Erosion Information Paper Eagle City and Eagle Village, Alaska Current as of January 21, 2008

Similar documents
Erosion Information Paper - South Naknek, Alaska Current as of November 14, 2007

Erosion Information Paper - Barrow, Alaska Current as of September 14, 2007

Community Erosion Assessment Napakiak, Alaska 15 January 2008

ICE IS THICKER THAN WATER GALENA, ALASKA. Taunnie Boothby, CFM State of Alaska NFIP Coordinator Alaska Division of Community and Regional Affairs

5. MANY COASTAL COMMUNITIES AND FACILITIES WILL FACE INCREASING EXPOSURE TO STORMS.

APPENDIX A M&T/Llano Seco Long-Term Water Reliability Study These photos are examples of rock spurs in use throughout the United States

YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT

EROSION HAZARD OF MINNESOTA'S LAKE SUPERIOR SHORELINE. Carol A. Johnston Principal Investigator

Great Lakes Update. Volume 194: 2015 Annual Summary

APPENDIX 1 LITTLE EGYPT FROM THE AIR

CHAPTER FIVE: THE LOWER MISSISSIPPI REGION AND PLAQUEMINES PARISH

The last three sections of the main body of this report consist of:

Materials. Use materials meeting the following.

NEEDLES S STREET LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID #

Sacramento River Bank Protection Project

Mapping Climate Change in a Yupik Eskimo Village

3.12 Geology and Topography Affected Environment

Ingle Creek Placer Mine

White River Update. Jeanne Stypula, Supervising Engineer. Advisory Committee Meeting April 26, 2016

SAVANNAH HARBOR EXPANSION BANK EROSION STUDY UPDATE

Appendix C Fluvial Flood Hazards

Drilling Holes in Ice to Reduce Ice Jam Potential

Draft exercise for share fair at Bozeman workshop only. This exercise is not ready for distribution. Please send helpful suggestions to

NEWS RELEASE UNDER SECTION 404 OF THE CLEAN WATER ACT (33 USC 1344) ACTION NUMBER SPA ABQ

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2

Red River Levee Panel

Local Flood Hazards. Click here for Real-time River Information

CR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District

Understanding coastal erosion in Alaska

NORTHUMBERLAND COUNTY, PA

Learning Objectives: I can identify and interpret river flows and directions.

Looking after Lyme Regis

Assessing Climate Change Vulnerability of Cultural Resources

1 INTRODUCTION AND MAJOR FINDINGS... 1

Climate Change Impacts in Alaska: the Weather Perspective

MVP WMS, George Schorr

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

UPPER COSUMNES RIVER FLOOD MAPPING

FOLLOW-UP ON CHANNELIZATION IN SPRING CREEK SUB-WATERSHED

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON

SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID #

2267 N o r t h 1500 W C l i n t o n U T 84015

LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON

City of Madison Flooding Event AUGUST 20 TH, 2018-PRESENT

Sessom Creek Sand Bar Removal HCP Task 5.4.6

U.S. Army Engineer Research and Development Center, Hanover, New Hampshire

Presented by Larry Rundquist Alaska-Pacific River Forecast Center Anchorage, Alaska April 14, 2009

Background and Purpose of Meeting. River Towers Meeting. Flood Risk Management Study Alternatives Overview

USGS Flood Inundation Mapping of the Suncook River in Chichester, Epsom, Pembroke and Allenstown, New Hampshire

Information for File MVP RMM

Application #: TEXT

What are the issues?

PW Parkway ES Prince William County, Virginia WSSI #

Roger Andy Gaines, Research Civil Engineer, PhD, P.E.

3.12 Geology and Topography Affected Environment

Floods Lecture #21 20

Elwha River response to dam removals through four years and a big flood:

Cripps Ranch 76+/- Acres Orchard Development Opportunity Dixon, CA. Presented By:

Bank Erosion and Morphology of the Kaskaskia River

Missouri River Basin Water Management Monthly Update

DE PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE


R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973


How does erosion happen?

CHAPTER 10. TORNADOES AND WINDSTORMS

Great Lakes Update. Volume 191: 2014 January through June Summary. Vol. 191 Great Lakes Update August 2014

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013

Four Mile Run Levee Corridor Stream Restoration

Great Lakes Tributary Modeling: Canaseraga Creek Watershed

MEDIA RELEASE FOR IMMEDIATE RELEASE March 17, 2014 Preparing for the Spring Thaw

Name: Mid-Year Review #2 SAR

Semester Project Final Report. Logan River Flood Plain Analysis Using ArcGIS, HEC-GeoRAS, and HEC-RAS

Summary of the 2017 Spring Flood

EA SOUTH WEST. Hillfarrance. Flood defence scheme

Missouri River Basin Water Management Monthly Update

Aid to Critical Infrastructure and Key Resources During a Disaster. Pete Grandgeorge MidAmerican Energy Company

Effect of Erosion in Alaskan Coastal Villages

Changing Landscapes. Coastal Erosion. Middle School Guide. REACH Up Raising Educational Achievement. through Cultural Heritage Up

Dalton Highway Flood - Disaster in the Arctic

Appendix E Guidance for Shallow Flooding Analyses and Mapping

Missouri River Basin Water Management Monthly Update

USING GIS TO MODEL AND ANALYZE HISTORICAL FLOODING OF THE GUADALUPE RIVER NEAR NEW BRAUNFELS, TEXAS

Response Case Study: April 2014 Historic Flood Event. Severe Weather April 29 30, 2014

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION DISTRICT 6-0 HYDROLOGIC AND HYDRAULIC REPORT. for SR 3062, SECTION 29S STRASBURG ROAD.

DAMAGE SURVEY OF THE BINGER, OKLAHOMA TORNADO OF MAY 22, 1981

APPENDIX E. Photographs of Hazard Events in Broome County. DMA 2000 Hazard Mitigation Plan Broome County, New York E-1

SNOW CREW CALL IN SHEET

Why Geomorphology for Fish Passage

SEARCHING FOR SEDIMENT SOURCES IN SPRING CREEK

Weathering and Soil Formation. Chapter 10

5.2. IDENTIFICATION OF NATURAL HAZARDS OF CONCERN

CLEA# Approved Date: Feb Revision Date: Aug 02, May06, Mar08, Jan 09 New ( ) Amends ( ) Rescinds ( ) Pages:

HURRICANE IVAN CHARACTERISTICS and STORM TIDE EVALUATION

Applying Hazard Maps to Urban Planning

CE415L Applied Fluid Mechanics Laboratory

Background on the March 13-14, 2007 Flooding in Browns Valley (Traverse County), Minnesota

Case Study 2: Twenty-mile Creek Rock Fords

JOURNAL OF ENVIRONMENTAL HYDROLOGY The Electronic Journal of the International Association for Environmental Hydrology VOLUME

Current Functions (Enter categories from instructions) Materials (Enter categories from instructions)

Transcription:

U.S. Army Corps of Engineers ALASKA BASELINE EROSION ASSESSMENT Erosion Information Paper Eagle City and Eagle Village, Alaska Current as of January 21, 2008 Community Information The City of Eagle, population 110, is on the Taylor Highway, 6 miles west of the Alaska- Canadian border, and 200 miles from Fairbanks. Eagle is incorporated as a 2nd class city in the unorganized borough. The Village of Eagle, population 70, is 3 miles upriver from the city along the left bank of the Yukon River. The Village of Eagle is unincorporated and is also within the unorganized borough. Description of Erosion Problem City of Eagle. Ice formation and melting, ice jams in the spring, river flow, wind, gully runoff during swift spring thaws over the bluff, and high river stages all contribute to bank erosion on the Yukon River. Notable erosion was reported by the city for 1927, 1934, 1972 and 1992. Prior to 1994, an estimated 75 feet had been lost off the end of the runway and the old U.S. Army parade grounds for Fort Egbert over a 40 year period. Village of Eagle. Ice jams from spring break up are the primary cause of bank erosion. The eroding area is estimated to be 1,690 feet in length with the height of the eroding bank estimated at 25 to 40 feet. The old village area was in the 40-year floodplain where slow erosion continues to occur, however a new community development has begun to take place 5 miles back from the river. The risk from river bank erosion is reportedly low and the bank has not eroded much in recent years. Potential Damages City of Eagle. An approximately 950-foot-long sheet pile retaining wall was installed in 1994, which reduced the erosion rate in the area. Six hundred feet of riverbank downstream from the end of the sheet pile is currently eroding, however the upstream end of the sheet pile appears to be controlling the erosion. The sheet pile retaining wall was constructed at a cost of about $1.3 million as an Emergency Watershed Protection project. Structures and facilities presently threatened by the approximately 600-foot eroding area along the river bank downstream from the sheet pile structure include the Episcopal Church, the airstrip, and the National Park Service Yukon-Charley Rivers National Preserve headquarters buildings. Village of Eagle. Several residences, some outbuilding and sheds, the community well house, Charlie s Hall community building, Front Road, the clinic, the tribal work force office, the church, and the remains of the historic school house are all estimated at 1ess than 100 feet from the top of the bank. Items identified farther back from the river include fuel storage tanks, and a

junk yard behind the clinic. A site of archeological importance along Mission Creek and Eagle Bluff is an estimated 50 feet from the river bank. No protection measures have been implemented to reduce potential erosion damage, however several old buildings have reportedly been moved in past years. Photos and Diagrams Photos of erosion provided by the division of homeland security and emergency management are attached. Diagrams depicting the linear extent of erosion in the city and village are attached. References USACE. 1976. Section 14 Bank Erosion Reconnaissance, Eagle, Alaska., U.S. Army Corps of Engineers. USACE. 2008. Alaska Community Erosion Survey, OMB approved number 07100001, expires September 30, 2009 administered to Joyce Roberts, Eagle traditional council tribal administrator and Barry Westphal, tribal environmental coordinator on January 16, 2008, and Jerry Nelson, Eagle Mayor on January 15, and John Borg 40-year resident on January 21, 2008. Additional Information This information paper, as well as those for other communities, can be accessed on the internet at www.alaskaerosion.com. For more information please contact the Corps of Engineers, project manager at (907) 753-5694 or email Alaska.Erosion.POA@usace.army.mil

Photo 1: In Eagle village some homes are located close to the Yukon River shoreline; photo courtesy of the Division of Homeland Security and Emergency Management, 2001. Photo 2: Sheet pile retaining wall along the city of Eagle shoreline protects the bank from erosion. The unprotected high bluff area is in the background, beyond the end of the sheet pile wall; photo courtesy of the Division of Homeland Security and Emergency Management, 2001.

Old U.S. Army parade grounds/ airstrip YUKON RIVER National Park Service Headquarters for the Yukon-Charley Rivers National Preserve Flow Episcopal Church, Circa 1900 Date of Aerial Photo: 28 June 07 NOTE: The extent of erosion shown on this figure is based on interviews with the community. This data has not been field verified. This figure is only intended to show areas of erosion, not rates or severity of erosion Linear Extent of Erosion Part 1 EAGLE! ± Corps of Engineers Civil Works Branch Alaska Baseline Erosion Eagle, Alaska

Old Eagle Village Front Road YUKON RIVER Flow Date of Aerial Photo: 28 June 07 NOTE: The extent of erosion shown on this figure is based on interviews with the community. This data has not been field verified. This figure is only intended to show areas of erosion, not rates or severity of erosion Linear Extent of Erosion Part 2 EAGLE! ± Corps of Engineers Civil Works Branch Alaska Baseline Erosion Eagle, Alaska