REMOTE SENSING AND GEOSPATIAL APPLICATIONS FOR WATERSHED DELINEATION

Similar documents
Applying GIS to Hydraulic Analysis

HYDROLOGIC AND WATER RESOURCES EVALUATIONS FOR SG. LUI WATERSHED

4. GIS Implementation of the TxDOT Hydrology Extensions

CE 394K.3 GIS in Water Resources Midterm Quiz Fall There are 5 questions on this exam. Please do all 5. They are of equal credit.

A GIS-based Approach to Watershed Analysis in Texas Author: Allison Guettner

Section 4: Model Development and Application

Hydrology and Floodplain Analysis, Chapter 10

Designing a Dam for Blockhouse Ranch. Haley Born

Base Level Engineering FEMA Region 6

Dr. S.SURIYA. Assistant professor. Department of Civil Engineering. B. S. Abdur Rahman University. Chennai

ASFPM - Rapid Floodplain Mapping

Using GIS to Delineate Watersheds Ed Poyer NRS 509, Fall 2010

International Journal of Advance Engineering and Research Development

Hydrologic Engineering Applications of Geographic Information Systems

Chapter 6 Mapping and Online Tools

FLOOD HAZARD AND RISK ASSESSMENT IN MID- EASTERN PART OF DHAKA, BANGLADESH

Watershed Delineation in GIS Environment Rasheed Saleem Abed Lecturer, Remote Sensing Centre, University of Mosul, Iraq

MODULE 7 LECTURE NOTES 5 DRAINAGE PATTERN AND CATCHMENT AREA DELINEATION

Vulnerability of Flood Hazard in Selected Ayeyarwady Delta Region, Myanmar

LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON

A Comparison of Manual and Computer-Assisted Drainage Delineation Methods for Hydrologic-Unit Map Development

INTRODUCTION TO HEC-HMS

13 Watershed Delineation & Modeling

Workshop: Build a Basic HEC-HMS Model from Scratch

HEC & GIS Modeling of the Brushy Creek HEC & GIS Watershed Modeling of the

GIS in Water Resources Midterm Exam Fall 2012 There are five questions on this exam. Please do all five.

Assessing Groundwater Vulnerability and Contaminant Pathways at MCAS Beaufort, SC

USING GIS TO MODEL AND ANALYZE HISTORICAL FLOODING OF THE GUADALUPE RIVER NEAR NEW BRAUNFELS, TEXAS

GeoWEPP Tutorial Appendix

Out with the Old, In with the New: Implementing the Results of the Iowa Rapid Floodplain Modeling Project

USGS Hydrography Overview. May 9, 2018

A Cloud-Based Flood Warning System For Forecasting Impacts to Transportation Infrastructure Systems

Watershed Application of WEPP and Geospatial Interfaces. Dennis C. Flanagan

FLOOD HAZARD MAPPING OF DHAKA-NARAYANGANJ-DEMRA (DND) PROJECT USING GEO-INFORMATICS TOOLS

NAVAJO NATION PROFILE

Flood Hazard Inundation Mapping. Presentation. Flood Hazard Mapping

PROANA A USEFUL SOFTWARE FOR TERRAIN ANALYSIS AND GEOENVIRONMENTAL APPLICATIONS STUDY CASE ON THE GEODYNAMIC EVOLUTION OF ARGOLIS PENINSULA, GREECE.

FLOODPLAIN MAPPING OF RIVER KRISHNANA USING HEC-RAS MODEL AT TWO STREACHES NAMELY KUDACHI AND UGAR VILLAGES OF BELAGAVI DISTRICT, KARNATAKA

EXTRACTING HYDROLOGIC INFORMATION FROM SPATIAL DATA

Geo-spatial Analysis for Prediction of River Floods

Bushkill Creek 3 rd Street Dam Removal Analysis

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON

Lab 1: Importing Data, Rectification, Datums, Projections, and Coordinate Systems

GIS in Water Resources Midterm Exam Fall 2016 There are four questions on this exam. Please do all four. They are not all of equal weight.

Basin characteristics

Muhammad Rezaul Haider (A ). Date of Submission: Course No.: CEE 6440, Fall 2016.

Hydrologic and Hydraulic Analyses Using ArcGIS

ISSUES AND APPROACHES TO COUPLING GIS TO AN IRRIGATION DISTRIBUTION NETWORK AND SEEPAGE LOSS MODELS ABSTRACT

)UDQFR54XHQWLQ(DQG'tD]'HOJDGR&

Height Above Nearest Drainage in Houston THE UNIVERSITY OF TEXAS AT AUSTIN

Floodplain Modeling and Mapping Using The Geographical Information Systems (GIS) and Hec-RAS/Hec-GeoRAS Applications. Case of Edirne, Turkey.

StreamStats: Delivering Streamflow Information to the Public. By Kernell Ries

Breaking the 5 Mile per Hour Barrier: Automated Mapping Using a Normal Depth Calculation

Hydrologic Modelling of the Upper Malaprabha Catchment using ArcView SWAT

Geographic Information Systems. Introduction to Data and Data Sources

Delineation of Watersheds

Characterization of Catchments Extracted From. Multiscale Digital Elevation Models

Dam Break Analysis Using HEC-RAS and HEC-GeoRAS A Case Study of Ajwa Reservoir

GRAPEVINE LAKE MODELING & WATERSHED CHARACTERISTICS

George Mason University Department of Civil, Environmental and Infrastructure Engineering

THE HYDROLOGICAL MODELING OF THE USTUROI VALLEY - USING TWO MODELING PROGRAMS - WetSpa and HecRas

ARMSTRONG COUNTY, PA

ISSUES AND APPROACHES TO COUPLING GIS TO IRRIGATION DISTRIBUTION NETWORK AND SEEPAGE LOSS MODELS

8.9 Geographical Information Systems Advantages of GIS

CE 394K/CEE6440 GIS in Water Resources Fall 2018 Final Exam Solution

Lab 1: Importing Data, Rectification, Datums, Projections, and Output (Mapping)

MODELING STUDIES WITH HEC-HMS AND RUNOFF SCENARIOS IN YUVACIK BASIN, TURKIYE

Streams in the Ranching Country of South Texas

Watershed Modeling With DEMs

Leon Creek Watershed October 17-18, 1998 Rainfall Analysis Examination of USGS Gauge Helotes Creek at Helotes, Texas

A SIMPLE GIS METHOD FOR OBTAINING FLOODED AREAS

Floodplain modeling. Ovidius University of Constanta (P4) Romania & Technological Educational Institute of Serres, Greece

This week s topics. Week 6. FE 257. GIS and Forest Engineering Applications. Week 6

Introduction to Geographic Information Systems

TSEGI WASH 50% DESIGN REPORT

FLOOD RISK MAPPING AND ANALYSIS OF THE M ZAB VALLEY, ALGERIA

Extreme Phenomena in Dobrogea - Floods and Droughts

DATA SOURCES AND INPUT IN GIS. By Prof. A. Balasubramanian Centre for Advanced Studies in Earth Science, University of Mysore, Mysore

Semester Project Final Report. Logan River Flood Plain Analysis Using ArcGIS, HEC-GeoRAS, and HEC-RAS

ISSN Vol.03,Issue.10 May-2014, Pages:

Civil Engineering Journal

QGIS FLO-2D Integration

MISSOURI LiDAR Stakeholders Meeting

Title: ArcMap: Calculating Soil Areas for Storm Water Pollution Prevention Plans Authors: Brandy Woodcock, Benjamin Byars

MEMORANDUM. Situation. David Ford Consulting Engineers, Inc J Street, Suite 200 Sacramento, CA Ph Fx

Appendix C. Questionnaire Summary of Responses Geographic Information Systems

Chapter 10 - Sacramento Method Examples

Hydrologic Analysis of Watersheds West of Zacatecas, Zacatecas, Mexico

LESSON HEC-HMS

Using ArcGIS for Hydrology and Watershed Analysis:

Using Remote Sensing to Analyze River Geomorphology

Real-Time Flood Forecasting Modeling in Nashville, TN utilizing HEC-RTS

Chapter 5 CALIBRATION AND VERIFICATION

Floodplain mapping using HEC-RAS and GIS in semi-arid regions of Iran

GIS Techniques for Floodplain Delineation. Dean Djokic

UPPER COSUMNES RIVER FLOOD MAPPING

Hydrology and Watershed Analysis

CONVERTING A NEXRAD MAP TO A FLOODPLAIN MAP. Oscar Robayo, Tim Whiteaker, and David Maidment*

Quick Response Report #126 Hurricane Floyd Flood Mapping Integrating Landsat 7 TM Satellite Imagery and DEM Data

GIS feature extraction tools in diverse landscapes

Transcription:

REMOTE SENSING AND GEOSPATIAL APPLICATIONS FOR WATERSHED DELINEATION Gaurav Savant (gaurav@engr.msstate.edu) Research Assistant, Department of Civil Engineering, Lei Wang (lw4@ra.msstate.edu) Research Assistant, Department of Civil Engineering, and Dr. Dennis Truax (truax@engr.msstate.edu) Professor of Civil Engineering, Mississippi State University, P.O. Box 9546, 2351 Walker Engineering Building, MS 39762-9546 Abstract: Introduction: Many watershed analysis projects are limited by the information available for modeling parameters of concern. For example, topographic information is often outdated or costly to obtain. This paper presents an example that explores the advantages of applying remote sensing technologies and GIS application for the delineation of a gaged watershed. Specifically, we evaluated the watershed of a section of the Upper Pearl River in Mississippi. The DEM data is available from USGS or developed through GIS can be imported into software such as HEC Geo- HMS and manipulated to give considerably accurate representations of stream flow paths and the contributing areas. This would otherwise have required investment of significant time and precious resource when the information neither could wait for such a delay nor justified the cost. It was found that the delineated area from the use of software compares well with the areas determined by USGS. The foremost advantage of these techniques is that only basic training is required before a person becomes fully functional in it. The delineated watershed and associated data can then be exported to other modeling software for watershed management. Accurate delineation of a watershed plays an extremely important role in the management of the watershed. The delineated boundaries form the nucleus around which the management efforts such as land use, land change, soil types, geology and river flows are analyzed and appropriate conclusions drawn. Current remote sensing and graphic information system technologies provide ways for rapid collection of field data and prompt data processing. The aim of the study was to determine whether the use of current software technologies with remotely sensed data regressed with a digital elevation model could produce results that are comparable to the area that has undergone significant manually delineation. If successful, this effort validates the use of this technological approach to other areas. The study area consisted of the Upper Pearl watershed in Mississippi (H.U.C 03180001). In this region, the Upper Pearl flows through gently rolling terrain. As this is the headwater section of the river, it is not a particularly big river, traversing only about 60 miles[2], and is often difficult to delineate. However, the Upper Pearl is an important river as it passes near the city of Jackson and caused wide spread flooding in the city and neighboring areas in the past. The software used to conduct the study was ArcView GIS 3.2 and HEC Geo-HMS. ArcView is well known and widely used GIS software and was selected as being representative of the various software systems available. HEC Geo-HMS is software 1

embedded in ArcView, and was acquired from the US Army Corps of Engineers, Hydrologic Engineering Center. Geo-HMS was chosen because it not only delineates the watershed but also serves as a stepping stone to another software produced by the US Army Corps of Engineers, HEC-HMS for hydraulic modeling. Methodology: The most important part for an accurate delineation of any watershed is the accuracy of the DEM. In this study we used a standard USGS DEM of 1:25,000 scale corresponding to a cell size of thirty meters by thirty meters, the DEM was generated by a project team working under Dr. Charles O'Hara [3]. The DEM was transformed into Mississippi State Transverse Mercator (MSTM) projection. The specifications of the projection are given in table 1. There are several USGS gage stations in the study area. The digital locations of these stations were converted and then were projected in MSTM projection as shape files using the ArcView projection utility. Table 1 MSTM specifications Field Specification Spheroid GRS 80 Central Meridian -89.8167 Reference Latitude 32.5 False Northing +1300000 False Easting 500000 Scale Factor 0.999834 Because the values of some of the cells may not be available, the first step performed after importing the DEM into ArcView was the filling of holes and gaps in the DEM data by interpolating from nearby cells. GEO-HMS requires a rough guess about percentage of the total area at which a stream should be initiated. The selection of this percentage depends on a variety of factors such as topography, soil type, etc. However, more often than not the determination is made based on experience. We used a percentage of five percent. The subsequent procedures can either be performed manually or automatically. 2

We decided on a manual delineation scheme because it gives a firmer handle on the procedures. United States Geological Survey (USGS) maintains a network of self recoding rain gages which can be accessed from the USGS website [1]. We extracted 3 gage stations on the Upper Pearl covering the entire reach of the river with Carthage forming the outlet of the watershed and Burnside forming the upper watershed boundary. Figure 1, Upper Pearl DEM 3

Figure 2, U.Pearl River and Tributaries Delineated From Elevation Data Geo-HMS includes the results of its computations into separate shape files. These are available for export to other hydraulic modeling software. The results from our efforts to apply this program to the problem at hand are show in Figure 2. This presents a graphical representation of the river aggregation graphics. The exact details of the river delineation depend on the accuracy and resolution of the available DEMs. However for the available DEM the river shapefile as obtained from USGS exactly overlaid the river shapefile generated by the software, even though this would not be possible in all cases of delineation. HEC Geo-HMS has the ability to delineate the watershed using the downstream gages as the outlet. Therefore, in the graphic presented as Figure 3, the most downstream gage 4

Figure 3, Delineated Watershed and subwatersheds station located at Carthage, Mississippi, was used to delineate the entire Upper Pearl watershed. A similar process was undertaken using the other two gages located at Lena and Edinburg, Mississippi. Edinburg is the upper most of the gage stations used. One of the advantages of using software such as HEC Geo-HMS is that 100% accuracy in the position of the gage stations is not required. This is possible because the software delineates the watershed even if the location of the gage station does not exactly lie on the delineated river path. For our analysis, this was observed for all three of the gage stations. It should be noted that HEC Geo-HMS recognizes such location errors and generates a warning for the user. 5

Results: The results of our effort indicate that determination of the watershed areas using ArcView and Geo-HMS has the potential of providing accurate and reproducible results. This conclusion was derived from a comparison of the watershed characteristics developed using the GIS analysis approach outlined above against the data collected from the extensive on-site field survey data provided by USGS. Table 2 summarizes these data. Inspection indicates the total watershed areas calculated from the software-based delineation procedures are very close to those provide by USGS. The major benefit of using software was that we were able to develop these results in about three hours of computational time once the data was compiled and rectified. Data collection and preparation took about three days once we were able to correlate the area of interest against an area where USGS had accurate information. As one can imagine, it took over a month to collect and regress data to evaluate this area using conventional approaches incorporating ground-based measurement methodologies. Table 2 Comparison of Watershed Area Using Geo-HMS and Data From USGS Field Survey Area, sq. miles Gage Station Data from USGS Results using Geo-HMS Carthage 1346 1350 Lena 520 515 Edinburg 870.65 907 Another major advantage of using software to define a watershed s boundaries and its properties is that one can readily delineate the entire watershed and the various subwatersheds contained therein. These results as produced by Geo-HMS include the longest flow paths as well as classification of contributing regions by their drained areas. The final result obtained from the delineation process is watershed data that can be directly imported into HEC-HMS or similar modeling programs. In addition, it can be further manipulated in HEC Geo-HMS to allow the the addition of junctions, bridges, culverts, and other hydrogeologic and morphologic information. Obviously, once these manipulations are complete and model analysis of the data has been concluded, the data can be coupled using the Geographical Information System to provide output for analysis. 6

Conclusion: There are several future research avenues. These may include direct comparison of USGS topographical maps with software generated delineation maps and the comparison of river flow paths. These research topics can be useful in helping augment the accuracy of the USGS data as well as update the data USGS currently holds. Different terrain, source data accuracy, and source data resolution may affect the accuracy of the research. Due to limited experiments done in this project, more experiments are needed for different terrain and different data to conclude if the current technologies are good enough for watershed and watershed modeling. This effort has successfully demonstrated that the used of remotely sensed data and commercially available software is an effective approach to developing accurate watershed analysis for various uses with a minimum amount of time, effort, and cost. References: 1. Mississippi USGS website, http://ms.water.usgs.gov; Date accessed: August 25, 2002. 2. Hartley, Vernon; Pearl Basin Coordinator; MS Department of Environmental Quality (Vernon_Hartley@deq.state.ms.us). 3. O'Hara, Charles. Dr; Remote Sensing Technologies Center, Engineering Research Center, Mississippi State University (cgohara@erc.msstate.edu). 7