A Unique Approach to Telescope Control

Similar documents
VIRUS: A giant spectrograph

Using SkyTools to log Texas 45 list objects

LIVE FROM MCDONALD OBSERVATORY PROGRAM PRE-CONFERENCE ACTIVITIES. Purpose

What is SALT? An Introduction to SALT

SOFT 423: Software Requirements

WeatherWatcher ACP. Astronomers Control Panel (V4 or >) Ambient Virtual Weather Station (Pro or Internet editions) ASCOM platform v4.

HETDEX Overview. Hobby Eberly Telescope Dark Energy Experiment. HETDEX is: HETDEX enables a lot of ancillary science. HETDEX Science Workshop Feb 09

HETDEX March 25, 2006 HETDEX. The Hobby Eberly Telescope Dark Energy Experiment

Photoelectric Photometry of the Pleiades Student Manual

Photoelectric Photometry of the Pleiades Student Manual

The VLT dealing with the Atmosphere, a Night Operation point of view

Polar alignment in 5 steps based on the Sánchez Valente method

CHARTING THE HEAVENS USING A VIRTUAL PLANETARIUM

Starlight in the university lab: Astrolab

A GUI FOR EVOLVE ZAMS

Photoelectric Photometry of the Pleiades

Astro 3 Lab Exercise

CHARTING THE HEAVENS USING A VIRTUAL PLANETARIUM

The Hobby-Eberly Telescope Dark Energy Experiment (HETDEX)

Best Pair II User Guide (V1.2)

ACE Control System. 1.0-m Pomona College Telescope Table Mountain Observatory ACE User Manual April 2005 Revision All rights reserved.

ARISTARCHOS TELESCOPE 2.3 m

Claude. arxiv: v1 [astro-ph.im] 26 Feb Tim-Oliver Husser. An Automation Tool for the Monet Telescopes. Manual. (November 13, 2018)

Lesson Plan 2 - Middle and High School Land Use and Land Cover Introduction. Understanding Land Use and Land Cover using Google Earth

William H. Bauman III * NASA Applied Meteorology Unit / ENSCO, Inc. / Cape Canaveral Air Force Station, Florida

Lecture 8. October 25, 2017 Lab 5

Observation: NOT OBSERVING Either Not observing, Waiting, On Source, On reference, Scanning etc.

Astronomical coordinate systems. ASTR320 Monday January 22, 2018

This is the third of 3 parts detailing my experience of auto guiding for astrophotography.

WeatherHawk Weather Station Protocol

Hubble's Law and the Age of the Universe

2. 4 m O b s e r v a t o r y T e c h n i c a l N o t e Date: 2008 June 9 version 1.9

VIRUS Instrument Collimator Assembly

Photoelectric Photometry of the Pleiades

Objectives: (a) To understand how to display a spectral image both as an image and graphically.

PS 101: Introductory Astronomy Fall 2014

LCO Global Telescope Network: Operations and policies for a time-domain facility. Todd Boroson

CONFIRMATION OF A SUPERNOVA IN THE GALAXY NGC6946

Achievements of Space Debris Observation

NATIONAL RADIO ASTRONOMY OBSERVATORY MEMORANDUM

UNIWERSAŁ observatory dome

a computer running the CLEA activity The Large Scale Structure of the Universe. a computer running a spreadsheet program

An Adaptive Autoguider using a Starlight Xpress SX Camera S. B. Foulkes, Westward, Ashperton, Nr. Ledbury, HR8 2RY. Abstract

2008 Nightly Reports and Remote Observations

MEDIAGLOBE-III Feature 1 Highest resolution and contrast ratio as small sizes digital planetarium system

GPS Measurement Protocol

The Hubble Redshift Distance Relation

Operation of the 1-m Telescope and Echelle Spectrograph Ritter Observatory

Near-Infrared Tip-Tilt Sensor Observing Operations Concept Document

Addendum For NexStar GT Hand Control Section Of The Owner's Manual.

Starry Night Version 5.7 Features What s new and how to use them!

Introduction: Objectives: (a) To understand how to compile a list of objects for imaging with a CCD.

Remote Observing with HdA/MPIA's 50cm Telescope

LAB: Photometry of the Pleiades Cluster

Astro 101 Lab #1. To advance time forward and backward, click on the arrow toolbar. From left to right, the buttons will

LabVIEW: a Graphical Dataflow Language and Telescopes. Silicon Valley Forth Interest Group Sunnyvale, January 28, 2006

FIELD SPECTROMETER QUICK-START GUIDE FOR FIELD DATA COLLECTION (LAST UPDATED 23MAR2011)

Quick Reference Manual. Ver. 1.3

Stellar Astronomy 1401 Spring 2009

Remote and Robotic Operation of the Dominion Astrophysical Observatory 1.2-m Telescope and McKellar Spectrograph

Dear Teacher, Overview Page 1

O P E R A T I N G M A N U A L

Production line Assembly of 150+ VIRUS Spectrographs

CLEA/VIREO PHOTOMETRY OF THE PLEIADES

C2A for Pulsar2 how to control your telescope from C2A

Appendix 4 Weather. Weather Providers

Operating the Celestron 14 Telescope

Notifications and Accretions: Facility Role

Astronomy 50. Lab Manual

Gemini Integration Time Calculators

UltraWeatherBug3 HSPI User s Guide A HomeSeer HS3 plug-in to access live local weather conditions, forecasts and severe weather alerts

in the Mediterranean

The Mass of Jupiter Student Guide

-ASTR 204 Application of Astroimaging Techniques

08-Nov METARs and TAFs are shown in coded and decoded text format under the Airfield information where weather data is available.

1. Starting of a project and entering of basic initial data.

Structures in the Magnetosphere 2. Hover the curser over a point on the image. The coordinates and value at that point should appear.

The TexasET Network and Website User s Manual

Understanding Positional Astronomy Part 2 Celestial Co-ordinates Difficulty: Intermediate

Kitt Peak Nightly Observing Program

INTEGRAL. Science Operations Centre. Announcement of Opportunity for Observing Proposals (AO-7) Integral AO Tools Software User Manual

ON SITE SYSTEMS Chemical Safety Assistant

THE ATIS INSTRUCTION SET FOR COMMUNICATION WITH ROBOTIC ASTRONOMICAL TELESCOPES

On-line demonstrator experiment implemented CODE: DEL-040 VERSION: 01

An Instrument/Sensor Analysis of the MMSF Automated Photometric Telescope Indiana University Computer Science Department TR# 597

Telescopio Nazionale Galileo. GIARPS mode. Short Observer s Guide. Prepared by Avet Harutyunyan

Table of Contents and Executive Summary Final Report, ReSTAR Committee Renewing Small Telescopes for Astronomical Research (ReSTAR)

The Venus-Sun distance. Teacher s Guide Advanced Level CESAR s Science Case

Stellarium Walk-through for First Time Users

Bloomsburg University Weather Viewer Quick Start Guide. Software Version 1.2 Date 4/7/2014

Radar Measurement of the Rotation Rate of Mercury Student Manual

SuperCELL Data Programmer and ACTiSys IR Programmer User s Guide

Tools of Modern Astronomy

Star Cluster Photometry and the H-R Diagram

CHEMICAL INVENTORY ENTRY GUIDE

HARPS-N Operation Guide

3. When you enter the dome the telescope should be in its parked position.

Traffic accidents and the road network in SAS/GIS

INTEGRAL. Science Operations Centre. Announcement of Opportunity for Observing Proposals (AO-11) INT/OAG/ /Dc Issue 1.

Proper Motion of Barnards Star

Transcription:

A Unique Approach to Telescope Control Brandt M. Westing The University of Texas at Austin, Electrical Engineering Dept., Austin, TX 78705 westing@ece.utexas.edu Abstract A new Graphical User Interface (GUI) has been proposed to replace the current Telescope Control System (TCS) interface at the Hobby-Eberly Telescope (HET). The proposal centers on a purely graphical interface to supplant the current interface for use in controlling the telescope and related equipment, as well as providing a display for several sources of crucial data for the telescope operator. In this endeavor, I analyze the possibilities of a graphical interface. The observations of the telescope operator are described to elucidate some of the decisions made about the interface, as are some of the considerations that must be made when developing a new interface for a complicated telescope control scheme. I also discuss the decisions on the integration of other control GUI s into the control system interface. Introduction The Hobby-Eberly Telescope (HET) is unique in that unlike a classical equatorial or Alt- Azimuth telescope, it has a fixed elevation/zenith angle and moves only in azimuth. (Fig. 1) The Alt-Fixed Azimuth paradigm requires a moving instrument platform to allow tracking and precision pointing ability. The prime focus moving instrument platform, known as the tracker moves with six degrees of freedom and contains a spherical aberration corrector, the Low Resolution Spectrograph (LRS) unit, guide cameras, as well as feeds for the other instruments. The HET requires more than just the RA/DEC movements of classical telescopes to acquire a target. This design was developed to accommodate a low cost telescope suited for spectroscopy, although is capable of surveys, namely the future HET Dark Energy Experiment (HETDEX). The telescope is also unique in that it is a multi-mirror primary design. Ninety-one hexagonal mirrors make up the 10 by 11 meter primary to overcome some of the problems inherent in large mirror design, albeit at a computing and control cost. The HET is located on Mt. Fowlkes at the McDonald Observatory and is operated by the University of Texas at Austin and paid for by five institutions: The University of Texas at Austin, Pennsylvania State University, Ludwig-Maxmilians Universitat Munchen, Georg- August-Universitat Gottingen, and Stanford University. The telescope uses three instruments, a low, medium, and high resolution spectrograph to allow for diverse science operations. The medium and high resolution spectrographs are locating below the telescope in the basement of the dome and are fed by fiber.

Figure 1. HET Structure and Tracker Considerations for a New Observatory Control Scheme The HET is generally operated by two staff members at night: a telescope operator and a resident astronomer. During the day there is a full time engineering staff on duty. The telescope operator is responsible for several tasks in the observatory environment at night, but primarily safety and telescope operation. The definition of telescope operation is one we are primarily concerned with in designing a new control interface. There are several questions that must be asked to accurately provide the correct data and control methods for the operator s use. To provide an answer to this question, or to complete this definition, it is necessary to observe the operator on a nightly basis for an extended amount of time. In this case, the various operators were observed for a period of about six to seven weeks. The actions of the telescope operator on both a casual control basis and on a troubleshooting control basis are of concern. When the actions and the informational needs of the telescope operator are documented, an interface can then be designed around those requirements. Another consideration for a control interface is not only determining the data and information requirements of the telescope operator, but determining the regularity of use of said data. It is detrimental to include irrelevant information in the interface as it is impractical. The telescope operator should not have to sift through data to make a

decision, especially when such decisions are made regularly. If irrelevant information is reduced and relevant information is easy to discern then less mistakes are made by the operator, who is spending less time operating the telescope and more time taking data for scientific purposes. Defining the Project: An Operators Control System Fundamental decisions about how the project would proceed were made during the time in which the operators were observed. These decisions culminated in the fact that using the general method for programming a GUI would be unfit for this project and redundant. The current control system interface works as a control system(fig. 2), what would be the advantage in creating an interface around the programmer s ideas if the operators needs were not first documented and taken into account? The programmed interface may be no better than the original. Although a study on the operator use was not made previous to the prototype of the new Telescope Control System (TCS) GUI, programmed by a Research Experience for Undergraduates student from the previous year, considerations were taken into account on behalf of the operators. The groundwork for the new control system had been completed, and a mock-up interface was created. Accordingly, it has been the continuation of the project to document the telescope operator s data requirement needs as well as specify any changes that should be made to the prototype. It is important to also allow engineering use of the telescope via the new TCS. In addition, a new telescope hand paddle system has been specified as well as a few complements to the interface that astronomers and operators have expressed interest in.. Figure 2. The current control interface.

The New User Interface Several changes have been made to the prototype interface as well as a couple additional functionality features specified. Specifically, Differential Image Motion Monitor (DIMM) data have been requested in the user interface as well a separate interface for the resident astronomer to monitor some of the information that the telescope operator uses. It is more pertinent, however, to explain the new interface (Fig. 3) as well as mention some of the changes made from the prototype over the course of the summer: 1. Text Module Figure 3. The New TCS Interface The text module displays the current time as well as data that is pertinent to the T.O. The content of the text module will contain the track time and the current and next azimuth. 2. Go Next Go Next will initiate a target move. The button will automate the dome to the Next Azimuth position assuming dome automation is enabled. Go Next will take the RA and Dec sent by the astronomer via Htopx protocol and calculate the correct offsets for X, Y, Z, and theta for slew and track.

3. The Heading Circle The heading circle is the center of the telescope status representation. The red pointer will indicate the azimuth of the telescope and dome. Also included within the heading circle is a reference star field from an online sky survey database. 4. History Module This module will show the latest input from the T.O. to the interface. The history module with respond to a left mouse click by expanding to show the last 5 10 entries in the history. The history module will also contain programming to log the input to the interface. 5. Radar Map The Radar Map will show the current weather conditions radar from an online source via expansion after a left mouse click. 6. Hand Paddle Module The new hand paddle module will differ from the previous hand paddle in several ways based off of T.O. input. It has been suggested that two hand paddles should be used, one for night operations and one for engineering operations. An example sketch of the new hand paddle for night operations: A simple control set as in the hand paddle above will make a less cluttered and simpler interface for night operations while supporting all manual controls. Minimal controls will reduce T.O. fatigue. A second hand paddle, for engineering use, could be similar to the current hand paddle. The hand paddle displayed when

clicking the hand paddle icon will depend on the option set in the menu under hand paddle type. 7. SkyCam 8. Menus The SkyCam is currently in development and will display the current sky conditions in a picture format (FITS) updated every 5 minutes. The source of the saved camera image is TBD, however it will likely be a web server. The SkyCam picture will expand to cover the primary window when left clicked. The Menus object will display a drop down menu for several configurable options as well as an optional method to view the modules. The menu will support engineering operations for the telescope 9. Flag/Warning Module This module will display the current warning or flags received by the system. The system will flag or flash a warning when either a fault occurs or an action of relevance to telescope safety or operation occurs. A text message will be displayed. Examples of such events are: rain detected, humidity warnings, wind warnings, and operation faults. This will warn the TO of any faults or problems with the system, and is meant to keep the TO from constantly needing to monitor data. 10. Weather Data Module This module will expand to cover the primary interface when left clicked and will display Mt. Fowlkes local weather available from the dome computer. This is optional, the dome weather status is generally visible via the TV monitor during night operations. While some of the interface details had been determined previous to operator observations and documentation, a large majority had not. The viability of the following have been determined over the summer and included into the interface plans: Skycam functionality, a hand paddle module, menu functionality, warning and flag module, as well as the weather data module. Another functionality of the interface that has been determined is a dome and structure follow telescope automation. Currently, the operator must specify a dome azimuth and structure azimuth separately upon receiving the next target via the resident astronomer. It would be prudent as well as obvious to integrate a dome and structure automation scheme in the new TCS. This, again, would allow more time for science by decreasing operation time.

Summary A new GUI for telescope control at the Hobby-Eberly Telescope has been defined and the specific interface details have been determined according to the relevancy of the control information to the telescope operator. The requirements of the operator were determined by a six week period of observation of the telescope operator both in troubleshooting situations as well as in casual control situations. The observed requirements of the operator were used to further define and develop the new Telescope Control System interface. Acknowledgements Special thanks to the National Science Foundation for support in the McDonald Observatory REU program. I would like to than Dr. Matthew Shetrone for acquiring the NSF grant and showing us how great a REU summer can be. I am thankful for Dr. Jim Fowler for his guidance and insight into how much more there is to programming than just the code; Of course, the code is very important as well! I would especially like to thank the entire McDonald Observatory staff for showing myself and others how attractive a field astronomy really can be, and that it is not just contained in a textbook or a classroom.