Building Long Term Shareholder Value

Similar documents
Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

News Release. Infill Drilling Program

Corporate Presentation June 2018

Building Long-Term Shareholder Value TSX : RMX OTCQX : RBYCF

Building Long-Term Shareholder Value TSX : RMX OTCQX : RBYCF

Underground Activities Temporarily Suspended at the Phoenix Gold Project; Rubicon to Enhance its Geological Model and Develop an Implementation Plan

Rubicon Updates Mineral Resource Statement for the Phoenix Gold Project And Evaluates Strategic Alternatives

News Release TSX:RMX NYSE AMEX:RBY November 29, 2010

CAUTIONARY STATEMENT

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

Probe Metals Continues to Expand Gold Zones At Val-d Or East

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

Rubicon Minerals Provides an Updated Preliminary Interpretation of the Structural Geology of the F2 Gold Deposit

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

Coeur Mining Provides Silvertip Exploration Update

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

KIRKLAND LAKE GOLD REPORTS WIDE, HIGH-VALUE GOLD INTERCEPTS AT SWAN ZONE UP TO 200 METRES FROM CURRENT MINERAL RESERVES

Cove Gold Project 2201 Discovery Update, May 2014

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE

Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project

(416) Highlights include:

Northern Dynasty Minerals Ltd.

Wesdome Announces Interim Mineral Resource Estimate for Kiena Mine Complex and Continued Drilling Extends Kiena Deep A Zone Along Plunge

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Form F3 MATERIAL CHANGE REPORT

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

Detour Gold Reports Drilling Results from Lower Detour

GOLDEN MINERALS DISCOVERS ADDITIONAL HIGH GRADE VEINS AT SANTA MARIA RESULTS UP TO 1.88 g/t Au and 648 g/t Ag

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

NEWS RELEASE. Gold Canyon Encounters Meters at 1.81 Grams per Tonne Gold at its Springpole Gold Project

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

The Valentine Gold Camp:

Photo: Jean Laforest, Qiqavik Property, Nunavik

Dalradian Intersects 2.48 metres Grading g/t Gold and 4.87 metres Grading 8.35 g/t Gold With Infill Drilling at Curraghinalt

April 26, 2012 SBB NR SBB-T

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

GoviEx completes acquisition of African Energy s Zambian uranium assets

Investor Presentation October 2012

Press Release Thunder Bay: August 2, 2018

PRESS RELEASE NEW MINERAL RESOURCE UPDATE AT PRAIRIE CREEK MINE. Measured + Indicated and Inferred Resource Tonnages Increased

NEWS RELEASE. Gold Canyon Encounters Meters at 1.47 Grams per Tonne Gold at its Springpole Gold Project

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

- 2 - TABLE 1. INDICATED AND INFERRED GOLD AND SILVER RESOURCES. All Indicated

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

Highlights from the four holes announced in this news release include:

PRESS RELEASE. Banro Announces a Mineral Reserve Estimate at its Namoya Gold Mine, Democratic Republic of the Congo

Junior Uranium explorer in the Athabasca Basin. Patterson Claims

Fission s Initial Resource Totals at PLS: 79.6M lbs Indicated and 25.9M lbs Inferred

Yellowknife Gold Project

Orford Completes Phase 1 Exploration Program and Generates High-Quality Drill Targets on its Carolina Gold Properties

Sept 20, 2012 TSX Venture Exchange Tier 1 Trading Symbol: OK

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

Goldcrest Resources Ltd.

Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project.

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

For personal use only

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

A New Direction. Copper-Gold Deposit at Thor TSX.V:COL. August 11, May 2013

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

V Sample from C.O.D vein 15 metres southwest of V

Table 1 Updated Mineral Resource Tabulation for the Vertikalny Deposits of the Mangazeisky Property. Contained Metal Ag (koz)

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

Comparison Between July 2012 Technical Report and December 2012 Mineral Resource Statement July 2012 December 2012 Percentage Difference.

555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M June 13, 2017 SBB NR SBB TSX

BGM ANNOUNCES MINERAL RESOURCE UPDATE AT BARKERVILLE MOUNTAIN TO SUPPORT BONANZA LEDGE OPERATIONS

August 20, 2018 SBB NR SBB TSX

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

Fortuna Updates Reserves and Resources

For Immediate Release ASCOT DRLLING AT UNICORN INTERSECTS MORE HIGH-GRADE GOLD

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

North American Palladium Provides Update on Lac des Iles Exploration Program

Disclaimer. Forward-Looking Statements. Competent Person s Statement

TSX.V: AZS AZASF -OTCQB. Exploring Large Open Pit Silver Targets In Arizona 1

KIRKLAND LAKE GOLD REPORTS STRONG GROWTH IN MINERAL RESERVES AND MINERAL RESOURCES

JUNE 25, 2015 TSX: WDO

Sabina Announces More Positive Drill Results from 2012 Drilling at the Back River Gold Project, Nunavut

CANDENTE UPDATES CAÑARIACO NORTE MINERAL RESOURCE ESTIMATE

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C Form 6-K

Transcription:

2017 Annual General and Special Meeting of Shareholders Building Long Term Shareholder Value June 14, 2017

Cautionary Statements Regarding Forward-Looking Statements and Cautionary Notes This corporate presentation contains statements that constitute "forward-looking statements" and "forward looking information" (collectively, "forward-looking statements") within the meaning of applicable Canadian and United States securities legislation. Generally, these forward-looking statements can be identified by the use of forwardlooking terminology such as "believes", "intends", "may", "will", "should", "plans", "anticipates", "potential", "expects", "estimates", "forecasts", "budget", "likely", "goal" and similar expressions or statements that certain actions, events or results may or may not be achieved or occur in the future. In some cases, forward-looking information may be stated in the present tense, such as in respect of current matters that may be continuing, or that may have a future impact or effect. Forward-looking statements reflect our current expectations and assumptions, and are subject to a number of known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements to be materially different from any anticipated future results, performance or achievements expressed or implied by the forward-looking statements. Forward-looking statements include, but are not limited to statements relating to the exploration potential in Red Lake, the potential growth to the Company s mineral resources, the potential advancement of the Phoenix Gold Project to development and pre-production, the targeted zones of the planned drilling, drifting and bulk sampling programs, the objectives and outcomes of the planned additional analysis of the geology of the deposits, the objectives and outcomes of the planned additional testing of the resource model, the objectives and outcomes of the planned drilling, drifting and bulk sampling programs, the areas of focus in a future updated resource estimate, the anticipated components of the 2017 and 2018 Exploration Programs, the proposed development and trial mining at the Phoenix Gold Project, the anticipated exploration work on the Company s Red Lake Regional Properties and the anticipated Exploration Program timeline. Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made and represent management's best judgment based on facts and assumptions that management considers reasonable. If such opinions and estimates prove to be incorrect, actual and future results may be materially different than expressed in the forward-looking statements. The material assumptions upon which such forward-looking statements are based include, among others, that: the demand for gold and base metal deposits will develop as anticipated; the price of gold will remain at or attain levels that would render the Phoenix Gold Project potentially economic; that any proposed operating and capital plans will not be disrupted by operational issues, title issues, loss of permits, environmental concerns, power supply, labour disturbances, financing requirements or adverse weather conditions; Rubicon will continue to have the ability to attract and retain skilled staff; and there are no material unanticipated variations in the cost of energy or supplies. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Rubicon to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others: possible variations in mineralization, grade or recovery or throughput rates; uncertainty of mineral resources, inability to realize exploration potential, mineral grades and mineral recovery estimates; actual results of current exploration activities; actual results of reclamation activities; uncertainty of future operations, delays in completion of exploration plans for any reason including insufficient capital, delays in permitting, and labour issues; conclusions of future economic or geological evaluations; changes in project parameters as plans continue to be refined; failure of equipment or processes to operate as anticipated; accidents and other risks of the mining industry; delays and other risks related to operations; timing and receipt of regulatory approvals; the ability of Rubicon and other relevant parties to satisfy regulatory requirements; the ability of Rubicon to comply with its obligations under material agreements including financing agreements; the availability of financing for proposed programs and working capital requirements on reasonable terms; the ability of third-party service providers to deliver services on reasonable terms and in a timely manner; risks associated with the ability to retain key executives and key operating personnel; cost of environmental expenditures and potential environmental liabilities; dissatisfaction or disputes with local communities or First Nations or Aboriginal Communities; failure of plant, equipment or processes to operate as anticipated; market conditions and general business, economic, competitive, political and social conditions; our ability to generate sufficient cash flow from operations or obtain adequate financing to fund our capital expenditures and working capital needs and meet our other obligations; the volatility of our stock price, and the ability of our common stock to remain listed and traded on the TSX. It is important to note that the information provided in this corporate presentation is preliminary in nature. There is no certainty that a potential mine will be realized. A mine production decision that is not based on a feasibility study demonstrating economic and technical viability does not provide adequate disclosure of the increased uncertainty and specific risks of failure associated with such a production decision. 2

Cautionary Statements Regarding Forward-Looking Statements and Cautionary Notes Forward-looking statements contained herein are made as of the date of this corporate presentation and Rubicon disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise, except as required by applicable securities laws. Readers are advised to carefully review and consider the risk factors identified in the Management's Discussion and Analysis for period ending December 31, 2016 under the heading "Risk Factors" for a discussion of the factors that could cause Rubicon's actual results, performance and achievements to be materially different from any anticipated future results, performance or achievements expressed or implied by the forward-looking statements. Readers are further cautioned that the foregoing list of assumptions and risk factors is not exhaustive and it is recommended that prospective investors consult the more complete discussion of Rubicon's business, financial condition and prospects that is included in this corporate presentation. The forward-looking statements contained herein are expressly qualified by this cautionary statement. Securities legislation in certain of the Canadian provinces provides purchasers, in addition to any other rights they may have at law, with a remedy for rescission or damages where an offering memorandum, such as this presentation, or any amendment to it, and in some cases, advertising and sales literature used in connection therewith, contains a misrepresentation. This corporate presentation does not constitute an offer of securities for sale in the United States. The securities referred to herein may not be offered or sold in the United States absent registration or an exemption from registration. Qualified Person The content of this corporate presentation relating to geology and exploration has been read and approved by George Ogilvie, P.Eng., President, CEO, and Director, who is a Qualified Person as defined by NI 43-101. Cautionary Note to U.S. Readers Regarding Estimates of Indicated and Inferred Resources This corporate presentation uses the terms measured and indicated mineral resources and inferred mineral resources. The Company advises U.S. investors that while these terms are recognized and required by Canadian securities administrators, they are not recognized by the SEC. The estimation of measured, indicated and inferred mineral resources involves greater uncertainty as to their existence and economic feasibility than the estimation of proven and probable reserves. The estimation of inferred resources involves far greater uncertainty as to their existence and economic viability than the estimation of other categories of resources. It cannot be assumed that all or any part of a measured, indicated or inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility studies, pre-feasibility studies or other economic studies, except in prescribed cases, such as in a preliminary economic assessment under certain circumstances. The SEC normally only permits issuers to report mineralization that does not constitute reserves as in-place tonnage and grade without reference to unit measures. Under U.S. standards, mineralization may not be classified as a reserve unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. U.S. investors are cautioned not to assume that any part or all of a measured, indicated or inferred mineral resource exists or is economically or legally mineable. Information concerning descriptions of mineralization and resources contained herein may not be comparable to information made public by U.S. companies subject to the reporting and disclosure requirements of the SEC. Mineral resources that are not mineral reserves do not have demonstrated economic viability. The estimation of mineral resources is inherently uncertain, involves subjective judgement about many relevant factors and may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues. The quantity and grade of reported inferred resources in this estimation are uncertain in nature and there has been insufficient exploration to define these inferred resources as an indicated or measured mineral resource and it is uncertain if further exploration will result in upgrading them to an indicated or measured mineral resource category. The accuracy of any such estimates is a function of the quantity and quality of available data, and of the assumptions made and judgments used in engineering and geological interpretation, which may prove to be unreliable and depend, to a certain extent, upon the analysis of drilling results and statistical inferences that may ultimately prove to be inaccurate. Mineral resource estimates may have to be re-estimated based on: (i) fluctuations in mineral prices; (ii) results of drilling and development; (iii) results of test stoping and other testing; (iv) metallurgical testing and other studies; (v) proposed mining operations, including dilution; (vi) the evaluation of mine plans subsequent to the date of any estimates; and (vii) the possible failure to receive required permits, approvals and licenses. The mineral resources in this corporate presentation were reported using Canadian Institute of Mining, Metallurgy and Petroleum ( CIM ) Standards. 3

CEO s Vision Three-pronged approach to build long-term shareholder value To build a mid-tier gold Company over 5 to 7 years by: 1. Potentially advancing the Phoenix Gold Project to commercial production; 2. Organically growing the project pipeline from targets within 2 km proximity to the Phoenix Gold Project; and 3. Exploring our vast Regional Land Package in Red Lake. 4

Accomplishments Rebuilding confidence Completed Restructuring Transaction in December 2016 Raised approximately C$55 million in equity to bolster balance sheet Strengthened Board and Management team Hired external consultants Golder Associates and T. Maunula Associates, and Boart Longyear for drilling Commenced exploration activities at the Phoenix Gold Project 5

Capital Structure and Shareholder Info Balance Sheet and Capital Structure (Jun 12/17)** Approximate cash balance: Nominal long-term debt outstanding (December 31, 2020): Lease liabilities ~C$31.0 M C$12.0 M C$3.3 M Shares outstanding: 57,877,133 Options outstanding: 2,910,703 RMX share price: Market Data (Jun 12/17)** Market capitalization: Avg. 30-day daily trading volume (TSX & OTC markets) C$1.70 C$98.4 M 53,696 George Ogilvie 0.65% Equity ownership breakdown* Retail 5.60% CPPIB Credit 17.28% Royal Gold 5.20% Institutional Investors 71.27% Analyst Coverage BMO TD Securities Laurentian Bank Mackie Research Andrew Mikitchook Daniel Earle Ryan Hanley TBD Institutional Shareholders include: Mackenzie Financial Sprott Asset Management Donald Smith & Co. Greywolf Sentry Investments Sun Valley Gold Franklin Templeton RBIM *Numbers may not add due to rounding **Source: TSX and OTC markets 6

Infrastructure and Permits in Place >C$770 million spent on infrastructure and development Head frame and hoist commissioned 9k of U/G development; Shaft completed to 730 m below surface 200-person Camp Tailings management facility completed 1,250 tpd mill Substantially permitted Surface roads, earth and civil works in place Power line and substation on site Mill construction Surface construction Item: Underground development & underground exploration drilling and sampling Total Tax loss pools (to be updated) 7 Capital spent (C$) ~C$150 M ~C$95 M ~C$525 M +C$770 M ~C$550 M 7

2017 Exploration Program Update 8

Health, Safety and Environment Achievements Health and Safety highlights***: 412 days since last lost time injury 289 days since last medical aid 2015* 2016 YTD 2017 No Lost Time Injuries (NLTI) (Medical Aids) 13 2** 0 Lost Time Injuries (LTI) 2 1 0 Total Injuries (NLTI + LTI) 15 3 0 WSN Rate Group 110 Injury Frequency 4.24 3.87 Environment highlights: MOECC Director s Order revoked (August 2016); WSN Rubicon Injury Frequency 3.19 7.00 * Includes company and contractor injuries ** One of these injuries was a hearing loss claim *** Effective 4 th June 2017 Rubicon enhanced its water treatment system resulting in a reduction in deleterious elements in its effluent; and Company has maintained effluent levels in its tailings below regulatory limits and continues to discharge treated effluent. 9

Phoenix Gold Project Near-term and mid-term objectives 1. Better understand the structural geology of the F2 Gold Deposit and update the current geological model; 2. Potentially grow the mineral resources near existing underground infrastructure and development between the 122- and 854-metre levels: To minimize the timeline and capital cost to potential commercial production; and To potentially upgrade mineral resources in the Measured and Indicated category. 3. Provide an updated NI 43-101 Mineral Resource Estimate in H2/2018; 4. Conduct a Feasibility Study in late 2018/early 2019 and to secure funding for the Project; and 5. Target potential Commercial Production in 12-18 months after securing project funding. 10

2017 Exploration Program Clean up and U/G infrastructure upgrades Progress (June 11 2017) Approximate timeline Ongoing Throughout 2017 Re-logging of 10,000 m of core from historical drilling 5,556 m core re-logged Throughout 2017 Engagement of Golder Associates (Primary Consultant) & Tim Maunula (Peer Review) 3,500 m of oriented structural drilling at the upper F2 Gold Deposit 20,000 m of oriented infill drilling at the 610-metre level Completed February 2017 Completed June 2017 4,884 m End of 2017 Develop into the main mineralized zone TBD Starting H2/17 and beyond 2017 TOTAL SITE COST ESTIMATE (including exploration expenses, external consulting fees, etc.) C$14 million to C$15 million 11

2017 Exploration Program Proper steps and procedures are followed 10,000 m of historical core from the main F2 zone which intersect the D2 structures Rubicon Geology Team working in unison with Golder Associates on resource modelling 23,500 m of new core samples from 244-, 305-, and 610- metre level drilling Core logged for: D2 structures and other shears Lithology Mineralization Gold grade Golder Associates: Conduct structural analysis and underground mapping Update geological and resource model Provide recommendations Assaying: New core split and sent to the Red Lake SGS Assay Lab Gold grade results logged Continue drilling T. Maunula Associates provides peer review over the exploration program 12

Structural Drilling, Logging and Analysis Typical core sample from 244-, 305-, & 610-metre level Drill core is with oriented diamond drilling Focus of structural program was to identify dip directions of quartz veins, dip direction and frequency of breccia veins and determine east-west shear kinematics Structural analysis still in early stages; too soon to understand the influence of structures on gold mineralization 13

2017 Exploration Program Underground diagram long section facing north Shaft Fresh air raise Return air raises Surface 10,000 m of historical core re-logged core for structure, spread between 122ml and 854ml 305-metre haulage level 337-metre loading pocket Ore and waste passes 3,500 m structural drilling program, mainly between 244-, 305-, & 610-metre levels 610-metre haulage level Conveyer system 685-metre loading pocket Crusher station 20,000 m of infill and step-out drilling structural drilling program, mainly between 366- and 854- metre levels Completed development TSX Diagram : RMX OTC facing : RBYCF North (not to scale) Drilling platforms F2 Gold Deposit 14

3,500 m Structural Drilling 244-, 305-, & 610-metre levels Plan View 305 metre level Long section looking south Main F2 Gold Deposit 244-metre level 305-metre level (Diagrams not to scale) Planned Drilling Potential East-West mineralized shear swarms The coloured areas represent the high-grade domains from the 2016 SRK mineral resource estimate, at a 3.0 g/t Au cut-off Please refer to the Cautionary Statements Regarding Forward-Looking Statements and Cautionary Notes at the beginning of this presentation with respect of the Company s Qualified Person. 15

20,000 m Drilling Program from 610-Metre Level Targeting the deposit between the 366- to 854-metrel levels 2016 SRK Mineral Resource Estimate 4 The coloured areas represent the high-grade domains at a 3.0 g/t Au cut-off grade, along with selected significant drill intersections Long section looking west 305-metre level F2-05 6.0g/t Au over 17m 305-03-167 152.4g/t Au over 1.5m 122-16 16.8g/t Au over 3.0m 610-metre level 305-03-162 13.5g/t Au over 13.8m 305-73 11.1g/t Au over 4.0m Planned 20,000 m drilling program will in-fill historic drill intersections to test continuity and potentially build resource at depth (Diagram not to scale) F2-42 15.52g/t Au over 4m 122-10 14.08g/t Au over 44.9m F2-35 41.89g/t Au over 2.15m 122-56 - 18.2g/t Au over 5.5m 122-60 - 24.0g/t Au over 5.5m Planned drill holes (4) Refer to endnote #4 Please refer to the Cautionary Statements Regarding Forward-Looking Statements and Cautionary Notes at the beginning of this presentation with respect of the Company s Qualified Person. 16

Anticipated Exploration Program Timeline 2017 Exploration Program: 2017 2018 H1 H2 H1 H2 Underground clean up & infrastructure upgrades Ongoing Re-logging of core and structural geology analysis Structural analysis: Golder Associates 56% complete 3,500 m drilling (March start) 20,000 m drilling (April start) Drilling: Boart Longyear Completed 24% complete Exploratory development in the main F2 Gold Deposit 2018 Exploration Program: Trial mining (mining, stockpiling, processing) NI 43-101 Mineral Resource Estimate Modelling and mineral resource estimation: Golder Associates Decision on Feasibility Study 17

Long-Term Organic Growth Potential: Close proximity targets Red Lake Regional properties 18

Prolific Red Lake Gold Camp: Camp has produced more than 28 million ounces of gold RMX claims: 28,776 hectares ~40% of claims in Red Lake Goldcorp (G) claims Ultramafic units F2 folds Gold projects in active exploration Existing gold mines RMX prospective exploration targets Phoenix Gold Project (RMX) East Bay (RMX) N Slate Bay (RMX) McCuaig (60 RMX/40 Golden Tag) D2 Structures DMC (RMX) Cochenour (G) H.G. Young (G) Rahill-Bonanza (PG/G) Red Lake Gold Mines (G) Adams Lake (RMX) Hasaga (PG) Red Lake, ON 19

Recent Land Transactions in Red Lake Rubicon owns a sizeable land package in Red Lake Date Property Size (ha) Seller Buyer Sale price* Price/ha Additional info Mar 2017 Derlak (near Madsen) 219 Orefinders Pure Gold C$1.2 M C$5,465/ha Land transaction Dec 2015 Buffalo claims (near Hasaga) 513 Pure Gold Nov 2015 Springpole 32,448 Gold Canyon Jun 2014 Newman- Madsen >807 Mar 2014 Madsen 4,193 Sabina Gold & Silver Claude Resources Premier Gold First Mining Finance ~C$5.0 M ~C$56.2 M C$9,747/ha C$1,732/ha Land transaction; Pure Gold gets 1.0% NSR Company acquisition; MRE Pure Gold ~C$2.8 M C$3,463/ha Land transaction Pure Gold ~C$8.8 M C$2,087/ha Asset transaction 500 tpd mill, MRE Rubicon Red Lake Exploration Land Package 28,448 ha *Total consideration of cash and share values at the time of acquisition Source: Company reports and Rubicon estimates 20

Close Proximity Targets Historical drilling; long section facing west Shaft 244-metre level exploration drift Camp McFinley Northern Peninsula CARZ Island Zone F2 North F2 Gold Deposit 1000 m Focus on potential areas that could provide plant feed within 2 km of the Phoenix Gold Project Collate data sets for each of the mineralized zones In-house modelling of the mineralized zones and generate conceptual tonnes and grade for the zones Rank each zone as to potential to fit in pipeline Build Rubicon Red Lake model to look at bigger picture (Structural and Lithological Model) 21

Close Proximity Targets Within 2 km of the Phoenix Gold Project Historical high-grade intercepts along strike and adjacent to the F2 Gold Deposit warrant follow up drilling Historical NI 43-101 mineral resource estimate at McFinley requires follow-up work F2 North Select historical high-grade intercepts: Island Zone PZ-23: 70.1 g/t Au over 3.1 m PZ-12: 28.7 g/t Au over 1.4 m PZ-47: 22.2 g/t Au over 1.7 m PZ-25: 15.8 g/t Au over 3.5 m PZ-03: 15.5 g/t Au over 4.8 m PZ-02: 15.0 g/t Au over 2.8 m Carbonate Zone ( CARZ ) PR-15-11: 24.17 g/t Au over 2.00 m PR-15-11: 4.88 g/t Au over 10.50 m (incl. 6.43 g/t Au over 7.00 m) PR-15-16: 8.48 g/t Au over 3.25 m (incl. 11.10 g/t Au over 2.25 m) PR-15-19: 8.43 g/t Au over 1.05 m PR-15-19: 2.30 g/t Au over 12.00 m (incl. 5.76 g/t Au over 2.00 m) PR-15-06: 10.77 g/t Au over 2.65 m PR-15-09: 7.84 g/t Au over 1.50 m Plan view 22

Close Proximity Targets 5 Close Proximity Targets within 2 km of the Phoenix Gold Project All are potentially accessible from the Phoenix Gold Deposit via underground Consolidation and analysis of historical data needs to occur Potentially targeting work in 2018 once priority targets identified Potential for incremental feed over the LOM of Phoenix Gold Project 23

Red Lake Regional Properties Numerous targets 10 km Exploration program targets Sidace N 24

Red Lake Regional Properties The Red Lake Regional Properties contain several highly prospective exploration targets that warrants exploration work to potentially unlock shareholder value; Assuming that the Phoenix Gold Project s advancement is on the right path and funding is available, the Company plans to commence exploration work on its Red Lake Regional Properties; and The Company has hired an exploration consultant, with +20 years of experience in Red Lake, to evaluate, prioritize and develop programs for the exploration targets. 25

CEO s Vision Three-pronged approach to build long-term shareholder value To build a mid-tier gold Company over 5 to 7 years by: 1. Potentially advancing the Phoenix Gold Project to commercial production; 2. Organically growing the project pipeline from targets within 2 km proximity to the Phoenix Gold Project; and 3. Exploring our vast Regional Land Package in Red Lake. 26

Appendices 27

Board and Management Team Strengthened Expertise in geology, underground mining, finance and law Management Team Additions George Ogilvie, P.Eng., President and CEO Led the successful turnaround of Kirkland Lake Gold and its acquisition of St. Andrew Goldfields Grew Rambler Metals from grassroots exploration to profitable junior producer Mike Willett, P.Eng., Director of Projects Led the increase in mineral resources and permitting as CEO of Tamerlane Ventures Inc. Held senior roles with March Consulting Associates/Hudbay. Board of Directors Julian Kemp, BBA, CPA, CA, C.Dir (Chair) Peter R. Jones, P.Eng. Dr. David A.S. Palmer, PhD, P.Geo. Daniel Burns, JD, MBA, CPA, CMA, ICD.D, ACC Led Rubicon through a successful strategic review and CCAA process Former CFO Fortune Minerals Led the successful IPO of Hudbay Minerals Inc. and its turnaround Former Chair and CEO of Adanac Molybdenum, Chair of Medusa Mining and Augyva Mining Resources Led the discovery of the Borden Deposit as President and CEO of Probe Mines and the sale of the company to Goldcorp in 2015 Current President and CEO of Probe Metals Experienced director in fields of financial services President and CEO of NDC Solutions Inc. Current Chair of World Council of Credit Unions George Ogilvie, P.Eng. 28

1,250 tpd SAG and Ball Mill Circuit Built Recoveries were 91.5% overall, meeting expectations Mill recoveries had met designed expectations; Grinding circuit capacity was at 80 tonnes per hour with run-of-mine material; and Mill rotated every 3 days as part of care and maintenance. 29

Substantial Underground Development Approximately 9,000 m of development completed Surface Shaft Fresh air raise Return air raises Functional loading pocket at 337-metre level 305-metre haulage level 337-metre loading pocket Ore and waste passes Ore/waste passes require further work and commissioning 610-metre level haulage system not complete 610-metre haulage level Crusher station Conveyer system 685-metre loading pocket >380 m of development needed to access the mineralization Completed development Diagram facing North (not to scale) 30

History of Mineral Resource Estimates suggests more exploration work is needed Grade (g/t Au) GEOEX Amended 1,5 (2011) AMC 2,5 (2011) 17.3 (inferred, capped) 14.5 (indicated) 17.0 (inferred) Ounces 3.1 M (inferred) 0.5 M (indicated) 2.3 M (inferred) Tonnes (t) 5.500 M (inferred) 1.028 M (indicated) 4.230 M (inferred) Grade interpolation Grade capping Cut-off grade (g/t Au) Metres drilled at F2 Gold Deposit Grade to the mill (g/t Au) Average stope width polygonal 10-5-2 oz (311-155.5-62.2 g/t Au) inverse distance cubed SRK 3,5 (2013) 8.5 (indicated) 9.3 (inferred) 1.1 M (indicated) 2.2 M (inferred) 4.120 M (indicated) 7.452 M (inferred) ordinary kriging 270 g/t Au 200 g/t Au (Main) 150 g/t (HW), 30 g/t (Ext) 5.0 5.0 4.0 4.0 166,886 m 259,000 m + 2,000t bulk sample 6.7 (indicated) 6.3 (inferred) SRK 4,5,6 (2016) 0.1 M (indicated) 0.3 M (inferred) 0.492 M (indicated) 1.519 M (inferred) ordinary kriging 10 120 g/t Au (HG domains) 5 45 g/t Au (LG domains) 355,611 m 450,175 m + trial stoping Metrics from PEA n/a 13.9 8.1 n/a n/a 2.0 m 7.8 m n/a Overall dilution n/a 18% 44% n/a (1) Refer to endnote #1, (2) Refer to endnote #2, (3) Refer to endnote #3, (4) Refer to endnote #4, (5) Refer to endnote #5 (6) Refer to endnote #6 Please refer to the Cautionary Statements Regarding Forward-Looking Statements and Cautionary Notes at the beginning of this presentation with respect of the Company s Qualified Person. 31

Structural Analysis of the F2 Gold Deposit Warranted 4 Main zone remains largely untested Conceptual diagram plan view The revised geological interpretation of the F2 Gold Main Zone was largely based on limited exposures from stopes drawn down from in the Hanging Wall of the deposit, where the mineralized zones were narrower and may not be representative; Stopes in the F2 main zone have not been extracted and require additional testing; and The planned exploration drilling and development is intended to target the main zone of the F2 Gold Deposit and test this geological interpretation. (4) Refer to endnote #4 Please refer to the Cautionary Statements Regarding Forward-Looking Statements and Cautionary Notes at the beginning of this presentation with respect of the Company s Qualified Person. 32

Positive Grade Rec from First Trial Stope 7 Results warrant further exploration and sampling Tonnage Grade g/t Au Au Ounces 2013 SRK Block model of first trial stope (long section looking east) Mill results 15,584 5.03 2,520 2016 SRK Block Model estimate 20,695 3.54 2,355 2013 SRK Block model estimate 17,190 4.85 2,680 The trial stopes were predominantly located in the hanging-wall zones and utilize the longhole stoping method, which may not have been the most economic method; and Company believes additional analysis of the geology could contribute to the potential optimization of planned tonnes and gold grades in future stopes. (7) Refer to endnote #7 Please refer to the Cautionary Statements Regarding Forward-Looking Statements and Cautionary Notes at the beginning of this presentation with respect of the Company s Qualified Person. 33

Proposed Trial Mining Plan view of 366-metre level N West Limb Basalts (HiTi) East-West D2 structures 305-metre level Long section looking north 305-metre level Down Ramp West Limb HiTi Zone F2 Main HiTi Zone F2 Gold Deposit Main Zone (HiTi) The coloured areas represent the high-grade domains from the 2016 SRK mineral resource estimate, at a 3.0 g/t Au cut-off Planned development (Diagram not to scale) Existing development Dark blue planned trial mining Dark purple waste development (Diagram not to scale) Please refer to the Cautionary Statements Regarding Forward-Looking Statements and Cautionary Notes at the beginning of this presentation with respect of the Company s Qualified Person. 34

Endnotes 1. For more information regarding the amended inferred mineral resource and geological potential estimates prepared by Geoex Ltd. please refer to the news release dated March 31, 2011, which is available on our website at www.rubiconminerals.com and the Technical Report dated April 11, 2011 available on under Rubicon s profile in SEDAR at www.sedar.com. 2. For more information regarding the 2011 PEA study prepared by AMC Mining Consultants, please refer to the news release dated June 29, 2011, which is available on our website at www.rubiconminerals.com and the Technical Report dated August 11, 2011 available on under Rubicon s profile in SEDAR at www.sedar.com. 3. For more information regarding the 2013 PEA study prepared by SRK Consulting (Canada) Inc., please refer to the news release dated June 25, 2013, which is available on our website at www.rubiconminerals.com and the Amended & Restated Technical Report dated February 28, 2014 available under Rubicon s profile in SEDAR at www.sedar.com. 4. For more information regarding the 2016 SRK mineral resource estimate prepared by SRK Consulting (Canada) Inc., please refer to the news release dated January 11, 2016, which is available on our website at www.rubiconminerals.com and the Technical Report filed on February 25, 2016 available under Rubicon s profile at www.sedar.com. 5. Mineral resources are not mineral reserves and have not demonstrated economic viability. All figures are rounded to reflect the relative accuracy of the estimate. Samples have been capped where appropriate. 6. Underground mineral resources reported at a cut-off grade of 4.0 g/t Au of gold per tonne assuming a gold price of US$1,125/oz. and a gold recovery of 92.5%. 7. For more information regarding the first trial stope reconciliation, please refer to the news release dated November 3, 2015, which is available on our website at www.rubiconminerals.com. 35

For more information, please contact: Allan Candelario, CFA Director, Investor Relations and Corporate Development 416-766-2804 acandelario@rubiconminerals.com 36