NEWS RELEASE CANADIAN ZINC REPORTS REMAINING DRILL RESULTS AT LEMARCHANT DEPOSIT, SOUTH TALLY POND PROJECT, NEWFOUNDLAND

Similar documents
PRESS RELEASE NEW MINERAL RESOURCE UPDATE AT PRAIRIE CREEK MINE. Measured + Indicated and Inferred Resource Tonnages Increased

EXPLORATION & DEVELOPMENT

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

A B C PAD A HIGHLIGHTS

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Mineral Resource Estimate Comparison at 3 g/t Au cut-off

Probe Metals Continues to Expand Gold Zones At Val-d Or East

EXPLOR INTERSECTS MULTIPLE COPPER ZONES GRADES UP TO 3.65% CU OVER 5.35 METERS ON THE CHESTER COPPER PROPERTY

NEWS RELEASE. FORAN INTERSECTS 9.4% ZINC OVER 6.1 METRES Feasibility Drilling Continues

Salazar intersects metres (13.07m true) averaging 2.65 g/t gold, g/t silver, 1.32% copper, 6.63% zinc at its Curipamba Project.

NEWS RELEASE. Foran Intersects Over 28 Metres of Copper Mineralization

ANTLER GOLD DRILLS GRAMS PER TONNE GOLD OVER 5.35 METRES AT THE WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

Skeena Intersects g/t AuEq over metres at Eskay Creek

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

ANTLER GOLD EXPLORATION UPDATE, WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

NEWS RELEASE FORAN INTERSECTS 27 METRES OF CONTINUOUS MINERALIZATION

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

ANTLER GOLD HIGHLIGHTS NEW GOLD-IN-SOIL ANOMALIES, CENTRAL NEWFOUNDLAND

GOLDEN RIDGE RESOURCES DRILLS 60.27m of 2.60 G/T AUEQ AT THE HANK PROJECT IN BC S GOLDEN TRIANGLE

A New Direction. Copper-Gold Deposit at Thor TSX.V:COL. August 11, May 2013

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Highlights from the four holes announced in this news release include:

ET and and and

NEWS RELEASE. Foran Mining Intersects High Grade Zinc at McIlvenna Bay. Results expand area of known mineralization

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

SilverCrest Expands Babicanora High Grade Footprint to 600 metres; New High Grade Vein Discoveries Highlight District Scale Potential

Bass Metals records further positive drill results & progress at 3 prospects.

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

Drilling Extending Mineralization in La Mina North Zone

Rich Saddle North Au-Cu-Ag Porphyry Expands by 275m Along Strike and 250m Down-Dip

News Release. Infill Drilling Program

NEWS RELEASE. Foran Completes Winter Program with High-Grade Copper and/or Zinc in All Holes Drilled at Bigstone

July Exploring for Canadian Gold in the Rainy River District of Ontario

EXCELLON ANNOUNCES LA PLATOSA EXPLORATION RESULTS: HIGH GRADES CONTINUE TO EXTEND MANTO SULPHIDES DRILL HOLE ENCOUNTERS SOURCE ENVIRONMENT INDICATORS

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

Constantine Drills More High-Grade at Nunatak AG Zone Discovery, Palmer Project, Alaska

InZinc Intersects 6.8m of 16.5% Zinc Focuses on Western Expansion of High Grades at West Desert Project

V Sample from C.O.D vein 15 metres southwest of V

Atico Mining Provides Exploration Update

(TSXV: GPLY, OTCQB: GLYXF

News Release No GOLD AND COPPER MINERALIZATION DISCOVERED DURING PHASE 2 EXPLORATION AT THE MCBRIDE PROPERTY

Drilling Extending Mineralization in La Mina North Zone

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

BALMORAL CONTINUES TO EXPAND GRASSET NI-CU-PGE DISCOVERY

LME m averaging 0.65 g/t Au and 0.32% Cu, or 1.19 g/t Au Equiv LME m averaging 0.64 g/t Au and 0.11% Cu, or 0.

Project 81. Drill Ready Geophysical Targets & Trends. Timmins-Cochrane Northern Ontario Canada

The Inferred Mineral Resource Statement prepared by SRK for the Talbot Deposit is detailed below.

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

April Exploring for Canadian Gold in the Rainy River District of Ontario

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

KIRKLAND LAKE GOLD EXPANDS NEW HIGH-GRADE ZONE BELOW TAYLOR MINE, REPORTS MINERALIZED EXTENSIONS ALONG STRIKE AND AT DEPTH

CARACARA SILVER INC. PLANNING DRILL PROGRAM AT PILUNANI ZINC-LEAD PROJECT IN PERU

FYRE LAKE VMS PROJECT

CANARC RESOURCE CORP Howe Street Vancouver, BC V6C 2T6. News Release

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

NEWS RELEASE FOR IMMEDIATE RELEASE: MARCH 5, 2018

OSISKO INTERSECTS 36 g/t Au OVER 6.9 METRES AT LYNX

NEWS RELEASE TSX: ELD NYSE: EGO September 6, Eldorado Announces Drilling Results from KMC Project, Serbia

IAMGOLD PROVIDES EXPLORATION UPDATE ON BOTO PROJECT IN SENEGAL

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

BROAD ZONES OF MASSIVE AND SEMI-MASSIVE SULPHIDE MINERALIZATION ENCOUNTERED AT SAN DIEGO PROPERTY, MEXICO

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East

MEXICAN GOLD INTERSECTS 7.18 G/T GOLD EQUIVALENT (2.00 G/T AU, G/T AG, 3.05 % CU) OVER 14.0 METERS AT LAS MINAS DIKE CONTACT ZONES

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

Advancing High Grade Gold Assets in Red Lake, Ontario

TriAusMin Limited LEWIS PONDS PROJECT

OSISKO INTERSECTS 115 g/t Au OVER 8.4 METRES AT LYNX. Interval (m)

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

KIRKLAND LAKE GOLD INTERSECTS NEW MINERALIZATION AT TAYLOR MINE, CONTINUES TO EXTEND PORPHYRY DEPOSITS TO DEPTH

NEWS RELEASE LATEST EXPLORATION PROGRAM CONTINUES TO DEMONSTRATE NARANJILLO AS A HIGH GRADE SILVER HOST

At the contact, mineralization is associated with strong tourmalinization of the Bevcon Intrusion.

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT

Surface Trenching Highlights. Santos Target. To (m) Width (m) Au (g/t) Comment. (m) Santos (1)-includes internal dilution

NEWS RELEASE. Evrim and Harvest Gold Complete Drilling at Cerro Cascaron

MEXICAN GOLD SAMPLES 5.11 G/T GOLD & 7.15 % ZINC OVER 2.0 METRES AND G/T GOLD OVER 1.4 METRES AT CHANGARRO ZONE, LAS MINAS PROJECT

Summary of Rover Metals Geologic Mapping Program at the Up Town Gold Project, Northwest Territories

NEW COBAR-STYLE COPPER DISCOVERY IN NSW

Suite West Georgia Street Vancouver, B.C. V6E 4M3 NEWS RELEASE

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

TSX.V: TR. Drilling in the Shadow of World-Class Deposits. TR: TSX.V January 2019

Corvus Gold Drills g/t Gold, Extends Mother Lode Sediment Hosted Gold System to at Least 450 Metres Along Strike

Spruce Ridge Resources Ltd Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) , Fax: (519)

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

82 Richmond Street East Toronto, ON M5C 1P1 T: E: W: eskaymining.com

True Width (m) Carneritos to

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

36 Holes drilled in an approximate 100 meter by 100 meter grid covering an area of 1,000 meters long by 400 meters depth

Detour Gold Reports Drilling Results from Lower Detour

Transcription:

NEWS RELEASE CZN-TSX CZICF-OTCQB FOR IMMEDIATE RELEASE March 5, 2018 CANADIAN ZINC REPORTS REMAINING DRILL RESULTS AT LEMARCHANT DEPOSIT, SOUTH TALLY POND PROJECT, NEWFOUNDLAND 2017 drill program successfully extends the Lemarchant Deposit mineralization 14.5% copper over 0.6 metres (LM17-161) in latest drilling results National Instrument 43-101 resource update in progress for Q1 2018 Vancouver, British Columbia, March 5, 2018 - Canadian Zinc Corporation (TSX: CZN; OTCQB: CZICF) is pleased to report the remaining results of its 2017 diamond drill exploration program on the Lemarchant zinc-lead-copper-silver-gold volcanogenic massive sulphide deposit and drill results for two priority base metal prospects, all located on the 100%-owned South Tally Pond VMS project in central Newfoundland. The 2017 drill program at the Lemarchant deposit, totaling 48 drillholes for 12,422 metres, has successfully extended the Lemarchant deposit mineralization. Drilling at the Lemarchant Main Zone has extended the mineralization up-dip, by up to 80 metres over a 250-metre strike length at vertical depths of 120 to 170 metres below surface. Drilling at the Lemarchant Northwest Zone has extended the mineralization by up to 50 metres along strike to the north and south. Results of the 2017 drilling are provided in previous news releases with results from the remaining 8 drillholes provided below. We are very pleased and encouraged with the drill results from the 2017 drill program at the South Tally Pond project. Our first priority was to find extensions to the mineralization at the Lemarchant deposit and we have successfully accomplished that goal with the 2017 drill program. In addition, we tested two priority base metal prospects on the South Tally Pond project with encouraging geological results, stated Michael Vande Guchte, VP Exploration NL. We look forward to an updated Lemarchant Mineral Resource Estimate in 2018 and to begin testing interpretations from the Lemarchant structural study. The remaining 8 drillholes (3,113 metres) of the 2017 drill program at Lemarchant tested for additional south extensions to the Main Zone and extensions to the Northwest Zone. Results are summarized below. Drill Hole Section From Lemarchant Main Zone To Length Zn Pb Cu Ag Au LM17-160 100+50N 163.7 164.8 1.1 3.92 0.52 0.73 15.43 0.07 LM17-161 100+75N 170.5 174.75 4.25 1.89 0.27 2.36 23.19 0.19 including 174.15 174.75 0.60 1.18 0.02 14.50 51.2 0.77 1

Drill Hole Section From To Length Zn Pb Cu Ag LM17-163 100+50N No Significant Assays Lemarchant Northwest Zone Au LM17-156 106+75N 252.0 254.0 2.0 3.02 0.65 0.30 16.05 0.02 295.0 299.0 4.0 1.92 0.73 0.13 71.28 0.82 LM17-157 107+50N 447.0 451.0 4.0 1.25 0.34 0.13 19.63 0.15 LM17-158 105+00N No Significant Assays LM17-159 107+00N No Significant Assays LM17-162 106+00N 448.0 455.0 7.0 2.19 0.05 0.19 3.87 0.12 Drillhole intervals are core length with true thickness estimated to be 80-100% of core length Three drillholes (618 metres) tested for further south extensions to the Lemarchant Main Zone. Two of the drillholes successfully intersected the mineralized horizon with stringer to massive sulphide base metal mineralization. Drillhole LM17-160 intersected 3.92% zinc, 0.52% lead, 0.73% copper, 15.4 g/t silver, 0.07 g/t gold over 1.1 metres extending the mineralization 25 metres south of previous drillhole LM17-113, which intersected 10.10% zinc, 4.54% lead, 2.32% copper, 147.9 g/t silver, 0.88 g/t gold over 1.5 metres. The mineralized horizon remains open along strike to the south. Drillhole LM17-161 extended the mineralization 25 metres up-dip of LM17-113 on section 100+75N with 1.89% zinc, 0.27 lead, 2.36% copper, 23.19 g/t silver, 0.19 g/t gold over 4.25 metres. The mineralized horizon remains open up-dip on this section. Drillhole LM17-163 tested 25 metres south of LM17-161 where the projected mineralized horizon has been replaced by unmineralized felsic intrusions. Five drillholes (2,495 metres) tested for additional extensions to the Lemarchant Northwest Zone. Three of the drillhole intersected footwall stringer and disseminated base metal mineralization over 2 to 7 metres widths. Drillholes LM17-156 and 157 targeted up-dip and north extensions, respectively, to the mineralization intersected in LM17-150 which intersected 3.05% zinc, 1.78% lead, 0.35% copper, 14.6 g/t silver, 0.5 g/t gold over 21.4 metres. Drillholes LM17-158 tested 50 metres up-dip of LM10-24 where previous drilling intersected 6.60% zinc, 0.68% lead, 0.61% copper, 28.28 g/t silver, 0.46 g/t gold over 6.0 metres. No significant mineralization was intersected. Drillholes LM17-159 and 162 targeted down-dip extension to the Northwest Zone mineralization. LM17-162 intersected weak base metal mineralization in a strongly sheared interval. Additional information on the South Tally Pond project along with drillhole location maps and key sections are provided on the Canadian Zinc website (www.canadianzinc.com). Drill Results Two Priority Base Metal Prospects Two priority base metal prospects, the Lost Pond prospect and Lake Ambrose West prospect, both located within 6 km of the Lemarchant deposit, were also drill tested in the final round of the 2017 drill program. 2

Lost Pond Prospect Drilling at the Lost Pond prospect, located 6 km north of the Lemarchant deposit, followed up on three drillholes completed in 2011, where 4.0% copper mineralization was intersected over 0.5 metres. No other drilling has been undertaken in this area. Thirteen drillholes, totaling 3,559 metres were completed in 2017 and intersected a thick sequence of variably altered mafic-felsic volcanic rocks over a 400-metre strike length with thick intervals of pyrite-rich to graphitic mudstone horizons containing anomalous base metal mineralization. The metalliferous mudstone horizons, are geochemically similar to those that overlie the Lemarchant deposit and suggest a favorable hydrothermal depositional environment for massive sulphide development. The drilling results are being assessed for further follow-up exploration. Lake Ambrose West Prospect The Lake Ambrose West prospect is located 4.5 km northeast of the Lemarchant deposit and had never been drill tested. Three drillholes, totaling 909 metres, were completed to test priority airborne EM conductors identified from previous surveys and coincident historical ground horizontal loop EM conductors. The drilling intersected felsic to mafic volcanic stratigraphy with a local pyritic, graphitic mudstone horizon intersected in two of the drillholes that explains the EM conductors. The mudstone horizon is associated with elevated base metal mineralization with the lithogeochemistry suggesting a more distal hydrothermal depositional environment. The drill results are being assessed for further follow-up exploration. Updated NI 43-101 Resource Estimate underway on Lemarchant Deposit Canadian Zinc has engaged Mercator Geological Services Limited ( Mercator ) of Dartmouth, Nova Scotia, to complete an updated National Instrument ( NI ) 43-101 Mineral Resource Estimate of the Lemarchant deposit. The updated Mineral Resource Estimate is scheduled to be completed in Q1 2018. As part of the Mineral Resource Estimate update, a geological structural study of the Lemarchant deposit was completed by Mercator and Terrane Geoscience Inc. The structural study will be incorporated into the Lemarchant geological model and will be utilized to target other areas of potential mineralization including faulted offsets adjacent to the Lemarchant deposit. About the South Tally Pond Project The South Tally Pond project covers approximately 13,700 hectares and is located in a proven mining district in the same productive volcanic belt as the past-producing Duck Pond Cu-Zn Mine, owned by Teck Resources. The Lemarchant deposit is situated 20 km southwest of the former Duck Pond Mine. Since acquiring the South Tally Pond project in September 2012, Canadian Zinc has completed 94 drill holes totaling 28,800 metres at the Lemarchant deposit and 16 drillholes totaling 4,468 metres at 2 priority prospects. Highlights of the Company s exploration work to date includes: Drilling programs in 2013 and 2014 led to the discovery of the Lemarchant Northwest Zone, a new lense of Zn-Pb-Cu-Ag-Au mineralization located 250 metres northwest of the Lemarchant Main Zone. The drill programs were followed up with a successful metallurgical research program completed in 2016. The metallurgical program was designed to test the technical and 3

economic viability of processing five central Newfoundland base metal deposits including the Company s Lemarchant and Boomerang-Domino deposits at a central milling facility. The metallurgical results demonstrated that the mineralization from the deposits can be successfully processed in a central mill using a sequential flotation flowsheet, and that selective zinc, lead and copper concentrates at marketable grades can be produced from these deposits. The 2017 drill program successfully extended the Lemarchant Main Zone mineralization updip, by up to 80 metres over a 250-metre strike length at vertical depths of 120 to 170 metres below surface. Drilling at the Northwest Zone extended the mineralization by up to 50 metres along strike to the north and south. The Company s exploration strategy in central Newfoundland is to continue to build on its existing polymetallic resource base with the aim of developing either a stand-alone mine, similar to the past-producing base metal mines at Buchans and Duck Pond, or a number of smaller deposits that could be developed simultaneously and processed in a central milling facility. About Canadian Zinc Canadian Zinc is a TSX-listed exploration and development company trading under the symbol CZN. The Company s key project is the 100%-owned Prairie Creek Project, a fully permitted, advanced-stage zinc-lead-silver property, located in the Northwest Territories. The Company also owns an extensive land package in central Newfoundland that it is exploring for zinc-lead-copper-silver-gold deposits including the South Tally Pond project (Lemarchant deposit), Tulks South project (Boomerang-Domino deposit) and Long Lake (Long Lake deposit). For further information contact: Alan B. Taylor Michael J. Vande Guchte Steve Dawson Chief Operating Officer & Vice President Exploration Vice President Exploration NL Vice President Corporate Development (604) 688-2001 (604) 688-2001 (416) 203-1418 Suite 1710 650 West Georgia Street, Vancouver, BC V6B 4N9 Tollfree:1-866-688-2001 Suite 1710 650 West Georgia Street, Vancouver, BC V6B 4N9 Tollfree:1-866-688-2001 Suite 1805, 55 University Avenue, Toronto, ON M5J 2H7 Quality Assurance and Quality Control E-mail: invest@canadianzinc.com Website: www.canadianzinc.com Drillhole intervals are core length with true thickness estimated to be 80-100% of core length. Samples were sawn from NQ-sized core with half core sections sealed in plastic bags and transported by Canadian Zinc personnel to Eastern Analytical Labs in Springdale, Newfoundland. Samples were analyzed for Cu, Pb, Zn, Ag and Au at Eastern Analytical Labs from the sawn NQ-sized half core sections. Data quality is monitored through the insertion of control samples consisting of one prepared base and precious metal standard and one blank sample for every 20 samples of drill core. All control samples conformed to the accepted contained grades of base and precious metals. Select samples pulps were shipped to ALS Minerals in North Vancouver, BC for 33-element ICP analysis for further check assays of significant base and precious metal bearing samples. Historical results were obtained from published reports and news releases available in the public domain. Michael J. Vande Guchte, P.Geo., VP Exploration NL for Canadian Zinc Corporation is responsible for the Newfoundland exploration programs, and is a Qualified Person as defined by NI 43-101 and has reviewed and has approved the contents of this news release. Cautionary Statement Forward-Looking Information This press release contains certain forward-looking information, including, among other things, the expected completion of acquisitions and the advancement of mineral properties. This forward looking information includes, or may be based upon, estimates, forecasts, and statements as to management s expectations with respect to, among other things, the completion of transactions, the issue of permits, 4

the size and quality of mineral resources, future trends for the company, progress in development of mineral properties, future production and sales volumes, capital costs, mine production costs, demand and market outlook for metals, future metal prices and treatment and refining charges, the outcome of legal proceedings, the timing of exploration, development and mining activities, acquisition of shares in other companies and the financial results of the company. There can be no assurances that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Inferred mineral resources are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that mineral resources will be converted into mineral reserves. 5