PRACTICAL EVALUATION OF LUGEON S AND PAUTRE S CRITERIA FOR LEAKAGES THROUGH CONCRETE DAMS

Similar documents
DISPLACEMENTS OF THE XINGÓ CONCRETE FACE ROCKFILL DAM - BRAZIL

Geotechnical Engineering and Dams

MONITORING SEEPAGE FLOW THROUGH CARUACHI LEFT EMBANKMENT DAM DURING INITIAL RESERVOIR FILLING

Analysis of the quality of suspended sediment data

The Furnas Type II Stress Measurement Cell

Seepage Analyses and Monitoring of Khlong Tha Dan Dam

Final design of Belesar III and Los Peares III Hydropower Projects. (Galicia, Spain).

HOOVER DAM: Grout Curtain Failure and Lessons Learned in Site Characterization

REEVALUATION OF METHODS FOR ESTIMATING THE PERMEABILITY OF SELECTED SLOVAK DAMS

The owner and designer is the Comisiòn Federal de Electricidad (Federal Comission of Electricity).

The first steps in the hydropower project cycle:

Rock Cycle. Presented by Kesler Science

Practical aspects of dam break analysis

Observed and calculated arching in the clayey silt of an earth dam

Bedrock Dewatering for Construction of Marmet and Soo Lock Projects

WHAT SEISMIC HAZARD INFORMATION THE DAM ENGINEERS NEED FROM SEISMOLOGISTS AND GEOLOGISTS?

PRELIMINARY COST ESTIMATES OF STORAGE OPTIONS IN THE HURUNUIWAIRAU ZONE

Flood Forecasting in large basins

Chapter 2 Water Flow in Rock: Geometry of Water Conducting Paths and Lugeon-Values

The epsilon method: analysis of seepage beneath an impervious dam with sheet pile on a layered soil

LE BARRAGE FAIT PEAU NEUVE

DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING Urban Drainage: Hydraulics. Solutions to problem sheet 2: Flows in open channels

K. FUJITA INTRODUCTION. Dr., Managing Director of Hazama-Gumi, Ltd. K. UEDA. Deputy Director, Institute of Technology, Hazama-Gumi, Ltd. M.

Poisson s ratio effect of slope stability calculations

Temperature-based seepage monitoring of Bark Lake embankment dam

Instream Sediment Control Systems

DETERMINING HIGH VOLTAGE CABLE CONDUCTOR TEMPERATURES. Guy Van der Veken. Euromold, Belgium. INVESTIGATIONS. INTRODUCTION.

mountain rivers fixed channel boundaries (bedrock banks and bed) high transport capacity low storage input output

Practical methodology for inclusion of uplift and pore pressures in analysis of concrete dams

A. Baiocchi 1, W. Dragoni 2, F. Lotti 1, S.M. Piacentini 2, V. Piscopo 1

(Refer Slide Time: 02:10)

ICOLD TCDS - Technical Committe on Dam Surveillance

Session 3 - Case histories KARIBA DAM

A note on top-k lists: average distance between two top-k lists

OVERVIEW OF ER DRILLING IN EARTH EMBANKMENT DAMS AND

Innovative Underground Works at Madeira Island, Portugal

In Situ Triaxial Tests

CASE STUDY BINGA, PHILIPPINES

A test boring program was utilized in this study in order to verify. existing information, and to obtain otherwise unavailable data that was

Temporal variability of partially-contaminated sediments in a strongly regulated reservoir of the upper Rhine River

CHAPTER 6, PRELIMINARY SITE INVESTIGATION CONTENTS

Rock Sizing for Waterway & Gully Chutes

Outils de Recherche Opérationnelle en Génie MTH Astuce de modélisation en Programmation Linéaire

NAM NGUM 2 CFRD - BEHAVIOUR DURING CONSTRUCTION AND FIRST IMPOUNDING

DISTRIBUTION of WATER RESOURCES

DANGEREUSEMENT HEUREUX (FRENCH EDITION) BY VARIAN KRYLOV DOWNLOAD EBOOK : DANGEREUSEMENT HEUREUX (FRENCH EDITION) BY VARIAN KRYLOV PDF

Reservoirs and Production

Site investigation results versus tunnelling conditions a study with emphasis on water leakage based on Norwegian cases

Chapter I Basic Characteristics of Soils

THE STUDY OF CEMENT GROUTING ON THE IMPROVEMENT OF DARBAND DAM STRUCTURE OF BOJNORD-IRAN

NOTE OUTLINE : Chap 5 & 6: Rocks

IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6

WP2.1 BREACH FORMATION LARGE SCALE EMBANKMENT FAILURE

Developing rules of thumb for groundwater modelling in large open pit mine design

TAKING THE MYSTERY OUT OF USACE S ER DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES

Implementation of geomechanical model to identify total loss zones

Your web browser (Safari 7) is out of date. For more security, comfort and. the best experience on this site: Update your browser Ignore

Module 9 : Foundation on rocks. Content

Geology Test Review Answers

Apprentissage automatique Méthodes à noyaux - motivation

HYDRAULIC PROPERTIES OF UNCONSOLIDATED SEDIMENTARY AQUIFERS IN KRIBI, CAMEROON: ENVIRONMENTAL IMPLICATIONS

Open Channel Flow Part 2. Ch 10 Young, notes, handouts

The Russian Practice of Assessment of Earth Dam Seepage Strength

Rogun Hydropower Project

Amistad Dam Investigation and Oversight: Karst- Founded Dam on the USA-Mexico Border

Mathematical model for reservoir silting

Sediment Budgets (Proceedings of the Porto Alegre Symposium, December 1988). IAHS Publ. no. 174, 1988.

Reservoirs and Production

Evaluating permeability and groutability at the Karun 4 dam Iran using Lugeon values and grout Take

A set of formulas for primes

Nipigon River Landslide, Ontario, Canada

Sediment yield and availability for two reservoir drainage basins in central Luzon, Philippines

PRINCIPLES OF GEOTECHNICAL ENGINEERING

1. Base your answer to the following question on The diagram below represents a part of the crystal structure of the mineral kaolinite.

Apprentissage automatique Machine à vecteurs de support - motivation

Contaminant Isolation By Cutoff Walls: Reconsideration Of Mass Fluxes

8 th Grade Science Tutoring. Earth Space, Ms. Winkle

UGRC 144 Science and Technology in Our Lives/Geohazards

FRED BURR DAM FEASIBILITY STUDY

LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS)

Application of Rock Mass Classification Methods to the Klong Tha Dan Project Tunnels

Pressure Grouting of Fractured Bedrock to Control Acid Mine Drainage

Phase II Report: Project Definition Options. Dam Safety

3D Modeling of the Santa Terezinha Coalfield, Brazil - implications for estimation of the CBM potential

Impulse response function analysis of pore pressure in earthdams

10.52 Mechanics of Fluids Spring 2006 Problem Set 3

ENGINEERING GEOLOGY AND ROCK ENGINEERING ASPECTS OF OPERATION AND CLOSURE OF KBS-3

Evaluation of the behaviour of an arch-gravity dam. featuring a pre-existing crack

Lecture Note for Open Channel Hydraulics

Planning and evaluation for quarries: case histories in Thailand

The Production of Sediment. Contents. Weathering. Chapters 1, 3

CASE STUDY BINGA, PHILIPPINES

Application of Real-Time Rainfall Information System to CSO control. 2 October 2011 Naruhito Funatsu METAWATER Co., Ltd.

GOING WITH THE FLOW (1 Hour)

On a multivariate implementation of the Gibbs sampler

Qualitative Foundation Rock Block Stability Evaluation Performed for Green Peter Dam

Hillside of left bank of dam site is covered by higher terrace deposit.

Sediment storage requirements for reservoirs

A set of formulas for primes

Basis Function Selection Criterion for Modal Monitoring of Non Stationary Systems ABSTRACT RÉSUMÉ

Transcription:

PRACTICAL EVALUATION OF LUGEON S AND PAUTRE S CRITERIA FOR LEAKAGES THROUGH CONCRETE DAMS João Francisco SILVEIRA Technical Director, SBB Engenharia Ltda. BRAZIL 1. INTRODUCTION One of the difficulties arising in the design phase of concrete dams is the evaluation of leakages, through either the foundation or the concrete structures, which will be drained and pumped through the foundation drainage galleries. Because of the uncertainties affecting the theoretical forecast of these leakages, an alternative is to use some criteria that make it possible to forecast them in a faster and more practical way, which periodically need, however, some experimental evaluation by the comparison of the forecast flows with those ones really measured. Based on real infiltration data verified through 10 (ten) concrete gravity Brazilian dams seven of them of conventional type and three of them of roller compacted concrete (RCC), it was tried to make a comparison between the maximum observed flows at the end of the reservoir filling and the flows forecast by Lugeon s and Pautre s criteria, whose basic principles of application are presented afterward. 2. LUGEON S AND PAUTRE S CRITERIA Maurice Lugeon, who lived from 1879 to 1953, was a Swiss geologist specialized in the study of hydraulic transmissivity through rock masses. The unit of transmissivity through rock masses is called nowadays Lugeon and was named after him. Lugeon s criterion was developed to analyze infiltration through sections of boreholes and corresponds to the infiltration flow of 1 l/min per meter of borehole under a pressure of 10 atmospheres, i.e.: 1 Lugeon = (1,0 l/min)/(m.10 atm) For leakages through concrete drains, the following control values were used: Attention Limit: 0,2 Lugeon, above which a possibility of treatment should be considered; 1

Warning Limit: 1,0 Lugeon, above which an immediate treatment should be done to reduce the leakages. The empirical Pautre s method defines as expected leakage the one corresponding to the infiltration flow of 1,0 cm³/s x m² of wetted area and it is applied then to the surfaces in touch with water, like the upstream face of a dam. The control values recommended by Pautre are those presented next: Limit: 0,2 Pautre (considering the grouting curtain area in m²); Concrete Limit: 0,02 Pautre (considering the upstream face area in m²). Based on the fact that Lugeon s criterion was conceived for estimating leakages through bore holes in rock and, on Pautre s criterion, for estimating leakages through surface in contact with water, one can initially predict that the former would be applied more specifically for infiltration through the foundation and the latter would be more appropriate for infiltration through the dam itself. This will be investigated afterward by the application of these two criteria for a total of 10 (ten) Brazilian concrete gravity dams and by their comparison with the maximum leakages observed just after the first reservoir filling. According to what can be observed on Fig.1, which illustrates the evolution of the drainage flows of the weir gauges installed at the drainage galleries of Três Irmãos dam, belonging to CESP Energy Company of São Paulo, the observed leakages pass by a maximum value, immediately after the final period of the reservoir filling, and then start decreasing, as a consequence of a natural sediment deposition process upstream. This graph presents the flows measured in four triangular devices installed along the drainage foundation gallery from Feb 1990, the beginning of the reservoir filling, until Mar 2008. SICESP - Sistema CESP de Segurança de Barragens TRI - UHE Três Irmãos Medidores de Vazão - Período: 28/02/1990 a 12/02/2008 MV-401 MV-306 MV-402 MV-451 8 7 6 5 Vazão (l/s) 4 3 2 1 0 fev-90 mar-91 mar-92 mar-93 mar-94 mar-95 mar-96 mar-97 mar-98 mar-99 mar-00 mar-01 mar-02 mar-03 mar-04 mar-05 mar-06 mar-07 PERÍODO Fig. 1 Evolution of the leakages measured at Três Irmãos dam CESP 2

3. APPLICATION OF LUGEON S AND PAUTRE S CRITERIA FOR THREE RCC DAMS In this item, it is presented a comparison of the leakages observed in three RCC gravity dams, recently built in the state of Rio Grande do Sul, in the south region of Brazil. These structures have between 27 and 60 m of maximum heights and between 230 and 600 m of lengths, whose operation of the respective hydropower plants occurred between 2000 and 2008. The application of Lugeon s criterion was done drain to drain, not only along the foundation drainage curtain but also through the internal concrete drains. On the other hand, Pautre s criterion was applied to the area corresponding to the drainage curtain, to the foundation and to the upstream dam facing, in its underwater part. On the following Table 1, the results obtained by the application of these two criteria are presented, with a comparison of the predicted flows with the real maximum flow obtained in situ, immediately after the first reservoir filling, when the measured flows reached a maximum value. Table 1 Lugeon s and Pautre s criteria application to RCC dams Criteria Infiltration flows RCC Dam (l/min) Dona Francisca Monte Claro Castro Alves Concrete 40,5 4,1 11,8 Pautre 341,5 18,2 91,9 TOTAL 382,0 22,3 103,7 Lugeon Concrete 235,5 / 1178,0 8,6 / 43,0 99,1 / 495,4 (Attention/ 1214,3 / 6071,6 40,4 / 245,0 211,3 / 1056,7 Alert) TOTAL 1449,8 / 7249,6 49,0 / 245,0 310,4 / 1552,1 In situ measurement after reservoir filling 2 240 385 210 The high leakages observed in the foundation of Dona Francisca dam, as emphasized in this table, is a consequence of the sandstone rock mass, hence more pervious than the basalt of the other two dams. Besides, the drainage system of this dam was very strengthened by the execution of three drainage curtains, two upstream and one other downstream, to guarantee suitable stability conditions. With regard to Monte Claro dam, it is highlighted that the measured leakages overtook Lugeon s criterion for the Alert value and this demanded the carrying out of an intense grouting campaign, to reduce the leakages occurring mainly through the concrete (RCC). 3

4. APPLICATION OF THE LUGEON S AND PAUTRE S CRITERIA FOR 10 CONCRETE GRAVITY DAMS In addition to the three RCC dams already mentioned, Lugeon s and Pautre s criteria were applied to other seven concrete gravity dam, of conventional concrete. On Table 2 the main characteristics of these dams are presented, all of them placed on basalt rock masses, except Xingó, which is situated on granite-gneiss. Table 2 Basic characteristics of the investigated concrete dams Dam Structure type Maximum height Length (m) (m) Jupiá Gravity 53 895 Basalt Ilha Solteira Gravity 74 970 Basalt Promissão Gravity 35 177 Basalt Água Vermelha Gravity 90 400 Basalt Três Irmãos Gravity 67 485 Basalt Itaipu Section H Gravity 142 160 Basalt Xingó Gravity 71 475 Granite Dona Francisca Gravity 51 610 Sandstone Monte Claro Gravity 27 232 Basalt Castro Alves Gravity 48 341 Basalt On the following tables and graphs, a comparison of the leakages obtained in these seven dams is presented, in addition to the flows of the RCC dams already commented, and also a comparison of the leakages forecast by Lugeon s and Pautre s criteria and those flows measured after the reservoir filling. 4

Table 3 Comparison between theoretical and measured leakages for the concrete and the foundation Dam Theoretical leakages Pautre s criterion (l/min) Measured leakage after filling (l/min) Concrete (0,02) (0,2) Total Jupiá 38,0 200,1 238,1 560 (*) Ilha Solteira 10,1 232,7 242,8 3.300 Água Vermelha 76,9 661,4 738,3 5.200 Três Irmãos 1,2 70,8 72,0 1.770 Promissão 0,42 85,6 86,0 1.110 Itaipu - DS - 900,0 900,0 1.620 Xingó 5,0 273,0 278,00 890 Dona Francisca 40,5 341,5 382,0 2.240 Monte Claro 4,1 18,2 22,3 385 Castro Alves 11,8 91,9 103,7 210 (*) Flow about 13 years after the reservoir filling 6000 Pautre s Criterion Leakage (l/min) 5000 4000 3000 2000 Concrete Total Measured Leakage 1000 0 Jupiá Ilha Solteira Água Vermelha Três Irmãos Promissão Itaipu - ED Gravity Dams Xingó Dona Francisca Monte Claro Castro Alves Fig. 2 Pautre s criterion for these dams Pautre s criterion appeared very conservative, as it can be observed on Fig. 2, because the measured flows showed generally much higher than the forecast values, particularly to the dams situated on basaltic rock masses. This is not considered 5

therefore a good criterion for the control of leakages through concrete dams, which could probably explain why this criterion is little known in the national technical sphere. 6000 Lugeon s Criterion - Attention Limit Leakage (l/min) 5000 4000 3000 2000 Concrete Total Measured Leakage 1000 0 Jupiá Ilha Solteira Água Vermelha Três Irmãos Promissão Itaipu - ED Gravity Dams Xingó Dona Francisca Monte Claro Castro Alves Fig. 3 Lugeon s criterion Attention values to the leakages 9000 8000 7000 Lugeon s Criterion - Alert Limit Concrete Total Measured Leakage Leakage (l/min) 6000 5000 4000 3000 2000 1000 0 Jupiá Ilha Solteira Água Vermelha Três Irmãos Promissão Itaipu - ED Gravity Dams Xingó Dona Francisca Monte Claro Castro Alves Fig. 4 Lugeon s criterion Alert values to the leakages. 6

Lungeon s criterion for Attention values was overtaken in 70% of the cases and it must be thus considered only as a basic reference value, which would not demand however any treatment, because all the dams that overtook it showed a behavior inside normal patterns. With respect to the Lugeon s criterion for the Alert value, it appeared as a suitable criterion for indicating the need of treatment and was overtaken by the leakages in the case of Água Vermelha and Monte Claro dams. In Monte Claro RCC dam, the high flows were a consequence of the infiltration through the concrete structures, which demanded an intense treatment by grouting of cement and of hydro-activated polyurethane. In Água Vermelha dam, the high leakages were a consequence of a geological anomaly that occurred in the foundation rock mass, named circular geological structures, in which the basalt layers appeared very fractured and weathered. This fact demanded in some spillway blocks the incorporation of a transversal gallery, in addition to the upstream and downstream longitudinal galleries, ending up to create high leakages. There was no need for any treatment to reduce the infiltration flows; only a partial (30%) closing of the foundation drains was done in the region where the higher leakages happened, based on the low uplifts pressures observed in it. For Jupiá, Ilha Solteira, Três Irmãos, Promissão, Itaipu, Xingó, Dona Francisca and Castro Alves dams, the maximum flows measured just after the end of the reservoir filling appeared always lower than the Alert value, which corresponds to 1,0 Lugeon, and this proves that it constitutes a good criterion in order to indicate the need of immediate treatment. 5. MAIN CONCLUSIONS The application of Lugeon s and Pautre s criteria to a total of 10 concrete gravity dams, being three of them of RCC Roller Compacted Concrete, allowed to know the practical representatively of them, by the comparison between forecast and measured leakages after the phase of reservoir filling. The application carried out involved gravity dams on basaltic rock masses, with lengths of until 500 to 1000 m and heights between 30 and 140 m. It was done structure by structure, i.e., computing the leakages through the Spillway, the Intake, the Powerhouse etc. separately. In this work, however, the data were presented in terms of total leakages observed in each dam, trying to synthesize in this way the results obtained. Pautre s criterion appeared extremely conservative, not applicable to the dams in study, most of them placed on basaltic rock masses. Lugeon s criterion for Attention value corresponding to 0,2 was overtaken by the maximum observed flows at the first filling in 70% of the observed dams. It is not considered then a 7

suitable value for the need of treatment. Even though it has been seen in Brazilian dams on basalt a significant reduction of the leakages in the initial period of dam operation, generally with reduction in the range of 30% to 50% in the first 10 years. For the possibility of an eventual treatment, this value should be adjusted to 0,5 Lugeon. Lugeon s criterion for the Alert value corresponding to 1,0 Lugeon was overtaken in two dams studied, which are Água Vermelha and Monte Claro. The latter one indicating the need of immediate treatment, as a consequence of the high leakages through the concrete. The grouting carried out in this dam used both cement grout and polyurethane foam to reach a substantial leakages reduction. On the other hand, for Água Vermelha Dam, there was no need of treatment, as high leakages were processed through the foundations, as a consequence of the existence of a geological anomaly named Circular Geological Structure, in which the basalt rockmass appeared extremely fractured, weathered and with high permeability. To synthesize it, therefore, this practical study of Lugeon s criterion ended by showed that it appeared a good criterion for establishing Alert values to take a decision about the need of treatment, for leakages through the concrete gravity dams, involving infiltration through both the concrete and the foundation. As it can be observed in the graphs presented in this work, normally the leakages through the basaltic rock foundation are preponderating over those ones through the concrete. ACKNOWLEGMENT The author of this work would like to express his acknowledgements to the following companies for the possibility to present the data regarding to the leakages in the dams here analyzed, without which the carrying out of such a large work would not be possible, concerning to the comparison of the results obtained in dams built in different places, with different geological conditions, building technologies and periods of time. They are: ITAIPU Binacional: Itaipu dam Diversion Structure CESP: Energy Company of São Paulo: Jupiá, Ilha Solteira, e Três Irmãos dams; AES Tietê Company: Promissão e Água Vermelha dam; CERAN: Energy Company Rio das Antas (state of Rio Grande do Sul): Monte Claro and Castro Alves dams; DFESA: Dona Francisca Energy and CEEE: Electric Energy Company of Rio Grande do Sul State: Dona Francisca dam. 8

SUMMARY The difficulties in forecast, in a reliable way, the infiltration through concrete dams, through the foundation and the concrete structures, have turned feasible the use of empirical criteria. These criteria are also useful, when, after the measurement of the observed leakages at the end of the reservoir filling, one must take a decision about the need of application of some eventual treatment, in order to reduce the total infiltration. Having into account Lugeon s and Pautre s criteria to establish control values for the infiltration through concrete dams, a comparison between the forecast and measured leakages is presented in this paper, involving 10 (ten) concrete gravity dams, with three of them in CCR and the others in conventional concrete. Through this comparison it was possible to verify that Pautre s criterion is not adequate, particularly for dams in area of basaltic lava flows, while the Lugeon s criterion appeared more adequate to establish control values for leakages through the foundation and the concrete of solid gravity dams. RÉSUMÉ Les difficultés à se prévoir de manière confiable les infiltrations à travers des barrages en béton, à travers de la fondation combien du béton, il vient favoriser l'emploi de quelques critères empiriques, pour l'estimation des infiltrations à travers de cettes barrages de béton. Ces critères sont aussi important, quand après la mesure des sorties observées aprés le remplissage de reservoir, quand il fout décider sur la nécessité d'un éventuel traitement, pour la réduction des infiltrations. En ayant par base les critères de Lugeon et de Pautre, pour l'établissement de valeurs de contrôle pour les infiltrations à travers des barrages en béton, se présente dans ce travail une comparaison entre les infiltrations prévues et les réellement mesurés, dans un total de 10 (dix) barrages type gravité, avec trois d'elles en CCR et les autres en béton classique. À travers de cette comparaison il s'est pu vérifier que le critère de Pautre ne se présente comme approprié, tandis que le critère de Lugeon se présente plus approprié, de telle façon pour l'établissement de valeurs de contrôle pour les infiltrations à travers la fondation, quand des structures en béton d une barrage. 9