For personal use only BUILDING A SUBSTANTIAL EUROPEAN COAL COMPANY

Similar documents
MAIDEN JORC RESOURCE CONFIRMS SIGNIFICANT COAL DEPOSIT AT MARIOLA COAL PROJECT, POLAND

BALAMARA SECURES ADVANCED WORLD-SCALE COKING COAL PROJECT IN POLAND

COKAL ANNOUNCES POSITIVE RESULTS FROM SCOPING STUDY OF UNDERGROUND MINING AT BBM COAL PROJECT INDONESIA

For personal use only

Confirmed mineralised porphyry discovery in maiden drill hole Near surface gold (>3g/t Aueq) resource potential confirmed

ASPIRE MINING LIMITED (ASX:AKM)

GLOUCESTER COAL LTD 2006 Annual Results Media Presentation 25 August 2006

Windy Knob Resources Limited (ABN ) Developing World Class Coal Deposits

Aspire Mining Limited

For personal use only Heemskirk Tin Project - Tasmania

For personal use only

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012

For personal use only

An ASX listed Perth-based gold explorer focused on Ghana in West Africa

FLEXIBILITY IN ADVERSITY KEY TO SUCCESSFULLY

Disclaimer. Forward-Looking Statements. Competent Person s Statement

For personal use only

For personal use only

October 2017 Investor Presentation. Moving to the next level: cash-flow, exploration and growth in WA s premier gold districts

Annual General Meeting

Lochinvar Coking Coal Project

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

Naltagua Copper District CHILE

SESE MEASURED RESOURCE EXCEEDS 650MT COAL

ASX RELEASE Annual General Meeting Managing Director Address

Lochinvar A major new coking coal project Investor Presentation October 2012

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDING 31 DECEMBER 2017

Annual General Meeting. 23 November 2011

Double Magic; A Tiger by the tail? First mover advantage in West Kimberley. April 2017 Eamon Hannon, Managing Director

Kodiak Coking Coal Project A financially robust, long life premium hard coking coal mine. August 2013

Maximising Gold Resources in Senegal

Aspire Mining 1Q2015 Update

VISTA COAL PROJECT RESOURCE INCREASES BY 297.1MT TOTAL COAL RESOURCE INCREASES TO 1.37BT

Kodiak Coking Coal Project creating long life premium hard coking coal mines. March 2013

Summary Redmoor Tungsten Tin Project Lochinvar Coking Coal Project

BMG SECURES LOW COST OPTION TO ACQUIRE ADVANCED HEAVY MINERAL SANDS PROJECT IN AUSTRALIA

8.1Mt Maiden JORC Coal Resource estimate at Titiribi Project

Acquisition agreement to move to 100% ownership of the Ashford Coking Coal Project

ASX:TLM. Closing in on world-class copper-gold deposits Resources Rising Stars, September 2011

Cash-flow, exploration and growth in WA s premier gold districts. Resources Rising Stars, May 2017 / Michael Fowler, Managing Director

For personal use only

FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT

MAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL MILLION TONNES

COMPLETION OF PHASE 1 DRILLING AT TITIRIBI PROJECT IDENTIFIES ADDITIONAL SIGNIFICANT COAL INTERCEPTS

ASX:TLM. Closing in on world-class copper-gold deposits Annual General Meeting, November 2011

ASX Small to Mid Cap Conference Singapore. KEITH BARKER Managing Director. 27 May ASX Code: NEC ABN:

Inferred Resource Estimate of the Muster Dam Magnetite Fe Deposit

For personal use only

Lochinvar Coking Coal Project

Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project

Kalongwe High Grade Copper-Cobalt Project Katanga Province, DRC

For personal use only

For personal use only

Ovoot Coking Coal Project (100%)

SHUMBA COAL UPGRADES GROSS IN-SITU TONNES COAL TO 1.14BT AT SECHABA

JV PROJECT UPDATE JORC COAL RESOURCE

ASX announcement 16 May 2016

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

SILVER CITY MINERALS LIMITED ABN Silver City Minerals Investor Update

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

Coburn Zircon Project

EMU NL Annual General Meeting

SCIENCE DISCOVERY GROWTH. Investor Presentation. Miga Arc Western Victoria s newly emerging copper belt

Aspire Mining Limited McCloskey Coal Conference (Ulaanbaatar) Investor Presentation Presentation April 2011

Annual Report Amended Additional Information

Well funded active explorer

The material published in this presentation is information about the activities of Gondwana Resources

For personal use only

For personal use only

Ulysses Gold Project, WA

2018 South Australian Exploration & Mining Conference

MAIDEN 26.6Mt JORC COPPER RESOURCE AT VISCARIA PROJECT, SWEDEN

AGM Presentation 2018

Ausgold awarded EIS grant for Jinkas deep drilling

For personal use only

Guildford Coal Mongolian Acquisition

South Boulder Mines Managing Director : Lorry Hughes

LOCHINVAR COKING COAL PROJECT. LOI-001 Raw Coal Analysis ASX RELEASE. 18 February 2013 ASX RELEASE. 11 April 2013

Sierra Rutile Limited. Sierra Rutile to start Gangama Dry Mine Project

ASX Release. 14 th September Corporate Update Divestment of Gold, Copper and Nickel Projects

For personal use only

For personal use only

Nickel, Gold and Lithium Western Australia. 15 September 2016

Successful Placement Raises $1.8 Million to Fund Kroussou Exploration and Drilling

Corporate Presentation February 2011

ASX:LEG. Prospective Fraser Range. Investor Presentation July 2018

African Energy Resources Limited

For personal use only

Pacific American Coal Proactive Investors Lunch March 2018

For personal use only

African Mining and Exploration plc ( AME or the Company ) AME Secures Entry into World Class Heavy Mineral Sands Province

Opportunities for further exploration and investment in Mozambican coal Graham Mascall CEO Ncondezi Coal Company

For personal use only

ASPIRE MINING LIMITED

Encounter Resources Limited (ASX Code: ENR)

For personal use only

Highlights from the four holes announced in this news release include:

Positive results in a 20 million ounce Greenstone Belt. Presented by Dr Bob Beeson, Managing Director Melbourne Mining Club 18 September, 2012

Transcription:

BUILDING A SUBSTANTIAL EUROPEAN COAL COMPANY

Investment Highlights A high quality European coal portfolio: Three tier-one large, advanced Polish coal projects Significant high quality coal both coking & thermal coal Safe, low-sovereign risk location for project development Low operating cost environment Low estimated CAPEX for first two projects First production targeted by end 2016 Strong Balance sheet and powerful Share register: +$3M cash; no debt Significant Singaporean major shareholder; strong supporter Experienced board owning 12% of BMB highly incentivized Divestment of other assets completing, including $15M Balkans asset sale Bottom of the cycle opportunity Strong demand forecast for coal in Poland 2

Poland s Competitive Advantage in Coal Australian Coal In General Characterized by: 1. High Entry Costs 2. High Capital Costs 3. High Operating Costs 4. High Logistical Costs to move coal to international market Net Effect: High amortization costs of acquisition Lack of infrastructure development CAPEX a significant barrier to production and development Low margins or loss making Poor market support Polish Coal Balamara Resources Characterized by: 1. Low Entry Cost 2. Low Capital Costs 3. Low Operating Costs 4. Low Logistical Costs to move coal to local market Net Effect: No amortization of high entry costs Excellent infrastructure throughout Poland CAPEX less of a barrier to production High operating margins and expected profitability 3

Poland Low Risk Environment Low sovereign risk (EU member state & member of NATO) Politically stable Well-defined mining laws Low tax rate Low operating costs Availability of skilled underground mining work force Excellent core infrastructure throughout Poland Close to large European market Power stations and coke plants nearby as potential off-takers Strong expanding economy with significant inward investment Nowa Ruda Resource Delineation Drilling Programme 4

Polish Coal Facts you may not know (1) 1. 2 nd largest producer of hard coal in Europe and the 8 th largest in the world. 2. Production of hard coal has dropped from peak 200Mt in 1980 to only 76Mt in 2011, due to change from Communist system to free-market. 3. Many coal mines closed after the fall of Communism (1990 s) as they could not compete commercially the coal was good, the system of exploitation was not. 4. Restructuring of Polish coal industry has only happened in past decade as the power of the unions declined and Govt support for noncommercial ventures has waned. 5

Polish Coal Facts you may not know (2) 5. First state-owned coal company to privatize was Bogdanka, which listed on Warsaw Stock Exchange in 2009 since this listing it has risen considerably to its current $1.8 billion market capitalization (8-10mtpa). 6. Economic efficiency and performance of Kompanie Weglowa largest Polish coal producer (40Mtpa) is under scrutiny and doubt. 7. Poland currently importing 11Mtpa hard coal bodes well for local producers. 8. Massive internal demand in Poland for both thermal and coking coal, with both types forecast to rise over the next decade. 6

Balamara s Polish Coal Portfolio Mariola Thermal Coal First JORC Resource in October 2014 Key Advantages: Advanced status Production target 2016 Size & scale High grade product Shallow UG deposit Low CAPEX and operating cost expected Existing power station 2km away wanting 1.5mtpa thermal coal Utilize cash flow to develop next 2 Projects Nowa Ruda Coking Coal 107Mt Foreign Estimate*, largely coking coal (Refer Slide 14) Key Advantages: Advanced status Long mine life High grade product Quality location Existing infrastructure Low CAPEX and operating cost expected 4 coking plants within 100kms as natural offtakers Sawin Thermal Coal 1.37Bt Foreign Estimate* (Refer Slide 15) Key Advantages: Considerable historical drilling + data Size & scale High grade product Quality location in emerging Lublin Basin Existing infrastructure Low operating cost environment Near to 10Mtpa Bogdanka Coal Project Adjacent to Prairie Mining 1.5Bt project * Tonnes as indicated to Polish Geological Standard Balamara converting to JORC over all three Projects over the course of next 6-12 months 7

Quality & Diversity of Locations 8

Project Overview: Mariola Thermal Coal Project 15% acquired for $1.6M (July 2014) Remaining 85% equity negotiated Advanced UG Thermal Coal Project: Extensively drilled historically (204 holes) Maiden JORC Resource in October 2014 Shallowest UG coal mine in Poland (~100m) Thick, continuous coal seams (average 2m) Expected low CAPEX, low operating cost mine Existing infrastructure available (rail, roads, power, water) Existing thermal power station within 2km that would like to secure Mariola coal High quality thermal coal; High calorific value, low ash, sulphur & moisture Existing wash plants within close proximity Washed product to sell into local thermal power plants accessible by conveyor and/or rail Scoping Study (4Q 2014), Bankable Feasibility Study (2H 2015), Production (end 2016) 9

Mariola Ideal Regional Location Key to bulk commodity projects = Simple Logistics, i.e. selling coal to adjacent power station just 2km away, connected to mine by conveyor 10

Mariola Adjacent Tauron Power Station Coal storage facility for 100kt + rail siding, loaders & admin offices Tauron 600MW power station only 2km from Mariola. Requires 1.5Mtpa thermal coal. Use of existing rail siding to move additional 2.5Mtpa regionally 11

Mariola Progress to Production Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015 Q1 2016 Q2 2016 Q3 2016 Q4 2016 MAIDEN JORC RESOURCE COMPLETE MERGER SCOPING STUDY PRE-FEASIBILITY STUDY POLISH LICENSING TO MINE BANKABLE FEASIBILITY STUDY PROJECT FINANCING MINE DEVELOPMENT FIRST COAL PRODUCTION 12

Nowa Ruda Coking Coal Project 100% owned via award of concession Ability to convert exploration license to mining license upon completion of studies Confirmatory drilling underway to convert large Polish Standard tonnage to JORC Drilling programme to complete end 2014 Revised JORC 1Q 2015 Licensing and BFS targeted end 2016 Large advanced UG Coking Coal Project: Previously producing 1.25Mtpa to 1995 Two main deposits (Waclaw & Lech) Two major coal seams (650m & 950m) Roads, rail, power, water all available Existing skilled & low cost workforce High quality coking coal, post-washing: Low ash, low sulphur, low volatility Product previously sold into local coking plants <150km accessible by rail, low cost 13

Nowa Ruda Foreign Estimate Coal* Coal Deposit Waclaw Lech (Piast) TOTAL Tonnage (Millions tonnes) Including; Polish standard Coal categorization 84 23 107 A + B 15 15 C1 49 1 50 C2 35 6 41 Calorific Value (Kcal/kg) 6,523 6,500 6,518 Ash content (post-wash) 8-9% 8-9% 8-9% Sulphur content 1.1% 0.7% 1.01% *These Foreign Estimates are not reported in accordance with the JORC Code and a Competent Person has not done sufficient work to classify these estimates as coal resources or reserves to the JORC standard. It is uncertain whether further work will reclassify these estimates to be reported as coal resources or reserves in accordance with the JORC Code. See Slide 21 for Accompanying Notes. 14

Sawin Thermal Coal Project Project Overview: Award of 13,200ha coal concession Presents size and scale to coal portfolio Prime location in world class Lublin Basin Huge UG Thermal Coal Project: Foreign Estimate 1.387Bn tonnes * First JORC resource - target end 2014 Scoping Study by 2Q 2015 Extensively drilled historically (14,000m) Exploration license for 3.5 years Planned 5 hole drilling programme (2015) Existing infrastructure (rail, roads, power) High quality thermal coal, similar to both Bogdanka and Prairie Mining deposits nearby Bogdanka Mine is the current lowest cost UG coal producer in Poland (~$40/t) *These Foreign Estimates are not reported in accordance with the JORC Code and a Competent Person has not done sufficient work to classify these estimates as coal resources or reserves to the JORC standard. It is uncertain whether further work will reclassify these estimates to be reported as coal resources or reserves in accordance with the JORC Code. See Slide 21 for Accompanying Notes. 15

Sawin Prime Location 16

Balamara Production Funnel 2016 2017 2018 2019 2020 2021 1. Mariola Production Finances Nowa Ruda Production 2. Nowa Ruda Production Finances Project Ramp-Ups and Sawin Production Mariola & Nowa Ruda Ramp-Ups 3. Sawin Production 17

News Flow to end 2014. Nowa Ruda Coking Coal Project: Concept Study Complete delineation drilling programme (2014) for updated JORC resource (1Q 2015) Mariola Thermal Coal Project: Maiden JORC resource Complete merger to acquire remaining 85% of Mariola Project * Scoping Study Tauron power station facilities agreement Sawin Thermal Coal Project: Maiden JORC resource Corporate: Complete $15M Balkans asset sale * Subject to regulatory approvals 18

Corporate Overview ASX Code : BMB Board of Directors: Share Price : 7c Ordinary Shares : 424m * Options : 6m (25c) Market Cap : $30m Cash : ~$3m Major Ample Skills Ltd 45% * Shareholders : Directors 12% Key Projects : (Poland) Nowa Ruda Coking Coal Mariola Thermal Coal Sawin Thermal Coal * Assumes fully diluted with 66m shares for US$5m per placement to be approved at AGM in Nov 2014. Executive Chairman : Derek Lenartowicz Mining Engineer and resource industry professional with 35 years experience developing projects and companies. GM of several large Australian mining operations including BHP Billiton s Mt Keith Nickel Mine. Managing Director : Mike Ralston Corporate and finance executive with 10 years experience developing several junior ASX resource companies. Built Kangaroo Resources (coal) from shell to $600m market cap in 2 years prior to sale of company in 2011 before joining Balamara. Executive Director : Milos Bosnjakovic Former lawyer from Balkans region with network and experience in that region; manages original Balamara base metal assets in Central Europe. Non-Executive Director : Michael Hale MD Western Capital; provides strong corporate governance and capital raising experience. 19

Food for Thought We simply attempt to be fearful when others are greedy and to be greedy only when others are fearful. Warren Buffett Someone is sitting in the shade today because someone planted a tree a long time ago. Warren Buffett 20

Disclaimer General Corproate Disclaimer: The information contained in this confidential document ( Presentation ) has been prepared by Balamara Resources Limited (the Company ). It has not been fully verified and is subject to material updating, revision and further amendment. While the information contained herein has been prepared in good faith, neither the Company nor any of its shareholders, directors, officers, agents, employees or advisers give, have given or have authority to give, any representations or warranties (express or implied) as to, or in relation to, the accuracy, reliability or completeness of the information in this Presentation, or any revision thereof, or of any other written or oral information made or to be made available to any interested party or its advisers (all such information being referred to as Information ) and liability therefore is expressly disclaimed. Accordingly, neither the Company nor any of its shareholders, directors, officers, agents, employees or advisers take any responsibility for, or will accept any liability whether direct or indirect, express or implied, contractual, tortuous, statutory or otherwise, in respect of, the accuracy or completeness of the Information or for any of the opinions contained herein or for any errors, omissions or misstatements or for any loss, howsoever arising, from the use of this Presentation. This Presentation should not be considered as the giving of investment advice by the Company or any of its shareholders, directors, officers, agents, employees or advisers. Each party to whom this Presentation is made available must make its own independent assessment of the Company after making such investigations and taking such advice as may be deemed necessary. In particular, any estimates or projections or opinions contained herein necessarily involve significant elements of subjective judgment, analysis and assumptions and each recipient should satisfy itself in relation to such matters. This Presentation should not be considered as the giving of investment advice by the Company or any of its shareholders, directors, officers, agents, employees or advisers. Each party to whom this Presentation is made available must make its own independent assessment of the Company after making such investigations and taking such advice as may be deemed necessary. In particular, any estimates or projections or opinions contained herein necessarily involve significant elements of subjective judgment, analysis and assumptions and each recipient should satisfy itself in relation to such matters. Foreign Estimate Disclosure: These are Foreign Estimates as per the Polish Standard as announced to the ASX dated 24 July 2013 and 21 July 2014. The Company confirms that the additional information provided in those announcements per Listing Rules 5.12 still applies, and that there is not new information or data relating to the Foreign Estimates that would materially impact the reliability of these Foreign Estimates. 21

P: +61 8 6365 4519 F: +61 8 9388 6040 www.balamara.com.au