SUB CATCHMENT AREA DELINEATION BY POUR POINT IN BATU PAHAT DISTRICT

Similar documents
Flood Water Level Mapping and Prediction Due to Dam Failures

HYDROLOGIC AND WATER RESOURCES EVALUATIONS FOR SG. LUI WATERSHED

MODULE 7 LECTURE NOTES 5 DRAINAGE PATTERN AND CATCHMENT AREA DELINEATION

DELINEATION OF CATCHMENT BOUNDARY FOR FLOOD PRONE AREA: A CASE STUDY OF PEKAN TOWN AREA

Vulnerability of Flood Hazard in Selected Ayeyarwady Delta Region, Myanmar

Use of Geospatial data for disaster managements

Application of Geographical Information System (GIS) tools in watershed analysis

DEVELOPMENT OF FLOOD HAZARD VULNERABILITY MAP FOR ALAPPUZHA DISTRICT

GRAPEVINE LAKE MODELING & WATERSHED CHARACTERISTICS

Dr. S.SURIYA. Assistant professor. Department of Civil Engineering. B. S. Abdur Rahman University. Chennai

Flood hazard mapping in Urban Council limit, Vavuniya District, Sri Lanka- A GIS approach

International Journal of Advance Engineering and Research Development

13 Watershed Delineation & Modeling

Progress Report. Flood Hazard Mapping in Thailand

Determination of flood risks in the yeniçiftlik stream basin by using remote sensing and GIS techniques

EFFICIENCY OF THE INTEGRATED RESERVOIR OPERATION FOR FLOOD CONTROL IN THE UPPER TONE RIVER OF JAPAN CONSIDERING SPATIAL DISTRIBUTION OF RAINFALL

A GIS-based Approach to Watershed Analysis in Texas Author: Allison Guettner

Flood Risk Map Based on GIS, and Multi Criteria Techniques (Case Study Terengganu Malaysia)

Watershed Delineation in GIS Environment Rasheed Saleem Abed Lecturer, Remote Sensing Centre, University of Mosul, Iraq

DETERMINATION OF SUITABLE LANDFILL SITE AT BATU PAHAT USING GIS AND ANALYTICAL HIERARCHY PROCESS

FLOODPLAIN MAPPING OF RIVER KRISHNANA USING HEC-RAS MODEL AT TWO STREACHES NAMELY KUDACHI AND UGAR VILLAGES OF BELAGAVI DISTRICT, KARNATAKA

CE 394K.3 GIS in Water Resources Midterm Quiz Fall There are 5 questions on this exam. Please do all 5. They are of equal credit.

Floodplain Modeling and Mapping Using The Geographical Information Systems (GIS) and Hec-RAS/Hec-GeoRAS Applications. Case of Edirne, Turkey.

River Inundation and Hazard Mapping a Case Study of North Zone Surat City

Effect of land use/land cover changes on runoff in a river basin: a case study

Outline. Remote Sensing, GIS and DEM Applications for Flood Monitoring. Introduction. Satellites and their Sensors used for Flood Mapping

Report. Developing a course component on disaster management

International Journal of Modern Trends in Engineering and Research e-issn No.: , Date: April, 2016

VILLAGE INFORMATION SYSTEM (V.I.S) FOR WATERSHED MANAGEMENT IN THE NORTH AHMADNAGAR DISTRICT, MAHARASHTRA

Extraction of Drainage Pattern from ASTER and SRTM Data for a River Basin using GIS Tools

Regional Flash Flood Guidance and Early Warning System

Inflow forecasting for lakes using Artificial Neural Networks

THE 3D SIMULATION INFORMATION SYSTEM FOR ASSESSING THE FLOODING LOST IN KEELUNG RIVER BASIN

Amitava Saha Research scholar IIT, Roorkee India

Digital Elevation Models. Using elevation data in raster format in a GIS

NAVAJO NATION PROFILE

4. GIS Implementation of the TxDOT Hydrology Extensions

Introduction to HEC-GeoHMS. Watershed boundary delineation. Assembling Hydrologic Modeling System

FLOOD HAZARD AND RISK ASSESSMENT IN MID- EASTERN PART OF DHAKA, BANGLADESH

Hydrologic Modelling of the Upper Malaprabha Catchment using ArcView SWAT

Flood management in Namibia: Hydrological linkage between the Kunene River and the Cuvelai Drainage System: Cuvelai-Etosha Basin

DROUGHT RISK EVALUATION USING REMOTE SENSING AND GIS : A CASE STUDY IN LOP BURI PROVINCE

UGRC 144 Science and Technology in Our Lives/Geohazards

MONITORING OF SURFACE WATER RESOURCES IN THE MINAB PLAIN BY USING THE STANDARDIZED PRECIPITATION INDEX (SPI) AND THE MARKOF CHAIN MODEL

IJESRT INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY

4 th Joint Project Team Meeting for Sentinel Asia 2011

Basin characteristics

GIS Based Delineation of Micro-watershed and its Applications: Mahendergarh District, Haryana

ENGINEERING HYDROLOGY

Haiti and Dominican Republic Flash Flood Initial Planning Meeting

International Journal of Scientific & Engineering Research, Volume 6, Issue 8, August ISSN

A Simple Method for Watershed Delineation in Ayer Hitam Forest Reserve using GIS

Civil Engineering Journal

Integrating Geographical Information Systems (GIS) with Hydrological Modelling Applicability and Limitations

CLIMATE RESILIENT ALTITUDINAL GRADIENTS (CRAGs)

ISSN Vol.03,Issue.10 May-2014, Pages:

REMOTE SENSING AND GEOSPATIAL APPLICATIONS FOR WATERSHED DELINEATION

INTERNATIONAL JOURNAL OF PURE AND APPLIED RESEARCH IN ENGINEERING AND TECHNOLOGY

Remote Sensing and GIS Applications for Hilly Watersheds SUBASHISA DUTTA DEPARTMENT OF CIVIL ENGINEERING IIT GUWAHATI

INTERNATIONAL JOURNAL OF GEOMATICS AND GEOSCIENCES Volume 6, No 1, 2015

Designing a Dam for Blockhouse Ranch. Haley Born

INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCES Volume 5, No 1, Copyright by the authors - Licensee IPA- Under Creative Commons license 3.

CHAPTER VII FULLY DISTRIBUTED RAINFALL-RUNOFF MODEL USING GIS

Analysis of Risks and Impacts of Flooding with Satellite Remote Sensing

Geo-spatial Analysis for Prediction of River Floods

Eagle Creek Post Fire Erosion Hazard Analysis Using the WEPP Model. John Rogers & Lauren McKinney

URBAN WATERSHED RUNOFF MODELING USING GEOSPATIAL TECHNIQUES

PROANA A USEFUL SOFTWARE FOR TERRAIN ANALYSIS AND GEOENVIRONMENTAL APPLICATIONS STUDY CASE ON THE GEODYNAMIC EVOLUTION OF ARGOLIS PENINSULA, GREECE.

A GIS-based Subcatchments Division Approach for SWMM

GIS BASED ANALYSIS ON ENVIRONMENTAL SENSITIVE AREAS AND IDENTIFICATION OF THE POTENTIAL DISASTER HAZARDOUS LOCATIONS IN SOUTHERN SRI LANKA

FFGS Additional Functionalities and Products. Konstantine P. Georgakakos, Sc.D. HYDROLOGIC RESEARCH CENTER 23 May 2018

Lab 1: Landuse and Hydrology, learning ArcGIS II. MANIPULATING DATA

Flood Hazard Mapping in Dikrong Basin of Arunachal Pradesh (India)

INTRODUCTION TO HEC-HMS

Characterization of Catchments Extracted From. Multiscale Digital Elevation Models

Transactions on Information and Communications Technologies vol 18, 1998 WIT Press, ISSN

Flood map of Tupai River using combined 1D and 2D modeling

Terrain Analysis in GIS and Its Significance to Surface Runoff Analysis (A Study of Basawa Community in Sabon Gari L.G.A. of Kaduna State, Nigeria)

Flash Flood Guidance System On-going Enhancements

Hendra Pachri, Yasuhiro Mitani, Hiro Ikemi, and Ryunosuke Nakanishi

Governing Rules of Water Movement

GIS in Water Resources Midterm Exam Fall 2012 There are five questions on this exam. Please do all five.

Application of high-resolution (10 m) DEM on Flood Disaster in 3D-GIS

DOWNLOAD OR READ : GIS BASED FLOOD LOSS ESTIMATION MODELING IN JAPAN PDF EBOOK EPUB MOBI

Planning Road Networks in New Cities Using GIS: The Case of New Sohag, Egypt

FLOOD PLAIN SIMULATION MODEL BY INTEGRATION OF SURVEYING PACKAGES AND GIS

Floodplain modeling. Ovidius University of Constanta (P4) Romania & Technological Educational Institute of Serres, Greece

BSEN 6220 GIS LAB #5

DESCRIPTION OF A HYDROLOGIC DATASET. Department of Environmental Sciences, Wageningen University and. Research Center. Wageningen, The Netherlands

Rick Faber CE 513 Watershed and Streamwork Delineation Lab # 3 4/24/2006

Detecting Flood Susceptible Areas Using GIS-based Analytic Hierarchy Process

FIRST PASS METHODOLOGY OF CITYWIDE FLOOD INUNDATION MAPPING

INTERNATIONAL JOURNAL OF GEOMATICS AND GEOSCIENCES Volume 1, No 4, 2011

Application of Geographic Information Systems (GIS) in Analysing Rainfall Distribution Patterns in Batu Pahat District

Hydrologic Engineering Applications of Geographic Information Systems

ESTIMATING PROBABLE PEAK RUNOFF FOR GREATER COLOMBO RIVER BASIN SRI LANKA

Georeferencing and Satellite Image Support: Lessons learned, Challenges and Opportunities

The AIR Tropical Cyclone Model for India

)UDQFR54XHQWLQ(DQG'tD]'HOJDGR&

Surface Processes Focus on Mass Wasting (Chapter 10)

Transcription:

SUB CATCHMENT AREA DELINEATION BY POUR POINT IN BATU PAHAT DISTRICT Saifullizan Mohd Bukari, Tan Lai Wai &Mustaffa Anjang Ahmad Faculty of Civil Engineering & Environmental University Tun Hussein Onn Malaysia 86400, Batu Pahat, Johor, Malaysia saifulz@uthm.edu.my, laiwai@uthm.edu.my, mustafa@uthm.edu.my ABSTRACT Geographical Information System (GIS) has been recognized as a tool that could help in the study of natural resources and is able to prepare a plan to deal with the natural disaster. Reservoir and watershed area can be determined manually via topographic maps or simplified using digital elevation model (DEM) data. This article is described a procedure for manually delineating sub catchment and watershed of Batu Pahat area from DEM. By adding pour points element, the procedure is capable for terrain with flat level area and low DEM resolution at 20 meter interval. Field of Research: Sub catchment, watershed, pour point, GIS ---------------------------------------------------------------------------------------------------------------------- -- 1. Introduction Batu Pahat is a district that synonymous with flood events that occurred each time coming monsoon season which usually will last at the end or beginning of the year. Besides influenced by heavy rain, the flood also was due to overflow of major rivers drain that makes the area around the river basin continues to flood or hold water. In Batu Pahat own, land development was in full swing and changing patterns of land use map to form drastically in the last ten years. Most of the status of agricultural land converted to oil palm type than rubber, coconut or pineapple. Status changes gradually with the production of crop in the country for high returns to livelihoods. Exploration rainfall within the catchment area into the new planting area or developed for other uses causes the catchment area declining in percentage. To overcome the severe threats caused by the floods, the dangers of a comprehensive prevention strategy should be made, and cooperation between authorities should be provided especially to the Batu Pahat flood prone area. However, the priority areas where assistance should be provided have not operated in more detail. Hydrological map will provide very useful information when developing a proper and efficient strategy to overcome the flood disaster. Thus, in sequence with the process, Batu Pahat needs an appropriate bank data of hydrological database to improve the flood prevention and mitigation strategy. 2. Study Area As previously stated, this study develops an approach to synthesize the relevant database in a spatial framework to evolve a flood hazard map of Batu Pahat. The purpose of catchment is to identify the areas within a development plan that are at risk of flooding base on factors that are relevant to flood risks. Policies are then outline to be applied to such areas to minimize and manage such risk in the Batu Pahat (see Figure 1).The major river basins of the Batu Pahat are the Sembrong river and the Bekok river which sources from Sembrong and Bekok dam. These two rivers as well as Simpang Kiri river and two dams are the distributaries of Batu Pahat river. Proceeding of the World Conference on Integration of Knowledge, WCIK 2013. 25-26 November 2013, Langkawi, Malaysia. (e-isbn 978-967-11768-2-5). Organized by WorldConferences.net 495

Figure 1: Batu Pahat district study area. This study considered the Sembrong river catchment area due to its devastating effect when the Sembrong dam in neighboring Kluang district releases water into it. Batu Pahat district is located in the Johore state and bounded in the Malacca Strait in the west. The study area lies between latitudes 1 53 N and 1 59 N, and longitudes 103 07 W and 103 11 E. For this study, overall data are present as attribute and spatial data such as topographic DEM, stream network, district boundary, irrigation, land use and road network map within study area were used. 3. Catchment Area and Watershed The determination of Catchments and watershed boundaries is necessary when generating a drainage system. Drainage demarcations are used in flood forecasting system, water quality projects, as well as public interest. Accurate model are essential comes from accurate drainage boundaries. Capability of ArcGIS in terms of determination catchment and watershed boundaries are most welcome as beneficial to researcher. A catchment is defined as the land area that contributes runoff to a given stream line. Catchment characteristic derived directly from the geology, soils and land use (3). Raindrop falling on an edge catchment has a unique path to stream line and thus to being routed down through the stream network. In ArcGIS data model, the edge catchment represent by polygon features. Figure 2: Sub-catchment boundaries Figure 3: Each distinct color Edge catchment Figure 4: Dam shown in striking color- Water body 496

catchment Digital Elevation Model Preprocess steps is needed to be carried out as a vital step in extraction of delineation catchment and watersheds. Artificial spurious depressions will be generated during perform spatial interpolation. DEM are use for standard operation for delineating catchment areas. Terrain elevations for ground location are derived from standard topographic maps through the use of digitization methods. ArcInfo grid functions will easily process the grid to generate a DEM. The next description explains the fundamental theory about the ArcInfo functions for watershed delineation. Derivation of watershed delineation are all from the basic that water flows downhill, and in so doing it will follow the path of with the steepest slope (largest gradient). In a DEM grid structure, there exist at most 8 cells adjacent to each individual grid cell. (Cells on the grid boundary will not be bounded on all sides). Accordingly, water in one cell travels in 1 out of at most 8 different directions in order to enter another cell. This concept is deemed the 8-direction pour point model. Figure 5: Direction of pour point model Catchment Boundaries Set By Pour Point In order to determine catchment and watershed area using ArcGis, some steps are required through processing steps. The following chart shows the process of extracting watershed and stream networks. Figure 6: Hydrological watershed delineation flowchart In the study area data set, the flow accumulation cells are set with accumulated flow greater than 10000 cells. The value is looks reasonable according to vector stream network. 497

Figure 7: Flow accumulation (red line) stretch line up with river netwok (blue line). The snap pour point in ArcGIS is used to ensure the selection of points of high accumulated flow when delineating catchment or watershed. When using Watershed tool, the snap pour point will search within a snap distance around the specific pour points for the cell of highest accumulated flow and move the pour point to that location. Pour point is selected by adding a new point layer to the ArcGIS project. These are typically points at the edge of downstream of major confluences. Points should be added that are as close the center of cells as possible. The location of pour points is selected manually where drainage points are located at the each stream as shows as figure 8. Figure 8: Pour point location in study area. In result of flow direction result and pour point selection a catchment area is delineation. The catchment area creates a grid in which grid code indicating to which catchment the cell belongs. 498

Figure 9: Main river and minor river subcatchments 4. Results and Discussion After the batch subcatchment delineation succesfull generated, the total number is 50 subcatchments. Reducing the number through the size of area, we divided and merge the major sub catchment into 6. Table 1 shows the data breakdown. Table 1: Area of calculated sub catchments Subcatchment Subcatchment Area (km2) Sg. Simpang Kiri 131.04 Sg. Simpang Kanan 287.9 Sg. Batu Pahat 103.0 Sg. Bekok 340.0 Sg. Sembrong 251.9 As comparison, Batu Pahat s subcatchment area total calculated using pour point method compared to Syed Mohamad, Hooi & Binnie Sdn Bhd (SMHB) year 2000 has shown in table 2 below. Total catchment area of Sungai Batu Pahat catchment is 1944 km 2 Table 2: Area of comparison calculated sub catchments Catchment Area (km 2 ) Pour Point Area (km 2 ) SMHB Sg. Bekok Sg. Sembrong 340.0 251.9 342 273 499

5. Summary Referring to the recent developments, the quality of the main drainage in Batu Pahat catchment area has been enhanced. A source of data and database management technology has been used as far as possible to carry out flood management more effective and competitive. The conclusion that can be made is the GIS are the suitable and excellent tools that can help to combine information from various sources and it is really a helpful tool for decision making procedure. References [1] Eric K.F., Digital Terrain Modelling in a GIS Environment. Proceedings of The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, Volume 37, (2008), pp. 1023-1029 [2] Hazalilah, H., Johor; The Sinking State? Case Study: District of Muar and Batu Pahat, Introduction of FHM. East and Southeast Asia Regional Seminar on Flood Hazard Mapping, (2007) [3] Keokhumcheng, Y., Flood Hazard Assessment of the Eastern Region of Bangkok Floodplain, Thailand. 2nd International Conference on Biotechnology and Environment Management, IPCBEE vol.42 (2012) (2012) IACSIT Press, Singapore. [4] Mohd Sani., Application of Remote Sensing and Geographical Information System (GIS) for Reservoir Water Balance Analysis. Proceedings of the Asian Conference on Remote Sensing, (2010). [5] Mokhtar, A.R., Kemajuan dan Status Perlaksanaan Profile Julai 2011, JPS Daerah Batu Pahat. (2011) [6] Miller, S.N., GIS based Hydrologic Modeling: The Automated Geospatial Watershed Assessment Tool. American Grant Writers' Association, (2004). [7] Yee, L.W., The Social Economic Costs of Flood: A case of the Johor Floods During North-east Monsoon 2006/2007, National Seminar on Socio-Economic Impacts of Extreme Weather and Climate Changes. 500