CLIC Detector studies status + plans

Similar documents
Short Introduction to CLIC and CTF3, Technologies for Future Linear Colliders

CERN R&D on Linear Collider Detectors. Lucie Linssen CERN

CLIC Project Status. Roger Ruber. Uppsala University. On behalf of the CLIC Collaborations. Thanks to all colleagues for materials

CLIC THE COMPACT LINEAR COLLIDER

Towards a CLIC detector, opportunities for R&D. Lucie Linssen CERN

CLICdp work plan and foreseen documents in preparation for the next European Strategy Update

THE CLIC PROJECT - STATUS AND PROSPECTS

Current and Future Developments in Accelerator Facilities. Jordan Nash, Imperial College London

CLIC Status. Philip Burrows. John Adams Institute Oxford University

Studies of Higgs hadronic decay channels at CLIC. IMPRS Young Scientist Workshop at Ringberg Castle 18 th July 2014 Marco Szalay

Beam-beam Effects in Linear Colliders

THE COMPACT LINEAR COLLIDER (CLIC) STUDY

e + e - Linear Collider

The International Linear Collider. Barry Barish Caltech 2006 SLUO Annual Meeting 11-Sept-06

Measurement of Higgs couplings and mass in e + e collisions at CLIC in the s range of 350 GeV - 3 TeV

Status and Future Prospects

On the future plan of KEK for ILC(International Linear Collider) Junji Urakawa(KEK) Contents

Thanks to all Contributors

Proposal for a US strategy towards physics & detectors at future lepton colliders

Simulation of the ILC Collimation System using BDSIM, MARS15 and STRUCT

SiD concept adapted to CLIC

Status of linear collider designs:

Challenges of the Beam Delivery System for the future Linear Colliders

X-band Experience at FEL

CARE-ELAN Final Report

Report from the Luminosity Working Group of the International Linear Collider Technical Review Committee (ILC-TRC) Chairman: Greg Loew

High-gradient X-band RF technology for CLIC and beyond

PARTICLE BEAMS, TOOLS FOR MODERN SCIENCE AND MEDICINE Hans-H. Braun, CERN

Status of Accelerator R&D at ILC

1.1 Report on the First ILC Workshop, KEK (Japan) November 04

THE ACTIVE PREALIGNMENT OF THE CLIC COMPONENTS H. MAINAUD DURAND, T. TOUZE CERN

SPPC Study and R&D Planning. Jingyu Tang for the SPPC study group IAS Program for High Energy Physics January 18-21, 2016, HKUST

PUBLICATION. The Global Future Circular Colliders Effort

The TESLA Dogbone Damping Ring

TLEP White Paper : Executive Summary

ILC Beam Dynamics Studies Using PLACET

SLS at the Paul Scherrer Institute (PSI), Villigen, Switzerland

X-band high-gradient and CLIC R&D for future colliders

Tools of Particle Physics I Accelerators

LCWS 05 Machine Detector Interface Design Updates. Tom Markiewicz SLAC 22 March 2005

OVERVIEW OF THE LHEC DESIGN STUDY AT CERN

THE ILC BEAM DELIVERY SYSTEM DESIGN AND R&D PROGRAMME

ILC concepts / schematic

Simulation of Laser-wires at CLIC using BDSIM

EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN - SL DIVISION. Multi-TeV CLIC Photon Collider Option. H. Burkhardt

Recent Progress at the CLIC Test Facility 3 at CERN

Machine-Detector Interface for the CEPC

CERN & the High Energy Frontier

LC Commissioning, Operations and Availability

CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CTF3 DRIVE BEAM INJECTOR OPTIMISATION

Why are particle accelerators so inefficient?

LHC Luminosity and Energy Upgrade

CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH THE CLIC POSITRON CAPTURE AND ACCELERATION IN THE INJECTOR LINAC

CLIC Detectors and Physics

Dean Karlen University of Victoria & TRIUMF. APS NW Section Meeting 2005 Victoria, Canada

S2E (Start-to-End) Simulations for PAL-FEL. Eun-San Kim

LHC Status and CERN s future plans. Lyn Evans

FACET-II Design Update

Accelerator development

Large Hadron Collider at CERN

RESEARCH AND DEVELOPMENT OF FUTURE MUON COLLIDER*

Integrated luminosity performance studies of linear colliders with intra-train IP-FB system: ILC and CLIC

Proton-driven plasma wakefield acceleration

R&D ON FUTURE CIRCULAR COLLIDERS

Experimental Measurements of the ORION Photoinjector Drive Laser Oscillator Subsystem

Status of the Standard Model. Outline. The nineties precision physics at LEP and SLC. Precision electroweak measurements: e+e- colliders

Physics 736. Experimental Methods in Nuclear-, Particle-, and Astrophysics. - Accelerator Techniques: Introduction and History -

CEPC Detector and Physics Studies

Positron Source using Channelling for the Baseline of the CLIC study

Instrumentation of the Very Forward Region of a Linear Collider Detector. Wolfgang Lohmann, DESY

Charge for WG2 (Optics and Beams)

CERN Medical Applications. Giovanni Porcellana. Medical Applications Officer. Knowledge Transfer Accelerating Innovation

LHC accelerator status and prospects. Frédérick Bordry Higgs Hunting nd September Paris

WG2 on ERL light sources CHESS & LEPP

ILC Laser-wires. G A Blair, RHUL Snowmass 17 th August 2005

On-axis injection into small dynamic aperture

Higgs Factory Magnet Protection and Machine-Detector Interface

First propositions of a lattice for the future upgrade of SOLEIL. A. Nadji On behalf of the Accelerators and Engineering Division

Towards a Multi TeV Linear Collider; Drive Beam Generation with CTF3

Will LHCb be running during the HL-LHC era? Burkhard Schmidt for the LHCb Collaboration

Two Beamline Ground Motion Simulation for NLC

LHC operation in 2015 and prospects for the future

TESLA LINEAR COLLIDER DESIGN AND R&D STATUS

MDI and detector modeling

ICAN Kick-Off. R.-D. Heuer. February 2012

Linear Collider Workshop 2017, Strasbourg

The European Strategy for Particle Physics. Discussion with staff and fellows of IR Sector, FHR Sector, HSE, DG units

Non-collision Background Monitoring Using the Semi-Conductor Tracker of ATLAS at LHC

Overview of Future Colliders

A 6 GeV Compact X-ray FEL (CXFEL) Driven by an X-Band Linac

The Large Hadron electron Collider at CERN

arxiv: v1 [physics.acc-ph] 13 Jun 2013

International Scientific Spring 2010, March 1-6, 1. R. Garoby. slhc

Accelerator R&D Opportunities: Sources and Linac. Developing expertise. D. Rubin, Cornell University

1.5-GeV FFAG Accelerator as Injector to the BNL-AGS

LCLS Accelerator Parameters and Tolerances for Low Charge Operations

The CMS ECAL Laser Monitoring System

CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH

Top Quark Precision Physics at Linear Colliders

CERN - European Laboratory for Particle Physics / ~2»~7. CLIC Study Annual Report summarised by I. Wilson for the CLIC Study Group

Transcription:

CLIC Detector studies status + plans Contents: - Introduction to CLIC accelerator - 2004 CLIC Study group report: "Physics at the CLIC Multi-TeV Linear Collider - CERN participation in Linear Collider R&D (EUDET, DevDet) - ILC-CLIC collaboration Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 1

CLIC basic features High acceleration gradient: > 100 MV/m Compact collider total length < 50 km at 3 TeV Normal conducting acceleration structures at high frequency Two-Beam Acceleration Scheme Cost effective, efficient Simple tunnel, no active elements Modular, easy energy upgrade in stages CLIC TUNNEL CROSS-SECTION QUAD QUAD POWER EXTRACTION STRUCTURE 4.5 m diameter ACCELERATING STRUCTURES Main beam 1 A, 156 ns from 9 GeV to 1.5 TeV 100 MV/m BPM 12 GHz 64 MW Drive beam - 95 A, 240 ns from 2.4 GeV to 240 MeV Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 2

CLIC layout 326 klystrons 33 MW, 139 µs drive beam accelerator 2.37 GeV, 1.0 GHz 1 km delay loop CR2 CR1 combiner rings Circumferences delay loop 80.3 m CR1 160.6 m CR2 481.8 m CR2 CR1 delay loop 326 klystrons 33 MW, 139 µs drive beam accelerator 2.37 GeV, 1.0 GHz 1 km Drive Beam Generation Complex decelerator, 24 sectors of 868 m TA BC2 245m R=120m e - main linac, 12 GHz, 100 MV/m, 21 km 48 km BDS 2.75 km IP1 BDS 2.75 km e + main linac BC2 245m TA R=120m CLIC overall layout 3 TeV e - injector 2.4 GeV e - DR 365m BC1 booster linac, 9 GeV, 2 GHz e + DR 365m e + injector, 2.4 GeV Main Beam Generation Complex Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 3

CLIC main parameters http://clic-meeting.web.cern.ch/clic-meeting/clictable2007.html Center-of-mass energy 3 TeV Peak Luminosity 7 10 34 cm -2 s -1 Peak luminosity (in 1% of energy) 2 10 34 cm -2 s -1 Repetition rate 50 Hz Loaded accelerating gradient 100 MV/m Main linac RF frequency 12 GHz Overall two-linac length 42 km Bunch charge 3.72 10 9 Bunch separation 0.5 ns Beam pulse duration 156 ns Beam power/beam 14 MWatts Hor./vert. normalized emittance 660 / 20 nm rad Hor./vert. IP beam size bef. pinch 40 / ~1 nm Total site length 48 km Total power consumption 322 MW Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 4

3x more energy loss due to beamstrahlung at CLIC w.r.t. ILC e - e + γ γ γ unavoidable at Linear Colliders in general: small beam sizes -> large beamstrahlung CLIcC luminosity spectrum Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 5

Time structure of the beam Train repetition rate 50 (100) Hz CLIC 1 train = 312 bunches 0.5 nsec apart ILC 5 Hz 1 train ~2820 bunches ~337 ns apart Experimenting at CLIC similar to the NLC Time stamping! Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 6

CLIC links, workshops and time-line CLIC website: http://clic-study.web.cern.ch/clic-study/ CLIC07 workshop, October 2007 http://cern.ch/clic07workshop CLIC08 workshop, October 14-17 2008 CLIC CDR foreseen for 2010 CLIC TDR foreseen for 2014 Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 7

hep-ph/0412251 ; CERN-2004-005 Detector Specifications CLIC Report 2004: Starting point: the TESLA TDR detector adapted to CLIC environment - Detailed studies performed for previous CLIC parameters - Update with new CLIC parameters is underway - Greater need for time-stamping of events - No significant physics difference found previously between NLC and TESLA at sub-tev energies - None expected between old and new multi-tev parameters Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 8

CERN participation in LC: EUDET 2006-2009 MICELEC: microelectronics user support VALSIM: optimisation of hadronization process in GEANT4 Magnet: magnetic field map of PCMAG magnet at DESY test beam Timepix: development of pixel chip for TPC pixelised readout TPC electronics: development of TPC pad readout (aiming for combined analog/digital readout fitting behind 1 4 mm 2 pads) Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 9

INPUTS 5 versions 7 standard channels PCMAG field map campaign at DESY 2007 OUTPUTS TPC pad readout, programmable amplifier 130 nm technology 55_m 5 Timepix chip 1 2 4 55_m 6 Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 10

CERN contribution to LC tasks in FP7 proposal DevDet http://project-fp7-detectors.web.cern.ch/project-fp7-detectors/default.htm Test beam for combined linear collider slice tests (providing beam, large magnet, general infrastructures etc.) Continued support for TPC electronics Participation in Project office for linear collider detectors (engineering tools for project office; design support for test beam set-up) Test-case of LC project tools on CLIC forward region example (together with DESY and ILC forward study teams) Software tools (geometry and reconstruction tools) Microelectronics user support Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 11

CLIC-ILC Collaboration? Following visit of Barry @ CERN (Nov 07) http://www.linearcollider.org/newsline/archive/2007/20071213.htm l Independently of US/UK financial crisis, but even more desirable now CLIC-ILC Collaboration meeting (Feb 08) http://indico.cern.ch/conferencedisplay.py?confid=27435 GDE/ACFA Meeting at Sendai/Japan (March 08) http://www.awa.tohoku.ac.jp/tilc08/ J.P.Delahaye TILC08: 06/ 03/ 08 1 Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 12

Subjects with strong synergy 1. Civil Engineering and Conventional Facilities 2. Beam Delivery Systems & Machine Detectors Interface 3. Detectors 4. Cost and Schedule 5. Beam Dynamics & Beam Simulations including Low Emittance Transport J.P.Delahaye TILC08: 06/ 03/ 08 5 Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 13

From: F. Richard, Sendai Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 14

ILC-CLIC working groups First working group meeting, 13/5/2008 Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 15

Topics for CLIC-ILC Detector R&D Summary: Detectors from meeting 8 Feb 08: 1) Define a CLIC detector concept at 3 TeV. (update of 2004 CLIC Study) based on ILC detector concepts. 2) Detector simulations - Simulation tools to be used by ILC and CLIC (WWS software panel) - Validation ILC detector options for CLIC at high energy, different time structure and different backgrounds - 1 TeV benchmark studies to provide overlap - compare performance using defined benchmark physics processes (e.g. WW/ZZ separation) Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 16

Continue Summary CLIC/ILC detector R&D, 8/2/ 08 3) EUDET /DEVDET ( infrastructure for LC detector R&D, with associated non-eu groups) - microelectronic tools - 3D interconnect technologies (for integrated solid state detectors) - simulation and reconstruction tools - combined test with magnet and LC sub-detectors 4) TPC - TPC performance at high energies (>500 GeV). - TPC read out electronics 5) Calorimetry - Dual Readout Calorimetry (feasible at LC?) 6) General - increased CLIC participation in future ECFA workshops (2008 Warsaw) on LC detectors Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 17

General layout and integration Common meeting/review required Common engineering tools for detector design in preparation (DESY, CERN, IN2P3, FP7) Background and luminosity studies Strengthen support Masking system Constraints on vertex detector Detector field Need a field for CLIC Magnet design Common simulation tools for detector studies Need to review what is available Low angle calorimeters Beam pipe design (LHC) Vacuum etc. (LHC) Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 18

Common simulation tools BDSIM () Integration into GEANT? FLUKA (CERN) Halo and tail generation (CERN) Common formats etc Study of machine induced background In particular, neutrons, muons and synchrotron radiation Mitigation strategies e.g. tunnel fillers against muons Study of beam-beam background and luminosity spectrum Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 19

LAPP, Oxford, CERN, FP7, BNL, SLAC, Other please join Low-noise design Noise level measurements (DESY, CERN) Among others, measurements at LHC Component design Mechanical design of quadrupole support Final quadrupole design Stabilization feedback design Sensors Actuators Interferometers Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 20

Common definitions Infra-structure Work is quite generic No large differences expected for CLIC detector to some ILC detector Collaboration has started LHC expertise Push-pull Is an option for both projects A collaboration has started Brings ILC/CLIC/LHC expertise Crossing angle Investigate requirements Then study benefits to find a common crossing angle Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 21

Push-Pull studies for two detectors Alain Herve, CERN, et al Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 22

Conclusions CLIC physics/detector studies are starting again Many similarities with ILC detector studies Good exchange and collaboration with ILC experts is fundamental and is underway.. thank you Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 23

Spare slides Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 24

DG to CERN staff Jan 08 Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 25

Two Beam Module Two Beam HW & Int. WG 20760 modules 71460 power production structures PETS (drive beam) 143010 accelerating structures (main beam) Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 26

CLIC Standard Two Beam Module Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 27

Single CLIC tunnel with alcoves for drive beam return loops and dumps Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 28

Major revision of CLIC parameters made 2007 (final parameter optimization still ongoing) Basic changes 30 GHz -> 12 GHz RF frequency close to old NLC frequency (11.424 GHz) easier to adapt NLC work and experience lower frequency allows more relaxed alignment tolerances 150 MV/m -> 100 MV/m reduces breakdown rate and surface damages in RF accelerating structures 50 km long LINAC allows 2 x 1.5 TeV = 3 TeV CM energy (was 5 TeV) 0.5 ns bunch spacing, 312 bunches (= 156 ns bunch trains), 50 Hz (3 TeV) optimized for maximum luminosity was subject of various changes in the past: 0.667 ns -> 0.267 ns -> 0.667 ns -> 0.5 ns Aim for feasibility and conceptual design report in 2010 Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 29

CLIC parameters Lucie Linssen, Krakow FCAL meeting 6/5/2008 slide 30

CLIC parameters 3x more energy loss due to beamstrahlung at CLIC w.r.t. ILC e - e + γ γ γ unavoidable at Linear Colliders in general: small beam sizes -> large beamstrahlung CLIcC luminosity Lucie Linssen, spectrum Krakow FCAL meeting 6/5/2008 slide 31