Emily-1 First Exploration Well in PEL-182

Similar documents
ACTIVITY REPORT FOR THE QUARTER ENDING 31 MARCH 2006

Western Flank Oil Fairway - Bauer-1 Oil Exploration Well Spuds

Testing of the Strawn Sand, White Hat 20#3, Mustang Prospect, Permian Basin, Texas

Update - Testing of the Strawn Sand, White Hat 20#3, Mustang Prospect, Permian Basin, Texas

For personal use only

For personal use only

KEY PETROLEUM COMPANY UPDATE AND PERTH BASIN EXPLORATION STATUS

Western Flank Oil Fairway - Arno-1 Oil Exploration Well Spuds

ASX release. Monthly drilling report March Highlights. Development Cooper and Eromanga Basins. 4 April 2018 Ref: #022/18

For personal use only

TIARO COAL JOINT VENTURE IRWIN RIVER COAL & COAL SEAM GAS QUEENSLAND TCJV AND WEST AUSTRALIAN COAL SEAM GAS PROJECT

COOPER BASIN DRILLING TO EVALUATE UNCONVENTIONAL POTENTIAL

For personal use only

For personal use only

PERTH BASIN OPERATIONS UPDATE

OTTO AT A GLANCE COMPANY OFFICERS. By E-Lodgement

For personal use only

Relinquishment Report for Licence P.1265, Block 12/28

Licence P1368: Relinquishment Report (end of 2 nd term) Hurricane Exploration PLC

For personal use only

Relinquishment Report

For personal use only

Licence Relinquishment Report. P.1400 Block 12/30. First Oil Expro Ltd

BLACK PLATINUM ENERGY LTD

Fortnightly drilling report Appraisal drilling continues at Snatcher oil field in the Cooper Basin

QUARTERLY ACTIVITIES REPORT

Significant Western Flank oil discovery at Stunsail-1. Six well exploration drilling program in ATP 855 completed with Etty-1

For personal use only

For personal use only

FAR builds on solid foundations

REID S DOME GAS DRILLING PROGRAM TO COMMENCE

For personal use only

Serica Energy (UK) Limited. P.1840 Relinquishment Report. Blocks 210/19a & 210/20a. UK Northern North Sea

For personal use only

AGM Presentation 26 November 2014 MD Kevin Wilson. Investor Update Augu013

1 Licence Information 4. 2 Licence Synopsis 4. 3 Work Programme Summary 5. 4 Database 6. 5 Prospectivity Update 8

RELINQUISHMENT REPORT FOR LICENCE P.1663, BLOCK 29/4b and 29/5e

March For Immediate Release 1 April 2015 Ref. #023/15

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE

The Waitsia Field. Onshore North Perth Basin, Western Australia. APPEA Conference, Brisbane 6 June 2016

JV PROJECT UPDATE JORC COAL RESOURCE

DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT

Karoon Awarded Exploration Permit EPP46 in Australia s Most Active Exploration Province, the Ceduna Sub Basin, Great Australian Bight

For personal use only

Relinquishment Report. for. Licences: P.1596 (Blocks 205/3, 205/4a) P.1836 (Block 205/2b) P.1837 (Block 205/5b)

For personal use only

THUNDELARRA EXPLORATION

HIGHLY SUCCESSFUL SEISMIC SURVEY DOUBLES SIZE OF DEEP PALAEOVALLEY AT LAKE WELLS POTASH PROJECT

For personal use only

Please find attached copy of a presentation to be delivered to the RIU Good Oil Conference in Perth on 13 September 2018.

Relinquishment Report. for. Licence P1605, Block 220/27

For personal use only

Implications of the Rabat Deep 1 exploration well on the prospectivity of the surrounding area

For personal use only. COMPANY PRESENTATION June, 2012

Relinquishment Report. for. Licence P.272 Block 20/7a

For personal use only

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

Axiom Announces First Energy Project Eden Vale Sedimentary Uranium

Beach Energy Secures Farmin to Permits Adjacent to Advent s EP386 and RL1

RUHUHU BASIN TANZANIA EXPLORATION PROJECT

For personal use only

Trapping Mechanisms along North Similan and Lanta Trends, Pattani Basin, Gulf of Thailand

Relinquishment Report

Investor Presentation

The Company was admitted to the Official List on 12 November 2010 and its shares commenced trading

MUHAMMAD S TAMANNAI, DOUGLAS WINSTONE, IAN DEIGHTON & PETER CONN, TGS Nopec Geological Products and Services, London, United Kingdom

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE

For personal use only

For personal use only

For personal use only. Pan Pacific Petroleum NL Excellence in Oil and Gas Conference 12th March 2014

For personal use only

RELINQUISHMENT REPORT. UK Traditional Licence P Blocks 12/16b & 12/17b. First Oil Expro Limited (Operator, 46.67%)

APPOINTMENT OF OIL BASINS LIMITED AS MANAGER OF VIC/P41 FARM-OUT

An ASX listed Perth-based gold explorer focused on Ghana in West Africa

COARSE GRAINED MAGNETITE DISCOVERED NORTH OF YORK

UK P2060, Block 29/06b Licence Relinquishment

BARAKA SEEKS HELIUM & CONVENTIONAL HYDROCARBON POTENTIAL

Phoenix South-3 drilling update 09 August 2018

24 October Dear Shareholders, 2014 ANNUAL REPORT

For personal use only

UKCS License P th Round Traditional Carrizo Oil & Gas, Inc. (operator) 100%

For personal use only

Bulletin of Earth Sciences of Thailand. Evaluation of the Petroleum Systems in the Lanta-Similan Area, Northern Pattani Basin, Gulf of Thailand

For personal use only

Relinquishment Report Licence P1597

Acquisition agreement to move to 100% ownership of the Ashford Coking Coal Project

Good Oil 2009 Presentation. Please find attached Carnarvon s 2009 Good Oil presentation as presented at the Good Oil Conference.

The Stratigraphic Trap in the Benchamas Field Pattani Basin, Gulf of Thailand

For personal use only

EAST BLINA-1 UPDATE RIG CONTRACT EXECUTED

RELINQUISHMENT REPORT. License P1546 Block April 2009

Licence P Relinquishment Report

Fox Resources Coking Coal Exploration Program commences at Bundaberg EPC 1523 early May 2013

ASX ANNOUNCEMENT Date: 03 October 2018 Number: 604/031018

KENYA ONSHORE, LAMU BASIN Block L14 FARM- IN OPPORTUNITY

Ausgold awarded EIS grant for Jinkas deep drilling

African Energy Resources Limited

DIAMOND DRILLING TO COMMENCE AT WODGER AND FORREST PROSPECTS

24 September Best results achieved at U40 Prospect (West Arnhem JV with Cameco Australia): o 1.34% eu 3 O 8

February 2012 AUSTRALIA. Beach Operated Cooper Basin Unconventional Gas Program. Beach Operated Cooper-Eromanga Oil and Gas ASX RELEASE

Transcription:

ACN 051 212 429 First Floor, 14 Outram Street, West Perth WA 6005 Telephone: +61 8 9481 3322 PO Box 913 West Perth WA 6872 Facsimile: +61 8 9481 3330 Emily-1 First Exploration Well in PEL-182 Drilling Announcement 04 Jan 2006 Eagle Bay Resources N.L.(EBR) as operator for the PEL-182 Joint Venture in the Cooper / Eromanga Basin, South Australia, advises that Century Resources Rig-18 under contract to Stuart Petroleum Limited, have both been retained by EBR - for one drill slot only - to drill the oil exploration well Emily-1 in PEL-182. Emily-1 is the first commitment well of a scheduled 1+5 = 6 well program to be drilled in year one of the permit. PEL-182 is a large 1745 sq km permit, and has over 11 oil & gas leads and prospects mapped for future evaluation. Emily-1 is selected as the first well as it is a simple 4 way closure, oil prone, with 3 separate oil objectives in the Hutton, Poolowanna and Tinchoo sandstones, with P50 recoverable reserves of 5.5+3.0+2.0 = 10.5 MMBls (if oil is present). An oil discovery here can be converted into profitable cash flow quickly by tying into nearby existing infrastructure. The Cooper Basin is proving to be a great place to explore, with success rates running near to 60%, i.e. almost 3 in 5 wells are discoveries. Emily-1 is located only 6.5km updip from the 1997 Santos oil discovery at Tarragon-1 which flowed 1500 BOPD from the Hutton and 500 BOPD from the Tinchoo sandstone reservoirs. Well Details Licence: PEL-182 Cooper/Eromanga Basin S.A. Participants: Eagle Bay Resources NL (Operator) 37.6% Audax Resources Ltd. 39.9% White Sands Petroleum Ltd 10.0% Australian Oil Company No2 P/L 12.5% Rig: Century Rig-18 Estimated Recoverable Oil: 5.5+3.0+2.0=10.5 MMBO (P50) Target Strata: Total Depth: Hutton SS Poolowanna SS Tinchoo SS 2364 m Page 1 of 8

Commentary The PEL-182 permit was awarded to EBR on the 10 th August 2005 after strong competitive bidding, with a 5 well drilling commitment scheduled for year 1. Numerous oil and gas fields have been discovered and developed by Santos in and around PEL-182, and a gas pipeline and an oil pipeline run diagonally NE-SW past the SE edge of the permit to the Tirrawarra and Moomba Oil & Gas processing facilities. Logistically, the area is relatively flat laying sand dune and inter-dune territory, and is well serviced by the existing road network. Emily-1 is located in the NE part of PEL-182, within the Innamincka regional reserve, approximately 85 Km by road north of Innamincka. It is located on the northern flank of the Cooper/Eromanga basin, just updip of the Permian pinchout edge (Blue) and down dip of the Triassic pinchout edge (Green), in an ideal position to capture hydrocarbons migrating up and out of the deeper Patchawarra Trough and Cooper Basin source kitchen, into the overlying Triassic and Jurassic sandstone reservoirs. The Emily oil prospect is a simple 4 way structural closure, mapped on 2D seismic of varying vintages and quality. It lays 6.5 km updip from oil production at the Santos 1997 Tarragon-1 well with 1500 BOPD from the Hutton and 500 BOPD from the Tinchoo. It is also only 6 KM updip from the Santos 1996 Coruna-1 well, with oil shows in the Jurassic Birkhead Fm, and an anomalous wireline log zone in the Triassic Poolowanna Fm. Pre-Drill Estimate of Recoverable Oil (if oil is present) Recoverable Oil (MMBls) Prospect Formation P90 P50 P10 Hutton SS 3 5.5 11 Emily-1 Poolowanna SS 1.5 3 6 Tinchoo SS 1 2 4.5 TOTAL 5.5 10.5 21.5 Target Formations & Seal The Emily Prospect has three primary potential reservoirs, which if successful, can each on their own provide an economic oil field. Hutton Sandstone (M Jr) The Hutton Sandstone is a good to excellent sandstone reservoir, and is the major objective at Emily-1, as it flowed 1500 BOPD from the nearby Tarragon-1 oil discovery. The Hutton SS is predominantly medium to coarse grained, and exhibits fair to good porosity in the upper portion of the formation. Poolowanna Sandstone (L Jr) The Poolowanna sandstone is a fair to good sandstone reservoir, as demonstrated in nearby fields and at the Tarragon-1& 2 wells. The Poolowanna Formation is predominantly sandstone with interbedded siltstones and occasional coals deposited a fluvial depositional environment with a significant lacustrine influence towards the top of the formation. Page 2 of 8

Tinchoo Sandstone (M Tr) The Tinchoo sandstones are poor to good potential reservoirs based on their reservoir performance in Tarragon-1 and in the above oil fields. The Tinchoo Formation is predominantly sandstone with some siltstone and claystone interbeds. The uppermost portion consists of a relatively thick 70 foot section of claystone that forms an effective vertical seal to the underlying thick Tinchoo formation reservoir sandstones. The sandstones are predominantly medium grained, and produce oil in the Keleary, James and Telopea oil fields (Figs. 1 & 2) which lie to the north east along the Permian / Triassic zero edge fairway. Birkhead Formation (M-U Jr) Regional Seal The Birkhead is the major regional seal in the Eromanga section in this part of the basin. This unit is designated as a secondary target for oil, as potential stratigraphically trapped sands also exist in this unit, and there is mapped anticlinal structure at this horizon at Emily-1. Summary of Potential Emily-1 is mapped as having cumulative P50 recoverable reserves of 10.5 MMBls of oil from 3 primary objective reservoirs. Each of these 3 reservoirs is a proven producer in nearby oil fields. At Emily, any one of these 3 primary reservoirs can be economic in its own right. A successful discovery at Emily would be immediately developed to quickly maximise oil production and cash flow, and benefit from the current high oil prices at near record levels. A 3D seismic survey would be programmed (subject to JV approval) to better define structural and stratigraphic details, and to determine optimum well locations, and to also identify other adjacent potential oil fields nearby in PEL-182. This would then be followed by an aggressive drilling program, using White Sands Petroleum s newly imported state of the art EDM drilling rig for 5 wells. Timing Emily-1 is anticipated to spud on or about 8 th January 2006. Anthony Rechner Chairman & Managing Director For further information please contact: - Ian Barr Manager Oil & Gas Ph 08 9481 3322 Email: ebr@indigo.com.au or ianbarr@indigo.com.au Web Site: www.eaglebayresources.indigo.net.au Disclaimer: The Oil and Gas information on PEL 182 in this report is based on information compiled by Mr Ian R Barr who is a geophysicist of the company and a Competent Person as described in Appendix 5A to the ASX Listing Rules. The report accurately reflects the information compiled by Mr Ian R Barr. Mr Barr based his assessment on work done by Mr Eric Tucker. Mr Eric Tucker and Mr I R Barr and most other publicly listed oil exploration companies use the words P50 Reserves in regard to an undrilled exploration prospect. These words indicate the unrisked oil or gas potential of a prospect if oil or gas is present and do not comply with the definition of reserves as set out in the JORC code which is a reporting code for mineral and coal exploration not for oil and gas exploration. Statements attributed to 3 rd parties do not necessarily reflect the opinions of Eagle Bay Resources but are statements by qualified people on the public record and are included for completeness of the company s obligations under continuous disclosure. The contents of this report are not and should not be used as a substitute for independent professional advice in making an investment decision involving Eagle Bay Resources NL or any of its associated entities. Eagle Bay Resources NL shall not be liable and the reader shall indemnify the company and its Directors for any loss or damage caused by or owing directly or indirectly as a result of the reader s use of the information contained within the documents that comprise this report, without first accessing professional advice. Page 3 of 8

EMILY-1 COOPER BASIN S.A. Sarahlyn-1 Page 4 of 8

EMILY-1 First Well in PEL-182 EMILY-1 Time Depth Drilling Curve Page 5 of 8

95 - fp Emily-1 Area: 3 sq km Net Pay: 10 m P50: 5.5 MMBls 95-fpp Sarahlyn-1 NEAR TOP BIRKHEAD/HUTTON FM DEPTH MAP 959-5 fp- EMILY-1 Emily-1 Area: 3 sq 1.7 km sq km Net Net Pay: Pay: 10 10 m m P50: P50: 3 3 MMBls, Pool. 2 2 MMBls, Tin. Tin. 95-fpp Saralyn-1 Sarahlyn-1 0 0 3km 3km TOP TRIASSIC DEPTH MAP ~ Poolowanna & Tinchoo Fms Page 6 of 8

Page 7 of 8

Page 8 of 8