WORKING TIMETABLE OF PASSENGER TRAIN SERVICES

Similar documents
Monday 5 th November 2018

The prediction of passenger flow under transport disturbance using accumulated passenger data

Carnes Hill - Liverpool. Carnes Hill - Middleton Grange - Liverpool. Carnes Hill (Greenway Dr) - Liverpool. Bus Route Numbers

Carnes Hill to Liverpool

A route for Railworks 2

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES TRANSPORTATION SYSTEM

South Western Railway Timetable Consultation for December 2018

China Clay for Export A route for Train Simulator 201X

which occurred on in the REPORT ON THE COLLISION SHEFFIELD, VICTORIA, STATION EASTERN REGION BRITISH RAILWAYS RAILWAY ACCIDENTS 25th January 1954 at

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES PARATRANSIT SYSTEM

2.2. The parties provided the following factual background (condensed to relevant facts)

Date of occurrence Location name O Porriño (Pontevedra) Local time 09:25 Latitude Railway vehicle movement events Train derailment.

Carnes Hill to Liverpool

CANADIAN PACIFIC CP CORA. The rules listed apply to operating between Cicero West and Bensenville Yard, part of the CP Elgin Sub

IN RE INVESTIGATION OF AN ACCIDENT WHICH OCCURRED ON THE UNION PACIFIC RAILROAD AT MENOKEN; KANS., ON JULY 24, 1930.

Eclipse Extravaganza FAQs

Working with equations for speed and velocity

Chapter 2 1D KINEMATICS

news update August 2018 (No.6/18)

Delay Attribution Board. Guidance No. DAB-28

Cambridge International Examinations Cambridge International General Certificate of Secondary Education

Report - Safety Investigation

Topic Check In Exact calculations

Network Rail Engineering Work between Queen s Park and Watford Junction

Town of Bowden Province of Alberta Policy Document ( ) SNOW REMOVAL POLICY

MEI STRUCTURED MATHEMATICS 4767

A Unique, Educational SELL-OUT EVENT. September 15, 2018 Convention Center 10am-3pm at the Empire State Plaza 2018 EXHIBITOR INFORMATION

RIDER S GUIDE. Virginia E. Haines Ocean Ride, Freeholder Liaison. Freeholder Liaison s Message

Data Collection. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew. 1 Overview 1

DOI /HORIZONS.B P40 UDC (71) MODELLING METRO STATION BOARDING AND ALIGHTING TIMES 1

Additional Mathematics. Paper 1 Pure Mathematics

JOURNAL OF THE CSXT HISTORICAL SOCIETY Volume 7 Number 2

Train Operations. Paul Finnegan. Celebrating the legacy of the Feather River Route

A train begins a journey from a station and travels 60 km in a time of 20 minutes. The graph shows how the speed of each runner changes with time.

Delay management with capacity considerations.

POLICY. Date initially approved: Pre-2005 Date of last revision: December 3, 2012

Typical information required from the data collection can be grouped into four categories, enumerated as below.

Physics 221, January 24

Traffic Modelling for Moving-Block Train Control System

Finding Aid for the Collection of Material about the Southern Pacific Railway,

An Investigation of the Influences on Train Dwell Time

AOP 16 Winter Operations (Aerodrome Operating Procedure)

Review of Rail Network Performance in the Snow of December 2010

It may be extreme weather to you, but to us it s just winter. Keith Bailey, Transport Focus Polly Hollings, GfK UK

Physics 101. Hour Exam I Spring Last Name: First Name Network-ID Discussion Section: Discussion TA Name:

IN RE INVESTIGATION OF AN ACCIDENT WHICH OCCURRED ON THE OREGON SHORT LINE RAILROAD NEAR MEDBURY, IDAHO, ON JANUARY 11, 1920.

Mountain View Community Shuttle Monthly Operations Report

Hamburg City Map (Cartographia Map) READ ONLINE

From Rodinia to Pangea: Geodynamics, Life and Climate

A LETTER OF INFORMATION International field geo-cryological course for students and young scientists at the Kodar ridge in Zabaikalsky krai, Russia

Parallel Requirements of Construction Standards for Accessibility ANSI, UFAS and ADAAG

IN THE MATTER OF AN ARBITRATION. and TEAMSTERS CANADA RAIL CONFERENCE

SONOMA COUNTY FIRE TIMELINE. November 1, 2017

NATMAP SURVEY BEACONS IN GOOD CONDITION AFTER 46 YEARS

Name. 1. Given the solution (3, y), what is the value of y if x + y = 6? 7. The graph of y = x 2 is shown below. A. 3 B. 4 C. 5 D.

Physics 117 Mock Midterm Sunday, February 10, 2019 * 2 pm Room 241 Arts Building *

Note on Posted Slides. Chapter 3 Pre-Class Reading Question. Chapter 3 Reading Question : The Fine Print. Suggested End of Chapter Items

SOME FACTORS INFLUENCING THE REGULARITY OF SHORT HEADWAY URBAN BUS OPERATION*


Review. A Bernoulli Trial is a very simple experiment:

Funsheet [ENERGY TRANSFORMATIONS] Gu 2017

T-12 / Informed Traveller

Tahlequah Public Schools Inclement Weather Transportation Plan

Western Treatment Plant (WTP)

Published by ASX Settlement Pty Limited A.B.N Settlement Calendar for ASX Cash Market Products

2019 Settlement Calendar for ASX Cash Market Products. ASX Settlement

UIC Physics 105. Midterm 1 Practice Exam. Summer 2013 Best if used by July 2 PROBLEM POINTS SCORE

ATTENTION PARENTS/GUARDIANS PLEASE READ THE ATTACHED INFORMATION AND RETAIN FOR YOUR RECORDS OR RETURN IF APPLICABLE

Demonstrate knowledge of a track warrant control (TWC) system

Access Statement for Kielder Observatory

Public Transport Versus Private Car: GIS-Based Estimation of Accessibility Applied to the Tel Aviv Metropolitan Area

Risk Assessment and Management System (RAMS)

This is a closed book exam. You have ninety (90) minutes to complete it.

A.R.M. 52 PLOW With QUICK ATTACH MOUNTING SYSTEM MODEL NUMBER BLACK MODEL NUMBER GRAY. Owner s Manual

Access Statement for Kielder Observatory

Mountain View Community Shuttle Monthly Operations Report

A control strategy to prevent propagating delays in high-frequency railway systems

Cardiff Astronomical Observatory

The drag lift pulls the skier from the bottom to the top of a ski slope. Figure 1. Which arrow represents the force pulling the skier up the slope?

WELCOME TO PROHIBITION

BOER WAR ATTACK ON A CAPE GOVERNMENT RAILWAY TRAIN AT SHERBORNE by Allen Duff

A Mixed Integer Linear Program for Optimizing the Utilization of Locomotives with Maintenance Constraints

Travel and Transportation

SECTION 3 - VELOCITY

Trip Generation Characteristics of Super Convenience Market Gasoline Pump Stores

Weybridge A317. Addlestone. Byfleet. Brooklands A 318. Woodham. Woking. B385 Byfleet Avoiding low bridge B K L A N D S D R B R O O

Welcome to Stargazing LIVE Main University Hall University of Surrey Guildford PROGRAMME

THIS IS A NEW SPECIFICATION

PLC Papers. Created For:

Facing the winter challenges for railways in Europe - Winter & Railways Fact Sheet Root Causes Rolling Stock and Infrastructure UIC Survey Evaluation

City of Hermosa Beach Beach Access and Parking Study. Submitted by. 600 Wilshire Blvd., Suite 1050 Los Angeles, CA

On solving multi-type railway line planning problems

CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION

Created by T. Madas POISSON DISTRIBUTION. Created by T. Madas

Grade 11 Physics Homework 2. D. Distance moved in a given direction (1) P L

September 13, 2018 MEDIA RELEASE. Waynesboro Department of Emergency Management Waynesboro Police Department Waynesboro Fire Department

HWA CHONG INSTITUTION 2018 JC2 PRELIMINARY EXAMINATION. Monday 17 September hours

REQUEST FOR PROPOSALS

CAP 437 Offshore Meteorological Observer Training

LNER Class L1. By Peter Sheppard

Transcription:

Spa Valley Railway 2017 SECTION WE A DESTINATION AT EVERY STATION! WORKING TIMETABLE OF PASSENGER TRAIN SERVICES SOUTHERN REGION (CENTRAL DIVISION) SPA VALLEY LINE Saturday 27 th, Sunday 28 th & Monday 29 th August 2017 20 th Birthday Bash When trains are running late, Drivers must endeavour to make up time with due regard to ALL speed restrictions and the braking capability of the train. The Spa Valley Railway reserves the right to alter or suspend any services shown below without prior warning and cannot be held responsible for any disappointment or disruption caused. Jonnie Wesson General Manager Spa Valley Railway Version 1.0 Wednesday 9 th August 2017

Locomotives/Units (all subject to availability): BR Standard 4MT 80078 RSH 62 Ugly Drewry 2591 Southerham Class 31 5518 Courtesy of Suburban Preservation Class 33/0 33063 R.J.Mitchell Class 50 50026 Indomitable Courtesy of PTG Tours Ltd Class 207 DEMU 1317 Class 421 3CIG 1497 Freshwater Courtesy of its owners Coach Sets: A: QMBV 4999 (TSO) 21214 (BCK) 25843 (SOB) 4828 (SO) 9414 (BSO) Seating: 20 Standing 64 30 30 48 27 B 76764 (DTCsoL) 62402 (MBSO) 76835 (DTCsoL) 60142 (DMBSO) 60619 (DTC) Seating: 55 40 55 42 76 B/V London Transport Brake Van Standing: 10 standing CIG: 76764 (DTCsoL) 62402 (MBSO) 76835 (DTCsoL) Seating: 55 40 55 DEMU: 60142 (DMBSO) 60619 (DTC) Seating: 42 76 Headcodes: T = Tunbridge Wells West, J = Eridge, G = Groombridge 0 = Light Engine 1 = Fast through High Rocks/Groombridge and/or Dining train 2 = Stopping train. Symbols in Timetable: n/s = Does not stop here T Terminates, please alight from the train. X = Crossing point with another service R Request stop, please advise the Guard if you wish to alight. [ = Bar car Kate is included in this set serving alcoholic beverages, hot & cold drinks plus light refreshments. General Notes: Unless otherwise requested, locomotives on the rear will not assist the leading locomotive. Connections at Groombridge can only be made if alighting in from a down direction (towards Eridge) service you will not be able to connect with a down train if travelling on the up direction (towards Tunbridge Wells West) service. All passengers wishing to alight at High Rocks or make connections at Tunbridge Wells West, please be ready to alight as soon as the train has stopped. Travelling in the carriage at the Eridge end of the set is preferred for alighting at High Rocks. Please do not under any circumstances alight from a moving train and only alight where there are platforms or access steps. Where n/s is shown in the timetable that train does not stop there. Alighting is not possible in Groombridge Loop. Set C does not call at High Rocks or Groombridge unless otherwise shown, it will run fast between Tunbridge Wells West & Eridge. Stations: Platform 1 at Tunbridge Wells West is of full height; step free access is available. Platform 2 at Tunbridge Wells West is of half height, access to the train is by use of steps only. YARD is the Yard at Tunbridge Wells West, access to the train is by use of steps only. Platform 2 & 3 at Eridge is of full height, step free access to the station platforms is not available. Connections: Whilst we understand passengers like to make connections, please note in the event of late running this may not be possible.

Eridge section: To comply with our Eridge operating instructions, doors will be locked on the Network Rail side of the train between Groombridge and Eridge. Groombridge Drewry No. 2591 At selected intervals in between trains our Drewry locomotive will be available for Driver for a Fiver and Brake Van rides, these will be advertised on a separate timetable in advance. Please note: Our railway is run entirely by volunteers, we will not tolerate any verbal or physical abuse towards them. The Spa Valley Railway reserves the right to make changes to the timetable or locomotive allocations for whatever reason without prior notice being given. This may be due to late running, locomotive failure or otherwise, our decision is final. Full event updates can be found on our Facebook page.

SATURDAY 26 TH AUGUST 2017 Locomotive(s) Leading / (Trailing) 2591 ID 2G05 2J07 2J09 2J11 2J13 2J15 2J17 2J19 2J21 2J23 2J25 2J27 2J29 2J31 SET L/T A[ B A[ B A[ B A[ B A[ B A[ A[ A[ 62 50026 33063 80078 62 50026 33063 80078 62 50026 33063 Platform 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Depart 09:15 09:45 10:30 11:15 12:00 12:45 13:30 14:15 15:00 15:45 16:30 17:15 19:00 20:20 High Rocks Halt Depart n/s n/s 10:37 11:22 12:07 12:52 13:37 14:22 15:07 15:52 16:37 n/s n/s n/s 33063 33063 Arrive 09:35 09:57 10:44 11:29 12:14 12:59 13:44 14:29 15:14 15:59 16:44 17:27 n/s n/s Depart 09:37 09:59 10:46 11:31 12:16 13:01 13:46 14:31 15:16 16:01 16:46 17:29 n/s n/s Arrive 10:08 10:55 11:40 12:25 13:10 13:55 14:40 15:25 16:10 16:55 17:38 19:25 20:45 2 2 2 ID 2T06 2T08 2T10 2T12 2T14 2T16 2T18 2T20 2T22 2T24 2T26 2T28 2T30 2T32 SET A[ B A[ B A[ B A[ B A[ B A[ L/T A[ A[ Locomotive(s) Leading / (Trailing) 80078 62 50026 33063 80078 62 50026 33063 80078 62 50026 2 2 2 Depart 10:30 11:15 12:00 12:45 13:30 14:15 15:00 15:45 16:30 17:15 18:00 19:35 20:55 2591 80078 80078 Groombridge Loop Arrive 10:39 11:24 12:09 12:54 13:39 14:24 15:09 15:54 16:39 17:24 n/s n/s n/s Groombridge Loop Depart 10:47 11:32 12:17 13:02 13:47 14:32 15:17 16:02 16:47 17:30 n/s 18:15 n/s n/s Arrive 10:48 11:33 12:18 13:03 13:48 14:33 15:18 16:03 16:48 17:31 18:12 18:16 n/s n/s Depart 10:50 11:35 12:20 13:05 13:50 14:35 15:20 16:05 16:50 17:33 18:14 18:30 n/s n/s High Rocks Halt Depart 10:58 11:43 12:28 13:13 13:58 14:43 15:28 16:13 n/s n/s n/s n/s n/s n/s Arrive 11:05 11:50 12:35 13:20 14:05 14:50 15:35 16:20 17:02 17:45 18:26 18:47 20:00 21:25 Platform 1 1 1 1 1 1 1 1 1 1 1 YARD 1 1

SUNDAY 27 TH AUGUST Locomotive(s) Leading / (Trailing) 2591 1317 ID 2G05 2J07 2J09 2J11 2J13 2J15 2J17 2J19 2J21 2J23 2J25 SET L/T DEMU A[ DEMU A[ DEMU A[ DEMU A[ DEMU A[ 33063 1317 80078 1317 33063 1317 80078 1317 33063 Platform 1 1 1 1 1 1 1 1 1 1 1 Depart 09:15 09:45 10:30 11:15 12:00 12:45 13:30 14:15 15:00 15:45 16:30 High Rocks Halt Depart n/s n/s 10:37 11:22 12:07 12:52 13:37 14:22 15:07 15:52 16:37 Arrive 09:35 09:57 10:44 11:29 12:14 12:59 13:44 14:29 15:14 15:59 16:44 Depart 09:37 09:59 10:46 11:31 12:16 13:01 13:46 14:31 15:16 16:01 16:46 Arrive 10:08 10:55 11:40 12:25 13:10 13:55 14:40 15:25 16:10 16:55 ID 2T06 2T08 2T10 2T12 2T14 2T16 2T18 2T20 2T22 2T24 2T26 SET DEMU A[ DEMU A[ DEMU A[ DEMU A[ DEMU A[ L/T Locomotive(s) Leading / (Trailing) 1317 80078 1317 33063 1317 80078 1317 33063 1317 80078 Depart 10:30 11:15 12:00 12:45 13:30 14:15 15:00 15:45 16:30 17:15 2591 Groombridge Loop Arrive 10:39 11:24 12:09 12:54 13:39 14:24 15:09 15:54 16:39 17:24 Groombridge Loop Depart 10:47 11:32 12:17 13:02 13:47 14:32 15:17 16:02 16:47 17:30 Arrive 10:48 11:33 12:18 13:03 13:48 14:33 15:18 16:03 16:48 17:31 17:35 Depart 10:50 11:35 12:20 13:05 13:50 14:35 15:20 16:05 16:50 17:33 17:50 High Rocks Halt Depart 10:58 11:43 12:28 13:13 13:58 14:43 15:28 16:13 n/s n/s n/s Arrive 11:05 11:50 12:35 13:20 14:05 14:50 15:35 16:20 17:02 17:45 18:10 Platform 1 1 1 1 1 1 1 1 1 1 2

MONDAY 28 TH AUGUST 2017 Locomotive(s) Leading / (Trailing) 2591 ID 2G05 2J07 2J09 2J11 2J13 2J15 2J17 2J19 2J21 2J23 2J25 SET L/T A[ B A[ B A[ B A[ B A[ B 62 5518 50026 80078 62 5518 50026 80078 62 5518 Platform 1 1 1 1 1 1 1 1 1 1 1 Depart 09:15 09:45 10:30 11:15 12:00 12:45 13:30 14:15 15:00 15:45 16:30 High Rocks Halt Depart n/s n/s 10:37 11:22 12:07 12:52 13:37 14:22 15:07 15:52 16:37 Arrive 09:35 09:57 10:44 11:29 12:14 12:59 13:44 14:29 15:14 15:59 16:44 Depart 09:37 09:59 10:46 11:31 12:16 13:01 13:46 14:31 15:16 16:01 16:46 Arrive 10:08 10:55 11:40 12:25 13:10 13:55 14:40 15:25 16:10 16:55 ID 2T06 2T08 2T10 2T12 2T14 2T16 2T18 2T20 2T22 2T24 2T26 SET A[ B A[ B A[ B A[ B A[ B L/T Locomotive(s) Leading / (Trailing) 80078 62 5518 50026 80078 62 5518 50026 80078 Depart 10:30 11:15 12:00 12:45 13:30 14:15 15:00 15:45 16:30 17:15 62 (5518) 2591 Groombridge Loop Arrive 10:39 11:24 12:09 12:54 13:39 14:24 15:09 15:54 16:39 17:24 Groombridge Loop Depart 10:47 11:32 12:17 13:02 13:47 14:32 15:17 16:02 16:47 17:30 Arrive 10:48 11:33 12:18 13:03 13:48 14:33 15:18 16:03 16:48 17:31 17:35 Depart 10:50 11:35 12:20 13:05 13:50 14:35 15:20 16:05 16:50 17:33 17:50 High Rocks Halt Depart 10:58 11:43 12:28 13:13 13:58 14:43 15:28 16:13 n/s n/s n/s Arrive 11:05 11:50 12:35 13:20 14:05 14:50 15:35 16:20 17:02 17:45 18:10 Platform 1 1 1 1 1 1 1 1 1 1 2

Groombridge Brake Van Rides ID 2A63 2A65 2A67 2A69 2A71 2A73 2A75 2A77 2A79 2A81 2A83 2A85 2A87 2A89 2A91 2A93 2A95 2A97 SET L/T L/T L/T L/T L/T L/T L/T L/T L/T L/T L/T L/T L/T L/T L/T L/T L/T L/T Locomotive(s) Leading / (Trailing) 2591 2591 2591 2591 2591 2591 2591 2591 2591 2591 2591 2591 2591 2591 2591 2591 2591 2591 Depart 10:05 10:20 10:55 11:10 11:40 11:55 12:25 12:40 13:10 13:25 13:55 14:10 14:40 14:55 15:25 15:40 16:10 16:25 ASHURST SPUR Arrive 10:10 10:25 11:00 11:15 11:45 12:00 12:30 12:45 13:15 13:30 14:00 14:15 14:45 15:00 15:30 15:45 16:15 16:30 ID 2G64 2G66 2G68 2G70 2G72 2G74 2G76 2G78 2G80 2G82 2G84 2G86 2G88 2G90 2G92 2G94 2G96 2G98 SET L/T L/T L/T L/T L/T L/T L/T L/T L/T L/T L/T L/T L/T L/T L/T L/T L/T L/T Locomotive(s) Leading / (Trailing) 2591 2591 2591 2591 2591 2591 2591 2591 2591 2591 2591 2591 2591 2591 2591 2591 2591 2591 ASHURST SPUR Depart 10:11 10:26 11:01 11:16 11:46 12:01 12:31 12:46 13:16 13:31 14:01 14:16 14:46 15:01 15:31 15:46 16:16 16:31 Arrive 10:16 10:31 11:06 11:21 11:51 12:06 12:36 12:51 13:21 13:36 14:06 14:21 14:51 15:06 15:36 15:51 16:21 16:36 Notes: 1) Orange = Driver for a Fiver (no public accommodation) 2) Blue = Brake Van Rides (public accommodation) 3) In the event of a Driver for a Fiver not selling then it will operate as a Brake Van Ride. 4) The Brake Van Rides will operate using our London Transport Brake Van, maximum capacity is stipulated by the Guard, please note we may not be able to accommodate all enthusiasts in one trip, in the event of late running trips may have to be re-timed. 5) Brake Van Rides will operate along the former Ashurst Spur towards Ashurst Junction, there is no alighting at the end of the line, the Ashurst Spur is approximately 4 carriage lengths. 6) There is NO additional charge for Rover Ticket holders, for those arriving on the day and would just like a Brake Van Ride it is a 1 supplement payable to the Station Master at Groombridge Station Ticket Office. 7) Our railway is run entirely by volunteers, we will not tolerate any verbal or physical abuse towards them. 8) The Spa Valley Railway reserves the right to make changes to the timetable or locomotive allocations for whatever reason without prior notice being given. This may be due to late running, locomotive failure or otherwise, our decision is final. Full event updates can be found on our Facebook page.