Vendetta Mining Discovers New High Grade Zone at Pegmont Lead / Zinc Deposit

Similar documents
Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

Vendetta Reports Initial Results from 2017 Pegmont Program with High Grade Zone 3 Step Out Drilling

Vendetta Mining Intersects Meters of 11.91% Pb+Zn from Zone 5 at the Pegmont Lead-Zinc Deposit

Vendetta Continues to Intersect High Grade Lead-Zinc from Zone 2 Open Pit Target, Pegmont Lead-Zinc Project

FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7)

Vendetta Mining Announces Maiden Assay Results from the 2014 Zone 5 Drilling Program at the Pegmont Lead-Zinc Project

Vendetta Mining Announces First Assay Results from the 2014 Drilling Program at the Pegmont Lead-Zinc Project

Highlights from the four holes announced in this news release include:

V Sample from C.O.D vein 15 metres southwest of V

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

(TSXV: GPLY, OTCQB: GLYXF

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

Probe Metals Continues to Expand Gold Zones At Val-d Or East

For Immediate Release ASCOT DRLLING AT UNICORN INTERSECTS MORE HIGH-GRADE GOLD

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

NEW COBAR-STYLE COPPER DISCOVERY IN NSW

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

NEWS RELEASE TSX-V Ticker: SWA 23 April 2013 SWA.WT SARAMA RESOURCES EXTENDS HIGH-GRADE MINERALISATION AT MM PROSPECT IN BURKINA FASO

NEWS RELEASE August 10, 2017

Skeena Intersects g/t AuEq over metres at Eskay Creek

NEWS RELEASE NOVEMBER 28th, 2017 Trading Symbols: TSX-V: AMZ; OTCQX: AXDDF

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

For personal use only

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

GOLDEN RIDGE RESOURCES DRILLS 60.27m of 2.60 G/T AUEQ AT THE HANK PROJECT IN BC S GOLDEN TRIANGLE

Surface Trenching Highlights. Santos Target. To (m) Width (m) Au (g/t) Comment. (m) Santos (1)-includes internal dilution

True Width (m) Carneritos to

ET and and and

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

NEWS RELEASE August 8, 2018

NEWS RELEASE July 26, 2018

ENCOURAGING GOLD-BASE METALS AT MAY DAY, MOLY- GOLD AT ATTUNGA

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

BK Copper Project Strong Copper Results Confirm and Extend BKM

EXCEPTIONAL DRILL RESULTS FROM ALPHAMIN S BISIE TIN PROJECT, DEMOCRATIC REPUBLIC OF THE CONGO. Highlights

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

LH Property Update: Magnum Goldcorp Hits High Grade Gold 16.9 m of g/t, including 10.9 m of g/t, and as well, 11 m of 20.

AZUCAR MINERALS COMMENCES DRILLING AT THE EL COBRE PROJECT, MEXICO

MAWSON RESTARTS EXPLORATION DRILLING AT THE ROMPAS GOLD PROSPECT IN FINLAND

BALMORAL CONTINUES TO EXPAND GRASSET NI-CU-PGE DISCOVERY

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

Drilling Extending Mineralization in La Mina North Zone

NEWS RELEASE. September 30 th, Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTC Pink)

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT

Drilling Extending Mineralization in La Mina North Zone

Nortec Minerals reports Assays, Phase 1 drilling, Tom 1 North - Priority 1 Target, Tomboko Gold Property, Northeast Guinea, West Africa

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

NEWS RELEASE. March 22, 2017

Press Release Thunder Bay: August 2, 2018

EL CONDOR IN-FILL DRILLING INTERSECTS 26.9 METERS 2.19% CU & 0.58% NI

NEWS RELEASE. Evrim and Harvest Gold Complete Drilling at Cerro Cascaron

TRENCHING AT LAS DOLORES EXTENDS STRIKE LENGTH TO OVER 1,000 METRES, INTERSECTING

DRILLING FURTHER EXTENDS MINERALIZATION AT EXETER S CASPICHE GOLD-COPPER PORPHYRY PROJECT IN CHILE

ATON RETURNS 22.2 METRES OF 2.77 GRAMS PER TONNE GOLD EQUIVALENT FROM HAMAMA WEST; VISIBLE GOLD DISCOVERED AT BOHLOG

Diamond Drilling confirms depth potential for mineralisation at Mrima Hill.

ASX / MEDIA RELEASE 6 MAY MILE SILVER-LEAD-ZINC DISCOVERY; HIGH GRADE SILVER-GOLD IN ROCK CHIPS AT RUBY SILVER

New Drilling Program Commences at Mutiny s Deflector Deposit

May 17, Two holes explored the extension at depth of the historic Sta Rosa vein

Salazar intersects metres (13.07m true) averaging 2.65 g/t gold, g/t silver, 1.32% copper, 6.63% zinc at its Curipamba Project.

August 20, 2018 SBB NR SBB TSX

MINAURUM GOLD INC : : News Releases

July Exploring for Canadian Gold in the Rainy River District of Ontario

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

GOLDPLAY OUTLINES FIVE NEW EXPLORATION TARGETS AT THE SAN MARCIAL PROJECT IN MEXICO

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

Tel: (+61-8) Mob: (+61) (0)

Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia

Colt Resources intersects 17.4% Cu over 0.42 metres (0.32 m true width) at Miguel Vacas Copper Project in its Borba exploration concession in Portugal

Hole ID From (m) To (m) Interval (m) Au (g/t) Ag (g/t) AuEq (g/t)* Zn (%)

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura

A B C PAD A HIGHLIGHTS

Interval (meters) To (meters)

Monument Announces Significant Intercepts Assay Results at Buffalo Reef/Felda

Figure 1. Location of Boreal s Key Projects

VR SAMPLES 58.3 g/t GOLD AND 809 g/t SILVER AND STAKES NEW PROPERTY TO EXPAND ITS DANBO PROPERTY EPITHERMAL GOLD TREND IN NEVADA

Golden Predator Intersects 6.86 m of g/t Gold at the 3 Aces Project; Jack and Ace of Spades Zones Merging

NEWS RELEASE. Foran Mining Intersects High Grade Zinc at McIlvenna Bay. Results expand area of known mineralization

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

NORTHQUEST LTD. ANNOUNCES DRILLING RESULTS FROM THE PISTOL BAY GOLD PROJECT, NUNAVUT, CANADA

Corvus Gold Drills g/t Gold, Extends Mother Lode Sediment Hosted Gold System to at Least 450 Metres Along Strike

NEWS RELEASE. Evrim announces additional drilling results at Cuale Gold Project in Mexico

Transcription:

FOR IMMEDIATE RELEASE September 19 th, 2017 (VTT2017 NR # 10) Vendetta Mining Discovers New High Grade Zone at Pegmont Lead / Zinc Deposit Vancouver, BC September 19 th, 2017 Vendetta Mining Corp. (the Company ) (VTT-TSX:V) is pleased to announce the discovery of a new high grade lead/zinc zone in an area that had no previous drilling. The discovery hole PVRD092, intersected 6.2 metres of 12.99 Lead + Zinc in the area between the Burke Hinge Zone (BHZ) and Zone 2. The Company now refers to this area as the Bridge Zone. PVRD092 was immediately followed up with an additional seven drill holes on two section lines, see Table 1 for assay results and the plans in Figures 1 and 2, and cross section in Figure 3, for drill hole locations. Highlights: Bridge Zone PVRD092 Sulphide: 6.25 metres of 12.99 Pb+Zn (10.15 Pb, 2.84 Zn) PVRD112 Sulphide: 4.98 metres of 14.94 Pb+Zn (12.19 Pb, 2.76 Zn) PVRD114 Sulphide: 5.06 metres of 14.66 Pb+Zn (11.09 Pb, 3.57 Zn) PVRD117 Sulphide: 6.15 metres of 15.41 Pb+Zn (12.88 Pb, 2.53 Zn) Burke Hinge Zone PVRD092 Transition: 8.31 metres of 8.63 Pb+Zn (5.83 Pb, 2.81 Zn) PVRD092 Sulphide: 7.22 metres of 11.23 Pb+Zn (7.90 Pb, 3.32 Zn) Michael Williams, Vendetta s President and CEO commented This result is further validation of the technical team s understanding of the Pegmont geology. We are looking forward to quickly developing a maiden resource and we have expanded the drill program to further delineate the Bridge Zone. Drill success of the Bridge Zone confirms the concept whereby the structurally district settings of the moderately north-east dipping BHZ is connected to the generally flat dipping Zone 2. The success of PVRD092 was immediately followed up with a fan of three drill holes located approximately 85 m along strike to the south-east; PVRD106, 107 and 108. Both lead and zinc grades are improve in the down dip direction and a fourth drill hole is now planned 40 m down dip of PVRD108. The Company drilled a further four drill holes on the PVRD092 section from a different drill pad: PVRD112, 114, 115 and 117. All four drill holes intersected consistent grades and thicknesses, with a slight increase in grade in the down dip direction. Drill hole PVRD114 didn t lift as planned and intersected within 7 m of PVRD092, results indicate close spaced continuity of both grade and thickness.

Dip / Azimuth Interval (m) True Thickness* (m) The majority of the holes have a low grade footwall of 1 to 3 m in garnet sandstone. A thin 1-2 m thick mineralised horizon lies 8-9 m below the footwall of the main mineralised lens. The principal horizon intersected on the two sections is believed to be a continuation of Lens B, seen throughout Pegmont, which is now present over a continuous strike length of 1.8 km. The Bridge Zone holes discussed in this release were expedited through the core shed and at the ALS laboratory, being prioritised in front of other completed holes to assist with drill rig scheduling and drill pad preparation. A third Bridge Zone section is currently being drilled, located 85 m to the north-west of the PVRD092 section line, three drill holes are planned. The first hole on that section is a re-entry of an historic RC hole (PMR020) and is being extended in NQ core, drilling is currently underway. Table 1. Summary of Bridge Zone Assay Results. Grade # Bore Hole From (m) To (m) Pb+Zn Pb Zn Ag g/t Bridge Zone - Section 1 (ordered from up dip intersection to down dip intersection) PVRD115-52/204 234.38 242.00 7.62 7.6 9.72 7.75 1.97 13 including 234.38 239.03 4.65 6.5 14.00 11.02 2.98 17 PVRD112-55/205 232.30 238.30 6.00 5.9 12.96 10.56 2.40 13 including 232.30 237.28 4.98 4.9 14.94 12.19 2.76 14 PVRD114-64/201 219.60 225.66 6.06 6.0 13.00 9.96 3.05 15 including 219.60 224.66 5.06 5.0 14.66 11.09 3.57 16 PVRD092-54/205 265.16 271.41 6.25 6.2 12.99 10.15 2.84 15 PVRD117-76/039 235.00 245.15 10.15 10.0 9.86 8.24 1.62 11 including 236.00 242.15 6.15 6.0 15.41 12.88 2.53 16 Bridge Zone - Section 2 (ordered from up dip intersection to down dip intersection) PVRD106-57/204 243.81 249.34 5.53 5.5 4.91 2.17 2.74 11 PVRD107-63/205 230.78 233.75 2.97 2.9 9.87 8.15 1.72 17 PVRD108-65/205 230.62 236.24 5.62 5.5 10.88 8.73 2.15 14 including 230.62 235.24 4.62 4.5 12.81 10.27 2.53 16 *True thickness is estimated using three dimensional geological modeling and structural measurements. #Drill intersections are summarized using a combined 1 lead and zinc grade with maximum 1 m internal dilution. Included intervals are based on a combined 5 lead and zinc grade.

Dip / Azimuth Material Type Interval (m) True Thickness* (m) Burke Hinge Zone Intersections PVRD092 was collared in the BHZ so as to work from the known to the unknown, in doing so it intersected the upper and lower lenses of the BHZ as planned, although at better than expected grades. Results are summarized in Table 2. The first intersection (26.60 34.91 m) in the Hanging-wall Lens occurs in moderately weathered country rocks, the host banded iron formation is however more resistant to weathering and the lead-zinc mineralization is present as visible sulphides. This is typical of the transition mineralization intersected at the BHZ, where transition mineralization is defined as predominantly sulphide lead-zinc mineralization in variably weathered rocks. The second intersection (54.24-55.28 m) is sulphide leadzinc mineralization in fresh country rock. Table 2. Summary of Burke Hinge Zone Drill Assay Results. Grade # Bore Hole From (m) To (m) Pb+Zn Pb Zn Ag g/t PVRD092-76/136 26.60 34.91 8.31 8.2 8.63 5.83 2.81 10 Transition including 28.75 34.91 6.16 6.1 11.12 7.61 3.51 13 and Sulphide 54.24 61.46 7.22 7.0 11.23 7.90 3.32 17 *True thickness is estimated using three dimensional geological modeling and structural measurements. #Drill intersections are summarized using a combined 1 lead and zinc grade with maximum 1 m internal dilution. Included intervals are based on a combined 3 lead and zinc grade. Syncline Targets The conceptual syncline targets under the BHZ were tested with drill holes PVRD091, 094 and 118. PVRD091 intersected a thick sequence of amphibolite dyke interpreted to be near the hinge of the anticline which possibly forms the folded sequence at the BHZ. The hole, therefore, didn t intersect the target position it did however confirm the existence of an anticline. With a better understanding of the dip of the Bridge Zone banded iron formation, drill hole PVRD118 targeted the down extent of the Bridge Zone near the interpreted positon of Syncline Target 1. PVRD118 intersected 9.9 m of host garnet sandstone and banded iron formation with visible lead and zinc sulphide mineralisation, approximately 160 m down dip of PVRD117. Core logging of PVRD118 is ongoing, and no assays are available at this time. Drill hole PVRD094 was drilled to test the conceptual Syncline Target 2, however the hole dropped in dip more than planned and drilled the interpreted north-west limb of the anticline, intersecting a thick sequence of amphibolite dyke. The Syncline 2 remains a valid target, re-interpretation of the cross section in light of the structural measurements collected from the drilling described here is required before further work on the Syncline 2 occurs.

Pegmont Exploration Drilling Further exploration holes are planned as part of the 2017 drilling program, including the Copper target to the south west of Pegmont, where previous Vendetta drilling intersected 3m of 3.27 Cu and 0.57 g/t Au co-incident with an 800 m long ground EM anomaly. This drilling is expected to continue in to November. Figure 1. Map Showing Location of the Bridge Zone Target, June 2017 Mineral Resource Block Model Contours, Open Pit Shell and 2017 Completed Holes to Date.

Figure 2. Bridge Zone Drill Hole Locations Update on Pegmont Resource Development Drilling To date, a total of 62 drill holes have been completed during the 2017 program, for a total of 14,000 m. Including completed drill holes discussed in this release, the Company has announced the results from 32 drill holes, see news releases dated 25 th July 2017 (VTT2017 NR #7) and 24 th August 2017 (VTT2017 NR #9). Processing, logging, sampling and assaying of the core not released to date is ongoing. Results will be released as they become available. Priority will next be given to drill holes to be used in the Zones 1, 2 and 3 metallurgical test work. Drilling continues with one drill currently working in Zone 2 and the second drill working on the Bridge Zone.

Figure 3. Interpreted Bridge Zone Cross Section A-A (looking South East) Pegmont Project Tenement Land Holding Increased The Company would like to advise that the land holding for the Pegmont Project has been simplified and expanded. The Pegmont Project tenement package comprised two exploration permits; EPM 14491 and 15106 and three mining licences; ML 2620, 2620 and 2623. The two EPMs have been surrendered and in their place a single, lager exploration permit EPM 26210 has been granted, this occurred on the August 22 nd, 2017, for a total area of 8,290 ha. There is no change to status of the three mining licences. Queensland exploration permits are granted for an initial 5 year term and are subject to a relinquishment schedule, they can be renewed for a further 5 years. Notes on Bridge Zone Drilling and Assay QA/QC The drilling at Bridge involved drilling RC pre-collars using a 5.75 inch diameter face sampling bit to depth prior to casing and continuing the hole in either NQ2 or HQ2 diamond core. Diamond core samples were taken on nominal 1 m lengths but varied to match geological contacts. Samples of the core are obtained using a diamond saw to half cut the core. Field duplicate samples were taken and blanks and commercially prepared certified reference materials (standards) were added into the sample sequence for every hole submitted. These were analyzed by the Company and no issues were noted with analytical accuracy or precision.

Samples used for the results described herein were prepared and analyzed at ALS Laboratory Group in Townsville, Queensland. Analysis was undertaken using a four acid digest and ICP (ALS method: ME- ICP61 for 7 elements) with over limit (>10,000 ppm lead and zinc and >100 ppm silver) high grade samples being read with an atomic absorption spectrometer (AAS), (ALS methods: Pb-OG62, Zn-OG62 and Ag-OG62). Drill hole collars are located using handheld GPS, and the collars will be surveyed by a licensed surveyor prior to undertaking a mineral resource update. Down hole surveys were undertaken using a true north seeking gyroscope with stations nominally every 6 m. All NQ2 and HQ2 diamond core is orientated using digital core orientation systems and this data is incorporated into the 3D interpretations. Assay intervals shown in Table 1 and 2 are down hole intervals, and the true thickness noted are based on orientated core structural measurements and 3D models. About The Pegmont Lead Zinc Project Pegmont is a stratiform, Broken Hill-Type deposit that outcrops with an overall shallow dip to the south east and is hosted in a magnetite-rich banded iron formation within high grade metamorphic rocks. The project consists of three granted mining leases and one exploration permit that cover an area of approximately 8,290 ha. Pegmont is situated in the Mount Isa McArthur Mineral Province, which hosts one of the world s richest endowments of lead-zinc-silver mineralization, including several world-class lead-zinc-silver mines. Pegmont is located 25 km west of South 32 s Cannington silver-lead-zinc operation, one of the world s largest producers of lead and silver and 28 km north of Chinova Resources Osborne copper-gold operations. Pegmont is proximal to existing infrastructure including public roads, mine haul roads, rail, and a natural gas pipe line for power generation. In June 2017 Vendetta updated the Mineral Resource estimate for Pegmont, for full details please see Vendetta s news release, VTT2017-NR#6, June 27 th, 2017. About Vendetta Mining Corp. Vendetta Mining Corp. is a Canadian junior exploration company engaged in acquiring, exploring, and developing mineral properties with an emphasis on lead and zinc. It is currently focused on advanced stage exploration projects in Australia, the first of which is the Pegmont Lead Zinc project. Additional information on the Company can be found at www.vendettaminingcorp.com Qualified Person Peter Voulgaris, MAusIMM, MAIG, a Director of Vendetta, is a non-independent qualified person as defined by NI 43-101. Mr. Voulgaris has reviewed the technical content of this press release, and consents to the information provided in the form and context in which it appears. ON BEHALF OF THE BOARD OF DIRECTORS Michael Williams Michael Williams President & CEO

The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this release. Certain statements within this news release, other than statements of historical fact relating to Vendetta Mining Corp., are to be considered forward-looking statements with respect to the Company s intentions for its Pegmont project in Queensland, Australia. Forward-looking statements include statements that are predictive in nature, are reliant on future events or conditions, or include words such as expects, anticipates, plans, believes, considers, significant, intends, targets, estimates, seeks, attempts, assumes, and other similar expressions. The forward-looking statements are based on a number of assumptions which, while considered reasonable by Vendetta Mining Corp., are, by their nature, subject to inherent risks and uncertainties and are not guarantees of future performance. Factors that could cause actual results to differ materially from those in forward-looking statements include: the interpretation of current results from the 2017 drilling program mentioned in this news release, further results from the 2017 drilling program, the accuracy of exploration results, the accuracy of Mineral Resource Estimates, the anticipated results of future exploration, the forgoing ability to finance further exploration, delays in the completion of exploration, delays in the completion of the updated Mineral Resource Estimate, the future prices of lead, zinc, and other metals, and general economic, market and/or business conditions. There can be no assurances that such statements and assumptions will prove accurate and, therefore, readers of this news release are advised to rely on their own evaluation of the information contained within. In addition to the assumptions herein, these assumptions include the assumptions described in Vendetta Mining Corp. s Management s Discussion and Analysis for the year ending, May 31 st, 2017. Although Vendetta Mining Corp. has attempted to identify important risks, uncertainties and other factors that could cause actual performance, achievements, actions, events, results or conditions to differ materially from those expressed in or implied by the forward-looking statements, there may be other risks, uncertainties and other factors that cause future performance to differ from what is anticipated, estimated or intended. Unless otherwise indicated, forward-looking statements contained herein are as of the date hereof and Vendetta Mining Corp. does not assume any obligation to update any forward-looking statements after the date on which such statements were made, except as required by applicable law.