PRE- FEASIBILITY REPORT

Similar documents
ANNEXURE-I (AS PER FORMAT ISSUED BY BIHAR-SEIAA)

PRE FEASIBILITY REPORT. Quartz and Feldspar Sy No 119 & 126/3, Kambampadu Village A. Konduru Mandal, Krishna District, Andhra Pradesh

Kurnool vide Proceedings No. 712/Q1/2012 dated Ulindakonda Village, Kallur Mandal, Kurnool District,

FOR Sand Stone Quarry Village : Chhirraleva Tehsil : Basna District : Mahasamund


PRE-FEASIBILITY REPORT

APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT PRE- FEASIBILITY REPORT

Of Sri. Mohammad Akram. At Karigala Village, H.D. KoteTaluk, Mysore District, Karnataka Latitude & Longitude Piller Latitude Longitude Coordinates

TABLE OF CONTENTS. 1.0 Introduction. 2.0 Geology, Exploration and Reserves. 3.0 Mining. 4.0 Blasting. 5.0 Mine Drainage. 6.

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P.

PRE-FEASIBILITY REPORT VASAI LIMESTONE MINE (APPLICANT: SHRI KHERAJBHA KARUBHA KER)

PRE- FEASIBILITY REPORT

PRE - FEASIBILITY REPORT Shri Santosh Kumar Dwivedi S/o Shri Goverdhan Dwivedi R/o Village Adampur Saibasi Majre

PRE FEASIBILITY REPORT OF QUARTZ & FELDSPAR MINING PROJECT (ML No- 80/03) FOR TERMS OF REFERENCE

24.0 Mineral Extraction

JAI MAA SHARDA STONE CRUSHING

FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY

ANNEXURE I Site Location map of M/s. Stone Plus quarry lease A-1

APPLICANT: M/s. Rock Sand & Minerals Pvt Ltd PRE-FEASIBILITY REPORT

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

Grant 0299-NEP: Water Resources Project Preparatory Facility

Description DESCRIPTION

International Journal of Modern Trends in Engineering and Research e-issn No.: , Date: April, 2016

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:

Figure 2.1: Constituent Area

EMP. In respect of. Cluster of Two Mines (Cluster area Ha)

FOREST RESEARCH INSTITUTE, DEHRADUN

MCDR INSPECTION REPORT

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT

Chapter 10 Human Settlement Geography Book 1 Class 12

MCDR INSPECTION General. Date of Inspection Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha)

KRISHNA ENTERPRISES C-56, TDI City, Panipat Haryana

Flood hazard mapping in Urban Council limit, Vavuniya District, Sri Lanka- A GIS approach

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

GOAL 7 AREAS SUBJECT TO NATURAL DISASTERS AND HAZARDS. To protect life and property from natural disasters and hazards.

Fukien Secondary School Monthly Vocabulary/Expression List for EMI Subjects Secondary Two. Subject: Geography

Laboratory Exercise #4 Geologic Surface Processes in Dry Lands

MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,1988

1.0 PURPOSE AND FORMAT OF THE FINAL EIR

PRE-FEASIBILITY REPORT

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Chennai regional office

Granite Building Stone Quarry of Sri. Sajan Mani.

UNIT 11 SOUTH ASIA SG 1 - PHYSICAL GEOGRAPHY & THE ENVIRONMENT

2 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION:

Flash flood disaster in Bayangol district, Ulaanbaatar

Indian Minerals Yearbook 2013

MCDR INSPECTION REPORT. S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection

Geological report on Limestone Exploration of Goyla Block, Abadasa Taluka, Kachchh District, Gujarat. Executive Summary

For Sale - 56 Acre Sandstone Quarry State Route 511, Oberlin/Kipton, OH 44075

Result of Field Geological Survey and Ground Truth for the Analysis Date: 2007/7/5 Location (UTM) Elev Geological Unit Point No. NT-02 VSW Index 260,7

The Contested Cultural Landscape of a Lebanese Border Town: MARJA AYOUN

MCDR INSPECTION REPORT

Materials. Use materials meeting the following.

NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS

Land subsidence due to groundwater withdrawal in Hanoi, Vietnam

QUARRYING PLAN FOR. PARATAPUR SAND MINING BLOCK - 2 EXTENT Acres (4.93 Hectare)

MCDR INSPECTION REPORT

Topographical Maps ANSWER KEY- Assignment 6

Local Area Key Issues Paper No. 13: Southern Hinterland townships growth opportunities

Submitted to: Central Coalfields Limited Ranchi, Jharkhand. Ashoka & Piparwar OCPs, CCL

Downloaded from

Proposal Report On Flood Hazards Mapping Project In Xebangfai River

Report on Disaster statistics of Nepal

Changes in Texas Ecoregions Copy the questions and answers

Geological Report on Limestone Exploration Of Bhatvadiya B Block Of EXECUTIVE SUMMARY

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR )

Use of Geospatial data for disaster managements

GROUNDWATER CONFIGURATION IN THE UPPER CATCHMENT OF MEGHADRIGEDDA RESERVOIR, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH

PRELIMINARY WORKING DRAFT Work in Progress

This is intended for use to achieve the following regulatory and management objectives:

Geological Report on Limestone Exploration of Mudhvay Sub-block B, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary

PRE FEASIBILITY REPORT

Moreton Bay and Key Geographic Concepts Worksheet

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF BLACK GRANITE

U.S. ARMY CORPS OF ENGINEERS

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT HANOTA MAJOR PROJECT PRE FEASIBILITY REPORT. ESTIMATED COST : Rs

Geography. Programmes of study for Key Stages 1-3

Geological Report on Limestone Exploration of Mudhvay Sub-block A, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary

UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS International General Certificate of Secondary Education

A Review of Concept of Peri-urban Area & Its Identification

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GADSDEN ASH POND 40 CFR (c)(1)(i)-(xii)

NATIONAL SENIOR CERTIFICATE GRADE 12

2 Aggregates in Indiana

Earth s Structure and Natural Processes Practice Test

WATERCOURSE HARNESSING BANK EROSION AND CONSOLIDATION

FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY

HW #2 Landscape Travel from A to B 12,

Table 1.1 Salient Features of the Mine Site & Surrounding Details

Chapter 1 Data Collection

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

Climate Change in Bihar, India:A Case Study

INTRODUCTION. Climate

PRE-FEASIBILITY REPORT

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS

Paper presented in the Annual Meeting of Association of American Geographers, Las Vegas, USA, March 2009 ABSTRACT

Granite Building Stone Quarry of M/s Ulikkal Stone Crusher

PRE-FEASIBILITY REPORT

DROUGHT RISK EVALUATION USING REMOTE SENSING AND GIS : A CASE STUDY IN LOP BURI PROVINCE

netw rks Guided Reading Activity Essential Question: How does geography influence the way people live? Earth's Physical Geography

Transcription:

PRE- FEASIBILITY REPORT 0

EXECUTIVE SUMMARY The proposed project of 622.50 Ha area is of river bed sand mining and falls under Category- A, as per EIA Notification 2006 & amendments thereof as area is greater than 50 Ha of Ministry of Environment and Forests, New Delhi. The mining lease area is located in Village Stretch 1- Kothvara, Dobhi, Bajaura, Pirasin, Koshla, Khajbatti, mocharim, pachahatti, aamuwa, suraj pura, Stretch 2: pareva, kenduai, naranga, bhusanda, aakhara, ram shila, alipur, bitho sharit, sadipur, tineri, pochakand, shanti nagar, telbigha, dalelchak, keni, bhudhva Stretch 3: jalahi, mohanpur, litiya yahi, matihani, kenari Stretch 4: banahi, bajit pur, mahuuama, uchirma, paluhara. rajan, aamirganj, dakhiner, nepa, kusap, panch, guljana, nimsar, bala bigha, men, murat. Stretch 5: koeri bigaha, paraiya, milkibagh, manohar, Stretch 6: dhuwa, dedor garh, tarawan, kenar, milki, wazirganj, jamuawan, malti daur pur Stretch 7: soeya par, khesadi District: Gaya State: Bihar. Mine lease has been proposed in favor of M/s Westlink Trading Pvt. Ltd (Seerajdhawaj Singh- Director, & Anand Diwedi- (Authorized Signatory) through letter no 399/Mining dated 28/03/2015. The proposed rate of production is 1, 58, 40,000 TPA of Sand. The cost of the project is Rs. 25, 00, 00,000 including auction cost. The salient features of the project are detailed below: 1

Mining Lease Area 622.50 ha The entire mining block from Stretch 1 to Stretch 7 is proposed PROJECT: Gaya Sand Blocks (Stretch to 7) Mining on the1 River Lilajan,Project Falgu, Buddh, Dhadhar Mohana, Morhar, Location of mine APPLICANT: M/s Westlink Trading Pvt. Ltd. & Paimar. Stretch. Coordinates has been attached as Additional Document. Stretch No. 1 (Toposheet No. 72D/14 & 72H/02) Stretch No. 2 (Toposheet No. 72H/01) Stretch No. 3 (Toposheet No. 72H/02) Toposheet No. Stretch No.4 (Toposheet No. 72C/16 & 72D/13 & 72D/14) Stretch No.5 (Toposheet No. 72C/16 & 72D/13 & 72D/14) Stretch No.6 (Toposheet No. 72H/2 & 72H/5 & 72H/6) River/Nalla/Tanks/Lakes etc Stretch No. 7 (Toposheet No. 72H/01) Lilajan, Falgu, Mohana, Morhar, Buddh, Dhadhar & Paimar Maximum elevation is 163mRL & 83 mrl for all the blocks in Topography cluster situation Source: Google earth Minerals of mine Proposed production of mine Method of mining Drilling/Blasting Water demand Ultimate depth of Mining Man power Solid Waste Nearest railway station Sand 1, 58, 40,000 TPA Opencast Semi-Mechanized Mining No drilling and blasting is proposed 94 KLD 2 m bgl or above ground water level whichever comes first 4,476 No waste is expected as all the mineral collected is saleable STRETCH-1 Gaya Junction about 36.5 Km NE from Block-1 Gaya Junction about 10.0 Km NW from Block- 10 Tankuppa Railway Station about 12.5 Km NE from Block- 7 STRETCH-2 Gaya Junction about 8.0 Km NW from Block- 1 Gaya Junction about 2.5 Km W from Block-4 Neyamatpur Halt about 6.0 Km NW from Block- 13 Chankand Railway Station about 4.0 Km NW from Block-10 STRETCH-3 Paharpur Railway Station about 15.0 Km NE from Block-1 Tankuppa Railway Station about 10.0 Km NE from Block-5 2

2. INTRODUCTION 2.1 Identification of Project and Project Proponent The proposed project of 622.50 ha area is of river bed sand mining and falls under Category- A, as per EIA Notification 2006 & amendments thereof of Ministry of Environment and Forests, New Delhi. The mining lease area is located in Village Stretch 1- Kothvara, Dobhi, Bajaura, Pirasin, Koshla, Khajbatti, mocharim, pachahatti, aamuwa, suraj pura, Stretch 2: pareva, kenduai, naranga, bhusanda, aakhara, ram shila, alipur, bitho sharit, sadipur, tineri, pochakand, shanti nagar, telbigha, dalelchak, keni, bhudhva Stretch 3: jalahi, mohanpur, litiya yahi, matihani, kenari Stretch 4: banahi, bajit pur, mahuuama, uchirma, paluhara. rajan, aamirganj, dakhiner, nepa, kusap, panch, guljana, nimsar, bala bigha, men, murat. Stretch 5: koeri bigaha, paraiya, milkibagh, manohar, Stretch 6: dhuwa, dedor garh, tarawan, kenar, milki, wazirganj, jamuawan, malti daur pur Stretch 7: soeya par, khesadi District: Gaya State: Bihar. Mine lease has been proposed in favor of M/s Westlink Trading Pvt. Ltd) through letter no 399/Mining dated 28/03/2015. The copy of LOI is attached as addition documents. The details of the project and its proponent are given below: Name of the applicant Name & Address of POA Holder M/s Westlink Trading Pvt. Ltd. M/s Westlink Trading Pvt. Ltd. Name of Mine Kailashpuri, Banda (U.P) District Gaya Sand Blocks (Stretch 1 to 7) Mining Project Area 622.5 ha (Stretch No.- 1):113.5 ha (River bed) (Stretch No.- 2):240.6 ha (River bed) (Stretch No.- 3):23.25 ha (River bed) (Stretch No.- 4):137.15 ha (River bed) (Stretch(Stretch No.- 5):51 ha (River bed) (Stretch No.- 6):48 ha (River bed) 3

(Stretch No.- 7):09 ha (River bed) Mineral 2.2 Sand Brief description of the nature of the project It has been proposed to collect approximately 1, 58, 40,000 TPA of sand. No mining activity will be undertaken during the monsoon season. So the river bed material will be replenished during the monsoon season every year. Surface Mining: The mining is confined to excavation of sand from the river bed. The operation will be semi mechanized in which the river bed material will be collected in its existing form. Sand Mining will be carried out only upto a depth of 2 m bgl or above ground water level, whichever comes first. Mining will be carried out only during the day time. Excavation of river bed material will be completely stopped during the monsoon season. 2.3 Need for the project and its importance to the country and region The project lies on the river bed of Lilajan, Falgu, Mohana, Morhar, Buddh, Dhadhar & Paimar. The sediment in the form of river bed material (RBM) deposited in the last many years had changed the shape of the river bed from a valley to a raised land. Because of this, every year during monsoon season, heavy and devastating floods damage large tracts of land lying on both the banks of the river. Hence, it is necessary to remove the materials so that the river gets channelized. This project operation will provide employment directly and indirectly to the people residing in vicinity, thus improving the Socio-economic status of the area. 2.4 Demands-Supply Gap The demand for sand is ever growing with the growth of the infrastructure sector in our country. The mineral is used mainly in the construction activities like buildings, bridges etc. The requirement for the mineral is always high in the nearby cities and towns. Therefore there is always a good demand of the mineral in the domestic market. 2.5 Domestic/ Export Markets DOMESTIC MARKET There is always an ever increasing demand of these minerals in the domestic market. EXPORT MARKET 4

The proposed mining activity is for indigenous consumption only for real state, road making etc. So no export will be envisaged. 2.6 Employment Generation The total direct manpower requirement for the proposed mining operation will be around 4476. Indirect employment is also expected due to the associated activities. Manpower Requirement S. No. 1. 2. 3. 4. Category Administration Supervisor Skilled Un-skilled TOTAL Numbers 10 59 75 4332 4476 3. PROJECT DESCRIPTION 3.1 Type of project including interlinked and interdependent projects, if any The proposed project for excavation of Sand is an independent project in which minerals excavated will be directly sold in the local markets. 3.2 Location The mining lease area is located in Village Stretch 1- Kothvara, Dobhi, Bajaura, Pirasin, Koshla, Khajbatti, mocharim, pachahatti, aamuwa, suraj pura, Stretch 2: pareva, kenduai, naranga, bhusanda, aakhara, ram shila, alipur, bitho sharit, sadipur, tineri, pochakand, shanti nagar, telbigha, dalelchak, keni, bhudhva Stretch 3: jalahi, mohanpur, litiya yahi, matihani, kenari Stretch 4: banahi, bajit pur, mahuuama, uchirma, paluhara. rajan, aamirganj, dakhiner, nepa, kusap, panch, guljana, nimsar, bala bigha, men, murat. Stretch 5: koeri bigaha, paraiya, milkibagh, manohar, Stretch 6: dhuwa, dedor garh, tarawan, kenar, milki, wazirganj, jamuawan, malti daur pur Stretch 7: soeya par, khesadi District: Gaya State: Bihar. The mining lease area falls in Survey of India Toposheet No. 5

Stretch No. 1 (Toposheet No. 72D/14 & 72H/02) Stretch No. 2 (Toposheet No. 72H/01) Stretch No. 3 (Toposheet No. 72H/02) Stretch No.4 (Toposheet No. 72C/16 & 72D/13 & 72D/14) Stretch No.5 (Toposheet No. 72C/16 & 72D/13 & 72D/14) Stretch No.6 (Toposheet No. 72H/2 & 72H/5 & 72H/6) Stretch No. 7 (Toposheet No. 72H/01) All the mining blocks from Stretch-1 to Stretch-7 are proposed on the river Lilajan, Falgu, Mohana, Morhar, Buddh, Dhadhar & Paimar. Stretch. 6

Vicinity map showing site location is given below: Fig: Location maps the project sites along the river PROJECT SITES 7

3.3 Details of alternate sites considered Mineral is site specific as well as the lease has been allotted in the particular area. Hence no alternative site is examined for mining. 3.4 Size or magnitude of operation The proposed mine has lease over an area of 622.5 ha. The maximum rated capacity of the project will be 1, 58, 40,000 TPA which will be excavated out in layers. 3.5 Project description with process details The mining project is located on the river bed of Lilajan, Falgu, Mohana, Morhar, Buddh, Dhadhar & Paimar. The mining is confined to excavation of Sand from the river bed. The operation will be open cast Semi Mechanized with use of excavators/jcbs etc. Mining will be done up to a depth of 2m bgl or above the water level whichever is comes first. Proper benching of 1.0 m height and 6m width will be maintained for mining blocks as per guideline M.M.R-1961, under rule 106. Which the river bed material will be collected in its existing form. No drilling /blasting are required as the material is loose in nature. Mining will be done in layers of 1 m each which will avoid ponding effect. It will be done leaving a safety zone from bank for bank protection. Mining will be carried out only during the day time. Excavation of river bed material will be completely stopped during the monsoon season. Mining will be carried out only during the day time. Excavation of river bed material will be completely stopped during the monsoon season. 3.5.1 Reserve Total Mineable Reserve = 10829887Cum OR 19493796 Tonnes The annual extractable RBM comes to 10829887 cum or 19493796 tonne as against production target of 880000cum or 15840000 tonne per annum. It will be replenished after rainy season. Classification Mineral Reserves Qarry Area Geological Mineable Annual Annual Block (Hect) Reserves Reserves Production Production (m3) (m3) target (m3) target 8

GAYA 622.50 17687848 10829887 8800000 (tonne) 15840000 3.5.2 Mining Process: Mining will be done as per the guidelines of Bihar Minor Mineral Concession Rules, 2014. This is an open-cast mining project. The operation will be semi-mechanized with use of excavators/jcbs etc. The sand will be collected in its existing form. Sand Mining will be carried out only up to a depth of 2 m bgl or above ground water level (whichever is less), for river bed block. No drilling /blasting are required as the material is loose in nature. Proper benching of 1.0 m height and 6m width will be maintained for mining blocks as per guideline M.M.R-1961, under rule 106. Mining will be done only during the day time and completely stopped during the monsoon season. Restriction on mining: i) The quarrying of sand will be proposed after leaving a safety distance of 300 meter from bridge falling under NH/SH from both side of the bank, & leaving a safety distance of 100 meter from any bridge. However the prohibited zone in respect of any particular bridge may be extended by the State Government through a notification in this regard, if so required for reasons of safety. ii) No quarrying shall be permitted within 50 (fifty) meters of any public place i.e. cremation ghat or any religious place etc. iii) No quarrying shall be permitted within 5 (five) meters from both banks of the river. iv) The quarrying of sand shall be prohibited within 100 (one hundred) meters upstream and downstream from any dam/weir or any other structure erected for irrigation purpose. v) No quarrying shall be permitted within 46 (forty six) meters distance from Flood control embankments. The quarrying shall be restricted up to a depth of 1.80m within 46 (forty six) meters to 61 (sixty one) meters to 91 (ninety one) meters distance from the above said embankments. vi) The irrigation outlet shall be maintained at the same level as that of the river bed and in no case the river bed level shall be permitted to be below the irrigation outlet level. No quarrying shall be permitted around the infiltration well/intake well up to a distance of 5 meters. 9

vii) The extraction of sand shall be permitted only after obtaining a No Objection Certificate from the Water Resources Department in the case of rivers where from irrigation channels are out flowing. viii) No quarrying of sand shall be permitted in any private land owned by a person other than the settle unless the settle obtains the consent of the concerned land owner/royal tee. ix) No quarrying of sand shall be permitted in any area which the State Government notifies as a restricted area. 5.1 Mode of working: Applied area has been allotted for a period of 5 years in seven stretches namely Lilajan, Falgu, Mohana, Morhar, Buddh, Dhadhar & Paimar. Applied Area consist of 622.50 ha area in 59 blocks. Mining will be done in 7 stretches in each block leaving safety distance form bank and stream for river bed blocks and barrier zone of 7.5 m around the Applied Area. The sand is won from agriculture fields adopting mining and simultaneous reclamation method. The lessee (settle) purchases/ (pays compensation for the land), from the farmers for short periods. The sand shall be excavated by backhoe type excavator s capacity & mineral is directly loaded into large trucks for dispatch to consumers situated in and around Gaya District. Water is sprinkled in the area from where the sand is to be removed before the operation starts and thereafter at regular intervals to keep the dust allayed at the source itself. Removal of soil (overburden) precedes the winning of sand. Once a pre-determined area has been exhausted of the sand, it shall be replenished by sand during monsoon period leveled it & maintained its maximum original topography. There is no need for drilling & blasting as hard rock is not encountered in sand mining. Therefore Environment and Ecology of the area remains undisturbed. Light weight excavators/jcb will be deployed for extraction. Mining shall be carried through the formation of benches. Height & width of benches shall be kept 1.0m & 6m with face slope 40 0. Haul road having width 6.0 & gradient 1:12 shall be provided for the movement of machineries & transportation of sand. Mineral will be loaded in trucks of 10 tonne capacity. There will be no OB or waste generation as the sand is exposed in the river bed. Bench will advance parallel to the banks of the river. Height of bench will be 1.0 m. Workings will be restricted within the Applied Area/ khasra as per the description report given by Mining Department. 10

Mining activities will be carried out in a manner so that there is no obstruction to the movement of water flow, if any, during rainy season. The bench will be in the form of slices/ strips parallel to the banks of the river. Roads in the Applied Area for the movement of loaded trippers/ trucks will not have slopes more than 1 in 20. However, movement of trucks after mineral loading will be towards both sides through approach roads connecting to tar roads. Every block will have its own approach roads, well connected to main highways. No processing of mineral will be done. Proposed method of mining: Mining activity will be carried out by open cast Semi mechanized method. Light weight excavators will be used for loading of mineral in tippers. No OB/ waste material will be produced in river bed. The sand shall be exploited upto depth of 2.0m only through the formation of bench height 1.0m & width 6.0m. An approach road having width 6.0m & gradient 1.12 shall be provided for the movement of machineries & transportation of sand. The sand shall be exploited with the deployment of an excavator & filled into tippers & transported to various buyers. No drilling/ blasting are required as the material is loose in nature. Proper benching of 1.0 m height will be maintained. Roads will be properly made and sprayed by water for suppression of dust. Roads in the applied area for the movement of loaded trippers/ trucks will not have slopes more than 1 in 16. The mined out area shall be replenished each year during monsoon period and maintained in maximum original topography. Approach roads from the various blocks as already described earlier will be merging with permanent tar roads on both sides of the river for transportation of the mineral to final destinations. Working Depth (below ground level) During the entire lease period, the deposit will be worked from the top surface to 2 m bgl or above ground water level, whichever comes first. 3.6 Raw Material Required Along With Estimated Quantity, Likely Source, Marketing Area of Final Product/S, Mode of Transport of Raw Material and Finished Product No raw material will be required in the proposed project. The operation involves the excavation of sand in its existing form and transported to the end users/ market. 11

3.6.1 Use of Mineral The mineral sand is used: 3.6.2 As construction material for buildings As raw material for construction of dams, In roads making, paving, etc. Mineral Beneficiation No mineral beneficiation is involved for this mineral. 3.7 Resource optimization/ recycling and reuse Minerals are generally depleting asset once mined; but minerals like sand will be replenished naturally. Thus a scientific approach will be taken up for excavation of mineral with systematic method. 3.8 Availability of water its source, energy/ power requirement and source 3.8.1 Water Requirement S.No. 1. 2. Purpose Water Requirement (KLD) Dust Suppression Domestic Total 60 34 94 Thus total water requirement will be 94 KLD. This water will be supplied from the bore well from nearby villages through tankers as well as from surface water sources for dust suppression. Additional water will also be required for plantation purpose. 3.8.2 Power Requirement All the activities will be carried out in a semi mechanized manner. The material will be excavated and loaded directly into tractors by the workers themselves. The operation will be done only from sun rise to sun set. So there is no power requirement for the mining activity. 3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their management/ disposal. 3.9.1 Solid Waste Generation & its Disposal 12

In this project small amount of top soil will be generated, which will be used for purposed of applied for applied area stacked and later spread in the excavated area of off river bed blocks. Small amount of domestic waste will be generated by the workers at the site, which will be disposed off through proper municipal way. No other waste generation is expected. 3.9.2 Liquid Effluent No liquid effluent will be generated at the mine site due to the mineral excavation. 4. 4.1 4.1.1 SITE ANALYSIS Connectivity Nearest Railway Station STRETCH-1 Gaya Junction about 36.5 Km NE from Block-1 Gaya Junction about 10.0 Km NW from Block- 10 Tankuppa Railway Station about 12.5 Km NE from Block- 7 STRETCH-2 Gaya Junction about 8.0 Km NW from Block- 1 Gaya Junction about 2.5 Km W from Block-4 Neyamatpur Halt about 6.0 Km NW from Block- 13 Chankand Railway Station about 4.0 Km NW from Block-10 STRETCH-3 Paharpur Railway Station about 15.0 Km NE from Block-1 Tankuppa Railway Station about 10.0 Km NE from Block-5 STRETCH-4 Guraru Railway Station about 27.0 Km NW from Block-1 Jahanabad Railway Station about 18.0 Km NE from Block-14 Ner Halt about 7.5 km E from block 15 STRETCH-5 13

Ner Halt about 7.5 Km NE from Block-1 Guraru Railway Station about 29.0 Km NW from Block-3 & about 5 Km W from Block-2 STRETCH-6 Paharpur Railway Station about 4.5 Km SW from Block-1 Jamuawan Halt about 6.5 Km NE from Block-4 Tilaiya Railway Station about 9.0 km SE from block 7 STRETCH-7 Jethain Railway Station about 10.5 Km SE from Block-1 Natesar Railway Station about 5.0 Km E from Block-2 Rajgir Railway Station about 20.5 Km NE from Block-1 & 22.0 km from Block-2 4.1.2 Nearest Airport STRETCH 1 Patna international Airport About 123.0 Km NE from block 1 & 97.0 Km N from block 10 Gaya Airport About 28.5 km NE from block 1, about 18.5 km NW from block 5 & about 7.0 km NW from block 10 STRETCH 2 Patna international Airport About 95.0 Km N from block 1, about 80.5 Km N from block 8 & 66.5 Km N from block 15 Gaya Airport About 7.5 km NW from block 1, about 12.5 Km SW from block 8 & 31.0 Km SW from block 15 STRETCH 3 Patna international Airport About 120.0 km NW from block 1 & about 105.0 km N from block 5 Gaya Airport About 31.5 km NW from block 1 & about 14.5 km NW from block 5 STRETCH 4 Patna international Airport About 118.0 Km NE from block 1, about 106.0 Km NE from block 7 & about 62.5 Km NE from block 16 Gaya Airport 14

About 26.0 Km NE from block 1, about 15.5 Km NE from block 7 & about 34.0 Km SE from block 16 STRETCH 5 Patna international Airport About 67.5 Km NE from block 1 & about 90.5 Km NE from block 4 Gaya Airport About 29.0 Km SE from block 1 & about 12.0 Km SE from block 4 STRETCH 6 Patna international Airport About 108.0 Km NW from block 1 & about 85.0 Km NW from block 7 Gaya Airport About 33.5 Km NW from block 1 & about 40.0 Km SW from block 7 STRETCH 7 Patna international Airport About 72.5 Km NW from block 1 & about 71.5 Km NW from block 2 Gaya Airport About 35.0 Km SW from block 1 & about 37.0 Km SW from block 2 4.1.3 Nearest Highway NH-99 : About 0.5 Km NW from block 1 of Stretch 1 NH-83: About 3.5 Km W from block 10 of Stretch 1 NH-83: About 4.5 Km NW from block 1 of Stretch 2 SH-70: About 5.0 Km NE from block 1 of Stretch 2 NH-82: About 2.0 Km SE from block 7 of Stretch 2 NH-83 : About 1.0 Km W from block 7 of Stretch 2 NH-83: About 12.0 Km W from block 15 of Stretch 2 SH-4: About 0.7 Km E from block 15 of Stretch 2 SH-70: About 11.5 Km NE from block 5 of Stretch 3 NH-83: About 9.0 Km W from block 5 of Stretch 3 NH-2: About 5.0 Km S from block 1 of Stretch 3 SH-69: About 0.6 Km NW from block 1 of Stretch 4 15

NH-2: About 1.5 Km NE from block 1 of Stretch 4 SH-7: About 7.5 Km NE from block 8 of Stretch 4 SH-69: About 10.0 Km W from block 16 of Stretch 4 NH-83: About 6.5 Km E from block 1 of Stretch 5 SH-69: About 5.0 Km NW from block 4 of Stretch 5 SH-70: About 0.3 Km S from block 1 of Stretch 6 NH-82: About 5.0 Km S from block 7 of Stretch 6 SH-71: About 5.0 Km NE from block 2 & about 7.0 Km NE from block 1 of Stretch 7 4.2 Land form, land use and land ownership The proposed activity is to take place in the bed of the River Lilajan, Falgu, Mohana, Morhar, Buddh, Dhadhar & Paimar. The entire lease area is deposited with river bed material. Mine lease has been proposed in favor of M/s West link Trading Pvt. Ltd) through letter no 399/Mining dated 28/03/2015. 4.3 Geographical Area Gaya is located at 24.75 N to 85.01 E. District Gaya is a predominantly religious town situated 100 km South of Patna is a place revered by both Hindu and the Buddhist religious. Gaya is surrounded by several hills including Mangala-Gauri, Ram-Shila, Shringa-Sthan and Brahmayoni by three sides and the river falgu flowing on the fourth side. It has an average elevation of 111 meters (364 feet). District Gaya is situated at longitude of 84.40 to 85.50 towards East and the latitude is 24.50 to 25.100 towards North. The Gaya District is bordered by Arwal, Jahanabad and Nalanda districts on its north, Aurangabad District and parts of Palamu district of Jharkhand on its west, Chatra and Hazaribag districts of Jharkhand on its south and District Nawada and parts of Koderma district of Jharkhand on its east. 4.3.2 Geology Geologically, it represents the extreme northern front of Indian sub-continent. These include (i) the belt of Himalayan foothills in the northern fringe of Paschim Champaran (ii) the vast Ganga Plains, (iii) the Vindhyan (Kaimur) Plateau extending into Rohtas region, (iv) the sporadic and small Gondwana basin outliers in Banka district, (v) the Satpura Range extending into large part of the area North of Chotanagpur Plateau, (vi) the parts of Bihar 16

Mica belt in Nawada, Jamui and Banka districts and (vii) the Granite Gneissic complex of Chotanagpur plateau. Nearly two third of Bihar is under cover of Ganga basin composed of alluvium and masks the nature of basement rocks. Age Quaternary Geology Geography Alluvial deposits North Bihar Plain & Central Bihar Plain (Sand, Clay, Silt fragments Tertiary Sandstones and Clay North Champaran Hills Stones Coal Measures, forming a series of Gondwana Age Vindhyans Satpura Banka District small outlier basins Geology Geography Sandstones, Shales, Parts of Bhabhua and Rohtas districts Limestones etc. Schist, Phyllite, Part of Aurangabad, Gaya, Nawada, Quartzite Nalanda, Sheikhpura and Munger district. Mica Schist, amphibolites, quartzite, granite, Proterozoic Nawada, Jamui & Banka dolerite and pegmatite 17

Gneisses, Granites, Schists, Archaean Phyllites, Quartzites, Part of Aurangabad, Gaya, Nawada, amphibolites & Jamui, Banka and Bhagalpur. intrusive all metamorphosed sedimentary and Igneous rocks 4.3.3 Soil The district of Gaya (Bihar) is drought-prone. The soils of the region are generally deep andloamy. They have developed on alluvium. The dominant soilscapes, representing the northern plain, constitute gently to very gently sloping Ustochrepts, Haplustalfs and Eutrochrepts and gently to moderately sloping Ustifluvents 4.3.4 Topography The Gaya District comprises the northern and southern parts of the district constitute two distinct natural regions. The northern part is plain area underlain by alluvial soils. Consequently, it is densely populated and has a rich historical background. The southern part is hilly and undulating with a gentle ascends towards the south merging into hills and is part of southern fringes of the Chottanagpur Plateau. The entire southern boundary of the district is a conglomeration of ridges and spurs. 4.4 Climatic data & Rainfall The average annual rainfall in Gaya district is 1037 mm. The maximum rainfall in the district comes from South West monsoon with a little about 10% spread over the summer and winter. There is a large variation in the rainfall over year to year. Rainfall increases from Southwest to north-east. The climate of the district is sub-tropical to sub-humid in nature. The district experiences severe cold during winter 18

whereas on the other hand in summer it is very hot. The summer starts from the mid of March and it continues up to mid of June, after that monsoon starts and it continues up to mid of October. The nights are generally hot from the end of May till the first break of monsoon. The climate is generally hot and dry, the winter temperature ranges from 16 C to as low as 4 C whereas during the summer the mercury shoots to 460C. During rainy season it becomes cooler and temperature drops to 35 C to 25 C. 4.5 Existing land use pattern The mine lease area is flat river bed and river banks. There is no forest land or agriculture land in the mine lease area. The entire mining lease lies within River. 4.6 EXISTING INFRASTRUCTURE The site being on river bed has no existing infrastructure, except for connecting road for transportation. 4.6 SOIL CLASSIFICATION There is no top soil. The river bed only consists of sand. 5. PLANNING BRIEF 5.1 Planning concept Applied area has been allotted for a period of 5 years in seven stretches namely Lilajan, Falgu, Mohana, Morhar, Buddh, Dhadhar & Paimar. Applied Area consist of 622.50 ha area in 59 blocks. Mining will be done in 7 stretches in each block leaving safety distance form bank and stream for river bed blocks and barrier zone of 7.5 m around the Applied Area. The sand is won from agriculture fields adopting mining and simultaneous reclamation method. The lessee (settle) purchases/ (pays compensation for the land), from the farmers for short periods. The sand shall be excavated by backhoe type excavator s capacity & mineral is directly loaded into large trucks for dispatch to consumers situated in and around Gaya District. Water is sprinkled in the area from where the sand is to be removed before the operation starts and thereafter at regular intervals to keep the dust allayed at the source itself. Removal of soil (overburden) precedes the winning of sand. 19

Once a pre-determined area has been exhausted of the sand, it shall be replenished by sand during monsoon period leveled it & maintained its maximum original topography. There is no need for drilling & blasting as hard rock is not encountered in sand mining. Therefore Environment and Ecology of the area remains undisturbed. Light weight excavators/jcb will be deployed for extraction. Mining shall be carried through the formation of benches. Height & width of benches shall be kept 1.0m & 6m with face slope 40 0. Haul road having width 6.0 & gradient 1:12 shall be provided for the movement of machineries & transportation of sand. Mineral will be loaded in trucks of 25 tonne capacity. There will be no OB or waste generation as the sand is exposed in the river bed. Bench will advance parallel to the banks of the river. Height of bench will be 1.0 m. Workings will be restricted within the Applied Area/ khasra as per the description report given by Mining Department. Mining activities will be carried out in a manner so that there is no obstruction to the movement of water flow, if any, during rainy season. The bench will be in the form of slices/ strips parallel to the banks of the river. Roads in the Applied Area for the movement of loaded trippers/ trucks will not have slopes more than 1 in 20. However, movement of trucks after mineral loading will be towards both sides through approach roads connecting to tar roads. Every block will have its own approach roads, well connected to main highways. No processing of mineral will be done. Mining will be done upto a maximum depth of 2 m in layers of 1.0 m each which will avoid ponding effect. Mining will be confined within central 3/4th width of the river. This will prevent collapse of bank and erosion. It will be done leaving a safety zone of total of 1/4th of the width of the river from the banks for bank protection. 5.2 Excavated area will be replenished naturally due to sediment inflow from the catchment area. Population projection The project will employ most of the workers from nearby villages except for supervisory staff. Thus there will no increase in population due to the project. However, few people from other area may migrate in this area for business opportunities. 20

5.3 Amenities/facilities The following facilities/amenities will be extended by the mine management: Direct and indirect Employment, of which most of which will be from nearby villages. Arrangements for safe and healthy working conditions Provision of Drinking water. Conducting medical camps for workers and nearby villagers at regular interval. 6. PROPOSED INFRASTRUCTURE 6.1 Industrial area (Processing Area) No industrial area is proposed. 6.2 Residential area (Non Processing Area) As the local people will be given employment, no residential area/ housing are proposed. 6.3 Green belt The area of the proposed project lies in the river bed and in agriculture fields & devoid of any forest land. Mining activities in River Bed blocks will not cause any harm to riparian or aquatic vegetation as mining will be only in the dry river bed portions of the river leaving safety distance from the bank. Hence it proposed to plant trees along the banks (wherever possible), along the road sides or near the civic amenities in consultation with village authority/local bodies. In river bed mining cases plantation will be done along the barrier zone i.e. around the periphery of the Applied Area of 7.5m width. It is proposed to have plantation along the road sides on both sides to provide cover against dust dissemination and also to act as noise absorber. Plantation will also be carried out as social forestry programme in villages, school/ and the areas allocated by the village authority/local bodies. Every year 500 to 600 trees of will be planted with various types of species. List of species is recommended for plantation. Native plants like Mango, Neem, Eucalyptus, Peepal, Gulmohar, and other local species will selected in suitable combination, so that can grow fast and also have good leaf cover. It is proposed to plant. 6.4 Social infrastructure 21

6.5 Road facility (existing roads will be maintained regularly) Employment opportunity Medical camps Social awareness camps, Donations to schools Secondary employment opportunities Formation of self help groups for the women in nearby villages Connectivity There are metalled roads and unmetalled road up to the mine site. The area is well connected to the State Highway. 6.6 Drinking Water Management Water required for drinking purpose will be obtained through tankers. 6.7 Sewerage System No sewerage system is proposed at the mine site. However, septic tanks will be made available near the site for sanitation purpose. 6.7 Industrial Waste Management Not applicable 6.8 Solid Waste management No solid waste is expected. Hence, no management is required. 6.9 Power Requirement & Supply/ Source All the activities will be carried out in a manual manner. The operation will be done only from sun rise to sun set hence there is no power requirement for the proposed activity. 7 REHABILITATION AND RESETTLEMENT (R&R) PLAN Not Applicable 8. PROJECT SCHEDULE & COST ESTIMATES 22

8.1 Likely date of start of construction and likely date of completion. The project will commence once Environmental Clearance and other necessary certificates are obtained from the respective departments. 8.2 Estimated project cost along with analysis in terms of economic viability of the project Budget for Corporate Social Responsibility (CSR) SI. No. Activity Capital Cost (in Rs.) 1 Provide drinking water facility in surrounding villages 50,00,000/- 2 Ladies toilets 25,00,000/- 3 Distribution of Solar Lamps 5,00,000 4 Medical camps, blankets distribution to poor s 5,00,000 5 Ambulance facilities for local villagers 40,00,000 TOTAL (in life time) 1,25,00000 8.3 Environmental Management Plan The environmental management plan consists of the set of mitigation, management, monitoring and institutional measures to be taken during the implementation and operation of the project, to eliminate adverse environmental impacts or reduce them to acceptable levels. The present environmental management plan addresses the components of environment, which are likely to be affected by the different operations in the mine area. 8.4 Social Infrastructure The Applicant shall spend some amount of project cost for the development of the area as per the local needs i.e. treatment of poor, schools, temples and other social work. 9.0 REHABILITATION AND RESETTLEMENT (R&R) PLAN Not Applicable 10. PROJECT SCHEDULE & COST ESTIMATES. 23

The project will commence once Environmental Clearance and other necessary certificates are obtained from the respective departments. The total cost of project would be around Rs. 25, 00, 00,000 including auction cost. 11. ANALYSIS OF PROPOSAL The project involves collection of river bed material. This is very essential in order to prevent widening of the riverbeds and to prevent flooding off and damage to the adjoining areas. This can only be achieved by maintaining the existing course of the river. The river banks, on both sides are covered by vegetation and human habitats. Widening of river banks results in excessive erosion; resulting in damage to flora, agricultural land and settlements which are situated at very close proximity. This project operation will provide livelihood to the poorest section of the society. It provides employment to the people residing in vicinity directly or indirectly by the project. The sand extracted is in high demand in the local market. This also ensures scientific method of sand extraction. *********** 24