Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

Similar documents
Drilling Extending Mineralization in La Mina North Zone

Drilling Extending Mineralization in La Mina North Zone

Toachi Mining Inc. Drills Four High Grade Gold-Copper-Zinc-Silver intercepts at the Gold-Rich La Plata VMS Project in Ecuador

First Phase Metallurgical Optimization Program Initiated

Toachi Mining Inc. Identifies High Priority Exploration Targets

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

A B C PAD A HIGHLIGHTS

Probe Metals Continues to Expand Gold Zones At Val-d Or East

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Salazar intersects metres (13.07m true) averaging 2.65 g/t gold, g/t silver, 1.32% copper, 6.63% zinc at its Curipamba Project.

Spruce Ridge Resources Ltd Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) , Fax: (519)

EXPLOR INTERSECTS MULTIPLE COPPER ZONES GRADES UP TO 3.65% CU OVER 5.35 METERS ON THE CHESTER COPPER PROPERTY

(TSXV: GPLY, OTCQB: GLYXF

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

Rock sample A13479 from cleared surface exposure assaying: 0.36ppm Au, 21.3ppm Ag, 0.57%Cu, 0.1% Pb, 0.58% Zn 580 M

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

The Inferred Mineral Resource Statement prepared by SRK for the Talbot Deposit is detailed below.

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

Highlights from the four holes announced in this news release include:

SilverCrest Expands Babicanora High Grade Footprint to 600 metres; New High Grade Vein Discoveries Highlight District Scale Potential

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

Detour Gold Reports Drilling Results from Lower Detour

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

True Width (m) Carneritos to

NEWS RELEASE. Foran Intersects Over 28 Metres of Copper Mineralization

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

AbraPlata defines gold-rich zone with up to 16.7g/t Au over 10.6m in the basement at its Diablillos property in Argentina

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

TRENCHING AT LAS DOLORES EXTENDS STRIKE LENGTH TO OVER 1,000 METRES, INTERSECTING

Melkior retains Geologica to complete a NI report on its Launay property, Québec

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

55 Adelaide Street East, Suite St-Charles west, Suite 411, West Tower

IAMGOLD ANNOUNCES RESULTS FROM THE WESTWOOD-MOOSHLA EXPLORATION PROJECT

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

NEWS RELEASE LATEST EXPLORATION PROGRAM CONTINUES TO DEMONSTRATE NARANJILLO AS A HIGH GRADE SILVER HOST

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project

NEWS RELEASE. FORAN INTERSECTS 9.4% ZINC OVER 6.1 METRES Feasibility Drilling Continues

EL CONDOR IN-FILL DRILLING INTERSECTS 26.9 METERS 2.19% CU & 0.58% NI

ANTLER GOLD EXPLORATION UPDATE, WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

Zinc One Reports Additional High-Grade Zinc Results From Surface Samples at Bongará Zinc Mine Project

ANTLER GOLD DRILLS GRAMS PER TONNE GOLD OVER 5.35 METRES AT THE WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

Form F3 MATERIAL CHANGE REPORT

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

ET and and and

Surface Trenching Highlights. Santos Target. To (m) Width (m) Au (g/t) Comment. (m) Santos (1)-includes internal dilution

Goldplay President and CEO Marcio Fonseca commented

SAVARY GOLD DRILLING EXTENDS KNOWN ZONES AND INTERSECTS SIGNFICANT GOLD MINERALIZATION AT FOUR NEW TARGETS

Suite West Georgia Street Vancouver, B.C. V6E 4M3 NEWS RELEASE

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

V Sample from C.O.D vein 15 metres southwest of V

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

NEWS RELEASE. Evrim announces additional drilling results at Cuale Gold Project in Mexico

Northern Dynasty Minerals Ltd.

ATON RETURNS 22.2 METRES OF 2.77 GRAMS PER TONNE GOLD EQUIVALENT FROM HAMAMA WEST; VISIBLE GOLD DISCOVERED AT BOHLOG

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO

Hole ID From (m) To (m) Interval (m) Au (g/t) Ag (g/t) AuEq (g/t)* Zn (%)

Sept 20, 2012 TSX Venture Exchange Tier 1 Trading Symbol: OK

NEWS RELEASE. Evrim and Harvest Gold Complete Drilling at Cerro Cascaron

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

NEWS RELEASE. March 22, 2017

ANTLER GOLD HIGHLIGHTS NEW GOLD-IN-SOIL ANOMALIES, CENTRAL NEWFOUNDLAND

MEXICAN GOLD SAMPLES G/T GOLD AND 37.2 G/T SILVER OVER 0.42 METRES AT PUEBLO NUEVO HISTORICAL MINES

Sherlock drilling returns best intercept to date of 0.63% Cu and 7.45 g/t Ag over m

Atico Mining Provides Exploration Update

CARACARA SILVER INC. PLANNING DRILL PROGRAM AT PILUNANI ZINC-LEAD PROJECT IN PERU

ADDITIONAL SAMPLING IDENTIFIES VEINS WITH UP TO 240 G/T GOLD AND 2,479 G/T SILVER AT INV METALS TIERRAS COLORADAS DISCOVERIES

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

Orford Completes Phase 1 Exploration Program and Generates High-Quality Drill Targets on its Carolina Gold Properties

At the contact, mineralization is associated with strong tourmalinization of the Bevcon Intrusion.

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

Toronto, Canada March 4, 2013

NEWS RELEASE. FOR IMMEDIATE RELEASE Shares Outstanding: 35,190,286

Nevsun Extends Harena 150 Metres Beyond Current Resource and Identifies New Regional Targets from VTEM Survey

PUMA EXPLORATION AND TREVALI MINING CORPORATION DRILLED 13.1% Zn, 4.8% Pb OVER 27.0 METERS AT MURRAY BROOK DEPOSIT

Interval (meters) To (meters)

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

GOLDPLAY OUTLINES FIVE NEW EXPLORATION TARGETS AT THE SAN MARCIAL PROJECT IN MEXICO

May 17, Two holes explored the extension at depth of the historic Sta Rosa vein

FALCO ANNOUNCES INITIAL HORNE 5 DRILLING RESULTS. Confirmation Holes in Line with Historical Data

Table 1 Updated Mineral Resource Tabulation for the Vertikalny Deposits of the Mangazeisky Property. Contained Metal Ag (koz)

NEWS RELEASE. Foran Completes Winter Program with High-Grade Copper and/or Zinc in All Holes Drilled at Bigstone

Orford Intersects 41.1 m Grading 1.36 g/t Au at Jones Keystone Project in North Carolina

RESULTS OBTAINED IN THE EXPLORATION HOLES DRILLED IN THE FALL OF 2018 ON THE DISCOVERY, FLORDIN, ALDERMAC AND ABCOURT-BARVUE PROPERTIES

Transcription:

Toachi Mining Inc. Intersects 13.91 m grading 3.51 g/t Au, 64.24 g/t Ag, 0.59% Cu, 4.11% Zn and 0.85% Pb at the Gold-Rich La Plata VMS Project in Ecuador Toronto, Ontario October 11, 2017 Toachi Mining Inc., ( Toachi or the Company ) (TSX-V: TIM) is pleased to announce results from on-going drilling at its La Plata gold-rich volcanogenic massive sulphide ( VMS ) project, located 100 kilometres southwest of Quito, Ecuador. Program Highlights Hole CMLP-17-93 intersected 13.91 metres (m) of massive and disseminated sulphide mineralization grading 3.51 grams per tonne (g/t) gold, 64.24 g/t silver, 0.59% copper, 4.11% zinc, and 0.85% lead from 339.43 m in the La Mina South zone of the La Mina deposit. Drilling Highlights Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP-17-93 339.43 353.34 13.91 3.51 64.24 0.59 0.85 4.11 Core widths in CMLP-17-93 are not considered to be true widths. Gold assay composites were calculated using uncut assays. A complete list of all intersections is available in Table 1 below along with a drill hole cross-section and plan map. Program Results The drill program began in August 2016 continued after the recently completed National Instrument 43-101 resource estimate, is designed to extend known mineralization within the resource area, and around the peripheries of the known mineralized corridor. Complete details for the National Instrument 43-101 resource estimate are available in our press release dated September 13, 2017 and available on our website at www.toachimining.com or on SEDAR at www.sedar.com.

Hole CMLP-17-93 was completed in the northern portion of the La Mina South block, targeting the depth extension of the known VMS mineralization on the eastern flank. Hole CMLP-17-93 was successful in extending mineralization approximately 30 m down dip, and still remains open at depth. Jonathan Goodman, President & CEO, stated, While the overall grade of hole 93 is slightly below the average resource grade, this shows that the mineralization extends beyond the resource shells. La Plata Deposit Geology Gold-bearing sulphide mineralization at La Plata occurs as compositional banding composed of chalcopyrite, sphalerite, and pyrite laminae with barite occurring as clasts and also as thin layers. Base and precious metal mineralization at La Plata is interpreted to have formed as part of multiple volcanic episodes that created a stacked volcanic-exhalite hydrothermal sequence which is considered favorable for hosting multiple VMS lenses. Examples of this exclusive group of gold-rich VMS camps include Rouyn-Noranda, Doyon- Bousquet-LaRonde, and the Flin Flon camps in Canada. Toachi s exploration staff has identified more than 14 discrete exploration targets across the property concessions which extend for more than 9 kilometres, attesting to the potential of this emerging district. Within the resource area, modelling of historic and current drill results by Toachi staff has delineated four discrete mineralized zones which define the La Mina North and La Mina South blocks. For a 3-D graphic of the wireframed zones, please visit our website at www.toachimining.com and to review our latest presentation. To date, Toachi has completed 13,747 m of drilling on the La Plata project, mainly on the La Mina deposit. The La Plata Project Toachi entered into an option agreement with a private Ecuadorian company to earn between a 60% to 75% interest in the La Plata gold-copper-silver-zinc VMS project, located 100 km south of Quito, Ecuador. For complete terms of the transaction, please see our press release dated February 11, 2016 which is available on our website at www.toachimining.com or on www.sedar.com. 2

La Plata is a gold-rich volcanogenic massive sulphide deposit which was the subject of small scale mining from both an open pit and underground workings from 1975-1981. From 1996 to 1998, Cambior Inc., a Canadian mining company, completed 8,628 metres of drilling and a preliminary resource estimate totaling 840,000 tonnes grading 4.8 grams gold per tonne, 4.1% copper, 54.4 grams silver per tonne and 0.7% lead and 4.2% zinc per tonne in 1999, according to a report completed by AMEC Foster Wheeler, a mining consulting firm, in March 2015. Following a drill program by Cornerstone Capital Resources Inc., which included 5,933 metres of drilling from 2006-2009, a revised mineral resource estimate totaling 913,977 tonnes grading 8.01 grams gold per tonne, 88.3 grams silver per tonne, 5.01% copper, 6.71% zinc and 0.78% lead per tonne in the inferred category was completed. The resource estimates described above are historical estimates as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects S.2.4 ( NI 43-101 ). Toachi has not completed the work required to independently analyze and verify the results of the previous operators nor has a qualified person completed sufficient work to classify the estimates as current mineral resources or mineral reserves. With respect to the Cambior estimate, the Company is also not aware of what categories were used in the estimate. As a result, Toachi is not treating these estimates as current mineral resources or mineral reserves. The Company believes these historic results provide an indication of the potential of the property and are relevant from an on-going exploration perspective. QA/QC Sampling and Core Sampling Protocols Before sampling, a centreline, representing bottom of hole (or a reference line when this is not known) is marked on the drill core. The core is cut and sampled, always sampling the right-hand side of the drill core. Samples are selected based on logged geological features, such as rock type, mineralization, alteration, veining etc. Sample length does not exceed 1.2 m nor is smaller than 20 cm. In areas of similar geological characteristics, sample length is, in general, 1 m. A total of 10% of the samples submitted are certified blanks and standards and field duplicates with, as a minimum, one blank submitted at the beginning of each sample batch. Certified standards are submitted at an average of 6% of the samples submitted. Field duplicates are taken at a rate of 1 in 20 of the samples taken. Drill hole analysis was completed by MS Analytical in Canada. 3

Analysis was completed by MS Analytical in Canada with preparation performed by Ecuadorian partner, LAC y Asociados. Both LAC y Asociados and MSA are ISO 9001:2008 registered companies. MS Analytical also meets the requirements as outlined in ISO/IEC 17025. Qualified Person Phil Fox, MAIG, a Qualified Person as defined by NI 43-101, has reviewed and approved the contents of this press release. About Toachi Mining Inc. Toachi brings a disciplined and veteran team of project managers together with a high grade goldcopper-silver-zinc project at La Plata in Ecuador. Toachi is focused on and committed to the development of advanced stage mineral projects throughout the Americas using industry best practices combined with a strong social license from local communities. Toachi Mining has 60,966,435 shares issued and outstanding. Forward Looking Statements Certain statements contained in this news release may constitute forward-looking information as such term is used in applicable Canadian securities laws. Forward-looking information is based on plans, expectations and estimates of management at the date the information is provided and is subject to certain factors and assumptions, including, that the Company s financial condition and development plans do not change as a result of unforeseen events and that the Company obtains regulatory approval. Forward-looking information is subject to a variety of risks and uncertainties and other factors that could cause plans, estimates and actual results to vary materially from those projected in such forward-looking information. Factors that could cause the forward-looking information in this news release to change or to be inaccurate include, but are not limited to, the risk that any of the assumptions referred to prove not to be valid or reliable, that occurrences such as those referred to above are realized and result in delays, or cessation in planned work, that the Company s financial condition and development plans change, and delays in regulatory approval, as well as the other risks and uncertainties applicable to the Company as set forth in the Company s continuous disclosure filings filed under the Company s profile at www.sedar.com. The Company undertakes no obligation to update these forward-looking statements, other than as required by applicable law. 4

FOR ADDITIONAL INFORMATION PLEASE CONTACT Jonathan Goodman, President and CEO Telephone: 416 365 2428 Candace Di Vito, Manager, Investor Relations Telephone: 416 365 7043 Email: cdivito@toachimining.com Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. Table 1 La Mina Drill Results Drill Hole From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP-17-93 339.43 353.34 13.91 3.51 64.24 0.59 0.85 4.11 5

Drill Section 6

Plan Map 7