Highlights of the latest results, produced from exploration drilling since the company s announced its last resource update just ten weeks ago:

Similar documents
INFILL DRILLING EXPANDS MINERALIZATION IN HIGH-GRADE GOLD-COPPER CORE AT SOUTHWEST DISCOVERY ZONE TURQUOISE HILL PROJECT, MONGOLIA

IVANHOE S EXPLORATION TEAM AWARDED THE THAYER LINDSLEY INTERNATIONAL DISCOVERY AWARD BY PDAC FOR DISCOVERY OF THE HUGO DUMMETT DEPOSIT IN MONGOLIA.

COPPER CONTAINED IN MEASURED AND INDICATED RESOURCES INCREASES BY MORE THAN 350% AT IVANHOE S OYU TOLGOI PROJECT

NEW GOLD AND COPPER DISCOVERY IN CENTRAL OYU ZONE AT TURQUOISE HILL PROJECT IN MONGOLIA S GOBI DESERT REGION

For Immediate Release May 21, 2002

December 8, Visit for pictures of the drill core and maps and sections of the new discovery.

IVANHOE S HUGO NORTH DEPOSIT NOW BELIEVED TO BE THE WORLD S HIGHEST-GRADE COPPER PORPHYRY DISCOVERY

LATEST EXPLORATION RESULTS CONFIRM GOLD AND COPPER VALUES INCREASE WITH DEPTH AT TURQUOISE HILL DISCOVERY IN MONGOLIA

IVANHOE MINES EXTENDS HUGO NORTH GEOPHYSICAL ANOMALY FOUR KILOMETRES NORTH ADDITIONAL GEOPHYSICAL TARGETS IDENTIFIED

INITIAL INDEPENDENT RESOURCE AUDIT OF SOUTHWEST OYU DISCOVERY ZONE AT IVANHOE S TURQUOISE HILL PROJECT RECEIVED

DRILLING EXPANDS SIGNIFICANT COPPER-GOLD PORPHYRY SYSTEM AT IVANHOE S KHARMAGTAI PROJECT IN MONGOLIA

MAJOR DRILLING CAMPAIGN STARTED ON PORPHYRY GOLD AND COPPER DISCOVERY AT TURQUOISE HILL IN MONGOLIA

New drill hole at Oyu Tolgoi intercepts 938 metres of near-continuous copper/gold mineralization between Heruga Deposit and Southern Oyu deposits

IVANHOE DISCOVERS IMPORTANT NEW GOLD-COPPER PORPHYRY DISTRICT IN SOUTHERN MONGOLIA NEW PORPHYRY DISTRICT NOW NAMED BRONZE FOX

IVANHOE MINES LTD ACQUIRES FOUR NEW COPPER-GOLD PROJECTS IN MONGOLIA

ENTRÉE GOLD REPORTS ADDITIONAL RESULTS FROM DRILLING ON JAVHLANT LICENSE, MONGOLIA

IVANHOE MINES DRILLING CONFIRMS MAJOR COAL SYSTEM IN SOUTHERN MONGOLIA, NEAR CHINA BORDER

IVANHOE RELEASES ADDITIONAL, HIGH-GRADE GOLD-SILVER DRILLING RESULTS AND ANNOUNCES PLANS FOR NEW MINE IN SOUTH KOREA

Altynalmas Gold s new upgraded and confirmed Bakyrchik East Mineral Resource Gold deposit boosts total gold resources at Kyzyl Project in Kazakhstan

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

IVANHOE COMMENCES RESOURCE DELINEATION DRILLING AT NARIIN SUKHAIT COAL PROJECT IN MONGOLIA S SOUTH GOBI

Highlights from the four holes announced in this news release include:

Altynalmas Gold announces a 50% increase in Indicated Mineral Resources at the Kyzyl Gold Project in Kazakhstan

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

CANDENTE UPDATES CAÑARIACO NORTE MINERAL RESOURCE ESTIMATE

News Release. Infill Drilling Program

GOLD REACH (GRV) ANNOUNCES A 141% INCREASE IN INDICATED AND 91% INCREASE IN INFERRED RESOURCES AT SEEL

Probe Metals Continues to Expand Gold Zones At Val-d Or East

FORM F3 MATERIAL CHANGE REPORT

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

Northern Dynasty Minerals Ltd.

Detour Gold Reports Drilling Results from Lower Detour

PRESS RELEASE NEW MINERAL RESOURCE UPDATE AT PRAIRIE CREEK MINE. Measured + Indicated and Inferred Resource Tonnages Increased

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012

Goldplay President and CEO Marcio Fonseca commented

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

Drilling at Perseverance in Arizona, USA Suggests Proximity to Porphyry Copper System

New Drilling Program Commences at Mutiny s Deflector Deposit

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

CAUTIONARY STATEMENT

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

Mineral Resource Estimate Comparison at 3 g/t Au cut-off

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

Drilling Extending Mineralization in La Mina North Zone

Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia

IAMGOLD ANNOUNCES RESULTS FROM THE WESTWOOD-MOOSHLA EXPLORATION PROJECT

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

Rich Saddle North Au-Cu-Ag Porphyry Expands by 275m Along Strike and 250m Down-Dip

Pershing Gold Extends High-Grade Mineralization through Step-Out Drilling in Phase 1 and Initiates Phase 2 Drilling Program

July Exploring for Canadian Gold in the Rainy River District of Ontario

April Exploring for Canadian Gold in the Rainy River District of Ontario

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

A B C PAD A HIGHLIGHTS

NEWS RELEASE. FORAN INTERSECTS 9.4% ZINC OVER 6.1 METRES Feasibility Drilling Continues

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

Ivanhoe has earned an initial 51% interest in the Ivanhoe Mines-Entrée Gold joint-venture properties

Press Release Thunder Bay: August 2, 2018

Fission s Initial Resource Totals at PLS: 79.6M lbs Indicated and 25.9M lbs Inferred

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

Drilling Extending Mineralization in La Mina North Zone

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

ATON RETURNS 22.2 METRES OF 2.77 GRAMS PER TONNE GOLD EQUIVALENT FROM HAMAMA WEST; VISIBLE GOLD DISCOVERED AT BOHLOG

Goldcrest Resources Ltd.

NEWS RELEASE. Foran Mining Intersects High Grade Zinc at McIlvenna Bay. Results expand area of known mineralization

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

AUC.V PRESS RELEASE NO. 01/06

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

For personal use only

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

NEWS RELEASE Ocean Park Ventures Identifies Large Multi-Structure Sulfide Mineralized System Trapper Gold Project, British Columbia

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

NEWS RELEASE TSX: ELD NYSE: EGO September 6, Eldorado Announces Drilling Results from KMC Project, Serbia

(TSXV: GPLY, OTCQB: GLYXF

NEWS RELEASE. Foran Intersects Over 28 Metres of Copper Mineralization

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

AZUCAR MINERALS COMMENCES DRILLING AT THE EL COBRE PROJECT, MEXICO

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

Pacific Empire Minerals Provides Copper King RC Drilling Results

T Boli Gold Mine Exploration Update

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

LME m averaging 0.65 g/t Au and 0.32% Cu, or 1.19 g/t Au Equiv LME m averaging 0.64 g/t Au and 0.11% Cu, or 0.

Asiamet Drilling Further Extends BKM Mineralisation

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

Transcription:

November 10, 3 NEW INDEPENDENT RESOURCE ESTIMATE INCREASES SIZE OF HUGO DUMMETT DEPOSIT IN MONGOLIA S SOUTH GOBI TO 1.36 BILLION TONNES AT 1.04% COPPER AND 0.15 g/t GOLD. & INFERRED RESOURCE AT HUGO DEPOSIT NOW CONTAINS 14.14 MILLION TONNES OF COPPER AND 6.43 MILLION OUNCES OF GOLD, AN INCREASE OF 4 MILLION TONNES OF COPPER AND 3 MILLION OUNCES OF GOLD IN 10 WEEKS. & HUGO HIGH-GRADE CORE DOUBLED IN SIZE FOR SECOND TIME THIS YEAR, TO 149 MILLION TONNES AT 2.88% COPPER AND 0.53 g/t GOLD. ULAANBAATAR, MONGOLIA Ivanhoe Mines Chairman Robert Friedland and Executive Vice-President, Exploration, Douglas Kirwin announced today that a new, independent estimate prepared by AMEC E&C Services (AMEC) of Canada, indicates that the Hugo Dummett Deposit now has inferred resources of 1.36 billion tonnes grading 1.04% copper and 0.15 g/t gold, at a 0.40% copper equivalent cut off. The Hugo Deposit, which remains open for significant expansion, contains an estimated 14.14 million tonnes (31.2 billion pounds) of copper and 6.43 million ounces of gold at the 0.40% cut-off grade. Drilling at the Hugo Dummett Deposit (formerly known as the Far North Zone) also has expanded the high-grade core of inferred resources to 149 million tonnes grading 2.88% copper and 0.53 g/t gold, at a cut-off grade of greater than 2% copper equivalent. This is more than double the high-grade tonnage that was reported in AMEC s previous estimate in August, which was 70.8 million tonnes grading 2.92% copper and 0.30 g/t gold. The Hugo Deposit is the largest of the four copper and gold deposits outlined to date at Ivanhoe s Turquoise Hill (Oyu Tolgoi) Project. AMEC s new estimate further confirms that the Turquoise Hill Project hosts one of the world s largest and highest-grade gold/copper porphyry systems. Highlights of the latest results, produced from exploration drilling since the company s announced its last resource update just ten weeks ago: The total inferred resources at a cut-off grade of 0.60% copper equivalent for all four deposits on the Turquoise Hill property have been increased to 1.28 billion tonnes grading 1.13% copper and 0.24 g/t gold. Based on drilling to this point in time, AMEC estimates that the property contains an inferred resource of approximately 14.6 million tonnes (30.1 billion pounds) of copper and 9.7 million ounces of gold an increase of 39% in the amount of copper and an increase of 61% in the amount of gold since the previous estimate was issued on August 25. 1

There also is an additional indicated resource in the Southwest Oyu deposit of 267 million tonnes grading 0.53% copper and 0.86 g/t gold, containing approximately 1.42 million tonnes (3.1 billion pounds) of copper and 7.35 million ounces of gold, at the 0.60% copper equivalent cut-off grade. The resources in the indicated category are approximately the same as were reported in the August estimate, as the company has conducted only a minimal amount of drilling into the Southwest Deposit since February, 3. At a lower cut-off grade of 0.30% copper equivalent, AMEC estimates that the entire Turquoise Hill project contains an inferred resource of 2.60 billion tonnes grading 0.73% copper and 0.17 g/t gold, containing approximately 19.1 million tonnes (42.2 billion pounds) of copper and 14.4 million ounces of gold. This represents an increase of 26% in the amount of copper and a 42% increase in the amount of gold since August. At the 0.30% cutoff, the project also contains an additional indicated resource of 509 million tonnes grading 0.40% copper and 0.59 g/t gold, containing 2.06 million tonnes (4.5 billion pounds) of copper and 9.69 million ounces of gold. The Hugo Dummett Deposit is one of four co-genetic copper and gold deposits delineated to date along a 5.3-kilometre-long chain of deposits at Turquoise Hill. The other three deposits are Southwest Oyu, South Oyu and Central Oyu. The new resource estimates now are being incorporated into the independent scoping study that is scheduled to be released in early December. The Scoping Study will establish the economic viability of Turquoise Hill and provide a fast-track development strategy to achieve early production from planned open pits in the gold-rich Southwest Oyu Deposit and the near-surface, high-grade, chalcocite blanket covering the Central Oyu Deposit. Planned underground mine production from the high-grade copper-gold core within the Hugo Deposit is expected to closely follow the development of the open pits. The high-grade core zones in the Hugo Deposit are expected to greatly enhance the economic viability of the project. The zones provide the potential for rapid payback of development capital as well as sustained high cash flows for ongoing expansions of the high-grade, gold- and copper-rich Hugo North deposit and a potential additional gold-rich porphyry under Hugo South. The scoping study will provide Ivanhoe with multiple development scenarios to take advantage of highly competitive Chinese fabrication capabilities in Inner Mongolia that can be accessed via a newly completed highway to the Mongolian border. The various development scenarios will maximize future returns as relative metal prices of copper and gold fluctuate over the planned life of the mine. The phenomenal growth of the Turquoise Hill Deposit in recent months, both in terms of tonnage and grade, has clearly established the project as the world s premier undeveloped copper and gold porphyry system and the most important source of copper for China, which is the world s fastest growing economy and the world s largest consumer and importer of copper, Mr. Friedland said. While we will continue to aggressively drill to further expand the deposit and to test new targets, we also have begun the process of assembling a topnotch team of mine builders, to be led by industry veteran John Macken who was appointed as Ivanhoe s new President on November 5th. Recent drilling has delineated the top of a gold-rich zone within the larger Hugo Deposit, named the Hugo North Zone. Initial indications are that this porphyry mineralization, open to depth, contains inferred resources totalling 50.4 million tonnes grading 3.22% 2

copper and 1.15 g/t gold, at a 2% copper equivalent cut-off, containing approximately 1.62 million tonnes (3.57 billion pounds) of copper and 1.86 million ounces of gold. The Hugo Dummett high-grade core remains open for very significant future expansion as additional drill holes are being targeted to intersect high-grade copper and gold mineralization upand down-dip of OTD514, one of the thickest gold and copper intersections recorded to date with 386 metres grading 2.35% copper and 0.82 g/t gold. In addition to the high, sustained gold and copper grades, the gold-to-copper ratio has increased progressively to 1:1 (g/t gold: %copper) down hole in intensely stockworked, quartz monzodiorite porphyry. The significance of these high gold-tocopper ratios in the intensely mineralized quartz monzodiorite indicate that the apex of a potentially large and expanding porphyry system has been discovered that could extend to significant depths vertically below these northern holes, as well as indicating potential for similar porphyry systems under Hugo South. Other holes in progress include hole OTD465C, which will test the continuity between the greater than -metre-spaced, high-grade intersections in holes OTD465A & B, while hole OTD449C will test down-dip of the high-grade intersection in 449A. A summary of recent, significant drill intercepts appears in a table near the end of this news release. Since the announcement of the discovery of the high-grade Hugo Dummett Deposit less than a year ago, the deposit has developed into a world-class discovery as confirmed by a panel of internationally recognized experts. The Hugo Deposit contains approximately 81% of the copper and 47% of the gold in Turquoise Hill s total inferred resources defined to date, using a 0.30% copper equivalent cut off. Given the depth potential of the Hugo South and North zones and the increasing gold grades recently discovered in Hugo North, Ivanhoe has focused its nine deep-capacity drill rigs on Hugo North to rapidly explore the extent of the emerging high-grade, gold-rich discovery. Hugo Dummett Deposit inferred resources Date of estimate Cu. Eq. Cut-off (%)¹ Tonnes s) (%) Current estimate (g/t) Contained Metal tonnes) (ounces) Nov. 10, 3 >= 2.00 149.4 2.88 0.53 4.31 2,560,000 >= 1.00 575.5 1.67 0.23 9.62 4,,000 >= 0.60 961.6 1.30 0.18 12.48 5,420,000 >= 0.50 1,082.5 1.21 0.17 13.06 5,,000 >= 0.40 1,358.1 1.04 0.15 14.14 6,430,000 >= 0.30 1,.3 0.86 0.12 15.50 7,220,000 August 3 estimate August 25, 3 >= 2.00 70.8 2.92 0.30 2.07 690,000 >= 1.00 341.7 1.61 0.13 5.52 1,380,000 >= 0.60 642.8 1.19 0.10 7.66 2,110,000 >= 0.50 859.6 1.01 0.10 8.71 2,680,000 >= 0.40 1,196.3 0.90 0.09 10.06 3,380,000 >= 0.30 1,652.2 0.70 0.08 11.48 4,,000 3

February 3 estimate Feb. 26, 3 >= 2.00 29.3 2.69 0.19 0.79 175,000 >= 1.00 257.8 1.38 0.08 3.56 643,750 >= 0.60 489.0 1.08 0.07 5.26 1,170,000 >= 0.40 702.2 0.89 0.07 6.22 1,618,000 >= 0.30 804.5 0.81 0.07 6.53 1,799,000 The November, 3, Far North inferred resource estimate has incorporated results from 136 drill holes, compared to drill holes used for the August estimate and 41 drill holes for the February estimate. The total strike length of the Hugo Deposit now included in the 0.6% copper equivalent inferred resource estimate is approximately 2.6 kilometres. The deposit can be partitioned into two mineralized zones. The shallower southern end, referred to as the Hugo South Deposit, is characterized by high-sulphidation mineralization hosted in quartz-rich zones within ash flow tuffs. The greater than 2% copper zone consists mostly of bornite and chalcocite deposited at lower temperatures and has inferred resources estimated at 35.3 million tonnes grading 2.71% copper and 0.19 g/t gold. This high-grade zone occurs near the base of, and is the core to, a 231.6-milliontonne, steeply-dipping tabular body grading 1.45% copper and 0.11 g/t gold at a 1% copper equivalent cut-off. With horizontal thicknesses in excess of metres, the body appears to be ideally suited to block-cave mining methods, which will begin in the highest grades of the deposit. The pre-feasibility study will examine in detail the continuing possibility of mining Hugo South as a massive open-pit mine while underground bock-cave development and mining is centred on Hugo North. The northern Hugo zone, referred to as the Hugo North Deposit, is hosted by basalt that underlies the ash flow tuffs. As in Hugo South, the highest-grade intersections occur in quartz stockwork that replaces up to 90% of the basalt. Intense chlorite, hematite after biotite and magnetite alteration reinforces the gold-rich porphyry association. At a 2% copper equivalent cut-off, the Hugo North Deposit contains inferred resources of 114.1 million tonnes grading 2.94% copper and 0.64 g/t gold. The marked increase in gold grades is directly attributable to the apparent higher temperatures of emplacement due to the increased depths and close proximity to the highly mineralized, quartz monzodiorite (QMD) intercepted in OTD514 and at the western end of OTD449B. With approximately metres of lateral separation between the gold- and copper-rich QMD intercepts in OTD514 and OTD449B there is significant potential to expand the gold-rich copper resources to depth along the vertical extent of the quartz monzodiorite intersected in these two holes. The fleet of 18 rigs being used in the exploration program at Turquoise Hill now includes a UDR0, one of the world s largest mineral exploration drilling rigs. The UDR0 rig can test mineralization to depths up to 3,000 metres. The UDR0 is currently drill-testing the mid-section of the Hugo North Deposit, targeted on a section that was inadequately tested due to adverse drilling conditions. The UDR0 rig should be able overcome the adverse drilling conditions by its capacity to drill to large-diameter core (PQ) to depths in excess of 1, metres. The holes then will be continued to depths in excess of 2,000 metres to test a deep IP chargeability anomaly that could be an expression of the down-faulted, western section of the Hugo North Deposit. 4

DEVELOPMENT WORK UNDERWAY A box cut excavation is currently nearing completion to provide a solid bedrock foundation for a decline tunnel to provide underground access to the Hugo South Deposit. Once the mid-level of the deposit is reached by the tunnel, a horizontal drift will be driven along the strike extent within the high-grade core of the Hugo South deposit to provide underground drill stations to fully delineate the zone by shorter, infill drill holes. The location for the first vertical shaft, possibly extending to a depth of 1, metres, is being tested by a vertical geotechnical drill hole. The planned shaft will be located on the west side of the Hugo Deposit, mid-way between Hugo South and Hugo North in a competent biotite granodiorite dyke that appears to be ideal for shaft sinking. The shaft will provide early access to the deeper Hugo North deposit for detailed, underground infill drilling. Its central location will also allow it to be linked to the tunnel for purposes of multiple access and ventilation. UPDATED HUGO DUMMETT RESOURCE ESTIMATE Detailed analyses of the updated inferred mineral resources for the Hugo Dummett Deposit, at various copper equivalent cut-off grades, are provided in the following table. The new estimates were prepared in conformance with the requirements set out in National Instrument 43-101 by AMEC under the direction of Dr. Harry Parker, Ch. P. Geol., and Dr. Stephen Juras, P.Geo., independent qualified persons as defined by NI 43-101. As required by NI 43-101, AMEC will prepare an addendum to its August, 3, technical report within 30 days. Updated Hugo Dummett Deposit inferred resource table (at various copper-equivalent cut-off grades¹) Cu. Eq. Cutoff ¹ Tonnes Equivalent Contained Metal (%) (%) (g/t) (%) (tonnes) (ounces) >=3.50 47,,000 3.68 0.96 4.29 1,760,000 1,470,000 >=3.00 75,,000 3.42 0.76 3.91 2,590,000 1,860,000 >=2.50 115,,000 3.11 0.61 3.51 3,590,000 2,270,000 >=2.00 149,,000 2.88 0.53 3.22 4,310,000 2,560,000 >=1.50 234,,000 2.39 0.40 2.65 5,610,000 3,020,000 >=1.25 412,,000 1.92 0.27 2.09 7,930,000 3,550,000 >=1.00 575,,000 1.67 0.23 1.82 9,620,000 4,,000 >=0.90 654,,000 1.57 0.22 1.71 10,,000 4,640,000 >=0.80 778,,000 1.45 0.20 1.57 11,280,000 4,990,000 >= 0.70 889,,000 1.36 0.18 1.47 12,060,000 5,230,000 >= 0.60 961,,000 1.30 0.18 1.41 12,480,000 5,420,000 >= 0.50 1,082,,000 1.21 0.17 1.31 13,060,000 5,,000 >= 0.40 1,358,,000 1.04 0.15 1.14 14,140,000 6,430,000 >= 0.30 1,,,000 0.86 0.12 0.94 15,,000 7,220,000 The footnotes below apply to all resource tables within this release. 1) equivalent grades have been calculated using assumed metal prices (US$0.80/lb. for copper and US$350/oz. for gold); %Cu eq. = %Cu + Au (g/t) x (11.25/17.64). 2) The contained gold and copper represent estimated contained metal in the ground and have not been adjusted for the metallurgical recoveries of gold and copper. The determination of an adjustment factor to account for differences 5

in relative metallurgical recoveries between gold and copper will depend upon the completion of definitive metallurgical testing. 3) Resource classifications conform to CIM Standards on Mineral Resources and Reserves referred to in National Instrument 43-101. Mineral resources that are not reserves do not have demonstrated economic viability. An indicated mineral resource is that part of a mineral resource for which quantity and grade can be estimated with a level of confidence sufficient to allow the application of technical and economic parameters to support mine planning and evaluation of the economic viability of the deposit. An inferred mineral resource is that part of a mineral resource for which quantity and grade can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified. UPDATED TURQUOISE HILL RESOURCE ESTIMATE Analyses of the updated indicated and inferred mineral resources for the Turquoise Hill Project, at 0.30% and 0.60% copper equivalent cut-off grades, are provided in the following two tables. The company s drilling since February has focused on expanding and delineating the Hugo Dummett Deposit, so AMEC has not updated its February, 3, resource estimates for the Southwest, South and Central deposits at this time. Ivanhoe currently has eight rigs drilling at the Central Oyu deposit to upgrade the inferred resources in the deposit s chalcocite blanket and underlying covellite, chalcopyrite and gold zones to the higher measured and indicated categories, and to provide geotechnical information for pit-wall stabilities. Large-diameter core from the shallow, supergene chalcocite blanket also is being drilled to provide samples for column-leach testing. This infill drill program will continue at Central Oyu for two to three months, after which the drills will move to the Southwest Oyu and South Oyu deposits to upgrade the resources to the measured and indicated categories. The indicted and measured resources will be used for a feasibility study planned for late-4. Updated Turquoise Hill resource table, by deposit, (based on a 0.30% copper-equivalent cutoff)¹ Deposit Southwest Oyu Resources tonnes) (%) (g/t) Equiv. (%) tonnes) Contained Metal ounces) Equiv. tonnes)² Indicated 508.9 0.40 0.59 0.78 2.06 9.69 3.98 Inferred 290.8 0.32 0.50 0.64 0.92 4.70 1.86 South Oyu Inferred 270.3 0.39 0.13 0.48 1.07 1.10 1.28 Central Oyu Inferred 236.8 0.67 0.18 0.79 1.59 1.36 1.86 Hugo Dummett Inferred 1,.3 0.86 0.12 0.94 15.50 7.22 16.92 Grand total: Indicated 508.9 0.40 0.59 0.78 2.06 9.69 3.98 plus Grand total: Inferred 2598.2 0.73 0.17 0.84 19.08 14.38 21.92 6

Updated Turquoise Hill resource table, by deposit, (based on a 0.60% copper-equivalent cutoff)¹ Deposit Southwest Oyu Resources tonnes) (%) (g/t) Equiv. (%) tonnes) Contained Metal ounces) Equiv. tonnes)² Indicated 267.0 0.53 0.86 1.08 1.42 7.35 2.88 Inferred 126.6 0.44 0.68 0.87 0.55 2.78 1.10 South Oyu Inferred 48.4 0.61 0.26 0.77 0.29 0.40 0.37 Central Oyu Inferred 147.5 0.84 0.24 0.99 1.24 1.14 1.46 Hugo Dummett Inferred 961.6 1.30 0.18 1.41 12.48 5.42 13.56 Grand total: Indicated 267.0 0.53 0.86 1.08 1.42 7.35 2.88 plus Grand total: Inferred 1284.1 1.13 0.24 1.28 14.58 9.74 16.50 The resource estimates for the Southwest, South and Central deposits were prepared by AMEC E&C Services Limited, of Canada, in February, 3, and were previously reported in Ivanhoe s February 26 th news release. Scoping Study Update The preliminary assessment, or scoping study, to evaluate options for the development of a commercial mining operation at Turquoise Hill now is in the final stages and is expected to be released in early December. The study, evaluating the potential for the development of the project by surface and underground mining, is being conducted by an alliance of AMEC, Ausenco Limited, GRD Minproc and SRK Consultants. The scoping study will form the basis for feasibility studies that will establish the viability of a commercial mining operation at Turquoise Hill and determine a range of capital and operating costs. The new, high-grade mineralization discovered in the northern portion of the Hugo Dummett Deposit is expected to greatly enhance the economic parameters of the project as it is integrated into a conceptual mine production schedule for the overall project. Internal scoping work has indicated that an open-pit operation at the Southwest Zone could form the basis for initial, low-cost production that then could be expanded and enhanced with highgrade underground production from the Far North Zone. 7

Table of recent significant drill-hole Intercepts in Hugo North: From To Interval Drill Hole (metres) (metres) (metres) g/t % OTD449B 1090 1160 70 0.16 1.70 1160 1174 14 dyke 1174 1242 68 1.29 2.85 1242 1264 22 0.05 0.10 1264 1464 0.24 1.08 1464 1486 22 dyke 1486 1572 86 1.31 1.56 OTD465B Total >1% 1140 1552 412 0.32 2.33 1140 1230 90 0.04 1.37 Total >2% 1230 1426 196 0.42 3.38 Including >3% 1238 1366 128 0.43 4.13 1426 1552 126 0.36 1.36 OTD514 Total>1% 1086 1562 476 0.67 2.16 Total>2% 1176 1562 386 0.82 2.35 Including 1448 1562 114 1.37 1.73 OTD522 854 980 126 0.05 1.34 980 1232 252 0.32 3.28 including 1032 1208 176 0.42 3.89 1232 1276 44 0.04 1.19 Total >1% 854 1276 422 0.21 2.48 Charles Forster, P.Geo., Ivanhoe Mines Turquoise Hill Manager, a qualified person as defined by National Instrument 43-101, supervised the preparation of the information in this release. SGS Analabs Pty. Ltd. prepares the split core at the project site and assays all samples at its facility in Ulaanbaatar, Mongolia. Ivanhoe s QA/QC program is monitored by independent consultant Dr Barry Smee, P.Geo., and managed on site by Dale Sketchley, M.Sc., P.Geo. Prepared standards and blanks are inserted at the sample preparation lab on the project site to monitor the quality control of the assay data. Duplicate samples of core, rejects and pulp are taken on a 1-in-20 basis to provide precision analysis of the sampling processes. Ivanhoe holds a % interest in the Turquoise Hill Project and has exploration rights covering approximately 111,000 square kilometres in central and southern Mongolia. Ivanhoe shares trade on the Toronto and Australian stock exchanges under the symbol IVN. Information contacts: Investors: Bill Trenaman: +1.604.688.5755 / Media: Bob Williamson: +1.604.688.5755 8

Forward-Looking Statements: Statements in this release that are forward-looking statements are subject to various risks and uncertainties concerning the specific factors disclosed under the heading Risk Factors and elsewhere in the corporation's periodic filings with Canadian and Australian Securities Regulators. Such information contained herein represents management's best judgment as of the date hereof based on information currently available. The company does not assume the obligation to update any forward-looking statement. 9

0 1 OTD479 1143.4m OTD402 o954.9m 0 OTD560 7.6m OTD367G q1732.0m OTD505A 1188.7m 1 1650 OTD505 1203.8m 1 1 OTD465A 1358.5m 0 1 OTD465B 1571.8m OTD465C 1.0m 1 1 1 OTD425 851.0m 1 1 0 0 OTD465 613.0m 1 mrl 651 me OTD402 OTD402 OTD402 OTD402 OTD402 OTD402 OTD402 OTD402 OTD402 651 me OTD560 OTD560 OTD560 OTD560 OTD560 OTD560 OTD560 OTD560 OTD560 OTD425 OTD425 OTD425 OTD425 OTD425 OTD425 OTD425 OTD425 OTD425 OTD505 OTD505 OTD505 OTD505 OTD505 OTD505 OTD505 OTD505 OTD505 650 me 1 mrl OTD465 OTD465 OTD465 OTD465 OTD465 OTD465 OTD465 OTD465 OTD465 mrl mrl OTD505 OTD425 OTD465 OTD560 OTD479 q706.2m OTD479 OTD402 >1% Cu shell OTD425 mrl mrl 10 / 0.10 / 1.08 40 / 0.07 / 1.12 20 / 0.10 /0.94 88 / 0.06 / 1.31 0 154 / 1.75 / 3.81 / 0.74 / 3.22 OTD367G OTD367G 1 1 11 36 / 0.03 / 0.94 236 / 0.63 / 2.87 0 mrl o1555.6m 1 1 0 mrl Lithology Sediment Lava Dacitic block ash tuff Basaltic tuff Rhyolite dyke Basalt dyke Biotite granodiorite dyke Andesitic lava Dacitic lava - mrl Hydrothermal breccia Ignimbrite Augite basalt Assay intercept length (m) / Au (g/t) / Cu % greater than 1% Cu less than 1% Cu 324m 651 me Eiffel Tower (drawn to scale) 124.9m HoleID histogram Lithology trace OTD210 hstogram 196 / 0.42 / 3.38 OTD465A planned 0-0.01 ppm Au 0.01-0.05 ppm Au 0.05-0.1 ppm Au 0.1-0.25 ppm Au 0.25-0.5 ppm Au 0.5-1 ppm Au 1-1.5 ppm Au 1.5-3 ppm Au > 3 ppm Au 0-0.05 % Cu 0.05-0.1 % Cu 0.1-0.25 % Cu 0.25-0.5 % Cu 0.5-1 % Cu 1-1.5 % Cu 1.5-2 % Cu > 2 % Cu 651 me OTD465B >2% Cu shell 412 / 0.32 / 2.33 Ivanhoe Mines Mongolia Inc. O Y U T O L G O I P R O J E C T H u g o D u m m e t t D e p o s i t N O R T H 650 me Oyu Tolgoi Projection : Non Earth Revised by : File No. : N4767 - mrl W-E Section N4767 [OTD465] Geology and - Assay Interval Date : Author : Data by : Drawn by : Nov. 08, 3 IK, CF 0 OT Team OT Team metres Office :

0 1 OTD479 1143.4m OTD367G 1763.8m 1 1 OTD505A o562.2m 1 1 1 1 OTD372 259.5m 1 0 1 mrl OTD479 OTD479 OTD479 OTD479 OTD479 OTD479 OTD479 OTD479 OTD479 651 me OTD505 OTD505 OTD505 OTD505 OTD505 OTD505 OTD505 OTD505 OTD505 OTD372 OTD372 OTD372 OTD372 OTD372 OTD372 OTD372 OTD372 OTD372 650 me 1 mrl OTD514 OTD514 OTD514 OTD514 OTD514 OTD514 OTD514 OTD514 OTD514 >1% Cu shell mrl mrl planned planned Eiffel Tower (drawn to scale) 90 / 0.05 / 1.36 324m OTD367G o1645.9m 476 / 0.67 / 2.16 0 mrl 124.9m Lithology Sediment Lava Dacitic block ash tuff Basaltic tuff Rhyolite dyke Basalt dyke Biotite granodiorite dyke Andesitic lava - mrl Dacitic lava Hydrothermal breccia Ignimbrite Augite basalt Assay intercept length (m) / Au (g/t) / Cu % greater than 1% Cu less than 1% Cu 386 / 0.82 / 2.35 me HoleID histogram Lithology trace OTD210 hstogram 0-0.01 ppm Au 0.01-0.05 ppm Au 0.05-0.1 ppm Au 0.1-0.25 ppm Au 0.25-0.5 ppm Au 0.5-1 ppm Au 1-1.5 ppm Au 1.5-3 ppm Au > 3 ppm Au q OTD514 1656.3m 0-0.05 % Cu 0.05-0.1 % Cu 0.1-0.25 % Cu 0.25-0.5 % Cu 0.5-1 % Cu 1-1.5 % Cu 1.5-2 % Cu > 2 % Cu >2% Cu shell Ivanhoe Mines Mongolia - Inc. mrl O Y U T O L G O I P R O J E C T H u g o D u m m e t t D e p o s i t N O R T H W-E Section N4767 [OTD514] Geology and - Assay Interval Date : Nov. 08, 3 Author : IK, CF Data by : OT Team Drawn by : OT Team 0 metres Office : Oyu Tolgoi Projection : Non Earth Revised by : File No. : N4767 000 me