIAL COVER - DEEPER DRILLING TARGET Figure 4: Crackling Rosie Shoot Drilling Target (with previous drill result) Clermont Project Area New gold zones detected in sub soil sampling have emerged at Niagara north and Carrols Creek in the Clermont Project Area (for location relative to Rannes see Figure 5). The peak sub soil value of 9.8 g/t Au at Niagara North is a remarkably strong result given the lack of outcrop and the suppressing effect of post mineral cover soils (see Figures 6 and 7). An initial first pass drilling program on these prospects will be commenced after the current short program on the Rannes Central prospects at Porcupine Pie, Double Scoop and Crunchie is completed (refer Location Plan Figure 1).

Figure 5: Location of Clermont Project Area Figure 6: Clermont Project Niagara North Prospect on radiometric background

MUTATION AND CARROLS CREEK REGOLITH GOLD TARGETS MIXED SOIL COVER SOILS ( VOLCANIC ) RADIOMETRIC IMAGERY BASE MUTATION > 3 PPB AU > 6 PPB AU > 20 PPB AU ALLUVIAL COVER NO OUTCROP RESIDUAL SOILS 50-300 PPB AU 7516000N N 0 0.5 1 kilometres TO CLERMONT CARROLS CREEK Figure 7: Clermont Project Update on Mutation and Carrols Creek Prospects (radiometric background) On behalf of the Board K M Schlobohm Company Secretary * ppb = parts per billion ** ppm = parts per million, equivalent to grams per tonne Competent Persons Statement The information herein that relates to Exploration Results is based on information compiled by Nicholas Mather B.Sc (Hons) Geol., who is a Member of The Australian Institute of Mining and Metallurgy. Mr Mather is employed by Samuel Holdings Pty Ltd which provides certain consultancy services including the provision of Mr Mather as the Managing Director of D Aguilar Gold Ltd (and a director of D Aguilar Gold Ltd s subsidiaries). Mr Mather has more than five years experience which is relevant to the style of mineralisation and type of deposit being reported and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Minerals Resources and Ore Reserves (the JORC Code). This public report is issued with the prior written consent of the Competent Person(s) as to the form and context in which it appears. For further information contact: Mr Nicholas Mather Mr Greg Runge Managing Director General Manager Ph: 07 3303 0680 or 0417 880 448 Ph: 07 3303 0680 or 0418 546 739 Email: info@daguilar.com.au Electronic copies and more information are available on the Company website: www.daguilar.com.au