LHC Collimation and Loss Locations

Similar documents
Beam losses versus BLM locations at the LHC

Simulations and measurements of collimation cleaning with 100MJ beams in the LHC

Commissioning of the LHC collimation system S. Redaelli, R. Assmann, C. Bracco, M. Jonker and G. Robert-Demolaize CERN, AB department

Simulations of HL halo loss and IR losses. R. Bruce, F. Cerutti, R. de Maria, A. Marsili, S. Redaelli

Status of the LHC Beam Cleaning Study Group

HiLumi LHC FP7 High Luminosity Large Hadron Collider Design Study. Deliverable Report SIMULATION MODELS FOR ENERGY DEPOSITION

Beam Cleaning and Collimation Systems

Case study: Energy deposition in superconducting magnets in IR7

Beam Loss Monitors, Specification

LHC APERTURE AND COMMISSIONING OF THE COLLIMATION SYSTEM

LHC Commissioning in 2008

Collimation strategy for the high-β Special Physics run at injection

Machine Protection Systems

Merlin scattering models for the HL-LHC collimation system

EuCARD-2 Enhanced European Coordination for Accelerator Research & Development. Conference/Workshop Paper

Collimators and Cleaning, Could this Limit the LHC Performance?

AFP - TCL collimator studies

ASPECTS OF MACHINE INDUCED BACKGROUND IN THE LHC EXPERIMENTS

The Luminosity Upgrade at RHIC. G. Robert-Demolaize, Brookhaven National Laboratory

HiLumi LHC FP7 High Luminosity Large Hadron Collider Design Study. Deliverable Report. Conceptual Design of IR Collimation

The Very Large Hadron Collider Beam Collimation System

MACHINE PROTECTION ISSUES AND STRATEGIES FOR THE LHC

HiLumi LHC FP7 High Luminosity Large Hadron Collider Design Study. Deliverable Report BEAM HALO SIMULATIONS

Status and Results of the UA9 Crystal Collimation Experiment at the CERN-SPS

2008 JINST 3 S Main machine layout and performance. Chapter Performance goals

Accelerators. Lecture V. Oliver Brüning. school/lecture5

Sources of machine-induced background in the ATLAS and CMS detectors at the CERN Large Hadron Collider

Interface with Experimental Detector in the High Luminosity Run

LHC commissioning. 22nd June Mike Lamont LHC commissioning - CMS 1

LHC operation in 2015 and prospects for the future

Main aim: Preparation for high bunch intensity operation with β*=3.5 m and crossing angle (-100 µrad in IR1 and +100 µrad in IR5)

Beam. RF antenna. RF cable

LHC Luminosity and Energy Upgrade

Modeling of beam-induced damage of the LHC tertiary collimators

LHC Run 2: Results and Challenges. Roderik Bruce on behalf of the CERN teams

The LHC: the energy, cooling, and operation. Susmita Jyotishmati

SPPC Study and R&D Planning. Jingyu Tang for the SPPC study group IAS Program for High Energy Physics January 18-21, 2016, HKUST

Overview of LHC Accelerator

Status and Outlook of the LHC

Practical Lattice Design

LHC. Construction Understanding first the commissioning. Prospects for

Large Hadron Collider at CERN

Simulation of the ILC Collimation System using BDSIM, MARS15 and STRUCT

BEAM TESTS OF THE LHC TRANSVERSE FEEDBACK SYSTEM

Machine Protection. Lars Fröhlich DESY. CERN Accelerator School on FELs and ERLs June 9, 2016

LHC status & 2009/2010 operations. Mike Lamont

Collimation method studies for next-generation hadron colliders

BETATRON SQUEEZE: STATUS, STRATEGY AND ISSUES

LHC Beam Operations: Past, Present and Future

Daniel Wollmann, CERN

FLUKA studies on the radiation in the Point 5 Q6-Q7 area: Roman Pots, TCL6 and RR

Tobias Baer February, 9 th 2012

Machine Protection Basics of Accelerator Science and Technology at CERN

DYNAMIC APERTURE STUDIES FOR HL-LHC V1.0 *

1. Introduction. LHC Project Note 213. Computer simulation of Beam Loss Detection in the Arcs of the LHC

arxiv: v1 [physics.acc-ph] 10 Aug 2016

Tools of Particle Physics I Accelerators

Operational Experience with HERA

The TESLA Dogbone Damping Ring

A Luminosity Leveling Method for LHC Luminosity Upgrade using an Early Separation Scheme

Plans for 2016 and Run 2

Gianluigi Arduini CERN - Beams Dept. - Accelerator & Beam Physics Group

New LSS optics for the LHC (status)

University of Huddersfield Repository

The LHC beam collimation

LHC Commissioning and First Operation

Much of this material comes from lectures given by Philippe Lebrun (head of CERN's Accelerator Technology Department), at SUSSP, Aug

Beam losses far downstream of the high luminosity interaction points of LHC - intermediate results

Measurements of Proton-Proton Elastic Scattering and Total Cross-Section at the LHC by TOTEM Diffraction 2012 Lanzarote, 15 September

Advanced Storage Photon Ring Source Upgrade Project:

Emittance blow-up and loss maps in LHC using the transverse damper as exciter

Beam-induced radiation in the compact muon solenoid tracker at the Large Hadron Collider

RING-RING DESIGN. Miriam Fitterer, CERN - KIT for the LHeC study group

Higgs Factory Magnet Protection and Machine-Detector Interface

LHC Commissioning The good, the bad the ugly

The LHC Collider. STOA lecture, Brussels, 27 th November 2012 Steve Myers Director of Accelerators and Technology, CERN

INJECTION AND DUMP CONSIDERATIONS FOR A 16.5 TEV HE-LHC

János Sziklai. WIGNER RCP On behalf of the TOTEM Collaboration:

arxiv: v1 [physics.acc-ph] 10 Aug 2016

Lattice Design and Performance for PEP-X Light Source

Copyright 2013 CERN for the benefit of the ATLAS collaboration

R&D ON FUTURE CIRCULAR COLLIDERS

OTHER MEANS TO INCREASE THE SPS 25 ns PERFORMANCE TRANSVERSE PLANE

Why are particle accelerators so inefficient?

The Beam Instrumentation and Diagnostic Challenges for LHC Operation at High Energy

FY04 Luminosity Plan. SAG Meeting September 22, 2003 Dave McGinnis

Nick Walker (for WG3) Snowmass, 2001

ILC Beam Dynamics Studies Using PLACET

gf g \ \ \l\l\\\ \\ \\\ \\\I I\lI \\I$ 1IIIl\I \lil\i1 I CERN-AC Muons and the Electronics Caverns of the LHC Experiments

Will LHCb be running during the HL-LHC era? Burkhard Schmidt for the LHCb Collaboration

LHC ORBIT SYSTEM, PERFORMANCE AND STABILITY

1.1 Machine-Detector Interface

The Large Hadron Collider Lyndon Evans CERN

Status of the LHC Machine

III. CesrTA Configuration and Optics for Ultra-Low Emittance David Rice Cornell Laboratory for Accelerator-Based Sciences and Education

LHC RUN 2: RESULTS AND CHALLENGES

RF System Calibration Using Beam Orbits at LEP

Beam diagnostics: Alignment of the beam to prevent for activation. Accelerator physics: using these sensitive particle detectors.

Transverse beam stability and Landau damping in hadron colliders

Status of Optics Design

Transcription:

BLM Audit p. 1/22 LHC Collimation and Loss Locations BLM Audit Th. Weiler, R. Assmann, C. Bracco, V. Previtali, S Redaelli Accelerator and Beam Department, CERN

BLM Audit p. 2/22 Outline Introduction / Motivation LHC Layout The LHC Challenge Collimation Principle / Multi Stage Cleaning Loss Rates Intensity and Cleaning Inefficiency Simulations: SixTrack and Beam Loss Pattern Loss location around the ring (injection and top energy) Summary

BLM Audit p. 3/22 Layout of the LHC Ring C. Bracco 7 TeV protons for collision super-conduction magnets to bend and focus beam four experimental insertions two dedicated cleaning insertions in region with normal conducting magnets dump protection (in case of kicker failure)

BLM Audit p. 4/22 The LHC Challenge R. Assmann Stored beam energy 360 MJ, 200 times larger than any other existing proton machine, enough energy to melt 500 kg of copper. For quenching a superconducting magnet one needs mj cm 3

BLM Audit p. 5/22 Multi-Stage Cleaning CFC CFC Cu / W tertiary collimator: W

BLM Audit p. 5/22 Multi-Stage Cleaning CFC CFC Cu / W tertiary collimator: W

BLM Audit p. 6/22 Loss Rates (slow) The following table summarises the specified maximum loss rates for a safe operation of the LHC machine and its collimation system. Mode T τ R loss P loss [ s] [ h] [p/ s] [ kw] Injection cont. 1.0 0.8 11 6 0.1 8.6 11 63 Ramp 1 0.006 1.5 13 98 Collision cont. 1.0 0.8 11 97 0.2 4.3 11 487 keep in mind that for nominal LHC operation at 7 TeV the beam lifetime is 20 h

BLM Audit p. 7/22 Loss Rates (fast) For an asynchronous dump (dump kicker pre-fire) it is assumed that 6 bunches can be lost into the collimation system. Similar scenario as for injection kicker failure. collimators (prim. and sec. type) can sustain shock beam impacts of 6.4 MJ mm 2 in 200 ns (7 TeV) TCT collimator may be hit by one bunch in case of misalignment of the dump protection by about 2σ, otherwise the TCT is in the shadow of the dump protection and primary/secondary collimators. The intensity of one bunch is sufficient to damage the collimator (tertiary are made of tungsten).

BLM Audit p. 8/22 Intensity and Cleaning Inefficiency allowed intensity beam lifetime e.g. 0.22h quench threshold 7.8 6 p/m/s at 7 TeV 7.0 8 p/m/s at 450 GeV dilution length 50 m (simplified) N max p τ R q L dil η c cleaning inefficiency (for L dil = 1 m) η c = 2 5 m 1 at 7 TeV η c = 1 3 m 1 at 450 GeV

BLM Audit p. 9/22 Simulation Tools: SixTrack For the collimation studies we use an extended version of SixTrack (full 6d treatment) including a scattering routine for simulating the interaction of the primary protons in the collimator (Colltrack routines). The field maps are generated using MADX (using official LHC optics). To reduce computing time only the beam halo, which hits the primary collimator (6σ half-gap), is considered in the simulations. A typical simulation tracks around 5 million particles over 200 turns. Reminder: aim is a cleaning inefficiency of 2 5 m 1 In general the simulation treats only the beam halo particle, beam gas interactions are not included. But it is possible load an external distribution for tracking studies (e.g. for kicker failure or for p-p interactions)

BLM Audit p. /22 Simulation Tools: Beam Loss Pattern The tracking information received by SixTrack is afterwards analysed using the beam loss pattern program. It compares the particle tracks with an detailed aperture model and returns the loss locations (particles touching the aperture before being absorbed in a collimator) with an cm resolution. S. Redaelli

BLM Audit p. 11/22 System Performance at 7TeV (Phase1) [1/m] local inefficiency η c -4-5 IR1 IR2 IR3 IR4 IR5 IR6 IR7 IR8 1-1 -2-3 -6-7 τ =.0h τ = 1.0h τ = 0.2h low β optics, 7000GeV inter action points losses in warm section losses in cold section losses in collimator beam 1 7 TeV horizontal betatron halo standard settings ideal machine -8 0 5000 000 15000 20000 25000 s [m] [1/m] local inefficiency η c -4-5 -7 1-1 -2-3 -6-8 τ =.0h τ = 1.0h τ = 0.2h low β optics, 7000GeV inter action points losses in warm section losses in cold section losses in collimator 0 5000 000 15000 20000 25000 s [m] beam 2 7 TeV horizontal betatron halo standard settings ideal machine

BLM Audit p. 12/22 Cleaning Insertion in IR7 [1/m] local inefficiency η c 1-1 -2-3 -4-5 τ =.0h τ = 1.0h τ = 0.2h low β optics, 7000GeV inter action points losses in warm section losses in cold section losses in collimator -6-7 -8 19700 19800 19900 20000 200 20200 20300 20400 20500 s [m] [1/m] local inefficiency η c 1-1 -2-3 -4-5 τ =.0h τ = 1.0h τ = 0.2h low β optics, 7000GeV inter action points losses in warm section losses in cold section losses in collimator -6-7 -8 19400 19500 19600 19700 19800 19900 20000 200 20200 20300 s [m]

BLM Audit p. 13/22 System Performance at Injection [1/m] local inefficiency η c -4-5 IR1 IR2 IR3 IR4 IR5 IR6 IR7 IR8 1-1 -2-3 -6-7 quench level injection optics, 450GeV inter action points losses in warm section losses in cold section losses in collimator beam 1 450 GeV horizontal betatron halo standard settings ideal machine -8 0 5000 000 15000 20000 25000 s [m] [1/m] local inefficiency η c -4-5 -7 1-1 -2-3 -6-8 quench level injection optics, 450GeV inter action points losses in warm section losses in cold section losses in collimator 0 5000 000 15000 20000 25000 s [m] beam 2 450 GeV horizontal betatron halo standard settings ideal machine

BLM Audit p. 14/22 System Performance at 7TeV (Phase1) (with closed orbit, alignment error, jaw flatness error) η [m 1 ] η [m 1 ] 0 1 2 3 4 5 0 1 2 3 4 5 IP2 IP3 IP4 IP5 IP6 IP7 IP8 IP1 Warm losses Cold losses Inelastic scattering on collimators Quench limit 0 5 15 20 25 s [km] IP2 IP3 IP4 IP5 IP6 IP7 IP8 IP1 Warm losses Cold losses Inelastic scattering on collimators Quench limit 0 5 15 20 25 s [km] beam 1 C. Bracco horizontal betatron halo collimator misalignment closed orbit horizontal betatron halo collimator misalignment closed orbit aperture misalignment

BLM Audit p. 15/22 p-p Interactions (DPE) dp/p -0-0.005-0.01-0.015-0.02-0.025-0.03-0.035-0.04 Loss loactions according to momentum loss for DPE -0.045 p/m/s -0.05 0 00 2000 3000 4000 5000 6000 7000 9 8 7 6 5 IR5 IR4 IR3 0 00 2000 3000 4000 5000 6000 7000 s[m] s[m] Expected loss rate for DPE and SD events at peak luminosity 34 cm 2 s 1

BLM Audit p. 16/22 Losses for Ions G. Bellodi LHC CWG meeting Nov.2006

BLM Audit p. 17/22 Simulation Results available Overview of available simulated cases. standard optics (injection, early collision, all IRs squeezed, IR1 and IR5 squeezed), ideal machine start-up configuration (early collision optics with reduced number of TCS collimators in IR7) commissioning scenarios energy ramp error scenarios collimator misalignment (tilt, gap, offset) closed orbit aperture misalignment losses from p-p interactions in the IRs (only IR5 so far)

BLM Audit p. 18/22 Loss Locations injection energy collision energy beam 1 beam 2 beam 1 beam 2 Q11.R3 Q27.R7 Q28.R3 MB20.L6 Q31.L7 MB11.L7 Q6L3 Q21.R7 Q11.R6 Q9.L7 DFBA.R6 Q31.R7 Q18.L4 MB16.L6 Q27.L7 MB9.L7 Q8.R7 MB34.L8 MB12.R6 MB9.L7 MB9.R7 Q33.L8 Q.L4 MB14.L6 Q23.L7 Q8.L7 MB9.R7 Q33.L8 Q25.R6 Q8.L7 MB11.R7 Q29.L8 Q22.R5 MB12.L6 Q19.L7 MB8.L7 Q9.R7 Q25.L8 Q33.R6 MB8.L7 Q11.R7 Q25.L8 Q28.L6 MB9.L6 MB19.L7 Q.R7 Q17.L8 Q19.L7 MB13.R7 Q2.R8 MB28.L6 MB8.L6 Q15.L7 MB11.R7 Q16.R8 Q13.L7 Q13.R7 Q6.R8 Q25.L6 Q4.L6 MB15.L7 Q11.R7 Q30.R8 MB13.L7 Q23.R7 Q20.L6 Q11.R6 Q11.L7 Q13.R7 Q22.L1 Q11.L7 MB21.R7 MB11.L7 (see thesis G. Robert-Demolaize) p-p interactions for beam 2 from IR5 MB.A9L5 MB.B9L5 Q9.L5 MB.B11L5 MS.11L5 Q11.L5 MB.C13L5 MS.13L5 Q13.L5 MS.21L5 Q21.L5 MS.24L4 Q24.L4 MS.22R3 Q22.R3 MS.14R3 Q14.R3 BPM.6R3

BLM Audit p. 19/22 Summary Full set of simulation tool available to simulate the cleaning inefficiency of the collimation system and generate beam loss maps along the ring. Loss location for different optics, running scenarios and mechanical alignment errors available. Standard run considers around 5 million particles, due to the required low cleaning inefficiency only a few hundred particles are lost to the aperture. Main loss locations (see also previous slide): dispersion suppressor after the cleaning insertions dispersion suppressor in experimental insertion (for p-p interaction) Q6 in IR3

BLM Audit p. 20/22 Spare Slides

BLM Audit p. 21/22 Estimated Damage Interlock Limits R. Assmann: Damage Limits for LHC Collimators (note in preparation)

BLM Audit p. 22/22 Estimated Damage Interlock Limits R. Assmann Damage Limits for LHC Collimators (note in preparation)