Brookfield Place Tel: (416) Bay Street, Suite 3630 Fax: (416) FOR IMMEDIATE RELEASE February 7, 2012

Similar documents
Mineral Resource Estimate Comparison at 3 g/t Au cut-off

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

Table 1 Updated Mineral Resource Tabulation for the Vertikalny Deposits of the Mangazeisky Property. Contained Metal Ag (koz)

Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project

Comparison Between July 2012 Technical Report and December 2012 Mineral Resource Statement July 2012 December 2012 Percentage Difference.

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

Sept 20, 2012 TSX Venture Exchange Tier 1 Trading Symbol: OK

July Exploring for Canadian Gold in the Rainy River District of Ontario

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

BELO SUN ANNOUNCES INFERRED RESOURCE ESTIMATE OF 356,600 OUNCES GRADING 2

CAUTIONARY STATEMENT

Goldplay President and CEO Marcio Fonseca commented

BGM ANNOUNCES MINERAL RESOURCE UPDATE AT BARKERVILLE MOUNTAIN TO SUPPORT BONANZA LEDGE OPERATIONS

KIRKLAND LAKE GOLD REPORTS STRONG GROWTH IN MINERAL RESERVES AND MINERAL RESOURCES

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia

Tahoe Resources Mineral Reserves as of January 1, 2018

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION

Highlights from the four holes announced in this news release include:

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

Detour Gold Reports Drilling Results from Lower Detour

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

MINERAL RESERVE AND MINERAL RESOURCE STATEMENT PROVEN AND PROBABLE MINERAL RESERVES

Table 1: Mineral Resources at Costerfield, Inclusive of Mineral Reserves as of December 1, 2018 and December 31, 2017.

Argonaut Gold announces San Agustín resource of 845,000 gold ounces and 28.3 million silver ounces (1,280,000 gold equivalent ounces)

PRESS RELEASE NEW MINERAL RESOURCE UPDATE AT PRAIRIE CREEK MINE. Measured + Indicated and Inferred Resource Tonnages Increased

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

Northern Dynasty Minerals Ltd.

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

Details of the NI compliant mineral resource estimate are as follows. Total Inferred 7,603,

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

CANDENTE UPDATES CAÑARIACO NORTE MINERAL RESOURCE ESTIMATE

April Exploring for Canadian Gold in the Rainy River District of Ontario

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

Fission s Initial Resource Totals at PLS: 79.6M lbs Indicated and 25.9M lbs Inferred

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

Form F3 MATERIAL CHANGE REPORT

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

MINERAL RESERVE AND MINERAL RESOURCE STATEMENT

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

Alamos Gold Reports Mineral Reserves and Resources for the Year-Ended 2018

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

Wesdome Announces Interim Mineral Resource Estimate for Kiena Mine Complex and Continued Drilling Extends Kiena Deep A Zone Along Plunge

Fortuna Updates Reserves and Resources

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

GOLD REACH (GRV) ANNOUNCES A 141% INCREASE IN INDICATED AND 91% INCREASE IN INFERRED RESOURCES AT SEEL

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT

(416) Highlights include:

555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M June 13, 2017 SBB NR SBB TSX

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

NEWS RELEASE. Gold Canyon Encounters Meters at 1.81 Grams per Tonne Gold at its Springpole Gold Project

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

IAMGOLD REPORTS FURTHER HIGH-GRADE INTERSECTIONS FROM INFILL AND EXPANSION DRILLING AT SARAMACCA

INFILL DRILLING EXPANDS MINERALIZATION IN HIGH-GRADE GOLD-COPPER CORE AT SOUTHWEST DISCOVERY ZONE TURQUOISE HILL PROJECT, MONGOLIA

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

Coeur Mining Provides Silvertip Exploration Update

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

CENTRAL ZONE CONTINUES TO EXPAND AT EL GALLO 1 MINE REGIONAL DRILLING DELIVERS HIGH SILVER GRADES OVER GOOD WIDTHS NEW RESOURCE UPDATE PENDING

Continental Gold Announces an Updated Mineral Resource Estimate for the Buriticá Project, Colombia

News Release. Infill Drilling Program

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

FILO MINING REPORTS UPDATED MINERAL RESOURCE ESTIMATE FOR THE FILO DEL SOL PROJECT

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:

Lalor Project Disclaimer

Fission Increases Indicated Resource; Doubles Inferred Resource

GoviEx completes acquisition of African Energy s Zambian uranium assets

Continental Gold Announces an Updated Mineral Resource Estimate for the Buriticá Project, Colombia

Kalana Main Diluted Mineral Resource Estimate Above a 0.9 g/t Au Cut-off Grade 1,2

MILLENNIUM MINERALS LIMITED

Ongoing Drilling of Kiena Deep a Zone Confirms Multiple High Grade Lenses and Extends Zone Down Dip

KIRKLAND LAKE GOLD REPORTS WIDE, HIGH-VALUE GOLD INTERCEPTS AT SWAN ZONE UP TO 200 METRES FROM CURRENT MINERAL RESERVES

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development

EXCELLON ANNOUNCES LA PLATOSA EXPLORATION RESULTS: HIGH GRADES CONTINUE TO EXTEND MANTO SULPHIDES DRILL HOLE ENCOUNTERS SOURCE ENVIRONMENT INDICATORS

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

EXPLORATION NEWS RELEASE MAGISTRAL DISTRICT: MORE GROWTH, MORE GOLD, MORE SILVER

NEWS RELEASE November 5, 2018

NEWS RELEASE. Helio Announces Updated Mineral Resource Estimate at SMP Gold Project, Tanzania.

Replacement: Material Increase to Tuzon Resource

Orezone s Bomboré Gold Project Reaches World Class Size

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

ATLANTIC GOLD ANNOUNCES MINERAL RESOURCE ESTIMATES FOR FIFTEEN MILE STREAM AND COCHRANE HILL DEPOSITS, NOVA SCOTIA

August 20, 2018 SBB NR SBB TSX

Fura Gems Inc. FURA ANNOUNCES MAIDEN MINERAL RESOURCE ESTIMATE FOR THE COSCUEZ EMERALD MINE, A FIRST FOR THE COLOMBIAN EMERALD SECTOR

SilverCrest Expands Babicanora High Grade Footprint to 600 metres; New High Grade Vein Discoveries Highlight District Scale Potential

Orford Completes Phase 1 Exploration Program and Generates High-Quality Drill Targets on its Carolina Gold Properties

First Cobalt Extends Iron Creek 100 Metres Downdip in Central Area

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

Alamos Gold Reports Mineral Reserves and Resources for the Year-Ended 2017

IAMGOLD REPORTS HIGH-GRADE DRILL INTERSECTIONS FROM ITS 2017 DRILLING PROGRAM ON THE DIAKHA DEPOSIT, SIRIBAYA PROJECT IN MALI

Transcription:

FOR IMMEDIATE RELEASE Brookfield Place Tel: (416) 367-5500 181 Bay Street, Suite 3630 Fax: (416) 367-5505 Toronto, Ontario M5J 2T3 E: info@romarco.com NEWS RELEASE FOR IMMEDIATE RELEASE February 7, 2012 ROMARCO RESOURCE AT HAILE GROWS TO 4.0 MILLION OUNCES GOLD MEASURED AND INDICATED (TSX:R) (the Company ) is pleased to announce an updated mineral resource estimate for its wholly owned Haile Gold Mine in South Carolina, USA. Resources were calculated for both open pit and underground mineralization based on a block model created by Independent Mining Consultants ( IMC ) that included drill hole assay data through November 16, 2011 and updated lithologic interpretation. A National Instrument ( NI ) 43-101 Technical Report is underway and will be filled on SEDAR within 45 days. New graphics can be viewed at www.romarco.com Resource Highlights - Measured and Indicated resources increased 29% (916,000 ounces) - Through 2011 drilling, mineralized zones within the Haile footprint have now merged into a single mineralized system - At $1,200 per ounce gold, a significant portion of the underground material pulls into the open pit shell demonstrating the continuity of the orebody o The resources currently classified as open pit and underground are estimates and do not presume the mineralization will be mined using these methods. Additional exploration, engineering and trade-off analyses are being conducted on the open pit and underground resources - Open Pit Resources include: o Champion, 601, Small, South Pit, Ledbetter, Snake, a significant portion of Horseshoe and all of Mustang - Underground Resources include: o Palomino and portions of Snake and Horseshoe - First half of 2011 exploration focused on in-fill and condemnation drilling - Second half of 2011 exploration focused on step out drilling - Drill data is through November 16, 2011 Combined Open Pit and Underground Resources Total Haile gold resources stand at 4.0 million ounces measured and indicated, plus an additional 0.8 million ounces of inferred resources. These combined open pit and underground resources represent a 29% increase (approximately 916,000 ounces) in measured and indicated gold resources from the December 14, 2010 NI 43-101 Technical Report. The increase in measured and indicated gold resources was partially offset by a reduction in the inferred portion of the combined resource (equivalent to approximately 271,000 ounces or 25%) as in-fill drilling within the economic shell during 2011 increased the information necessary to classify a significant portion of the previously reported inferred resources as measured and indicated in the current year.

Table 1 below summarizes the current tonnage, grade, and combined open pit and underground, contained ounces at US$1,200 per ounce gold as compared to the previous resources (see NI 43-101 Technical Report dated December 14, 2010): Table 1 Current Resources versus December 14, 2010 Resources at US$1,200/oz Gold Measured Indicated Measured + Indicated CURRENT PREVIOUS VARIANCE CURRENT PREVIOUS VARIANCE CURRENT PREVIOUS VARIANCE (g/t) Ounces 36,894 27,782 9,112 34,277 25,596 8,681 71,171 53,378 17,793 1.79 1.89 (0.10) 1.74 1.75 (0.01) 1.77 1.82 (0.05) 2,125 1,684 441 1,914 1,439 475 4,039 3,123 916 26% 33% 29% CURRENT PREVIOUS VARIANCE (g/t) Ounces 20,125 24,944 (4,819) 1.24 1.34 (0.10) 801 1,072 (271) (25%) The updated resource estimate includes approximately 170,000 meters of new drilling in 416 core and reverse circulation holes added to the drill database between October 1, 2010 and November 16, 2011, of which 70% was exploration (approximately 118,000 meters) and 30% of the holes were for condemnation (approximately 52,000 meters). The resources currently classified as open pit and underground are estimates and do not presume the mineralization will be mined using these methods. Additional exploration, engineering and trade-off analyses are being conducted on the open pit and underground resources. Gold mineralization that lies within the block model but outside of the $1,200 floating cones and identified underground resource shapes has not been reported in this resource estimate. The first half of the 2011-drill program comprised mainly of in-fill and condemnation drilling as the Company focused on advancing the project into production. The second half 2011 exploration drill program focused predominately on step-out drilling exploring for new mineralization. Due to the success of the 2011 drill program and the continuity of the Haile system, a significant portion of the deep mineralization (Horseshoe and Mustang), pulled into the US$1,200 open pit resource shell ( $1,200 shell ). The Palomino zone, discovered later in 2011, is still early in development but holds significant exploration promise and will be a focus of the 2012 program. 2

Diane Garrett, President and CEO stated: Our drilling program for 2011 was a success on all fronts. We cleared the areas we needed for condemnation, converted much of our inferred to M&I, made significant increases in our resources at Haile and had great success in our regional exploration away from Haile. These were our four goals for exploration for the year and our team hit a grand slam. We learned a lot about this very complex system, and it will pay off in continued exploration at Haile and in the region. This updated resource estimate will not require Romarco to alter its pending applications for federal and state approvals because the applications are based on economic reserves, not on resource shells. Open Pit Resources The open pit resource calculations were developed using a US$1,200 per ounce gold price, estimated metallurgical recoveries that average 83%, and a cutoff of 0.41 g/t within a floating cone pit geometry. These resource cones do not necessarily represent final detailed engineered or reserve pits. At its deepest point, the $1,200 shell is 411 meters below surface and contains a significant portion of Horseshoe and all of Mustang. Table 2 below summarizes the tonnage, grade, and contained ounces within the $1,200 shell: Table 2 Open Pit Resources, $1,200 Shell Category (grams per tonne) Ounces Measured 36,767 1.78 2,107 Indicated 33,561 1.68 1,813 M&I 70,329 1.75 3,920 19,424 1.13 707 Underground Resources Snowden Mining Industry Consultants, Vancouver BC (Snowden) used an economic stoping simulator tool that creates underground minable shapes from a block model to determine the underground resources below the $1,200 shell. Longhole blasthole stoping with paste back-fill was selected as the mining method. The underground resource results were based on 30.5-meter strike by 30.5-meter wide by 18.3-meter high stopes. These stope size criteria were applied to the block model prepared by IMC. The cutoff grade of 2.74 g/t used for the underground resource was based on Snowden s estimated total production cost of US$73 per short ton (US$80 per metric tonne) milled. The total production cost was inclusive of underground development, mining, processing and administration costs. Metallurgical recoveries of approximately 83% were applied for underground resource estimates. Only the economic, underground resources outside and below the $1,200 shell have been reported. Isolated zones that were not considered to be amenable to practical mine access, generally less than 100,000 short tons (90,718 metric tonnes), were excluded from the analysis. Underground access would likely be accomplished via decline driven from the surface or from the bottom of a mined pit. The study of the underground resource is ongoing. Trade-off studies will be conducted throughout the mine life to assess the value of reducing or increasing the size of the open pit, and extracting more or less material by underground methods. 3

Table 3 below summarizes the tonnage, grade, and contained ounces at US$1,200 per ounce gold (2.74 g/t cutoff grade) outside and below the open pit resource shell: Table 3 Underground Resources at US$1,200/oz Gold: Category (grams per tonne) Ounces Measured 127 4.39 18 Indicated 716 4.39 101 M&I 843 4.39 119 701 4.18 94 During the process of constructing the computerized block model, basic statistics are calculated on the drillhole assay data. The cumulative frequencies of the assays are plotted on log scale and based on these data, high-grade outliers are selected as limits or cap grades. Cap grades are applied to the assay data to limit the influence of very high-grade information that would otherwise cause over estimation of block grades. Cap grades were applied to assay data according to geologic zones. The cap grades applied to the underground zones are: Palomino - 24 g/t, Snake - 34.3 g/t, and Horseshoe - 103 g/t. Sensitivity Analysis These resource cones do not represent final detailed engineered or reserve pits. The open pit resources contain a significant portion of Horseshoe and all of Mustang at gold prices of US$1,200 per ounce. Gold mineralization within the block model but outside of the resource floating cones and underground stopes has not been reported. Table 4 illustrates the sensitivity analysis of the open pit resource to different gold prices: Table 4 Open Pit Resource Sensitivity to Gold Price Resource Cone Measured Indicated Measured + Indicated Ktonnes g/t Ktonnes g/t Ktonnes g/t Ktonnes g/t M&I Cont d koz Cont d koz US$1,200 (cutoff 0.41 g/t) US$1,400 (cutoff 0.34 g/t) US$1,500 (cutoff 0.34 g/t) US$1,700 (cutoff 0.27 g/t) 36,767 1.78 33,561 1.68 70,329 1.75 19,424 1.13 3,920 707 40,069 1.71 37,922 1.58 77,992 1.65 25,660 1.03 4,131 849 41,161 1.68 41,465 1.54 82,625 1.61 37,454 1.10 4,280 1,321 47,395 1.51 49,253 1.37 96,648 1.44 46,568 0.96 4,470 1,437 4

Qualified Persons The resource calculations were completed by Independent Mining Consultants of Tucson, Arizona under the direction of Mr. John Marek, PE, an independent Qualified Person ("Q.P.") pursuant to NI 43-101. The underground mining methods and production costs and underground stope layouts were completed by Snowden Mining Industry Consultants of Vancouver, BC, under the direction of Mr. Anthony Finch P. Eng, MAusIMM (CP Min) (Divisional Manager Snowden), an Independent Q.P. pursuant to NI 43-101. M3 Engineering & Technology Corp. are currently in the process of completing the NI 43-101 Technical Report under the direction of Mr. Joshua Snider, PE, an independent Q.P. pursuant to NI 43-101 and it will be SEDAR filed when completed. All Q.P. individuals have reviewed and approved this news release. The mineral resource estimate has been calculated using the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Definitions Standards for mineral resources in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects. For a full discussion of the Company's sampling, analysis, quality assurance, quality control, and other technical disclosure, please see the Company's NI 43-101 Technical Report dated February 10, 2010 and on SEDAR. Romarco's Q.P. under NI 43-101 is James Berry, Chief Geologist at Haile. About Romarco Minerals Inc. Romarco Minerals Inc. is a gold development company engaged in the acquisition, exploration and development of precious metals mineral properties. The Company has completed a positive Feasibility study and is continuing exploration and permitting for its flagship project, the Haile Gold Mine in South Carolina. For further information please contact: Romarco Minerals Inc. Diane Garrett, President and CEO Phone: 210-621-4200 E-mail: dgarrett@romarco.com Dan Symons, Vice President, Investor Relations Phone: 416-367-5500 E-mail: dsymons@romarco.com Renmark Financial Communications Inc. Maurice Dagenais 514-939-3989 or via e-mail at mdagenais@renmarkfinancial.com Please note: This entire press release may be accessed via fax, e-mail, Romarco s website at www.romarco.com and through CNW Group s website at www.newswire.ca. All material information on Romarco Minerals Inc. can be found at www.sedar.com 5