Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1.

Similar documents
@Copyright 2016 SKAPS Industries.

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

Sediment Control Log (SCL)

Materials. Use materials meeting the following.

U-Shaped Sediment Traps

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

Coarse Sediment Traps


**Temporary Erosion Control**

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

ONE ROCK DAM ORD. capture more sediment. The original ORD becomes the splash apron for the new layer. STEP 4: When ORD fills in, add a new layer

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Specifications Whitcomb Elementary School Demolition January 15, 2016

Rock & Aggregate Drop Inlet Protection

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

Stone Outlet Sediment Trap

Sediment Weirs (Instream)

APPENDIX B WORKSHEETS & EXHIBITS

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils

Large-Scale Sediment Retention Device Testing (ASTM D 7351) SedCatch Sediment Basket Inlet Filter Exposed to 6% Sediment Load

Large-Scale Sediment Retention Device Testing (ASTM D 7351) SedCatch Sediment Basket Inlet Filter Exposed to 1.5% Sediment Load

Culvert and Pipe Phasing

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

TPDES: Soil, Erosion and Sedimentation Methods

EROSION CONTROL FIELD GUIDE By Craig Sponholtz & Avery C. Anderson

CONSTRUCTION EXIT SEDIMENT BARRIER

Woodford County Erosion Prevention Plan and Permit. Application #

Template for Sediment and Erosion Control Plan General Instructions

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations.

Stormwater Inlet Sediment Traps

Long Valley Meadow Restoration Project

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax:

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

Module 5: Channel and Slope Protection Example Assignments

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

STATE OF COLORADO DESIGN CRITERIA FOR POTABLE WATER SYSTEMS WATER QUALITY CONTROL DIVISION. Price: $5.00. Revised March 31, 1997

SILT FENCE EFFECTIVENESS

Erosion and Sediment Control Measures 2.7 Silt Fences

ISSUED FOR CONSTRUCTION

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

Instream Sediment Control Systems

STANDARD OPERATING PROCEDURES

APPENDIX A: EROSION & SEDIMENT CONTROL FORMS

Instream Erosion Control General

Responsibilities: Effective Date: November Revision Date: February 8, VP, Facilities and Construction Management. Issuing Authority:

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

Standard Test Method for Flat Particles, Elongated Particles, or Flat and Elongated Particles in Coarse Aggregate 1

Evaluation of Miramat Under High Velocity Flows

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

MATERIAL AND EQUIPMENT STANDARD FOR. INHIBITOR FOR HYDROCHLORIC ACID AND HCl+HF DESCALING AND PICKLING SOLUTION FOR OIL AND GAS WELLS ORIGINAL EDITION

December 11, 2006 File:

SECTION AGGREGATE OR GRANULAR SUBBASE

Commonwealth of Pennsylvania PA Test Method No. 729 Department of Transportation October Pages LABORATORY TESTING SECTION. Method of Test for


Hazard Communication

EVALUATING SEDIMENT BARRIERS

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

Designation: NWI DIF Horizontal Hail impact Standard

Guidance for implementing the Potential Fossil Yield Classification (PFYC) System

January 16, Re: Soo Line Dump Site 2018 Annual Soil Cover Inspection. Dear Mr. Nichols:

HAZARD COMMUNICATION SAFETY PROGRAM

Construction Exits Vibration grids

Test Results: Results of the test period on 06/19/16 using the Equivalent CTS Method: Thermal transmittance at test conditions (U s ):

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

Lamp and Control Panel (Lamp Panel)

Specific Accreditation Guidance

AM 500A 500 WATT AM 1A 1 KILOWATT AM BROADCAST TRANSMITTERS. October, 1999 IM No

How to Check Your G4 Spread Pattern

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2

HAZARD COMMUNICATION PROGRAM

50 Gordon Drive, Rockland, Maine sherplows.com. STORM BOXX Snowplow. 10' and 12' Box Plow for Backhoe Loaders

GOAL 7 AREAS SUBJECT TO NATURAL DISASTERS AND HAZARDS. To protect life and property from natural disasters and hazards.

Limited Visual Dam Safety Inspections OA Oahu Reservoir No Oahu, Hawaii

Countermeasure Calculations and Design

Facilities Management

Core Barrels. Core Barrels

1 /square Intermittent temperature range -250 C to 150 C (-420 F to 300 F) Continuous temperature range -250 C to 120 C (-420 F to 250 F)

Chutes Part 5: Rock linings

M. Sloat, AAg., CPESC R.J. Redden, R.P.Bio., A.Sc.T., CPESC. EDI Environmental Dynamics Inc Continental Way Prince George, B.C.

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

Food Safety and Quality Management System

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

Technical Data Sheet DPT & DPIT-4005 SERIES DIFFERENTIAL PRESSURE TRANSDUCERS. Features. Description

Introduction to Geohazard Standard Specification for Simple Drapery

Drivable Grass Report for Hydraulic Performance Testing

Sediment Trap. At multiple locations within the project site where sediment control is needed.

RADIATION SAFETY GUIDELINES FOR NON-USERS

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Erosion and Sedimentation Basics

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

Track design and management

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

What Is Water Erosion? Aren t they the same thing? What Is Sediment? What Is Sedimentation? How can Sediment Yields be Minimized?

LUDLUM MODEL 42-5 NEUTRON BALL CART. August 2015 Serial Number PR and Succeeding Serial Numbers

Transcription:

Supplemental Technical Specification for SEDIMENT TUBES SCDOT Designation: SC-M-815-1 (03/08) 1.0 Sediment Tubes This Supplemental Specification replaces sections 815.1.1.2, 815.2.3, 815.4.5, 815.5, and 815.6 for sediment tubes in the South Carolina Department of Transportation Standard Specifications for Highway Construction, 2007 Edition. 1.1 Description Sediment tubes are temporary erosion control devices for use along contours, in drainage conveyance swales, and around inlets to help reduce the effects of soil erosion and to retain sediment. Locations for installation will be designated on the Plans or by the Resident Construction Engineer (RCE). 1.2 Materials Natural pine needles, leaf mulch, and grass clipping-filled sediment tubes are not permitted under this Specification. Straw bales are also not permitted under this Specification. Provide sediment tubes for ditch checks and Type A inlet structure filters that exhibit the following properties: Machine produced by a manufacturer experienced in sediment tube manufacturing. Composed of compacted geotextiles, certified 100% weed free curled excelsior wood with 80% of the fiber materials being at least four (4) inches in length, natural coconut fibers (bristle and mattress form obtained from freshwater cured coconut husk.), certified 100% weed free agricultural straw, certified weed free compost per SCDOT Specifications, certified 100% weed free hardwood mulch, or a mix of these materials enclosed by a flexible netting material. Constructed of a tubular, flexible outer netting consisting of one of the following: o Seamless, high-density, polyethylene, polyester, and/or ethyl vinyl acetate, photodegradable materials treated with ultraviolet stabilizers. o Seamless, high-density, polyethylene, non-degradable materials. o Seamless, high-density, polypropylene, non-degradable materials. o Coir netting or coir fastening twine. Straw, curled excelsior wood, or natural coconut rolled erosion control products (RECPs) that are rolled up to create a sediment tube are not allowed under this Specification. Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1. March 4, 2008 Page 1

Table 1: Minimum Performance Requirements for Sediment Tubes Property Test Method Value Diameter Mass per Unit Length Field Measured Field Measured 18.0-inch minimum 24.0-inch maximum 3.0 lbs/ft ±10% minimum for 18-in diameter, or 4.0 lbs/ft ±10% minimum for 24-in diameter Length per Tube Field Measured 10-ft minimum* Netting Unit Weight Certified 0.35 oz/ft minimum *Select a length to minimize the number of sediment tubes needed. If the ditch check or inlet length (perpendicular to the water flow) is 15 feet, then one 15-foot sediment tube is preferred over two overlapped 10-foot sediment tubes. 1.2.1 Quality Assurance Before installation of sediment tubes, provide the following information from the manufacturer: Written quality control program conforming to the requirements of subsection 1.2.2 Quality Control. Documentation of field and/or laboratory testing that quantifies the erosion control and sediment retention performance of the product conforming to the requirements of subsection 1.2.2 Quality Control. Ensure that each sediment tube bears complete identification including, but not limited to, the following: Manufacturer s name and location. Manufacturer s telephone number and fax number. Manufacturer s e-mail address and web address. Sediment tube name, model, and/or serial number. Sediment tube diameter, length, and weight. Sediment tubes are listed on the most recent edition of SCDOT Qualified Product List 57 prior to being accepted for use. Prior to inclusion on SCDOT Qualified Product List 57, sediment tubes must meet the physical and performance criteria outlined in this Specification. 1.2.2 Quality Control Before installation of sediment tubes, provide the following information from the manufacturer: Written description of the manufacturer s quality control program of field and/or laboratory testing that quantifies the performance of the product. Performance testing must take place at a laboratory accredited to perform tests required for the product tested. Instructions on the proper installation and maintenance of the sediment tube. Certification of the testing requirements upon request. Provide verification of conformance with manufacturer s published Specifications (i.e. the certification) which at a minimum identify the following: Independent qualified test facility. Manufacturer. Product ID. Test ID. Test date. March 4, 2008 Page 2

1.3 Construction Requirements 1.3.1 Site Preparation Proper site preparation is essential to ensure sediment tubes are in complete contact with the underlying soil or underlying surface. Remove all rocks, clods, vegetation, or other obstructions that would prevent the installed sediment tube from having direct contact with the underlying soil or surface. 1.3.2 Installation 1.3.2.1 Type A Inlet Filters If requested by the RCE, provide a manufacturer s representative on-site to oversee and approve the initial installation of sediment tubes. Install sediment tubes used as Type A inlet structure filters as required by the current SCDOT Inlet Structure Filters Specification. 1.3.2.2 Sediment Tube for Ditch Checks If requested by the RCE, provide a manufacturer s representative on-site to oversee and approve the initial installation of sediment tubes. Provide a letter from the manufacturer approving the installation if requested by the RCE. Construct a small U-shaped trench to a depth that is 20% of the sediment tube diameter. Lay the sediment tube flat in the U-shaped trench and compact the upstream sediment tube soil interface. Place and anchor the sediment tube ends so they are positioned upstream of the sediment tube center point. Sediment tubes weighing more than 18 pounds per foot do not require trenching. Backfill these sediment tubes with coarse filter media on the upstream side of the sediment tube to increase the contact area with soil, increase filter size, slow down flow, capture more sediment, reduce undercutting, and reduce installation time. Place and anchor the sediment tube ends so they are positioned upstream of the sediment tube center point. Do not completely bury sediment tubes during installation. Review all project Specifications for special installation requirements. Install sediment tubes ensuring no gaps exist between the soil and the bottom of the sediment tube. Lap the ends of adjacent sediment tubes a minimum of six (6) inches to prevent flow and sediment from passing through the field joint. Never stack sediment tubes on top of one another. Avoid damage to sediment tubes during installation. If a sediment tube becomes damaged during installation, place a stake on both sides of the damaged area terminating the tube segment and install a new tube segment. Perform field monitoring to verify that installation procedures do not damage sediment tubes. Replace sediment tubes damaged during installation as directed by the RCE or manufacturer s representative at no expense to the Department. Install sediment tubes in swales or drainage ditches perpendicular to the flow of water and extend them up the side slopes a minimum of one (1) foot above the design flow depth. Space sediment tubes according to Table 2. March 4, 2008 Page 3

Table 2: Sediment Tube Spacing Maximum Sediment Slope (%) Tube Spacing (feet) < 2 150 2 100 3 75 4 50 5 40 6 30 > 6 25 Sediment tubes weighing more than 18-pounds per foot do not require staking. Install sediment tubes using wooden stakes (1 inch x 1 inch) or steel posts (1.25 lbs/ linear foot) a minimum of four (4) feet in length. Space posts or stakes on two (2)-foot centers and drive them into the ground to a minimum depth of two (2) feet leaving less than one (1) foot of stake above the exposed sediment tube. Intertwine the stakes with the outer mesh on the downstream side of the sediment tube. An acceptable alternative installation is driving stakes on two (2)-foot centers on each side of the sediment tube and connecting them with natural fiber twine or steel wire to inhibit the non-weighted sediment tube from moving vertically. Sediment tubes can also be secured by installing the stakes on two (2)-foot centers in an X-crossing pattern ensuring direct soil contact at all times. Select the sediment tube check length to minimize the number of sediment tubes needed to span the width of the drainage conveyance. If the required ditch check length (perpendicular to the water flow) is 15 feet, then one (1) 15-foot sediment tube is preferred compared to two (2) overlapping 10-foot sediment tubes. Install sediment tubes for ditch checks over bare soil, mulched areas, or erosion control blankets. Keep sediment tubes for ditch checks in place until fully established vegetation and root systems have completely developed and can survive on their own. 1.3.3 Delivery, Storage, and Handling Follow the manufacturer s written storage and handling procedures for sediment tube labeling, shipment, and storage. Clearly show the manufacturer or supplier name and sediment tube diameter and length on product labels. Store sediment tubes off the ground and cover them to adequately protect them from the following: Construction damage. Precipitation. Extended exposure to ultraviolet radiation including sunlight. On-site chemicals. Flames including welding sparks. Excess temperatures. Other environmental conditions that can damage the physical properties of sediment tubes. 1.3.4 Inspection and Maintenance of Sediment Tubes Inspect sediment tubes after installation to ensure that no gaps exist under the sediment tubes or between the joints of adjacent ends of sediment tubes. Inspect sediment tubes every seven (7) days. Repair rills, gullies, and undercutting near the sediment tubes. March 4, 2008 Page 4

Remove sediment deposits that impair the filtration capability of a sediment tube when the sediment reaches one-third of the height of the exposed sediment tube. Remove and/or replace installed sediment tubes as required to adapt to changing construction site conditions. When the functional longevity of the sediment tube is exceeded as determined by the RCE or manufacturer s representative, remove them from the site. Gather and dispose sediment tubes in regular means as non-hazardous, inert material. Before final stabilization, backfill all trenches, depressions, or other ground disturbances caused by the removal of sediment tubes. 1.3.5 Acceptance Obtain RCE acceptance and approval of sediment tube installations. When requested by the RCE, ensure that a manufacturer s representative is on-site to oversee and approve the initial installation of sediment tubes. Obtain a letter from the manufacturer approving the installation when requested by the RCE. The RCE will measure the diameter of installed sediment tubes. The diameter of the installed sediment tube must be within 10% of the circumference printed on the manufacturers packaging slip for approval. 1.4 Measurement The quantity of the pay item sediment tube is the length of sediment tube installed, including overlaps and wastage, and is measured by the linear foot (LF) of sediment tube in-place, complete and accepted. Sediment tubes damaged by the Contractor s operations are not included in the measurement. The installation of sediment tubes may require written acceptance by the manufacturer s representative before the quantity is accepted. 1.5 Payment Payment for sediment tubes is full compensation for installing the sediment tubes as specified or directed and includes furnishing, placing, maintaining, inspecting, removing, and disposing of the sediment tubes, providing wooden stakes, steel posts, proper storage facilities, documentation of quality control and quality assurance programs, and all other materials, labor, equipment, tools, supplies, transportation, and incidentals necessary to fulfill the requirements of the pay item in accordance with the Plans, Specifications, and other terms of the Contract. Bid item numbers and descriptions are as follows: Table 4: Bid Item Number Bid Item Number Description Unit 8152007 Sediment Tube LF March 4, 2008 Page 5