LENK, BERNESE ALPS, CH

Similar documents
Debris Flow & Shallow Landslide Protection

OLT VALLEY, KM , RO

Consolidamento di versanti

EASTSIDE CATCHMENTS GIBRALTAR, GI

PEACE RIVER EAST HILL - HWY 2:60 (PH2) SELECT PHOTOGRAPHS August 22, 2007 File: Photo E003. Station May 2007

Debris flow mitigation with flexible ring net barriers field tests and case studies

Protection against debris flows with 13 flexible barriers in the Milibach River (Canton Berne, Switzerland) and first event analysis

WATERCOURSE HARNESSING BANK EROSION AND CONSOLIDATION

3/8/17. #20 - Landslides: Mitigation and Case Histories. Questions for Thought. Questions for Thought

The effectiveness of check dams in controlling upstream channel stability in northeastern Taiwan

Modeling Great Britain s Flood Defenses. Flood Defense in Great Britain. By Dr. Yizhong Qu

APPROACH TO THE SPANISH WATER ORGANISATION IMPROVING FLOOD HAZARD MAPPING, LAWS AND AUTHORITIES COORDINATION

TABLE OF CONTENTS LIST OF TABLES. Page

Natural hazards in Glenorchy Summary Report May 2010

Protection systems against debris flows

LOCATIONS OF SELECTED MITIGATION SITES IN JAPAN

Yoshinori KAWAMURA, Oriental Consultants Global Co., Ltd.

Preliminaries to Erosion: Weathering and Mass Wasting

Weathering, Erosion, and Deposition Guided Notes

Natural Terrain Risk Management in Hong Kong

Instream Erosion Control General

1. INTRODUCTION. EXAMPLE OF SECHILIENNE ROCKFALL (France)

CHAPTER FIVE 5.0 STABILITY OF CUT SLOPES IN THE STUDY AREA. them limited by a thick canopy of vegetation and steep slope angles.

3.12 Geology and Topography Affected Environment

Debris flows + sediment transport in torrents. Debris flows and sediment. transport in steep catchments

GG101 Lecture 22: Mass Wasting. Soil, debris, sediment, and broken rock is called regolith.

Flash flood disaster in Bayangol district, Ulaanbaatar

Multi Hazard Evaluation of a High Voltage Transmission Network. John Eidinger 1 and Leon Kempner 2

Instream Sediment Control Systems

Earthquakes. & Expansive Soils

EFFECT OF TWO SUCCESIVE CHECK DAMS ON DEBRIS FLOW DEPOSITION

Proceedings, 2012 International Snow Science Workshop, Anchorage, Alaska

27. Running Water I (p ; )

EROSION AND DEPOSITION

HYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE

CHAPTER FIVE: THE LOWER MISSISSIPPI REGION AND PLAQUEMINES PARISH

The 2005 Flood and Sediment Disaster in the Western Parts of Tyrol/Austria Facts und Conclusions

Bell Ringer. Are soil and dirt the same material? In your explanation be sure to talk about plants.

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

Chapter 11 10/30/2013. Mass Wasting. Introduction. Factors That Influence Mass Wasting. Introduction. Factors That Influence Mass Wasting

Rock Scaling Recommendations Logan Creek Drive Cut Slope

Earth processes are dynamic actions that occur both on

Also, when Cascade volcanoes do erupt, high-speed avalanches of pyroclastic flows

Experimental Study of the Sediment Trap Effect of Steel Grid-Type Sabo Dams

ARMORED DITCH DEGRADATION AND ISSUES WITH EROSION

Rebuilding Flood-Conscious Society

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

Stormwater Inlet Sediment Traps

Assessment of the catastrophic events originated in the river Vere basin

Problems with Landslide Stabilization of Dukat in the Road Vlora Saranda

Day 3 Weathering and Erosion.notebook. October 02, Section 7.2. Erosion and Deposition. Objectives

EFFECTS OF DEBRIS-FLOW CONTROL WORKS ON ENVIRONMENT AND CONSEQUENCES FOR LAND-USE PLANNING CASE STUDY MURBACH, TYROL, AUSTRIA

Surface Water and Stream Development

General. High Winds. High winds are a common hazard in the UAE.

Volcanoes. Introduction

How does erosion happen?

THE SALZKAMMERGUT A SHORT HISTORIC OVERVIEW. Austrian Service for Torrent and Avalanche Control, June 11th.2018:

Best Management Practices for Coldwater Fisheries Enhancement and Restoration

Mass Wasting: The Work of Gravity

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

Landslide Mitigation (BYUI)

Floods Lecture #21 20

GeoExtreme. Geohazards, Climate Change and Extreme Weather Events

Analysis of the Cause for the Collapse of a Temporary Bridge Using Numerical Simulation

Your web browser (Safari 7) is out of date. For more security, comfort and the best experience on this site: Update your browser Ignore

River Response. Sediment Water Wood. Confinement. Bank material. Channel morphology. Valley slope. Riparian vegetation.

Director, Operations Services, Met-Ed

Ch. 8: Mass Movements, Wind and Glaciers

Pirai river (Bolivia)

ENGINEERING HYDROLOGY

BUILDING STRUCTURES ON OR NEAR STEEP SLOPES

CASE STUDY NATHPA JHAKRI, INDIA

Risk analyses and risk management slope instabilities in alpine environments

The Effects of Flooding on Structures. Or What to Expect when the Drought Ends Violently

Level 1/Level 2 Certificate Specimen Paper

3/3/2013. The hydro cycle water returns from the sea. All "toilet to tap." Introduction to Environmental Geology, 5e

Introduction to Geohazard Standard Specification for Simple Drapery

Case Study 2: Twenty-mile Creek Rock Fords

Sedimentation in the Nile River

Appendix A Landslide Probability Classification Chart

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

Hydro-engineers.ch HEC-RAS ANALAYSIS. River: L Aïre Mesfin Tewolde. Hydro-engineers.ch 23 oct. 2017

THE WEATHER CASE STUDIES

Chapter 16 Weathering, Erosion, Mass Wasting. Chapter 16 Weathering, Erosion, Mass Wasting. Mechanical Weathering

Mass Movements. Rock Weathering. Accumulation of Debris on Slopes. Landslides 12/8/2014

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

CASE STUDY #9 - Brushy Fork Dam, Sugar Grove, West Virginia

Chapter 2: Landslides and Debris Flows

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

FLORA: FLood estimation and forecast in complex Orographic areas for Risk mitigation in the Alpine space

8 Current Issues and Research on Sediment Movement in the River Catchments of Japan

PHYSICAL GEOGRAPHY. By Brett Lucas

Programmatic Approaches to Assessing and Mitigating Risk to Pipelines from Natural Forces

Use of Launched Soil Nails to Stabilize Landslides in Summit County, Ohio

Debris flow: categories, characteristics, hazard assessment, mitigation measures. Hariklia D. SKILODIMOU, George D. BATHRELLOS

The last three sections of the main body of this report consist of:

Special edition paper

California OES Atmospheric River Events Weather Threat Briefing

GEOMORPHIC CHANGES IN LOWER CACHE CREEK 2012

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

Transcription:

Debris Flow & Shallow Landslide Protection LENK, BERNESE ALPS, CH

LENK, BERNESE ALPS Debris Flow & Shallow Landslide Protection Project Lenk, Bernese Alps Zip code 3775 Place Lenk Seiten Country/Region Switzerland Year of installation 2017 Customer Engineering Contractor Other participating companies Community of Lenk Emch+Berger AG Bern Steiger Ingenieure + Planer AG Burn & Künzi AG Situation The village of Lenk in Simmental valley (Bernese Oberland) was already affected by debris flows in the past. For example, mudflows in summer 1930 from side streams clogged the bed of the river Simme what caused a deluge in the village. Access to this mountain village - street and rail - was also blocked. During this large event, the quantity of debris flow was estimated as 135'000 m³. Many other minor to medium events were observed in the following decades. After a flood in 2005 (with minor damage), the danger map was revised and the present project was launched. The origin of the debris flow mobilization area is mainly a slump in the Bühlgraben as well as the strong gut erosion of the alluvial soils below it. The catchment area covers an area of around 20 km². It is assumed that the debris flows occur in several discharges. The location of the barrier is at the end of a winding stream. Based on a 3D debris modeling (RAMMS DEBRIS FLOW, carried out by Emch + Berger AG from Bern), the input parameters for the dimensioning flexible barriers were obtained. The final solution is dimensioned with a retaining capacity of 70'000 m³ (in four to five bays of 15'000 m³ each) and flow velocities up to 9 m/s. Debris Flow & Shallow Landslide Protection Lenk, Bernese Alps, CH 2/8

Description To prevent medium size debris flows reach the riverbed of the Simme, a restraint system for sludge and driftwood was created in geologically very demanding terrain. The annual normal water discharge with smaller solid particles can easily pass through the basal opening. Due to the required spans and the specified loads, a design with concrete slabs was chosen. For this purpose, Geobrugg dimensioned the nets and ropes between the concrete slabs (based on the Geobrugg standard barrier VX160-H6). The design of the concrete slabs was developed by Emch + Berger AG Bern. The six foundations of the concrete slabs were securely deeply seated using 15 m deep reinforced pails. Nevertheless, in the case of a major event, this retention volume could be exceeded. Then the remaining debris material passes via the overflow section in the middle of the barrier. Protected object Systems Road, Railway, Building, Touristic infrastructure, Residential area, Infrastructure, Other Special Solutions Corrosion protection GEOBRUGG SUPERCOATING System height System length 5.0 m, 7.0 m, 10.0 m, 12.0 m 40 m - 40 m Number of barriers 1 Retention capacity 40000 m³ Debris Flow & Shallow Landslide Protection Lenk, Bernese Alps, CH 3/8

The custom designed debris flow barrier based on Geobrugg's technology of flexible barriers Flood from 1930 - the village of Lenk in the Bernese alps was completely under water. Afterdebris flows, the Simme river bed was blocked and the village remained flooded for several weeks Overview of the debris flow accumulation area above the village Debris Flow & Shallow Landslide Protection Lenk, Bernese Alps, CH 4/8

Accumulation area and the barrier localization (red). Source: swisstopo, 2017 Concrete pillars foundation during installation - visible huge scale of the project Another view of the concrete pillars foundation during installation - totally ca. 130 m³ of concrete were used. The stream water was by-passed using a temporary piping (black pipe visible on the left) Debris Flow & Shallow Landslide Protection Lenk, Bernese Alps, CH 5/8

Concrete pillars foundation during installation - view from the top. Walls of the deep cut are stabilized with anchored retaining walls View of the almost finished barrier with rock blocks covering the winglet area of the barrier. That solution perfectly covers heavy concrete foundations and prevents erosion during the event To provide extra protection for the concrete pillars, they are covered with tree trunks (easy and cheap in maintenance) Also visible Geobrugg's brake rings, which absorb a large part of the impact energy. Debris Flow & Shallow Landslide Protection Lenk, Bernese Alps, CH 6/8

Side view of this exceptional protective installation in the Bernese Alps. Overview towards the valley - people standing on the right show the enormous size of the barrier equipped with Geobrugg's technology View from below the huge protective structure in the Bernese alps Debris Flow & Shallow Landslide Protection Lenk, Bernese Alps, CH 7/8

For questions please contact our Geobrugg specialist at your side Roger Moor Ost- und Zentralschweiz, Liechtenstein - Country Manager Phone 071 466 81 52 Mobile 078 783 46 81 Roger.Moor@geobrugg.com Geobrugg AG Aachstrasse 11 8590 Romanshorn Switzerland info@geobrugg.com www.geobrugg.com A company of the BRUGG Group Certified to ISO 9001 Debris Flow & Shallow Landslide Protection Lenk, Bernese Alps, CH 8/8