A25 Very High Resolution Hard Rock Seismic Imaging for Excavation Damage Zone Characterisation

Similar documents
M035 High Resolution 3D Tunnel Seismic Reflection at Olkiluoto, Finland

Borehole radar measurements aid structure geological interpretations

DETAILED SEISMIC TOMOGRAPHY IN RADIAL BOREHOLES

Reliable in situ rock stress measurement from the excavation surface

Stress measurements a Scandinavian perspective. Jonny Sjöberg Itasca Consultants AB (Sweden)

ENGINEERING GEOLOGY AND ROCK ENGINEERING ASPECTS OF OPERATION AND CLOSURE OF KBS-3

In-situ Experiments on Excavation Disturbance in JNC s Geoscientific Research Programme

Rock Suitability Classification for POPLU

Underground nuclear waste storage

Expertise from Surface to Great Depths

Presentations at NEA IRT hearing 12 December, 13:30 17:00. Geology, rock mechanics, hydraulic processes, (bio) geochemistry, hydrochemistry

Mise-a-la-Masse Measurements at Olkiluoto 2007 and 2008

P Jon Haycox, Damion Duckworth ASC, Applied Seismology Consultants. June 2009

Assessment of releases from a nuclear waste repository in crystalline rock

SUMMARY OF DOCTORAL THESIS BY TOPIAS SIREN

The Mine Geostress Testing Methods and Design

1. Introduction. 2. Model Description and Assumptions

Thermo-Hydro-Mechanical-Chemical (THMC) Modelling of the Bentonite Barrier in Final Disposal of High Level Nuclear Waste

Instructional Objectives

SEISMIC TOMOGRAPHY MEASUREMENTS IN THE RADIOACTIVE WASTE DISPOSAL SITE IN BÁTAAPÁTI

First Field Test of NAPL Detection with High Resolution Borehole Seismic Imaging

SELF-HEALING OF FRACTURES WITHIN THE EDZ AT THE MT. TERRI ROCK LABORATORY : RESULTS AFTER ONE YEAR OF EXPERIMENTAL WORK

R T-H-M couplings in rock. Overview of results of importance to the SR-Can safety assessment. Harald Hökmark, Billy Fälth, Clay Technology AB

Experimental program in the URL

Site Characterization & Hydrogeophysics

Mathematical Modelling of a Fault Slip Induced by Water Injection

WM2014 Conference, March 2 6, 2014, Phoenix, Arizona, USA

Clays in Geological Disposal Systems

The use of Underground Research Facilities in the development of deep geological disposal

Case study 2: Using seismic reflection to design a mine

Collaborating partners: NAGRA (CH), L3S (FR), G3S (FR), KUL (B), EPFL (CH), SOLEXPERTS (CH)

ON THE FACE STABILITY OF TUNNELS IN WEAK ROCKS

5.1 Conceptual Rock Mechanics Model and Its Component Parts

Introduction to Formation Evaluation Abiodun Matthew Amao

BUILDING 3D MODEL OF ROCK QUALITY DESIGNATION ASSISTED BY CO-OPERATIVE INVERSION OF SEISMIC AND BOREHOLE DATA

PETROLEUM GEOSCIENCES GEOLOGY OR GEOPHYSICS MAJOR

Predicting rock conditions ahead of the face

Correlating seismic wave velocity measurements with mining activities at Williams Mine

ERTH2020 Introduction to Geophysics The Seismic Method. 1. Basic Concepts in Seismology. 1.1 Seismic Wave Types

Damage-free coring technique for rock mass under high in-situ stresses

Application of Ground Penetrating Radar for hydro-geological study

Chemical erosion of bentonite: a challenge or a threat?

CNSC Review of the Long-Term Safety Case for a Deep Geologic Repository

APPLICATIONS OF ULTRASONIC TECHNIQUES TO IN-SITU INVESTIGATION OF CRITICAL STRUCTURES IN ROCK AND CONCRETE

Crosswell tomography imaging of the permeability structure within a sandstone oil field.

List of Abstracts. Automation and Introduction of New Technologies in Blasting Operations (9)

Information From Walk-Away VSP and Cross-Hole DataUsing Various Wave Modes: Tower Colliery, South Sydney Basin

Using multicomponent seismic for reservoir characterization in Venezuela

STRESSES AROUND UNDERGROUND OPENINGS CONTENTS

Hydrogeology of Deep Borehole Disposal for High-Level Radioactive Waste

Micro Seismic Monitoring Technique and Practice of Rock Blast in Deep Mining

Geophysical Applications GPR Ground Penetrating Radar

POTASH DRAGON CHILE GEOPHYSICAL SURVEY TRANSIENT ELECTROMAGNETIC (TEM) METHOD. LLAMARA and SOLIDA PROJECTS SALAR DE LLAMARA, IQUIQUE, REGION I, CHILE

Coal Loss and Dilution Considerations for Western Canadian Foothills Open Pit Coal Projects

Geotechnical & Mining Engineering Services

SEISMIC PEAK PARTCILE VELOCITY AND ACCELERATION RESPONSE TO MINING FACES FIRING IN A LIGHT OF NUMERICAL MODELING AND UNDERGROUND MEASUREMENTS

LECTURE 10. Module 3 : Field Tests in Rock 3.6 GEOPHYSICAL INVESTIGATION

Seismoelectric Ground-flow DC-4500 Locator

A scale/resolution problem

Main Means of Rock Stress Measurement

Summary paper of: Rock Mass Response to Coupled Mechanical Thermal Loading. Äspö Pillar Stability Experiment, Sweden.

Seismic Velocity Dispersion and the Petrophysical Properties of Porous Media

Evaluation of Geological Conditions Ahead of Tunnel Face Using Seismic Tomography between Tunnel and Surface

Observation of shear-wave splitting from microseismicity induced by hydraulic fracturing: A non-vti story

Workflows for Sweet Spots Identification in Shale Plays Using Seismic Inversion and Well Logs

Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon

PART A: Short-answer questions (50%; each worth 2%)

Initial Borehole Drilling in the Hornepayne and Manitouwadge Area

M. Cushing 1, A. Revil 2,3, C.. Gélis 1, D. Jougnot 3, F. Lemeille 1, J. Cabrera 1, A. De Hoyos 1, M. Rocher 1. Introduction

Bertrand Six, Olivier Colnard, Jean-Philippe Coulon and Yasmine Aziez CGGVeritas Frédéric Cailly, Total

Haulage Drift Stability Analysis- A Sensitivity Approach

Case Study: University of Connecticut (UConn) Landfill

The elastic properties such as velocity, density, impedance,

Microseismic data illuminate fractures in the Montney

4D stress sensitivity of dry rock frame moduli: constraints from geomechanical integration

Patterns in Geophysical Data and Models

Geotechnical modelling based on geophysical logging data

This is the published version of a paper presented at LITHOSPHERE 2016 Symposium, November 9-11, 2016, Espoo, Finland.

APPLICATION OF 1D HYDROMECHANICAL COUPLING IN TOUGH2 TO A DEEP GEOLOGICAL REPOSITORY GLACIATION SCENARIO

Multiscale Seismic Signature of a Small Fault Zone in a Carbonate Reservoir: Relationships Between V P Imaging, Fault Zone Architecture and Cohesion*

SEISMIC SURVEY METHODS

3D simulations of an injection test done into an unsaturated porous and fractured limestone

Ground support modelling involving large ground deformation: Simulation of field observations Part 1

CO 2 Rock Physics: A Laboratory Study

The use of seismic methods for the detection of dykes

Estimation of density from seismic data without long offsets a novel approach.

A PARAMETER STUDY OF THE DAMAGED ROCK ZONE AROUND SHALLOW TUNNELS IN BRITTLE ROCK MASS

GEOPHYSICAL SITE CHARACTERIZATION IN SUPPORT OF HIGHWAY EXPANSION PROJECT

Today s menu. Last lecture. Measurement of volume flow rate. Measurement of volume flow rate (cont d...) Differential pressure flow meters

EOS 350 MIDTERM OCT 4, 2013 STUDENT NAME: TEAM #:

Construction Technical Specifications on Rock-Foundation Excavating Engineering of Hydraulic Structures

Investigation of fracture zone properties using reflected seismic waves from passive microseismicity

3D Converted Wave Data Processing A case history

The failure of the sounding assumption in electroseismic investigations

Deep Borehole Disposal Performance Assessment and Criteria for Site Selection

Laboratory Measurements of the Coefficient of Thermal Expansion of Olkiluoto Drill Core Samples

Key Words: seismic method, fractured reservoir, Larderello field ABSTRACT

Introduction and Background

Interpretation of baseline surface seismic data at the Violet Grove CO 2 injection site, Alberta

Initial Borehole Drilling and Testing in Central Huron,

Transcription:

A25 Very High Resolution Hard Rock Seismic Imaging for Excavation Damage Zone Characterisation C. Cosma* (Vibrometric Oy), N. Enescu (Vibrometric Oy) & E. Heikkinen (Pöyry Finland Oy) SUMMARY Seismic and Radar investigations performed in 2009 at Olkiluoto in a niche excavated on the side of the ONKALO access tunnel. The objectives have been to confirm the existence of the EDZ at Olkiluoto, to evaluate its extent and to determine its physical characteristics. Three crosshole and one singlehole seismic sections have been measured before and after the excavation. The results of these investigations are presented and discussed. As direct consequence of the EDZ along the tunnel wall, a decrease of acoustic P and S wave velocities and an increase in attenuation can be observed both from direct cross-hole measurements done in the immediate vicinity of the excavated wall and from remote sensing by side-scan measurements done in a borehole parallel to the tunnel wall and away from it. The existence of the EDZ has been proven beyond doubt by both transmission and reflection seismic imaging. 6-8 September 2010, Zurich, Switzerland

Introduction The underground rock characterization facility, ONKALO, operated by Posiva Oy at Olkiluoto, Finland is used to assess the bedrock and groundwater conditions prevailing at the future spent nuclear fuel final disposal site and how construction works affect them. Investigations are carried out during the excavation of the access tunnel to the disposal facility and involve geology, hydrology, geochemistry, geophysics, and rock mechanics. A part of these studies focuses on the excavation damage zone (EDZ). Seismic and Radar investigations performed in 2009, in a niche drill and blasting excavated on the side of the access tunnel (Enescu and Cosma, 2010). The objectives have been to confirm the existence of the EDZ at Olkiluoto, to evaluate its extent and to determine its physical characteristics. Previous experiments with EDZ suggest that its depth into the tunnel wall varies from 10 cm to 100 cm, around and along the tunnel, being reportedly affected by the excavation technique and the position relative to the blast rounds (Cosma 1995, Cosma & Enescu 1996a, 1996b, Cosma & Heikkinen 1996, Cosma et al 2001; Emsley et al 1996; Bäckblom et al 1999). High Resolution Seismic System and Experimental Setup The EDZ niche (Investigation Niché TKU3) was built in the ONKALO access tunnel at Chainage 3620m. It is 5m wide, 4.5m high and 50m long, directed slightly upwards (1/50 or 1.15º). The blasting rounds were ~4m long. The seismic measurements were carried out in boreholes (Φ 76mm, diamonddrilled) and along the wall of the EDZ niche (see Figure 1). A cross-hole section had been measured between two boreholes (ONK-PP199 and PP200) drilled parallel to the planned axis of the niche, before it was excavated and was aimed at studying variations of the EDZ along the tunnel and the effect of different blasting designs. Borehole ONK-PP199 disappeared when the niche was excavated the repeat section being measured between the niche wall and borehole PP200. A second cross-hole section was measured between boreholes ONK-PP202 and PP203, drilled in a horizontal plane, transversely oblique to the niche axis. A third section was measured between boreholes ONK-PP204 and PP205, drilled downwards in a vertical plane, also oblique to the niche axis. The former section has been intended for mapping the variation of the EDZ with the depth into the tunnel wall, the latter for providing information on the EDZ in the tunnel floor. Both sections were re-measured after excavating the niche. Single-hole (side-scan) measurements were done in borehole ONK-PP200 before and after the excavation of the niche. The measuring tool was the PS-8R system (Figure 1), composed of a source module and eight receivers spaced at 0.15 m. All receivers point in the same direction, transversely to the axis of the tool and can be rotated to receive energy from various directions. The source and receivers can either be placed in-line in the same borehole, for side-scan measurements, or in different boreholes, for cross-hole measurements. All cross-hole measurements were done with at 15cm intervals for both the source and the receivers. For the side-scan measurements, the source-receiver assembly was moved along the borehole at 15cm intervals, the source being at 1.185m below the lowest receiver. The PS-8R instrument has been designed and built more than 15 years ago (Cosma, 1995), for singlehole or cross-hole operations in dry or water-filled boreholes of any orientation. Used as intended, the PS-8R produces very clean pulses with frequencies between 25 100 khz and can detect very faint variations of the rock mechanical properties, over a range of up to 10 15 m. The fieldwork was uneventful and the tools performed very reliably, the equipment being adequate for a proof of concept. For routine operation, the capability of the PS-8R will be enhanced by including multicomponent sources and receivers, automatic operation control and accessories for measuring easily on tunnel walls.

Figure 1 (Left) Geometry of boreholes / tunnel face and (Right) PS-8R high resolution system used for seismic measurements for EDZ characterisation at Olkiluoto in 2009. The distance between the tunnel wall and borehole ONK-PP200 ranges between 0.78cm to 135cm. Single-hole and Cross-hole Seismic Investigations Figure 2 presents results of the side-scan measurements performed before and after the excavation of the EDZ niche. These produced a clear image of the EDZ, displaying variable thickness along the tunnel wall (plots 9 & 10 in Figure 2). The EDZ zone appears as increased backscattered amplitude in the measurements repeated after excavation. The results of the tomographic inversion for direct arrival P-and S-wave velocity, baseline and repeat measurements are also shown in Figure 2 (plots 5 & 6). Velocities, both P and S, are generally lower by 1 2% after the excavation of the tunnel, while their standard deviations increased by ~20%. The additional set of measurements, done with the instruments at 45º from horizontal suggests some variation of the seismic velocities vs. the direction of the stress. The dynamic elastic constants computed along borehole ONK-PP200 from P & S wave velocities before and after excavation are also plotted in Figure 2. The density has been taken from gamma-gamma density logging in the drillhole which was statistically calibrated to level of core sample data. The results of the cross-hole measurements in the three sections are shown in Figure 3. A somewhat expected difficulty appeared with the cross-hole and tunnel-to-hole tomographic inversions. While microsecond accuracy of the P- and S-wave arrival time picking has been achieved, the distances from source to receiver stations could not be measured with a corresponding accuracy of 5mm. The positioning errors could reach 10cm and more, which seems to be a practical precision limit of the borehole position logging. This lack of precision, if not corrected for, translates in velocity reconstruction artefacts. Fortunately, with single-hole the transmitter-receiver distance is constant and free of errors. The velocities determined along the hole are significantly more accurate. The concomitant inversion of crosshole and singlehole data succeeded therefore in correcting positioning errors and in producing a consistent velocity field. In the absence of the single-hole measurements, as the case was with the two short radial crosshole sections, positioning corrections were derived from the crosshole data themselves (Cosma & Enescu, 2002). Positioning corrections appear over again as a major component of any high resolution seismic imaging exercise and enough geometrical diversity and redundancy must be provided with the data to allow their application.

Figure 2 Estimations made from time-lapse measurements along borehole ONK-PP200. Dynamic parameters: (1) Bulk modulus, (2) Shear modulus, (3) Young modulus, (4) Poisson ratio. S (5) and P (6) wave velocities. Borehole lithology and density (7). Fracture intensity and frequency (8). Envelopes of the S-wave migrated section away from borehole ONK-PP200 from the baseline (9) and repeat (10) horizontal side-scan measurements along the borehole. The rugged form of the wall contour is shown in lilac. Figure 3 Baseline (left) and repeat (right) P wave tomographic sections reconstructed from the crosshole data acquired in the EDZ niche. Conclusions As direct consequence of the EDZ along the tunnel wall, a decrease of acoustic P and S wave velocities and an increase in attenuation can be observed both from direct cross-hole measurements

done in the immediate vicinity of the excavated wall and from remote sensing by side-scan measurements done in a borehole parallel to the tunnel wall and away from it, at distances ranging between 78cm and 135cm. The S wave velocity is affected only by the mechanical integrity of the rock mass. The P wave velocity is affected also by the water saturation in the rock. Reflectivity or scattering (diffraction) of the seismic energy increases due to EDZ. Excavation generated fractures (and their effective porosity) and natural fractures open or close due to stress field, which affects the measurable properties in complex ways. Micro-fracturing, or porosity, changes the water content in the rock, reduces the strength, and plays a decreasing factor in the velocity of the acoustic waves. The objective of the study has been to confirm the existence of the EDZ phenomenon at Olkiluoto, to evaluate its extent and determine its physical characteristics. High frequencies were conveyed to the rock and back to the wall surface, without significant attenuation. The need of laborious positioning corrections has been the reason why the tomographic reconstruction has not at this time been applied also to S-waves. Concomitant P- and S- wave inversion, with positioning corrections can be done in the future. With the innovative realization of side-scan imaging it has been possible to detect remotely disturbances from the excavated wall. The existence of the EDZ has been proven beyond doubt by both transmission and reflection seismic imaging. Once more, seismic methods can be considered technically appropriate for monitoring and estimation of the EDZ. Acknowledgements The authors wish to express their appreciation to Posiva Oy and SKB for initiating this study and permission for presentation of these results. Special thanks to Sanna Mustonen of Posiva Oy and Tomas Lehtimäki of SKB for careful and patient supervision of this project. References G. Bäckblom and C. D. Martin, 1999. Recent experiments in hardrocks to study the excavation response: implications for the performance of a nuclear waste geological repository. Tunnelling and Underground Space Technology, vol. 14, nr. 3, pp. 377-394 C. Cosma, 1995. Ultra Acoustic Tomography for Characterizing the Excavation Disturbed Zone. 57 th EAGE Conference and Technical Exhibition, Glasgow, Scotland. C. Cosma and N. Enescu, 1996a. Detailed Seismic Tomography in Radial Drillholes D&B. SKB Technical Note. C. Cosma and N. Enescu, 1996b. Detailed Seismic Tomography in Radial Drillholes TBM. SKB Technical Note. C. Cosma and P.J. Heikkinen, 1996. ZEDEX Project Extension Extended Analysis of the Seismic Tomography Data Seismic Reflection Processing. SKB Technical Note. C. Cosma, O. Olsson, J. Keskinen and P. Heikkinen, 2001. Seismic characterization of fracturing at the Äspö Hard Rock Laboratory, from the kilometre scale to the meter scale. International Journal of Rock Mechanics and Mining Sciences, vol. 38, no. 6, 859-865. C. Cosma and N. Enescu, 2002. Ore delineation using crosshole tomographic inversion with positioning constraints. KEGS - MGLS Symposium, Toronto, Canada. S.J. Emsley, O. Olsson, R. Stanfors, L. Stenberg, C. Cosma, L. Tunbridge, 1996. Integrated characterisation of a rock volume in the Äspö HRL utilised for an EDZ experiment. Proceedings Prediction and Performance in Rock Mechanics and Rock Engineering - EUROCK 96, Torino, Italy Enescu, N. & Cosma. C. 2010. EDZ seismic investigations in ONKALO, 2009. Factual report. Posiva Working Report 2010. 106 p.