LHC Run 2: Results and Challenges. Roderik Bruce on behalf of the CERN teams

Similar documents
LHC RUN 2: RESULTS AND CHALLENGES

Status and Outlook of the LHC

LHC operation in 2015 and prospects for the future

Gianluigi Arduini CERN - Beams Dept. - Accelerator & Beam Physics Group

Plans for 2016 and Run 2

LHC Beam Operations: Past, Present and Future

LHC accelerator status and prospects. Frédérick Bordry Higgs Hunting nd September Paris

OTHER MEANS TO INCREASE THE SPS 25 ns PERFORMANCE TRANSVERSE PLANE

LHC Commissioning The good, the bad the ugly

LHC commissioning. 22nd June Mike Lamont LHC commissioning - CMS 1

COLLECTIVE EFFECTS IN THE LHC AND ITS INJECTORS

Large Hadron Collider at CERN

HL-LHC OPERATIONAL SCENARIOS

OPERATIONAL BEAMS FOR THE LHC

Main aim: Preparation for high bunch intensity operation with β*=3.5 m and crossing angle (-100 µrad in IR1 and +100 µrad in IR5)

Challenges and Plans for the Proton Injectors *

LHC Luminosity and Energy Upgrade

CHAMONIX WORKSHOP, SESSION 5 LIU SUMMARY

Status of the LIU project and progress on space charge studies

Beam. RF antenna. RF cable

1.1 Electron-Cloud Effects in the LHC

LHC Commissioning in 2008

The Luminosity Upgrade at RHIC. G. Robert-Demolaize, Brookhaven National Laboratory

PoS(EPS-HEP 2013)149. LHC, HL-LHC and beyond. M. Lamont.

LHC Collimation and Loss Locations

Operational Experience with HERA

BEAM TESTS OF THE LHC TRANSVERSE FEEDBACK SYSTEM

LHC Upgrade Plan and Ideas - scenarios & constraints from the machine side

Commissioning of the LHC collimation system S. Redaelli, R. Assmann, C. Bracco, M. Jonker and G. Robert-Demolaize CERN, AB department

Transverse beam stability and Landau damping in hadron colliders

IMPLEMENTATION AND EXPERIENCE WITH LUMINOSITY LEVELLING WITH OFFSET BEAM

LHC. Construction Understanding first the commissioning. Prospects for

TRANSVERSE DAMPER. W. Höfle, CERN, Geneva, Switzerland. Abstract INTRODUCTION AND HIGHLIGHTS IN Controlled Transverse Blow-up

Status of the LHC Beam Cleaning Study Group

LHC Commissioning and First Operation

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework

ULTIMATE LHC BEAM. G. Arduini, CERN, Geneva, Switzerland

HL-LHC ALTERNATIVES SCENARIOS

The Beam Instrumentation and Diagnostic Challenges for LHC Operation at High Energy

FY04 Luminosity Plan. SAG Meeting September 22, 2003 Dave McGinnis

Practical Lattice Design

Electron cloud effects for PS2, SPS(+) and LHC

(Lead) Ions in the LHC

LUMINOSITY LEVELLING TECHNIQUES FOR THE LHC

HL-LHC: parameter space, constraints & possible options

Plans for ions in the injector complex D.Manglunki with the help of I-LHC and LIU-PT teams

Results of UFO dynamics studies with beam in the LHC

Overview of LHC Accelerator

LHC RunII Commissioning and HL-LHC Status

Transverse dynamics Selected topics. Erik Adli, University of Oslo, August 2016, v2.21

SPPC Study and R&D Planning. Jingyu Tang for the SPPC study group IAS Program for High Energy Physics January 18-21, 2016, HKUST

Simulations and measurements of collimation cleaning with 100MJ beams in the LHC

Electron cloud observation in the LHC

Electron Cloud Studies made at CERN in the SPS

Collimators and Cleaning, Could this Limit the LHC Performance?

Luminosity for the 100 TeV collider

Beam-Beam DA Simulations for HL-LHC

TUNE SPREAD STUDIES AT INJECTION ENERGIES FOR THE CERN PROTON SYNCHROTRON BOOSTER

ACHIEVABLE SPACE-CHARGE TUNE SHIFT WITH LONG LIFETIME IN THE CERN PS & SPS

Report. LHC Full Energy Exploitation Study: Operation at 7 TeV

The LHC Collider. STOA lecture, Brussels, 27 th November 2012 Steve Myers Director of Accelerators and Technology, CERN

Run II Status and Prospects

Interface with Experimental Detector in the High Luminosity Run

Chamonix XII: LHC Performance Workshop. Requirements from the experiments in Year 1*

Thanks to all Contributors

Run2 Problem List (Bold-faced items are those the BP Department can work on) October 4, 2002

PBL (Problem-Based Learning) scenario for Accelerator Physics Mats Lindroos and E. Métral (CERN, Switzerland) Lund University, Sweden, March 19-23,

HiLumi LHC FP7 High Luminosity Large Hadron Collider Design Study. Deliverable Report SIMULATION MODELS FOR ENERGY DEPOSITION

Particle Physics Columbia Science Honors Program

Signaling the Arrival of the LHC Era December Current Status of the LHC. Albert De Roeck CERN Switzerland

LHC status & 2009/2010 operations. Mike Lamont

DYNAMIC APERTURE STUDIES FOR HL-LHC V1.0 *

Machine Protection Basics of Accelerator Science and Technology at CERN

Why are particle accelerators so inefficient?

2008 JINST 3 S Main machine layout and performance. Chapter Performance goals

Simulations of HL halo loss and IR losses. R. Bruce, F. Cerutti, R. de Maria, A. Marsili, S. Redaelli

(4) vacuum pressure & gas desorption in the IRs ( A.

Machine Protection Systems

On-axis injection into small dynamic aperture

MD Landau Damping: Beam Transfer Functions and diffusion mechanisms

The LHC. Part 1. Corsi di Dottorato Corso di Fisica delle Alte Energie Maggio 2014 Per Grafstrom CERN and University of Bologna

The TESLA Dogbone Damping Ring

LHC upgrade based on a high intensity high energy injector chain

Tools of Particle Physics I Accelerators

Status of the LHC Machine

Physics at Accelerators

The LHC: the energy, cooling, and operation. Susmita Jyotishmati

OVERVIEW OF THE LHEC DESIGN STUDY AT CERN

LHC Studies Working Group Notes from the meeting held on 8 December 2011

Accelerators. Lecture V. Oliver Brüning. school/lecture5

e + e Factories M. Sullivan Presented at the Particle Accelerator Conference June 25-29, 2007 in Albuquerque, New Mexico e+e- Factories

RUN II LUMINOSITY PROGRESS*

UPGRADE ISSUES FOR THE CERN ACCELERATOR COMPLEX

Beam Cleaning and Collimation Systems

(a) (b) Fig. 1 - The LEP/LHC tunnel map and (b) the CERN accelerator system.

Fermilab Collider Run II: Accelerator Status and Upgrades 1

Raising intensity of the LHC beam in the SPS - longitudinal plane

Last Friday: pp(bar) Physics Intro, the TeVatron

Beam Optics & Dynamics Studies for LHC

Tobias Baer February, 9 th 2012

Transcription:

LHC Run 2: Results and Challenges Roderik Bruce on behalf of the CERN teams

Acknowledgements A big thanks to all colleagues involved across various teams! Special thanks for material and discussions G. Arduini, B. Auchmann, J. Boyd, O. Bruning, L. Carver, M. Crouch, H. Damerau, R. de Maria, S. Gilardoni, M. Giovannozzi, W. Hofle, G. Iadarola, J. Jowett, K. Li, M. Lamont, A. Lechner, E. Metral, D. Mirarchi, T. Pieloni, S. Redaelli, G. Rumolo, B. Salvant, C. Schwick, G. Valentino, D. Valuch, J. Wenninger Apologies for topics not covered R. Bruce, 2016.07.04 2

Outline Introduction: LHC, general goals from Run 2 Recent highlights from luminosity production Beams from injectors 2015: commissioning year 2016: production year Outlook & conclusions R. Bruce, 2016.07.04 3

The Large Hadron Collider 27 km synchrotron, built to collide 7 TeV proton beams at 4 experiments About 1 month per year: heavyion collisions Switzerland France ATLAS ALICE LHCb LHC CMS R. Bruce, 2016.07.04 4

Where are we now? 2008 incident Splice repairs We are here LIU injector upgrades 3.5-4 TeV, 50 ns 6.5 TeV, 25 ns 2010 First collisions 2012 Higgs discovery HL-LHC installation R. Bruce, 2016.07.04 5

Goals for Run 2 Main physics goals for Run 2 (2015-2018): Measurement of standard model physics including W, Z, top Study of the Higgs boson (decays, spin/parity) Searches for new particles beyond the standard model (supersymmetry etc) Main accelerator goals for Run 2: Increased beam energy compared to Run 1 Go to 25 ns bunch spacing to decrease pileup (was 50 ns in Run 1) Collect > 100 fb -1 of data (got ~30 fb -1 in Run 1) In 2016: Collect > 25 fb -1 R. Bruce, 2016.07.04 6

Outline Introduction: LHC, general goals from Run 2 Recent highlights from luminosity production Beams from injectors 2015: commissioning year 2016: production year Outlook & conclusions R. Bruce, 2016.07.04 7

Fill from July 2, 2016 Luminosity production going quite well at the moment Last week, LHC design luminosity 10 34 cm -2 s -1 reached and surpassed for the first time ever! design R. Bruce, 2016.07.04 8

Nominal luminosity reached R. Bruce, 2016.07.04 9

Other recent records Other recent records: 0.74 fb -1 produced in one fill, 37 h More than 2 fb -1 in one week Starting June 26, 2016 R. Bruce, 2016.07.04 10

LHC heavy-ion highlights Pb-Pb run at end of 2015. p-pb planned for end of 2016 J. Jowett et al. In 2015, about 3 times design luminosity (Pb-Pb) achieved thanks to excellent injector performance (higher bunch charge) R. Bruce, 2016.07.04 11

Outline Introduction: LHC, general goals from Run 2 Recent highlights from luminosity production Beams from injectors 2015: commissioning year 2016: production year Outlook & conclusions R. Bruce, 2016.07.04 12

CERN accelerator complex LHC last in a chain of accelerators Transverse emittance given by PS Booster Longitudinal train structure given by the PS SPS creates bunch structure for injection into the LHC R. Bruce, 2016.07.04 13

Beam from the injectors Limitations in the injector chain define the LHC beams H. Bartosik, G. Rumolo et al. R. Bruce, 2016.07.04 14

Production schemes for LHC beams Standard 25 ns scheme used so far Alternative scheme: BCMS (Batch Compression, Merging & Splitting) Different RF manipulations in the PS Standard 25 ns BCMS H. Damerau et al. R. Bruce, 2016.07.04 15

LHC beam menu from the injectors BCMS gives higher brightness (smaller emittance and same bunch intensity), but also fewer bunches per train. Potentially higher luminosity if emittance can be kept in LHC, but watch out with beam stability and lifetime Standard BCMS 25 ns Bunch population ~1.2e11 ~1.2e11 Transv. emittance 2.5 μm 1.8 μm Max. n.o. bunches 2748 2268 H. Bartosik, G. Rumolo et al. Further alternative schemes under study 80 bunches, 8 bunches 4 empty, 50 ns Several further HB talks on LHC injectors: C. Bracco, E. Metral, E. Shaposhnikova, H. Bartosik, S. Machida, K. Li, E. Benedetto R. Bruce, 2016.07.04 16

Outline Introduction: LHC, general goals from Run 2 Recent highlights from luminosity production Beams from injectors 2015: commissioning year 2016: production year Outlook & conclusions R. Bruce, 2016.07.04 17

LHC in 2015 Commissioning year, relaxed parameter set main priority to get back after shutdown and commission 6.5 TeV beam energy and 25 ns bunch spacing Some issues encountered 3rd June: First Stable Beams Non-radiation hard electronics in quench-protection system: fixed Non-conformities on absorber for injection protection (TDI): fixed ULO (unidentified lying object). Aperture restriction in one specific magnet, bypassed with orbit bump: fixed R. Bruce, 2016.07.04 18

UFOs UFOs (unidentified falling object): Believed to be falling dust particles hit by the beam. Induced losses could cause beam dump or quench 2015 : 18 dumps, 3 quenches due to UFOs Conditioning with time A. Gerardin, T. Baer, et al. R. Bruce, 2016.07.04 19

Electron cloud (1) Electrons accelerated by passing bunches => secondary electrons emitted when hitting the chamber Possible avalanche effect when secondary electrons are accelerated G. Iadarola, G. Rumolo et al. Possible consequences: heat load on chamber wall, instabilities, vacuum degradation, emittance blowup R. Bruce, 2016.07.04 20

Electron cloud (2) Main limitation for LHC: heat load to cryogenics Transients at injection, ramp, beam dump. Working close to cooling power limit Main limit on the number of bunches achieved in 2015 Some issues also with vacuum spikes at injection kicker Conditioning observed with time scrubbing R. Bruce, 2016.07.04 21

Electron cloud (3) More details: Talk G. Rumolo tomorrow CERN e- cloud team Different heat loads in different machine sectors not well understood. R. Bruce, 2016.07.04 22

Fighting instabilities Main sources of instabilities: electron cloud and impedance LHC experience: Beams stable through the cycle (after scrubbing) with High chromaticity Impedance team More details: talk E. Metral High octupoles Optimized transverse damper High transverse damper gain Change of working point at 450 GeV Beam-induced heating not an issue anymore: significant effort done to minimize impedance and fix non-conformities K. Li R. Bruce, 2016.07.04 23

2015 achievements Main achievements Successfully established 6.5 TeV and 25 ns beams Achieved 2244 bunches (2748 possible) Peak luminosity of about 5 x 10 33 cm -2 s -1 (half of nominal) Peak production: ~1 fb -1 of data/week Physics: Accumulated 4.2 fb -1 of data 2016 Production year: must significantly increase luminosity (compare goal of more than 100 fb -1 in Run 2) Try to push the limitations encountered in 2015 R. Bruce, 2016.07.04 24

Pushing luminosity Higher intensity Increase bunch intensity Increase number of bunches Increase F: shorter bunches, smaller crossing angle Smaller β* Smaller beam size Smaller emittance R. Bruce, 2016.07.04 25

Intensity and emittance Through scrubbing and gradual intensity increase, try to approach the limit of 2748 bunches Temporary issue: vacuum leak on SPS dump. Limit on train length: 96 bunches to ensure dump is not damaged. Spares in preparation Presently limited to 2076 bunches in the LHC Close to cryogenic limit: even without SPS dump issue, not much margin due to e-cloud Smaller emittance from BCMS is promising option, in particular while number of bunches is anyway limited Ongoing efforts to understand emittance blowup during LHC cycle Bunch intensity: gradual increase recently, now close to limit R. Bruce, 2016.07.04 26

Increasing geometric factor Fewer collisions when bunches are not fully overlapping Decrease bunch length and/or crossing angle to minimize effect Crossing angle gives normalized beam-beam separation: dynamic aperture and beam lifetime sets lower limit R. Bruce, 2016.07.04 27

Decreasing bunch length Limited by electron cloud effects and longitudinal instabilities Presently at ~1.12 ns bunch length at 4 σ (8.4 cm at 1 σ) at start of fill after gradual decrease Not yet down at nominal ~1 ns (7.5 cm). Bunch length shrinks due to synchrotron radiation Consider longitudinal blowup to stay stable - ongoing efforts in RF team R. Bruce, 2016.07.04 28

Shrinking bunch length Clear measurements of bunch length shrinking due to synchrotron radiation in proton machine R. Bruce, 2016.07.04 29

Beam-beam studies Crossing angle limited by beam-beam considerations LHC operating with a beam-beam parameter of ~0.007 in 2016 with good lifetime. Head-on presently not a limitation Main concern: reduction of dynamic aperture from long-range encounters Dedicated experiments have demonstrated possibility to reduce IR1/5 beam-beam separation from 11 σ to 10 σ in 2016 Possibilities to go down further under study CERN beam-beam team More details: talk T. Pieloni on Thursday R. Bruce, 2016.07.04 30

Reducing β* β* in LHC so far limited mainly by aperture considerations R. Bruce, 2016.07.04 31

Ways of reducing β* β*: several ways to reduce. Decrease beam-beam separation and crossing angle so that less aperture is required Optimize collimation system to protect smaller aperture Much tighter settings in 2016 based on extensive experimental and theoretical studies Large part of previous margin for protection against asynchronous beam dumps. Reduction possible relying on special phase advance in optics R. Bruce, 2016.07.04 32

Gain in margin from phase advance Good phase advance protects against damaging impacts from miskicked beam during asynchronous beam dumps Using the tighter collimation hierarchy, new optics, and tighter beam-beam separation => 2016 baseline is β*=40 cm (compare nominal 55 cm, 80 cm in 2015) R. Bruce, 2016.07.04 33

Achieved optics correction Peak beta beat below 5% Essential for the machine performance Optics Measurements and Corrections (OMC) team Correction strategy Local correction of strongest quadrupole errors Global correction R. Bruce, 2016.07.04 34

Achieved beam cleaning Collimation working well with tighter settings Qualified cleaning performance for high intensity Factor 10 4 CERN collimation team R. Bruce, 2016.07.04 35

LHC stored energy per beam Quick rampup to ~250 MJ stored energy LHC beams highly destructive R. Bruce, 2016.07.04 36

Collimator gaps Opening of primary collimator: 2.2 mm More details: talk S. Redaelli on Wednesday 2.2 mm 250 MJ, 2.2 mm full gap R. Bruce, 2016.07.04 37

2016 technical issues Technical issues earlier in 2016 caused downtime, e.g. PS main power supply (main failed, shortly after spare failed) 6 days 66 kv transformer fault (not caused by weasel was a marten) 6 days Further issues: SPS beam dump, water on collimator cable connectors Weasel (Mustela nivalis) Beach marten (Martes foina) R. Bruce, 2016.07.04 38

Recent availability Recently excellent availability and reliability from all systems: cryogenics, power converters, RF, diagnostics, collimation. Excellent machine stability (optics, orbit ) Record: spent 75% of time doing physics during 1 st week of June R. Bruce, 2016.07.04 39

Status of 2016 luminosity production Luminosity goal of >25 fb -1 in 2016 : on a good track 9.5 fb -1 so far (July 3) - Compare: 4.2 fb -1 delivered in 2015? R. Bruce, 2016.07.04 40

Availability A good machine availability is key to success Most important parameter to maximize: integrated luminosity Need to maximize the time spent in physics operation Need to minimize unforeseen beam dumps, downtime and time spent preparing the beams Need both good reliability of all systems, a healthy set of operational parameters (avoid instabilities, large beam losses etc.), and good operational efficiency Several efforts made to minimize time outside physics, e.g. combined ramp and squeeze. Efforts continued on many fronts R. Bruce, 2016.07.04 41

Achieved parameters so far (p) Run 1 Run 2 2010 2011 2012 2015 2016 (so far) Design Energy [TeV] 3.5 3.5 4.0 6.5 6.5 7.0 Bunch spacing [ns] 150 50 50 25 25 25 No. of bunches 368 1380 1380 2244 2076 2808 Stored energy per beam (MJ) 23 112 143 277 272 362 β* [m] 3.5 1.0 0.6 0.8 0.4 0.55 Max. p/bunch [10 11 ] 1.2 1.45 1.7 1.2 1.25 1.15 Normalized emittance [μm] ~2.0 ~2.4 ~2.5 ~3.5 ~3.2 3.75 Peak luminosity [10 33 cm -2 s -1 ] 2.1 3.7 7.7 5.0 10.6 10.0 R. Bruce, 2016.07.04 42

Outlook on the rest of Run 2 Goal for Run 2: Produce >100 fb -1 Continued efforts for higher luminosity and availability Possible performance improvements Push emittance (BCMS?), while remaining stable Push electron cloud limits: increase number of bunches push bunch length Further decrease β* (collimation, beam-beam, optics). Flat optics? Increase energy 7 TeV would probably require hundreds of additional training quenches. More tests in 2016-2017 Christmas stop for better estimates A. Verweij R. Bruce, 2016.07.04 43

Summary LHC back after long shutdown at higher energy (6.5 TeV) 2015 commissioning year, 2016 production year Strong push in performance 2016 Sub-nominal β*=40 cm Excellent availability recently Just reached nominal luminosity for the first time Luminosity production on a good track Challenges ahead: Push the limits of electron cloud and maintain high availability Explore means of further increasing luminosity Hope for exciting physics ahead 1 more slide R. Bruce, 2016.07.04 44

Final slide: news from the experiments Recent results submitted for publication, based on 2015 data: arxiv:1606.03833, arxiv:1606.04093 CMS: A modest excess of events over the backgroundonly hypothesis is observed for mx 750 GeV Is this a statistical fluctuation or something interesting? More LHC data needed Exciting times ahead! R. Bruce, 2016.07.04 45

THE END for your attention! R. Bruce, 2016.07.04 46