Optimisation Success Reduces Leach Time By 60%

Similar documents
Global Geoscience Makes Groundbreaking Discovery Heap Leach Lithium-Boron Extraction at Rhyolite Ridge

Quarterly Activities Report For the period ending 31 March 2018

POSITIVE METALLURGICAL RESULTS FROM KHARMAGTAI

CENTAURUS EXPANDS JAMBREIRO STUDY WORK AS A RESULT OF EXCELLENT RESULTS IN SOUTH EAST EXTENSION ZONE

The Manager Companies ASX Limited 20 Bridge Street

Balogo Exploration Update

Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project

For personal use only

Updated Rhyolite Ridge Mineral Resource Statement

ROE HILLS COBALT AND GOLD DRILLING ADVANCES

Exploration targets identified to increase Browns Range Project s mine life

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT

For personal use only

Developing the +1.2Moz Pilbara Gold Project

Quarterly Activities Report March Quarter, 2017

MAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL MILLION TONNES

Savannah Resources Plc / Index: AIM / Epic: SAV / Sector: Mining

Global Geoscience Doubles High-Grade Lithium-Boron Mineral Resource

SUMBA GOLD MINERALISATION EXPANDED

HIGHLIGHTS. Drilling intersects wt% recovered DTR concentrate grading 69.8% Fe, including 27 metres in excess of 21% DTR.

24 October Dear Shareholders, 2014 ANNUAL REPORT

For personal use only

2010 RIU Sydney Resources Round-up

For personal use only

Hann Prospect New Gold Discovery Confirmed

SIGNIFICANT NEW MOLYBDENUM ANOMALY DISCOVERED AT PT PROMISTIS, MALALA MOLYBDENUM PROJECT, INDONESIA

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

For personal use only

MAJOR RESOURCE BOOST FOR QUEENSLAND NICKEL PROJECT

Well funded active explorer

HIGH GRADE GOLD-BEARING QUARTZ VEIN DISCOVERED AT MIAREE, KARRATHA AREA WESTERN AUSTRALIA

Silver City Minerals

For personal use only

For personal use only

For personal use only

For personal use only

MCINTOSH FLAKE GRAPHITE PROJECT TARGET 6

KINGSTON RESOURCES LIMITED

For personal use only

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project

MINCOR /GOLDEN RIM FIJI JOINT VENTURE SIGNIFICANT NEW EXPLORATION RESULTS

For personal use only

Symposium s Investor Roadshow Sydney 12 August 2014 Melbourne 13 August 2014

Rare Earth project update

Spectacular uranium assays from rock sampling. at FYI s Yarlarweelor project in Western Australia

KATINGAN RIA COAL RESOURCE UPGRADE

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project

For personal use only

FIVE RIGS DRILLING AT KARLAWINDA

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April.

For personal use only

Malachite Resources Limited ABN

704,000 OUNCE MIYABI GOLD PROJECT UPDATE

High Grade Copper-Gold-Silver Mineralisation Discovered At Bluebell

MARKET UPDATE ON URANIUM AND GOLD PROJECTS

DRILLING CONFIRMS CLEAVERVILLE FORMATION MAGNETITE POTENTIAL ON THE MIAREE MAGNETITE TREND HIGHLIGHTS

APOLLO SOUTH AUSTRALIAN EXPLORATION UPDATE

Aurora Tank Gold Drilling Update

For personal use only

For personal use only

Bass Metals records further positive drill results & progress at 3 prospects.

High-grade Copper and Gold Discovered at Productora

TWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT

FIRST ASSAYS FROM FALUN DRILLING CONFIRM HIGH GRADE GOLD MINERALISATION

Savannah Resources Plc

CRATER MOUNTAIN MAJOR MULTIPLE MINERALISATION EVENTS POTENTIAL ASSOCIATED WITH PORPHYRY SYSTEM NOW IDENTIFIED

African Energy Resources Limited

TRENCHING CONFIRMS HIGH GRADE GOLD AT SUMBA

For personal use only

For personal use only

For personal use only

For personal use only

For personal use only

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS

For personal use only

For personal use only

ASX ANNOUNCEMENT 21 MARCH 2011

COMPLETION OF PHASE 1 DRILLING AT TITIRIBI PROJECT IDENTIFIES ADDITIONAL SIGNIFICANT COAL INTERCEPTS

For personal use only

High-grade Copper in the Cobar Superbasin. Rob Tyson, Managing Director - Broken Hill Conference

Maximising Gold Resources in Senegal

13 March 2017 Georgian Mining Corporation Further drill results from Kvemo Bolnisi East Gold Discovery

Drilling Commences at Telfer West Gold Project

KURUNDI PROJECT EXPANDED TO INCLUDE PHOSPHATE

P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT

Savannah Resources Plc

Co-O MINE MINERAL RESOURCE UPDATE

For personal use only

For personal use only

For personal use only

For personal use only

High-grade Gold in First Drilling Undertaken at Productora South

ASX/MEDIA RELEASE 25 November EMERGENT CONFIRMS MAJOR JORC RESOURCE UPGRADE TO 561Mt FROM PREVIOUS 127Mt AT BEYONDIE IRON PROJECT

ASX Announcement. FLEM survey underway at Henrietta Cobalt Nickel Prospect, Tasmania ASX: AX8 HIGHLIGHTS. Market Data. Board and Management.

For personal use only

For personal use only

High Grade Gold Intercepts at Bangaba

News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY

Acquisition agreement to move to 100% ownership of the Ashford Coking Coal Project

Transcription:

ASX: GSC Suite 203, 161 Walker Street North Sydney NSW 2060 Optimisation Success Reduces Leach Time By 60% Highlights Latest results from ongoing optimisation acid-leach testwork on Rhyolite Ridge lithium-boron mineralisation show that reducing the crush size improves both leach time and recoveries: o Column leach time reduced from 41 to 15 days a 60% reduction o Recoveries to solution increased to 97% for lithium and 98% for boron Vat leach testwork returned high recoveries of both lithium (92%) and boron (80%) Further improvements for vat and column tests likely with ongoing optimisation testwork Consultants Amec Foster Wheeler are conducting trade-off studies as part of the Pre- Feasibility Study (PFS) to determine the optimal processing route Global s Rhyolite Ridge is the only lithium deposit in the world that has been demonstrated to be amenable to simple acid leach processing, reinforcing it as a credible alternative to spodumene and brine deposits as a major, low-cost and long-term source of lithium Wednesday, 21 February 2018 Australian-based lithium-boron mine developer Global Geoscience Limited ( Global or the Company ) (ASX: GSC) today announced the results of further acid-leach testwork at its 100%-owned Rhyolite Ridge Lithium-Boron Project in Nevada, USA. The latest column leach testwork (for heap leach) has shown that 97% of the lithium and 98% of the boron was extracted into solution within 15 days when the feedstock is crushed to minus 38mm. This represents a 60% reduction in leach time when compared to previous column tests where feedstock was crushed to minus 150mm. Global Geoscience s Managing Director, Bernard Rowe commented: In December, we announced the significant breakthrough of Rhyolite Ridge mineralisation being amenable to heap leaching based on the initial column leach testwork. These latest results show a major reduction in column leach times by simply crushing the feedstock to minus 38mm compared to the minus 150mm used for the initial tests. Recoveries to solution also improved to nearmaximum levels. The unique Rhyolite Ridge mineralogy enables the lithium and boron minerals to be readily dissolved in sulphuric acid meaning high recoveries and short leach times with acceptable sulphuric acid consumption. This testwork has further demonstrated that acid leaching is likely to be a simple, low-cost processing route for this unique lithium-boron mineralisation. 1

Our team and Amec Foster Wheeler are now evaluating the range of excellent testwork results obtained to date. This will determine the most favourable processing flowsheet to be progressed in the Rhyolite Ridge PFS. Ongoing metallurgical testwork conducted by Hazen Research (Denver) and Kappes Cassiday (Reno) has further demonstrated that simple, low-cost acid leach processes can be used to extract lithium and boron at high recovery rates into a Pregnant Leach Solution ( PLS ). Lithium and boron can then be removed from the PLS through crystallisation and purification steps to produce lithium carbonate and boric acid at the mine site. The table below compares the key results announced today (Column 4 and Vat 1) with the key results announced on 12 December 2017 (Columns 2 and 3). Column 2 Column 3 Column 4 Vat Leach Vat 1* Crush -150mm -150mm -38mm -150mm Lithium Recovery to PLS 90% 92% 97% 92% Boron Recovery to PLS 88% 89% 98% 80%* Leach Time 41 days 41 days 15 days 39 days* Acid Pre-treatment 10% 15% 5% 15% Acid Leach Solution 10% 10% 10% 15% Acid Consumption (kg/t of ore) 413 460 485 446 * Vat 1 represents a preliminary vat test and significant increase in boron recovery and decrease in leach time are expected based on the results obtained. All results to date indicate that the Rhyolite Ridge lithium-boron mineralisation responds extremely well to acid leaching. In January 2018, Global appointed Amec Foster Wheeler (part of Wood plc) as the engineering and design firm to complete the Rhyolite Ridge Pre-Feasibility Study ( PFS ). The high-grade lithium-boron mineralisation is the focus of the Rhyolite Ridge PFS as it represents potentially the highest value material combined with a low-cost, simple processing route. This is due to the low-clay, low-carbonate and high-searlesite (boron) content of the rock, which make the mineralisation amenable to low-cost acid leaching at ambient temperature and pressure. The proposed flowsheet will allow for the production of lithium carbonate and boric acid at the mine site. Since the Rhyolite Ridge lithium-boron mineralisation responds extremely well to acid leaching, Amec Foster Wheeler is currently evaluating various processing flowsheets to determine the best route to proceed with in the PFS. The processing routes being evaluated in this trade-off study include agitation (tank) leaching, vat leaching and heap leaching. On-going metallurgical testwork is also analyzing various options for the crystallisation and purification process steps. 2

Column and Vat Leach Testwork Testwork was conducted on samples collected from outcrop (424750E, 4185750N NAD27 Z11) from within the Rhyolite Ridge Mineral Resource. The samples are considered to be representative of the high-grade lithium-boron mineralisation across the Resource. On 12 December 2017, the Company announced column (heap-leach) testwork results for three large samples (150kg to 495kg) crushed to minus 150mm. The testwork results announced today are for two additional tests: 1. a column test comprising 58kg sample crushed to minus 38mm 2. a vat leach test comprising 150kg sample crushed to minus 150mm For the column test, the sample was blended with sulphuric acid prior to be loaded into a 20.2cm diameter and 181.6cm tall column. Dilute sulphuric acid solution was then applied to the top of the column using a continuously drained drip method at a flow rate of 9-12 g/min at ambient temperature. Recovery rates for lithium and boron were very high, reaching 98% after fifteen days. This compares very favourably with 41 days to reach 90% for previously announced column tests where the feedstock was crushed to minus 150mm. The results suggest that finer particle sizes (-38mm) allow a more rapid contact between the acid and the rock resulting in a significantly faster leach time. Further improvements are anticipated from ongoing testwork. The vat leach test represents a preliminary test for assessment purpose and significant improvement is expected in subsequent tests currently underway. Two of the advantages of a vat leach are that it allows control of both solution acidity (ph) and temperature. In the preliminary test the sample was blended with sulphuric acid prior to being loaded into a 56cm diameter heated plastic barrel (vat). The loaded sample measured 56cm high. The barrel was then flooded with dilute sulphuric acid. Additional acid was added to maintain the ph at around 0.6. The results of the vat leach are shown in the table below. Recoveries after 39 days were 92% for lithium and 80% for boron. Boron recovery was lower than expected and is likely due to boron reaching saturation and boric acid crystallising in the vat. Based on the results obtained, leach time is expected to reduce significantly with a faster application of acid. Additional vat leach testwork is underway. 3

The table below compares the heap leach column tests and agitation (tank) leach tests. Column 1 Column 2 Column 3 Column 4 Vat Leach Vat 1* Agitation (tank) Sample Size (kg) 495 150 150 58 150 Multiple 1kg samples Sample Head Grade 1,353ppm Li 2.30% B 1,303ppm Li 1,303ppm Li 1,280 ppm Li 2.12% B 1,303 ppm Li 1,500 ppm Li 2.12% B- Crush -150mm -150mm -150mm -38mm -150mm Yes Column Height (m) 4.4 1.5 1.5 1.8 N.A. N.A. Grind No No No No No Yes Flotation to remove carbonate No No No No No Yes, with 5% loss of Li & B Lithium Recovery % 89 90 92 97 92 93 Boron Recovery % 89 88 89 98 80* 94 Leach Time 164 days 41 days 41 days 15 days 39 days* 4 hours Acid Pre-Treatment 3% 10% 15% 5% 15% - Acid Leach Solution varied 10% 10% 10% 15% varied Acid Consumption (kg/t of ore) - 413 460 485 446 296 * Vat 1 represents a preliminary vat test and significant increase in boron recovery and decrease in leach time are expected based on the results obtained. Leach The chart below shows Li and B recoveries (%) on a daily basis for Column 4. 4

Contacts at Global Geoscience Bernard Rowe James D. Calaway Roger Howe Managing Director Chairman Investor Relations T: +61 419 447 280 T: +1 713 818 1457 T: +61 405 419 139 E: browe@ E: jcalaway@calawayinterests.com E: rhowe@ About Global Geoscience Global Geoscience Limited (ASX:GSC) is an Australian-based lithium-boron mine developer focused on its 100%-owned Rhyolite Ridge Lithium-Boron Project in Nevada, USA. Rhyolite Ridge is a large, shallow lithium-boron deposit located close to existing infrastructure. It is a unique sedimentary deposit that has many advantages over the brine and pegmatite deposits that currently provide the world s lithium. The Rhyolite Ridge Pre- Feasibility Study is well under way. Global Geoscience is aiming to capitalise on the growing global demand for lithium and boron. Lithium has a wide variety of applications, including pharmaceuticals, lubricants and its main growth market, batteries. Boron is used in glass and ceramics, semiconductors and agriculture. Global Geoscience aims to develop the Rhyolite Ridge Lithium-Boron Project into a strategic, long-life, low-cost supplier of lithium carbonate and boric acid. To learn more please visit: www.. Competent Persons Statement The information in this report that relates to Exploration Results is based on information compiled by Bernard Rowe, a Competent Person who is a Member of the Australian Institute of Geoscientists. Bernard Rowe is a shareholder, employee and Managing Director of Global Geoscience Ltd. Mr Rowe has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Bernard Rowe consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. 5