Monitoring Vertical Displacements by Means of Geometric Levelling for Sky Tower Building from Floreasca City Center, Bucharest

Similar documents
Objective questions for Practical Examination (CBCS scheme) Introduction to Surveying CE-112

GEOMATICS ENGINEERING / SURVEYING

Tsukuba, Japan International Institute of Seismology and Earthquake Engineering Building Research Institute STUDY TRIP TO ITAKO CITY

Sub. Code:

CIVIL ENGINEERING AND BUILDING SERVICE TOPOGRAPHIC PERMANENT LANDMARKS NETWORK. SPATIAL COORDINATE OPTIMIZATION

INDUSTRIAL PARK EVALUATION BASED ON GEOGRAPHICAL INFORMATION SYSTEM TEHNOLOGY AND 3D MODELLING

Surveying Prof. Bharat Lohani Department of Civil Engineering Indian Institute of Technology, Kanpur. Module - 11 Lecture No. # 01 Project surveys

It is the art of determining the relative positions of natural and artificial features on the earth s surface, vertically and horizontally.

CADASTRAL DELIMITATION OF ADMINISTRATIVE TERRITORY IN ROMANIA IN ORDER TO ACHIEVE GENERAL URBAN PLANS

Soil Mechanics Prof. B.V.S. Viswanathan Department of Civil Engineering Indian Institute of Technology, Bombay Lecture 51 Earth Pressure Theories II

Your Task: Read each slide then use the underlined red or underlined information to fill in your organizer.

STAFF REPORT ACTION REQUIRED

file:///d /suhasini/suha/office/html2pdf/ _editable/slides/module%202/lecture%206/6.1/1.html[3/9/2012 4:09:25 PM]

Abstract: Traffic accident data is an important decision-making tool for city governments responsible for

VERIFICATION OF MATERIAL PARAMETERS OF EARTHEN DAMS AT DIAMOND VALLEY LAKE USING GEODETIC MEASUREMENTS

Site Surveying Procedures for Construction and the Built Environment

Observational Methods and

Surveying I. Unit - I. Different methods and instruments are being used to facilitate the work of

WATERCOURSE HARNESSING BANK EROSION AND CONSOLIDATION

COMMON MISTAKES IN DIMENSIONAL CALIBRATION METHODS

namibia UniVERSITY OF SCIEnCE AnD TECHnOLOGY

Pushover Seismic Analysis of Bridge Structures

Urban Pattern Geometry and its Potential Energy Efficiency

SOFTWARE FOR THE ANALYSIS OF THE COMPLETE FACTORIAL EXPERIMENT IN MECHANICAL ENGINEERING

THE USE OF SPATIAL IMAGES IN THE PROJECTS OF URBAN DEVELOPMENT FOR BUCHAREST

ADVANCE GIS ANALYSIS ON ZONAL URBAN PLAN PROJECT

Place Syntax Tool (PST)

Predicting Tsunami Inundated Area and Evacuation Road Based On Local Condition Using GIS

ASPECTS REGARDING THE ANALYSIS OF HORIZONTAL DISPLACEMENTS AT CUMPĂNA DAM, ARGEŞ COUNTY

Foundation Engineering Prof. Dr N.K. Samadhiya Department of Civil Engineering Indian Institute of Technology Roorkee

Stations. MUSEUM of the MOUNTAIN MAN. Presented By. 9:00AM - 5:00PM May 1 - October 31 Fremont Lake Road Pinedale, WY

SEISMIC PERFORMANCE EVALUATION METHOD FOR A BUILDING WITH CENTER CORE REINFORCED CONCRETE WALLS AND EXTERIOR STEEL FLAME

Design Calculations & Real Behaviour (Hambly s Paradox)

Application of high-resolution (10 m) DEM on Flood Disaster in 3D-GIS

Using Map and Compass Together

LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS)

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

2012 Road School Light Weight Deflectometer (LWD)

The prediction of passenger flow under transport disturbance using accumulated passenger data

Author(s) Sawamura, Yasuo; Kishida, Kiyoshi;

NAME: DATE: Leaving Certificate GEOGRAPHY: Maps and aerial photographs. Maps and Aerial Photographs

Leveling. 3.1 Definitions

Residual Deformation Analyses to Demonstrate the Effect of Thin Steel Sheet Piles on Liquefaction-Induced Penetration Settlement of Wooden Houses

Surveying Prof. Bharat Lohani Department of Civil Engineering Indian Institute of Technology, Kanpur. Module - 4 Lecture - 1 Compass Surveying

Power Series. Part 2 Differentiation & Integration; Multiplication of Power Series. J. Gonzalez-Zugasti, University of Massachusetts - Lowell

LECTURE #11: Volcanoes: Monitoring & Mitigation

SURVEY AND ALIGNMENT FOR THE SYNCHROTRON LIGHT SOURCE ELETTRA

Development of a Vibration Measurement Device based on a MEMS Accelerometer

Your web browser (Safari 7) is out of date. For more security, comfort and. the best experience on this site: Update your browser Ignore

UNITED NATIONS E/CONF.96/CRP. 5

Spatial analysis of locational conflicts

CIV : THEODOLITE ADJUSTMENT

GEOTECHNICAL ENGINEERING ECG 503 LECTURE NOTE ANALYSIS AND DESIGN OF RETAINING STRUCTURES

EXTENSION OF A HOTEL IN POIANA BRASOV ON AN INCLINED SLOPE

FIS Specifications for Flex Poles (Edition May 2008) Original Text: German

Module 5: Failure Criteria of Rock and Rock masses. Contents Hydrostatic compression Deviatoric compression

Earthquake Loads According to IBC IBC Safety Concept

QUANTIFICATION OF THE NATURAL VARIATION IN TRAFFIC FLOW ON SELECTED NATIONAL ROADS IN SOUTH AFRICA

GPS Measurement Protocol

Revision History Date Version Description Author 03/06/ Initial Version Sergio Miguel Martin. Table of Contents

Transportation Engineering - II Dr.Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee

AMME3500: System Dynamics & Control

Spatial Data Science. Soumya K Ghosh

BASIC DETAILS. Morphometric features for landslide zonation A case study for Ooty Mettupalayam highway

STUDIES ON SEVARAL COUNTERMEASURES AGAINST LIQUEFACTION-INDUCED FLOW AND AN APPLIVATION OF A MEASURE TO EXISTING BRIDGES IN TOKYO

3D MATERIAL MODEL FOR EPS RESPONSE SIMULATION

Lecture Presentation Chapter 8 Equilibrium and Elasticity

Innovation in mapping and photogrammetry at the Survey of Israel

enny Mills chool of Civil ngineering & eosciences ewcastle University

Prevention Tsunami wall 10m high (breached by the tsunami due to land level falling by 3m)

DATA SOURCES AND INPUT IN GIS. By Prof. A. Balasubramanian Centre for Advanced Studies in Earth Science, University of Mysore, Mysore

4-3-1 Earthquake and Tsunami Countermeasures of Tokyo s

Practical reliability approach to urban slope stability

Estimation of the Gauging and the Calibration Time Interval for the Modern Total Stations

Global Monitoring of Changes in the Rock Mass Arising as a Result of Filling the Mining Workings with Wastes.

DEPARTMENT OF MECHANICAL ENIGINEERING, UNIVERSITY OF ENGINEERING & TECHNOLOGY LAHORE (KSK CAMPUS).

EARPHONES TEACHER S GUIDE. October 2007 WORKING DOCUMENT. Center for pedagogical development earphone_teacher.doc 1 05/12/07

USING NON-DESTRUCTIVE METHODS TO OBTAIN THE STRENGTH OF CONCRETE SAMPLES

Module 9 : Foundation on rocks. Content

Key Issue 1: Where Are Services Distributed?

EFFECT OF SOIL TYPE LOCATION ON THE LATERALLY LOADED SINGLE PILE

Engineering Geology at University Complutense of Madrid: 30 years of postgraduate courses

Advanced Strength of Materials Prof S. K. Maiti Mechanical Engineering Indian Institute of Technology, Bombay. Lecture 27

THE CHECK OF IMPORTANT MONUMENTS WITH TOPOGRAPHICAL METHODOLOGIES UDC (045)=20. Giorgio Bezoari

TAKE ROLL CALL TO DETERMINE IF THERE IS A QUORUM OF MEMBERS PRESENT

Japan Construction Information Center

First Midterm Exam. Physics General Physics Lecture 10 Work and Energy 9/25/2016. Fall 2016 Semester Prof. Matthew Jones

L ight color influence on obstacle recognition in road lighting. 1. Introduction

Influence of residual stresses in the structural behavior of. tubular columns and arches. Nuno Rocha Cima Gomes

The UN-GGIM: Europe core data initiative to encourage Geographic information supporting Sustainable Development Goals Dominique Laurent, France

Doctoral Dissertation 3-D Analytical Simulation of Ground Shock Wave Action on Cylindrical Underground Structures

Appendix 2. Extracts from Ministry for the Environment Active Fault Guidelines 2003

ROAD INFORMATION SYSTEM FOR MAINTENANCE MANAGEMENT OF ROAD INFRASTRUCTURE PROJECTS

Lab NotesIssue. Disability Glare in the Outdoor Workplace

Area-wide geotechnical information summary for CERA zoning review panel

A Broad View of Geospatial Technology & Systems

USER PARTICIPATION IN HOUSING REGENERATION PROJECTS

Natural hazards in Glenorchy Summary Report May 2010

Understanding The Law of Attraction

Urban White Paper on Tokyo Metropolis 2002

Transcription:

Monitoring Vertical Displacements by Means of Geometric Levelling for Sky Tower Building from Floreasca City Center, Bucharest CĂTĂLIN IONUT VINTILĂ, ANDREEA CARMEN RĂDULESCU, PETRE IULIU DRAGOMIR Surveying and Cadastre Department Technical University of Civil Engineering Bucharest Lacul Tei Boulevard, No. 14, District, Bucharest ROMANIA catalin.vintila@ymail.com, andreea3radulescu@yahoo.ro, petreiuliu.dragomir@gmail.com http://geodezie.utcb.ro Abstract: - It is widely known that any construction, old or new, suffers, more or less, long term displacements, these displacements can be measured with high precision by using topographical methods. Displacements are mainly influenced by the kind of the soil, where the building stands, by the material s endurance and elasticity, temperature variation, time and by the pressure generated by the construction s own weight. The main purpose of monitoring constructions behaviour in time is to learn the displacements and deformations that construction suffers in comparison to a given number of known points (benchmarks) situated near the construction but at a well calculated distance so their stability couldn t be affected by the building movements. Nowadays many modern technologies have been developed for real time and online deformation monitoring, but in order to assure the precision required, the monitoring method has to be wisely chosen. This paper presents the high precision geometric levelling method, the network adustment and the interpretation of obtained data, used to establish the displacements of the tallest construction ever made in Romania, the Sky Tower building, from Floreasca, Bucharest. Key-Words: - Levelling Network, Vertical Displacements, High Precision Geometric Levelling, Deformation Monitoring, Sky Tower, Parallel Coordinates Systems. 1 Introduction In the battle of finding the elements that certifies the correctness of proection calculations, the knowledge of geometrical form s modifications and their displacements has considerable importance. The measurement of those modifications is one of the most interesting problems in experimental researches which allow us to obtain precious indications of the elastic behaviour and material s endurance and of the field s behaviour on which the construction is situated. Also the deformation monitoring can bring useful contributions to improvement of the constructions techniques, by allowing a confrontation between the theoretical assumptions, the studies made in specialized labs and the practical results obtained. The deformation monitoring of a land or construction represents a systematic action of measurement and analysis of the way they react to influence of surrounding variables, taking permanently in consideration the proection parameters that refer to functionality, stability and safety. For a proper monitoring of constructions behaviour in time, constructions that are subect to experimental solicitations or even exploitation, obtaining observations in a relative short time and with higher precision is recommended. The deformation monitorisation of constructions behaviour in time can be divided in two categories: normal monitorisation and special monitorisation. Normal monitorisation consists in observing and recording issues that could indicate changes in the capacity to meet the strength, stability and durability established in the proect. The normal monitorisation is planned in the proect. Special monitorisation takes place in case of natural disasters (earthquakes, floods) and explosions. Analysis of deformations of constructions or lands includes geometric analysis and physical interpretation. The goal of the geometrical analysis is to determine in the whole deformable obect the displacement and strain fields in the space and time ISBN: 978-96-474-385-8 31

domains. Physical interpretation is to establish the relationship between the causative factors and the deformations. The purpose and location of the work To meet the growing demand for office space in crowded cities as Bucharest, but also because of the smaller and smaller buildable area in these cities, Raiffeisen Property Holding International decided to build the highest tower for office spaces in Bucharest. Sky Tower has 5 basements, ground floor and 36 upper floors with a total area of 54 square meters and held a footprint of ust 13 square meters. Sky Tower is located between two of the most important Streets in the north of Bucharest, Floreasca Street and Barbu Văcărescu Street, as can be seen in the figure below. The building has a total height of 137 meters, is visible from almost every part of the city, being the highest construction for office spaces ever built in Romania. business district of Bucharest and is not only the landmark of the city, visible virtually from all parts of Bucharest, but also provides its tenants and visitors with a unique view over the city thus creating a strong corporate presence and identity. [1].1 Recognition of the field To effectuate the vertical displacements of Sky Tower building in the first step the recognition of the field has been made. In this step there were identified and verified three reference points that are part of the state levelling network (RN1, RN, and RN3). The three reference points that were used were positioned around the building at a safe distance in order to consider that they were not affected by the displacements of the construction. Also the reference points used were sealed in 15 years old constructions with two or three levels, at to 3 metres from roads with heavy traffic, so it can be considered that the displacements of those constructions faded and the vibrations caused by traffic are insignificant. There were also three intermediate points (PIL1, PIL and PIL3) materialised by forced centring pilaster, those points were positioned in the building yard, so they could be considered affected by the displacements of the building. In order to verify the stability of the reference points and intermediate points a levelling line was made between them in the first step. Measurements were made with the digital level Leica DNA3, a high precision digital level with a standard deviation per Km double levelling of.3 mm. Fig. 1 Sky Tower, Bucharest The Sky Tower provides state of the art office spaces with unique panoramic views over Bucharest, a first class restaurant with a sky bar, a conference area on the top floors and a prime location in the north of Bucharest. The Sky Tower will become the main point of attraction in the new. Digital level Leica DNA3 For the measurements of the height differences digital level Leica DNA3 has been used. This level is a product of Leica Geosystems, is a part of the second generation of digital levels by Leica (the inventors of the first digital level) has a modern and ergonomic design, cutting edge electronic technology and excellent optical and mechanical system. For height measurements with invar staff, the standard deviation per km double levelling is.3 mm. The main reason for using a digital level is that it applies corrections from the measuring step. By measuring with the program back-front-front-back is no longer necessary to run double levelling lines with different line of sight. One of the most ISBN: 978-96-474-385-8 3

important correction applied is earth curvature correction (E): D E = (1) R Where D is the measured distance from the instrument position to the staff and R is 6.378. earth radius. Another correction applied by the digital level is the Line-of-sight correction: A1 B1 + B A α = () d1 d + d3 d4 In the formula above A 1, B 1, B, A are staff height and d 1, d, d 3, d 4 are distances from the instrument to the staff. [] 3 The measurement program After the recognition of the field phase was completed, phase in which the reference points were identified and the levelling line route has been established, there were marked all the intermediate points needed and also an approximate location of the instrument in each levelling line was marked to assure the precision required by having equal sections of levelling and by having almost the same route of line levelling. 3.1 Positioning the obect points In the monitoring proect of the Sky Tower building 8 obect points (PM1 PM8) were positioned at the 5 th basement for the proper determination of the stability of the structure. Those obect points were positioned on the key points of the infrastructure, on the piles and on the diaphragm walls, as it can be seen in Fig.. The position of the obect points was wisely chosen to verify the stability of each pile and diaphragm wall and also to observe, as soon as possible, an eventual inclination of the tower construction. In order to assure the precision required in the monitoring program an additional 4 obect points (M1 M4) have been placed at the ground floor on top of the diaphragm walls of the basements. The additional obect points, M1 M4, were sealed on top of the diaphragm wall for its proper monitorisation, which is constructed after the Fig. Obect points position in the 5 th basement Milano Method, the top being tilted inward to support the total weight of the construction. ISBN: 978-96-474-385-8 33

3. Displacements determination The measurement program was divided into three parts because the reference points were sealed in old buildings near the construction site and the obect points had to be positioned in the 5 th basement of the monitored construction, according to the monitoring proect. In the first part measurements were made from the reference points, through all the intermediate points established in the monitoring program, up to the additional obect points positioned at near the construction, on top of the diaphragm walls, as it can be seen in fig. 4. Second part consisted in making measurements by combined method using a steel tape and two digital levels, one at the ground floor and one in the 5th basement, repeated measurements were performed simultaneously. For high precision determination the combined method was applied in two places, as shown in fig. 3, and a third determination was made by performing a levelling line through the auto access, from the ground floor down to the 5 th basement to assure the accuracy of the method used. In the 3 rd part measurements were made between all 8 obect points positioned in the 5 th basement of the construction, as shown in fig. Fig. 3 The combined method Since October 11 until May 13 a total of 19 measurement runs have been effectuated, according to the given measurement program. The first measurement was done when all the basements were constructed and then at the end of construction of every three floors (almost one month), when the construction was built entirely a measurement run was made at every three months. Only in Fig. 4 Exterior levelling lines exceptional cases, when the hydrostatic level raised and 5 basement flooded was made a special leveling traverse. In present the measurement runs are made at every six months. In all the 19 observation runs that were taken, the misclosure of the levelling lines were not higher than. mm, which is the tolerance accepted for the purpose monitorisation. ISBN: 978-96-474-385-8 34

4 Deformation analysis The classical method for checking stability of reference and obect points involves comparing the differences in level obtained in the initial observations (run "") and existing (current run). Modern methods involve the application of statistical tests on each run of measurements, resulting conclusions on the stability of the measured points. If the measured level differences in the initial and current run differ by less than the measurement error then the reference and obects points can be considered stable. In a monitoring network measurements are carried out in two different runs. Measurements made in the first run are to determine the geometry of the network. After the measurements from the second run are completed, for the study of deformation the two networks are overlapped and their congruence is analysed as following: Networks are congruent if there is no deformation; Networks are non-congruent if errors occur due to changes in the position of the points.[3] 4.1 Calculation algorithm Calculation algorithm involves measuring the level differences in a levelling network at different stages. To establish if the networks are congruent, the parameters resulted from processing are analyzed. The results are analyzed as follows: If the results do not fall within the safe limits set, the two networks are not congruent, which means that deformation occurred; If these differences are within the safe set, the two networks are congruent, and differences are only due to errors in measurement, not because of movement points. The first step of the realization algorithm is the calculation of the corrections vector, it requires the following calculations: v i = x x i + li; Pi (3) Where: v i is the corrections vector; x i, x terms of coefficients matrix; l i free terms; P i weight. The free terms calculation: li = ( H H i ) hi (4) In the relation above the notations means: H provisional elevation; h i provisional elevation difference. The weight of correction equations P i is determined by the following relation: 1 P i = (5) n Where n is the total number of stations effectuated in the levelling line. After the corrections vector has been calculated, the compensated elevations are determined, as follows: H i = H i + xi (6) Following the calculation of corrections with elevation differences and provisional elevation differences can be calculated compensated elevation differences - h. i i i i h = h + v (7) Evaluation of measurement accuracy for each stage: [ Pvv] s i = ± (8) n u + d In which: s i is empirical standard deviation in the phase "i" of measurements; n number of equations; u number of unknown values; d rank defect. In the table below is presented a numerical example of the reference points, intermediate points and additional obect points used in the exterior levelling line calculated with the algorithm presented above. Table 1 Compensated values Name Levels Run Levels Run 1 Levels Run RN1 88.9655 88.9656 88.9656 RN 87.135 87.135 87.134 RN3 85.514 85.515 85.515 PIL1 84.363 84.364 84.364 PIL 84.6438 84.6437 84.6438 PIL3 83.781 83.783 83.78 M1 83.495 83.434 83.4317 M 83.518 83.58 83.54 M3 83.513 83.511 83.515 M4 83.4558 83.4568 83.4581 ISBN: 978-96-474-385-8 35

4. The global test of congruence Global test of congruence is applied if in the phases of measurements, deformations occurred or not, very useful information, but the application of this test cannot achieve localization of deformations. The global test of congruence is based on the assumption that there are no deformations: H : E{ Xˆ } = E{ Xˆ 1 } (9) Applying global congruence test is performed using the elements calculated at each stage of measurements. The discrepancy vector d is calculated, cofactors matrix Q dd and the empirical standard deviation s of the deformation model. d = X J X i (1) + + Q Q + Q = N + N (11) dd = xxi xx i s = + (1) ± si s After calculating the discrepancy vector, cofactors matrix and the empirical standard deviation of the deformation model, the Fisher F test value can be calculated: T + d Qdd d F = (13) s h Fischer test decision is determined based on the calculated value of the test Fischer - F and its theoretical value - F lim, value extracted from Fischer tables, as follows: If F Flim = Fh, E{ Xˆ } = E{ Xˆ 1} hypothesis H is true ( there are no deformations) If F Flim = Fh, E{ Xˆ } E{ Xˆ 1} hypothesis H is false ( there are deformations) With the formulas presented, the Fischer test value has been calculated, as shown in the table below: Table The global test of congruence d T Q + dd d =.156 s 1 =.9 mm/km s =.6 mm/km s =.11mm/Km h= 1 f= 4 h*s =.1 F calculated = 6.48587 F limit = 5.96437 It can be seen from the above table that the Fischer test hypothesis is false, which means that there are deformation between the two networks compared. 4.3 Locating the deformations Locating the deformations can be achieved through statistical test "Student" and the statistical test "Multiple F". 4.3.1 The Student test The Student test is based on the assumption that there is no movement in the monitored network: H : E{ d } = (14) For Student statistical test application use the following formulas: s = s Q (15) d dd t = (16) s t lim = t (17) Student test decision is determined by the following relations: If t t f,1 α = tlim (H ) is true, E{ d } = point is considered stable (there are no deformations) If t > t f,1 α = tlim (H ) is false, E{ d } point is considered displaced (there are deformations) Table 3 The Student test Benchmark t value Teoretical value Observations RN1 1.3738 stable RN 1.7637 stable RN3-1.68396 stable PIL1 1.76658 stable PIL -1.3931 stable.814 PIL3 1.46185 stable M1-4.5153 unstable M -4.56866 unstable M3-4.5544 unstable M4-3.6854 unstable According to the formulas above, the t value of the test has been calculated for each point of the network and it shows that the reference points are stable and the additional obect points sealed on top ISBN: 978-96-474-385-8 36

of the diaphragm walls of the basements are unstable, as presented in table 3. 4.3. The Multiple F test In the Multiple test F, the same hypothesis H is carried out, in which case there is no movement, points are considered stable. H : E{ Xˆ } = E{ Xˆ 1 } (18) For this test is used the following formula: T + d Qddd Fk = s * (19) Decision of the Multiple F test statistic is determined by the following relations: If F k Flim = F, E{ Xˆ } = E{ Xˆ 1} hypothesis H is true ( there are no deformations) If F k Flim = F, E{ Xˆ } E{ Xˆ 1} hypothesis H is false ( there are deformations) From the table below it is shown that the additional obect points were unstable as well as in the Student test. Table 4 The Multiple F test Benchmark F k F limit Observations RN1.1584 stable RN.36679 stable RN3.65919 stable PIL1 3.77398 stable PIL 3.647 stable 6.944719 PIL3 4.13315 stable M1 13.535 unstable M 16.719 unstable M3 13.3546 unstable M4 1.7317 unstable It can be seen that by applying the localization of deformations tests were determined the movement of marks M1-M4, reference points and intermediate points are considered stable. Likewise were localized movements for both levelling network created in the 5 th basement of the building and in the rest of the stages monitored. [4] 4.4 Vertical displacements of the obect points At every observation run the compensation of the levelling lines were made separately for the levelling line made at the ground floor and for the levelling line made at the 5th basement using the free network adustment. After the compensation of each observation run the networks were statistically tested using the global congruence test and displacements were identify using the student test and multiple F test. In the table below are shown the height differences and the level of the obect points from the 5 th basement at some of the observation runs. Table 5 Obect points in observation run and 1 No. of observation run: Date: Physical state of the buiding: Temperature C Hydrostatic level (m) Presure (kpa) Obect point: PM1 PM PM3 PM4 PM5 PM6 PM7 PM8 PM9 PM1 PM11 PM1 PM13 PM14 PM15 PM16 PM17 PM18 PM19 PM PM1 PM PM3 PM4 PM5 PM6 PM7 PM8 Level of obect point m 67.446 67.311 67.179 67.1165 Observation run "" 67.1335 67.199 Height difference since Height difference since Level of last first last first obect point reading reading 67.1644 67.778 m 67.437 67.165-1. -1. 67.979-1. -1. 67.1849-1.3-1.3 66.981-1. -1. 67.131 67.16 67.995 67.53 67.519 67.97 67.888 67.1963 67.861 67.935 67.981 67.175 67.989 67.186 66.9813 4/1/11 5S 5.688 mm 67.1817 67.1 67.1557 16 73.5 67.1953 67.33 67.111 67.1783 67.1634 67.1787 67.1776 67.161 67.143 67.133 67.189 67.767 67.514 67.918 67.879 -.9 -.9 67.51 -.9 -.9 -.9 -.9 -.9 -.9 67.1953-1. -1. 67.851-1. -1. 67.94 Observation run "1" 4/11/11 5S+P 9 73.6 6.54 mm -.9 -.9 -.9 67.1155-1. -.8 -.8-1. -1. -.9-1. 67.1548 -.9 -.9 67.1944-1. -1. -1. -1. 67.15-1. -1. 67.97-1. -1. 67.185-1. -1. The vertical displacements of the obect points measured were between 33. mm and 44.7 mm (as you can see in Table 6), which tells us, from the position of the obect points, that the construction had bigger vertical displacements in the middle area of the construction. This thing was predicted in the deformation monitoring proect because the area of the basements is bigger than the area of the tower and the tower s position is in the middle of the basements. ISBN: 978-96-474-385-8 37

the pressure on the foundation of the tower block exercised by its own weight. Given all these and the difference in time between phases performed, a second representation was done in a parallel coordinate system, as can be seen in Figure 6. It aims to visualize and interpret the importance of temperature, hydrostatic level, pressure on the foundation and the difference of time between consecutive stages of construction settlement. Fig. 6 The influence of temperature, hydrostatic level and pressure on the displacements 6 Conclusions To achieve accurate monitoring, reference points used must be placed at a considerable distance from the monitored building in order to consider that their elevation is not influenced by the constructions displacements. Regarding the effect of temperature on measurements made it can be said that the measurements were not affected by this, obect points being made of a special metal resistant to temperature variations. The level of hydrostatic also had no effect on compaction since there were no significant differences between the hydrostatic level one phase to another. Pressure of the weight of the building affected mostly the displacements. Although geometric levelling it s not considered a modern technique of deformation monitoring, it is a inexpensive, accurate and highly precise method. In this paper has been also shown that if it is considered most of the errors that could happen during the monitoring process by geometric levelling, it becomes a precious way of vertical displacements monitoring. References: [1] X1. www.skytower.ro [] X. www.leica-geosystems.com [3] X3. Onose, D., Lecture Notes: 3D modeling and monitoring technologies, Faculty of Geodesy, Bucharest, 1 [4] X4. Vintilă, C. I., Dissertation: Monitoring Technology of Time Behavior for Infrastructure Tower Block "Sky Tower" from Floreasca City Center, Bucharest, Faculty of Geodesy Bucharest, 13 ISBN: 978-96-474-385-8 39

[5] X5. Inselberg, A., Parallel Coordinates Visual Multidimensional Geometry and its Applications, New York, Springer, 9 ISBN: 978-96-474-385-8 4