Transition Hits 42.9 metres Grading 3.43 g/t PGM at Sunday Lake

Similar documents
Transition Continues to Intersect Significant Platinum-rich PGM Mineralization at Sunday Lake

Transition Metals and Implats Make Platinum Discovery at Sunday Lake, Intersecting 20.2 meters grading 3.22 Combined PGM s HIGHLIGHTS

Transition Metals Acquires Advanced Stage Ni-Cu-PGM Projects

Sudbury Platinum Discovers New Ni-Cu-PGM Mineralization at its Aer-Kidd Property

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

Sudbury Platinum intersects near surface Ni-Cu-Co-PGM mineralization at Aer-Kidd

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

Transition Vests 100% Interest in Key Gold Properties in the Abitibi and Provides an Update on Activities

Suite West Georgia Street Vancouver, B.C. V6E 4M3 NEWS RELEASE

V Sample from C.O.D vein 15 metres southwest of V

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

AbraPlata defines gold-rich zone with up to 16.7g/t Au over 10.6m in the basement at its Diablillos property in Argentina

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

True Width (m) Carneritos to

EL CONDOR IN-FILL DRILLING INTERSECTS 26.9 METERS 2.19% CU & 0.58% NI

NORTHERN SUPERIOR RESOURCES INC. 1351C Kelly Lake Road, Unit 7 Sudbury, Ontario, Canada P3E 5P5 Tel: (705) Fax: (705)

BALMORAL CONTINUES TO EXPAND GRASSET NI-CU-PGE DISCOVERY

LH Property Update: Magnum Goldcorp Hits High Grade Gold 16.9 m of g/t, including 10.9 m of g/t, and as well, 11 m of 20.

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

A B C PAD A HIGHLIGHTS

Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

North American Palladium Signs Option Agreement for the Sunday Lake Project and Commences New Exploration Strategy

Highlights from the four holes announced in this news release include:

Drilling Extending Mineralization in La Mina North Zone

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

Pacific Empire Minerals Provides Copper King RC Drilling Results

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

NEWS RELEASE. March 22, 2017

NEWS RELEASE July 26, 2018

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

NORTHQUEST LTD. ANNOUNCES DRILLING RESULTS FROM THE PISTOL BAY GOLD PROJECT, NUNAVUT, CANADA

NEWS RELEASE August 10, 2017

Drilling Extending Mineralization in La Mina North Zone

55 Adelaide Street East, Suite St-Charles west, Suite 411, West Tower

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

Gungnir Resources Inc.

CHAMPION BEAR RESOURCES

BALMORAL ANNOUNCES SIGNIFICANT GOLD DISCOVERY ON DETOUR GOLD TREND IN QUEBEC

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

Rich Saddle North Au-Cu-Ag Porphyry Expands by 275m Along Strike and 250m Down-Dip

NEWS RELEASE August 8, 2018

NEWS RELEASE. Evrim announces initial drilling results at Cuale Gold Project in Mexico

North American Palladium Provides Update on Lac des Iles Exploration Program

Spruce Ridge Resources Ltd Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) , Fax: (519)

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

NEWS RELEASE TSX-V Ticker: SWA 23 April 2013 SWA.WT SARAMA RESOURCES EXTENDS HIGH-GRADE MINERALISATION AT MM PROSPECT IN BURKINA FASO

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

Drilling at Perseverance in Arizona, USA Suggests Proximity to Porphyry Copper System

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

AZUCAR MINERALS COMMENCES DRILLING AT THE EL COBRE PROJECT, MEXICO

Copper Lake Samples g/t Gold and g/t Gold from the Queen Alexandra Gold Mine Property

ET and and and

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

(TSXV: GPLY, OTCQB: GLYXF

Salazar intersects metres (13.07m true) averaging 2.65 g/t gold, g/t silver, 1.32% copper, 6.63% zinc at its Curipamba Project.

Northern Dynasty Minerals Ltd.

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

For Immediate Release ASCOT DRLLING AT UNICORN INTERSECTS MORE HIGH-GRADE GOLD

NEWS RELEASE NOVEMBER 28th, 2017 Trading Symbols: TSX-V: AMZ; OTCQX: AXDDF

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

July Exploring for Canadian Gold in the Rainy River District of Ontario

EXPLORING NEW GOLD FRONTIERS IN CANADA

BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC

Drilling Highlights: Phase II BCV Infill Drilling

NEWS RELEASE July 13, 2018

NEWS RELEASE. Foran Intersects Over 28 Metres of Copper Mineralization

Orsu Metals completes Phase 2 drilling program and announces significant intercepts in drillhole SDH17-15 at Zone 23, Sergeevskoe Gold Project, Russia

WESDOME ANNOUNCES HIGH GRADE GOLD DISCOVERY AT KIENA COMPLEX IN VAL D OR QUEBEC

April Exploring for Canadian Gold in the Rainy River District of Ontario

Wallbridge Options 100% of the Beschefer Project near Fenelon Gold

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

NEWS RELEASE. Evrim and Harvest Gold Complete Drilling at Cerro Cascaron

EXPLORATION NEWS RELEASE MAGISTRAL DISTRICT: MORE GROWTH, MORE GOLD, MORE SILVER

NEWS RELEASE LATEST EXPLORATION PROGRAM CONTINUES TO DEMONSTRATE NARANJILLO AS A HIGH GRADE SILVER HOST

Vendetta Reports Initial Results from 2017 Pegmont Program with High Grade Zone 3 Step Out Drilling

EXPLOR INTERSECTS MULTIPLE COPPER ZONES GRADES UP TO 3.65% CU OVER 5.35 METERS ON THE CHESTER COPPER PROPERTY

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

RED EAGLE MINING INTERCEPTS 35.5 METRES AT 2.28 GRAMS GOLD PER TONNE AT SANTA ROSA

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

August 20, 2018 SBB NR SBB TSX

Form F3 MATERIAL CHANGE REPORT

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

CALIFORNIA GOLD COMMENCES RESOURCE EXPANSION DRILLING AT NEW ZONE ON ITS FREMONT PROPERTY

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

At the contact, mineralization is associated with strong tourmalinization of the Bevcon Intrusion.

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

Transcription:

Transition Hits 42.9 metres Grading 3.43 g/t PGM at Sunday Lake Sudbury, November 16, 2015 Transition Metals Corp. (XTM TSX.V) ( Transition, the Company ) and Impala Platinum Holdings Limited (Implats) are pleased to announce that Hole SL-15-013 intersected 42.90 metres averaging 3.43 g/t PGM (Pt+Pd+Au) including 10.10 metres of 5.61 g/t PGM associated with basal contact mineralization. This newly identified high grade zone appears to be hosted within a topographical depression associated with the basal contact of a thickened ultramafic package which remains open in all directions. The drilling program, funded by Implats, (Joint Venture 75% Implats and 25% Transition) has been effective at expanding the known limits of the mineralized envelope at Sunday Lake to a mineralized corridor extending at least 400 metres by 800 metres in lateral extent with thicknesses ranging from 3 to 43 metres hosting multi-gram PGM s. President & CEO Scott McLean commented: The latest results at Sunday Lake represent the longest and highest grade PGM mineralization to date on the property and continue to demonstrate the continuity of the PGM mineralization. The overall PGM grades we are seeing are comparable to those being commercially exploited at the nearby Lac des Isles Mine except that the mineralization at Sunday Lake contains significantly higher concentrations of platinum as well as an appreciable amount of nickel and copper. The thickening of the zone indicated in hole SL-15-013 appears to correspond to an embayment-type feature which is a very prospective environment to host significant tonnages of high grade material in a relatively small area. Highlight assay results are: Drill Hole From (m) To (m) Length (m) Pt Pd Au PGMs SL-15-012 No significant Mineralization SL-15-013 715.7 718.2 2.5 1.00 0.69 0.10 1.79 0.14 0.04 And 767.0 771.1 4.1 0.73 0.64 0.06 1.43 0.26 0.11 And 849.7 892.6 42.9 1.92 1.40 0.11 3.43 0.44 0.17 Including 860.8 865.6 4.8 2.87 2.24 0.16 5.28 0.68 0.22 Including 871.4 881.5 10.1 3.18 2.28 0.16 5.61 0.71 0.28 including 880.5 881.5 1.0 5.72 3.33 0.31 9.36 0.74 0.24 SL-15-014 No intrusion intersected Intersections interpreted to be close to true thickness. Please refer to Figures 1 to 3 which present a plan map of drilling and interpreted geological cross sections showing the location of drill holes and assay results relative to previous drilling. Cu (%) Ni (%) A borehole time domain electromagnetic (BHEM) survey was completed by Crone Geophysics in-hole SL-15-013 which showed a significant conductive response to mineralization below 850 metres. Interpretation of this response indicates that the borehole intersected the source horizon near its up-dip edge and that the conductive zone dips shallowly and extends to the south and east of the borehole as shown in Figures 1 and 3 attached. In addition an off-hole response was logged near the borehole at the bottom of the mineralized zone located north of the hole. Target areas are indicated on the plan map. Kevin Stevens, Transition s Chief Geophysicist comments The BHEM response that is associated with the mineralization in SL-15-013 indicates that BHEM should be useful to assist with follow-up drill targeting even in this relatively low sulphide environment.

Discussion of Drill Results Results from the fall program highlight the intrusion's potential to host an economic PGM-Cu-Ni deposit. Thick intersections of gabbroic breccias, ultramafic lithologies and hydrothermally altered country rocks suggest the Sunday Lake Intrusion (SLI) is a relatively large, primitive and contaminated intrusion that has been dynamically emplaced. Platinum group mineralization intersected continues to be platinum-rich and of (exceptional) higher grade tenor. Figures 2 and 3 are cross-sectional interpretations of the geology and mineralization along section lines A-A and B-B shown in Figure 1 and include assay highlights presented in this release. SL-15-012 (956.0m: 150 /-80 ): Intersected 507.5 metres of the SLI from 448.5 to 956.0 metres. The hole was shut down prior to intersecting the basal contact of the intrusion, which was deeper than the anticipated depth. SL-15-013 (941.0m: 45 /-80 ): Intersected 485.1 metres of the SLI from 407.5 to 892.6 metres. A 43.2 metre wide zone of varitextured melagabbro with blebby and disseminated chalcopyrite+pyrhotite+pyrite mineralization was intersected from 849.7 to 892.6 metres which returned assay values of 3.43 g/t PGMs, 0.44% Cu and 0.22% Ni. Included within this interval was a 10.1 metre thick high grade core of 5.62 g/t PGMs, 0.71% Cu and 0.28% Ni from 871.4 to 881.5 metres and 1 metre of 9.36 g/t PGMs, 0.84% Cu and 0.24% Ni from 880.5 to 881.5 metres. SL-15-014 (536.0m: 20 /-87 ): Failed to intersect the main mass of the SLI but intersected a series of narrow SLI related mafic sills between 315.8 and 362.3 metres before being shut down at a depth of 536.0 metres. About the Sunday Lake Project The Sunday Lake PGM-Cu-Ni discovery is located approximately 25 kilometres north of Thunder Bay and 25 kilometres west of Panoramic's Thunder Bay North PGM deposit (Indicated Resource of 9.83 Mt @ 2.87 g/t Pt-Eq and Inferred Resource of 0.53 Mt @ 2.87 g/t Pt-Eq) ¹ which is jointly held by Rio Tinto Exploration Canada and Panoramic Resources, and approximately 100 kilometres south by road from producing PGM mine and mill operations at Lac des Iles. The Lac des Iles mine is owned and operated by North American Palladium Ltd. and produced 174,194 Oz of palladium (Pd) by mining 2,637,023 tonnes grading 2.6 g/t Pd in 2014 ². The Sunday Lake project covers a 3.5 kilometre diameter circular reversely-polarized magnetic anomaly associated with a large buried mafic-ultramafic intrusion interpreted to be Proterozoic in age and related to the Midcontinental Rift (MCR). In January of 2014 the company announced a discovery hole intersecting 20.2 metres grading 3.22 g/t combined PGMs. In April of 2014, Transition and Implats were awarded the Bernie Schneider s Discovery of the Year Award in recognition for this discovery. PGM mineralization at Sunday Lake is exceptionally platinum rich with tenors exceeding 2:1 platinum to palladium observed. The Sunday Lake Project is a Joint Venture between Implats and Transition Metals owned 75% by Implats and 25% by Transition Metals. Under the terms of the Joint Venture, Implats is to provide all funding until the completion of a bankable feasibility study. ¹ Resource reported by Panoramic Resources, Thunder Bay North deposit: 2011 JORC compliant mineral resources estimate prepared by AMEC Americas Ltd. ² Operational Highlights from North American Palladium Ltd. s 2014 Annual Report filed at Sedar.com Qualified Person The technical content of this news release has been reviewed and approved by Mr. Grant Mourre, P.Geo (APGO), a Qualified Person under National Instrument 43-101. All samples were analyzed in Vancouver by

ALS Chemex. Platinum, palladium and gold values were determined together using standard lead oxide collection fire assay and ICP-AES finish. Base metal values were determined using a four acid digest and ICP- AES finish. A Certified Reference Material (CRM) standard, blank or duplicate is inserted on every 10th sample in the following order: CRM, blank, CRM, duplicate. The cycle repeats every 40 samples, thus ensuring that 10% of samples submitted are control samples. Laboratory checks are also done with one sample in every batch (max 40 samples) being submitted to an external lab for comparison. About Transition Metals Corp Transition Metals Corp (XTM -TSX.V) is a Canadian-based, multi-commodity project generator that specializes in converting new exploration ideas into Canadian discoveries. The award-winning team of geoscientists has extensive exploration experience in established, emerging and historic mining camps and actively develops and tests new ideas for discovering mineralization in places that others have not looked, which often allows the company to acquire properties inexpensively. The team is rigorous in its fieldwork and combines traditional techniques with newer ones to help unearth compelling prospects and drill targets. Transition uses the project generator business model to acquire and advance multiple exploration projects simultaneously, thereby maximizing shareholder exposure to discovery and capital gain. Joint venture partners earn an interest in the projects by funding a portion of higher-risk drilling and exploration, allowing Transition to conserve capital and minimize shareholder s equity dilution. The company, which went public in 2011, has an expanding portfolio that currently includes more than 25 gold, copper, nickel and platinum projects primarily in Ontario, Nunavut and Saskatchewan. About Impala Platinum Limited Implats is in the business of mining, refining and marketing of platinum group metals (PGMs), as well as nickel, copper and cobalt. The group produces approximately 22% of the world's supply of primary platinum and in FY2014 produced 2.370 million ounces of PGMs, including 1.178 million ounces of platinum. Implats mining interests are found on the two most significant known platinum group mineral-bearing orebodies in the world: The Bushveld Complex in South Africa and The Great Dyke in Zimbabwe. Impala Refining Services (IRS) takes advantage of Impala s excess smelting and refining capacity to process the concentrate and matte produced by the various mine-to-market group operations as well as material purchased from third party companies. Toll-refining is also undertaken on behalf of other companies. Implats has a primary listing on the JSE (IMP). The share may also be traded via a sponsored level 1 ADR programme (IMPUY). Cautionary Note on Forward-Looking Information Except for statements of historical fact contained herein, the information in this news release constitutes forward-looking information within the meaning of Canadian securities law. Such forward-looking information may be identified by words such as plans, proposes, estimates, intends, expects, believes, may, will and include without limitation, statements regarding estimated capital and operating costs, expected production timeline, benefits of updated development plans, foreign exchange assumptions and regulatory approvals. There can be no assurance that such statements will prove to be accurate; actual results and future events could differ materially from such statements. Factors that could cause actual results to differ materially include, among others, metal prices, competition, risks inherent in the mining industry, and regulatory risks. Most of these factors are outside the control of the Company. Investors are cautioned not to put undue reliance on forward-looking information. Except as otherwise required by applicable securities statutes or regulation, the Company expressly disclaims any intent or obligation to update publicly forward-looking information, whether as a result of new information, future events or otherwise. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Further information is available at www.transitionmetalscorp.com or by contacting: Scott McLean President and CEO Transition Metals Corp. Tel: (705) 669-0590

Figure 1: Plan Map of the Sunday Lake Property and Drill Hole Collar Locations

Figure 2: Vertical Cross Section A-A, Sunday Lake Project

Figure 3: Vertical Cross Section B-B