Mineral Resource for Pilbara Iron Ore Project increased to more than 900 Mt Pilbara Iron Ore Project (PIOP), Western Australia

Similar documents
AGM Geology Presentation. 30th November 2016

10 BILLION TONNES TOTAL RESOURCES ACHIEVED FROM MAJOR MAIDEN RESOURCE ESTIMATE FOR WESTERN HUB

Helix Resources Limited A.C.N Incorporated in Western Australia

Haoma Mining NL DALTONS-MT WEBBER DEPOSIT; UPGRADE TO INDICATED RESOURCE CATEGORY FOR MAIN SOUTHERN ZONE

Mount Gibson Iron Limited ABN

ASX ANNOUNCEMENT 21 MARCH 2011

For personal use only

INFERRED MINERAL RESOURCE AND CONCEPTUAL EXPLORATION TARGET UPDATE Mt FORREST IRON

MAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL MILLION TONNES

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

New Drilling Program Commences at Mutiny s Deflector Deposit

Deep Yellow Revises Resource Estimate at INCA Uranium Deposit in Namibia

ASX/MEDIA RELEASE 25 November EMERGENT CONFIRMS MAJOR JORC RESOURCE UPGRADE TO 561Mt FROM PREVIOUS 127Mt AT BEYONDIE IRON PROJECT

For personal use only

SHAY GAP DETRITAL IRON ORE PROJECT RECONNAISSANCE SAMPLING SHOWS HIGHGRADE POTENTIAL

PEAK HILL IRON PROJECT MAIDEN DSO INFERRED MINERAL RESOURCE

CENTAURUS EXPANDS JAMBREIRO STUDY WORK AS A RESULT OF EXCELLENT RESULTS IN SOUTH EAST EXTENSION ZONE

Co-O MINE MINERAL RESOURCE UPDATE

P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

Initial Gold Resource at Sissingue Tengrela Project (Ivory Coast)

For personal use only

ASX:LEG 18 July 2011 ASX Announcement DRILL ASSAYS UPGRADE IRON RESULTS. Drill assays from Melombo North confirm encouraging iron grades and

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development

For personal use only

D N HARLEY MANAGING DIRECTOR Attachment: Amended Consultant Report on MG 14 Mineral Resource Estimation.

For personal use only

For personal use only

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project

FIVE RIGS DRILLING AT KARLAWINDA

COARSE GRAINED MAGNETITE DISCOVERED NORTH OF YORK

Exploration targets identified to increase Browns Range Project s mine life

High Grade Gold Intercepts at Bangaba

High Grade Gold Drill Results Extend Buccaneer

Developing the +1.2Moz Pilbara Gold Project

New High Grade Lode Discovered at Wagtail South

704,000 OUNCE MIYABI GOLD PROJECT UPDATE

MAIDEN URANIUM RESOURCE PROOF OF CONCEPT

For personal use only

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead.

For personal use only

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project

ASX/Media Announcement

The Manager Companies ASX Limited 20 Bridge Street

HIGHLIGHTS. Drilling intersects wt% recovered DTR concentrate grading 69.8% Fe, including 27 metres in excess of 21% DTR.

NEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA

GOULAMINA DRILLING AND GENERAL PROGRESS UPDATE

For personal use only

For personal use only

EXCELLENT FIRST DRILL RESULTS FROM WELD RANGE

Encouraging drill results from Paroo Range

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April

RESOURCE INCREASED BY 75% TO 1.29 BILLION TONNES FOR GINDALBIE S KARARA MAGNETITE PROJECT

BUNDARRA RESOURCE UPDATE

INITIAL DRILLING AT CAPACETE DELIVERS ENCOURAGING RESULTS. DRILL RIG MOBILISED TO TEST LARGE BLOCK 5 TARGET AT MATA DA CORDA PHOSPHATE PROJECT, BRAZIL

TWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT

ASX announcement. Mylo-Frontier Pilbara Gold Project acquisition. 27 November Summary

For personal use only

Significant New Mineralised Zone Paroo Range (RGU:100%)

Bass Metals records further positive drill results & progress at 3 prospects.

More growth at Wa Gold Project as Julie-Collette resource increases to 410,700 ounces

For personal use only

Ovoot Coking Coal Project (100%)

ROE HILLS COBALT AND GOLD DRILLING ADVANCES

QUEEN SHEBA - RESOURCE TABLE: AUGUST 2011 RESOURCE CATEGORY. Tonnes Au Ag Cu (000) g/t g/t % GLOBAL RESOURCE TABLE: CONTAINED METAL

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

For personal use only

MAJOR RESOURCE BOOST FOR QUEENSLAND NICKEL PROJECT

EXPLORATION SUCCESS AT COYOTE GOLD MINE

Gold Intersected in Drilling at Canegrass (WA)

High-grade Copper and Gold Discovered at Productora

For personal use only

Consolidated Tin Mines Limited

Highlights. 9 November 2018 DRILLING UPDATE - SORBY HILLS Pb-Ag-Zn PROJECT CORPORATE DIRECTORY

For personal use only

Diamond Drilling to Commence in Axiom s Quang Tri Tenement, Vietnam

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT

For personal use only

ASX ANNOUNCEMENT Date: 03 October 2018 Number: 604/031018

ASX announcement 16 May 2016

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

ASX Announcement. New economic gold results confirm Dave East as an exciting new discovery. Highlights. 4 July 2011

For personal use only

For personal use only

For personal use only

Acquisition agreement to move to 100% ownership of the Ashford Coking Coal Project

Tel: (+61-8) Mob: (+61) (0)

KATINGAN RIA COAL RESOURCE UPGRADE

Option agreement with Randgold set to commercialise Massigui Gold Project

For personal use only

Resource upgrade at Greater Whitewash Project to 604 ppm Moly Equivalent*

QUARTERLY ACTIVITIES REPORT ENDING 30 SEPTEMBER 2010 HIGHLIGHTS

March 26 th Expansive Exploration Target Defined at Leonora Gold Project

GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT,

JV PROJECT UPDATE JORC COAL RESOURCE

8.1Mt Maiden JORC Coal Resource estimate at Titiribi Project

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

Alligator commences drilling of TCC4 uranium prospect in Arnhem Land, NT 4 September 2018

For personal use only

Transcription:

ASX ANNOUNCEMENT 14 November 2011 Mineral Resource for Pilbara Iron Ore Project increased to more than 900 Mt Pilbara Iron Ore Project (PIOP), Western Australia highlights Further 23% increase to 917 Mt @ 55.2% Fe Global Mineral Resource Maiden Measured Mineral Resource of 101 Mt @ 56.4%Fe Pilbara Iron Ore Project Western Australia Latest results further underpin the Company s confidence in progressing the development of the project Tenements E47/882 (Blacksmith) and E47/1560 (Anvil) Flinders Mines Limited (FMS) 100% Flinders Mines Limited (ASX: FMS) is pleased to announce a further significant increase in the Mineral Resource at the Company s 100%-owned Pilbara Iron Ore Project (PIOP) located in Western Australia s central Pilbara region. Flinders global Mineral Resource for the project has increased by a further 23% to 917 Mt @ 55.2% Fe (Table 1). The increase announced here is based on updates to the Champion, Delta and Eagle deposits only all the deposits remain open to exploration upside. The upgraded global Mineral Resource announced today, based on a +50% iron cut-off, now consists of a Measured Resource of 101.0 Mt @ 56.4% Fe, an Indicated Resource of 343.7 Mt @ 55.5% Fe and an Inferred Resource of 472.6 Mt @ 54.7% Fe. The Mineral Resource is comprised of 190.5 Mt of Brockman Iron Deposit (BID) at 56.3% Fe, 545.5 Mt of Detrital Iron Deposit (DID) @ 55.2% Fe and 181.3 Mt of Channel Iron Deposit (CID) at 54.0% Fe (Table 2). Global Mineral Resource for Fe > 50% (11/11/2011) JORC Classification Tonnage Mt Fe % SiO 2 % Al 2 O 3 % P% LOI% Total Inferred 472.6 54.7 10.2 5.0 0.067 5.7 Total Indicated 343.7 55.5 8.9 4.5 0.083 6.2 Total Measured 101.0 56.4 10.5 5.1 0.054 2.8 TOTAL 917.3 55.2 9.7 4.8 0.072 5.6 Table 1 Pilbara Iron Ore Project Global Measured, Indicated and Inferred Resource. Flinders Mines Limited ABN 46 091 118 044 www.flindersmines.com Level 1, 136 Frome Street, Adelaide South Australia 5000 PO Box 3065 Rundle Mall South Australia 5000 telephone 61 8 8132 7950 facsimile 61 8 8132 7999 email info@flindersmines.com

2 Delivered on schedule, the Mineral Resource is being integrated into the Definitive Feasibility Study, currently being undertaken by WorleyParsons. The optimisation study is likely to convert some of the additional tonnage from this Mineral Resource into the saleable inventory, increasing the existing tonnage of 273 Mt, thus providing for a greater production rate or increased life of mine. This upgraded Mineral Resource was compiled in accordance with the 2004 JORC (Joint Ore Reserves Committee) code. Global Resource Estimate The increase in the Global Resource Estimate to 917 Mt @ 55.2% Fe is a result of drilling carried out in the AREA J AREA G E47/1560 Anvil AREA H AREA F AJAX BLACKJACK E47/882 Blacksmith CHAMPION DELTA EAGLE PARAGON BADGER -22 10' 117 20' 117 25' 117 30' Indicated & Measured Resource (+50% Fe cutoff) Indicated Resource (+50% Fe cutoff) Inferred Resource (+50% Fe cutoff) RC drillhole Exploration licence 2 km 0 Figure 1 Location of PIOP Global Measured, Indicated and Inferred Resource. Deposit Type Inferred Resource (Mt) Indicated Resource (Mt) Measured Resource (Mt) Brockman Iron Deposit (BID) 99.1 91.4 Detrital Iron Deposit (DID) 287.8 156.7 101.0 Channel Iron Deposit (CID) 85.7 95.6 TOTAL 472.6 343.7 101.0 Table 2 Pilbara Iron Ore Project Mineral Resource summary of deposit types. last half of 2010 and the first half of 2011. The number of additional drill holes considered in this estimate is 1,154 holes for 58,920m, which brings total drilling undertaken at the project to 2,813 holes for 140,295m. This estimate includes upgrades to the Champion, Delta and Eagle deposits only (Table 3). While some of the changes are due to additional drilling in previously untested areas such as the BID extensions in the Delta hills, there are also changes due to the identification of further mineralisation as the result of infill drilling, particularly in Eagle. Infill drilling in the central parts of the Eagle deposit has intersected more extensive and thicker sequences of CID than previously anticipated.

Global Mineral Resource for Fe > 50% (11/11/2011) JORC Classification Tonnage Mt Fe % SiO 2 % Al 2 O 3 % P% LOI% Ajax Inferred 68.5 55.2 10.6 5.1 0.060 4.5 Blackjack Inferred 44.7 55.3 12.8 4.6 0.057 2.7 *Champion Inferred 61.1 55.6 10.1 4.6 0.069 4.7 *Champion Indicated 112.4 55.2 9.6 4.9 0.075 5.5 *Delta Inferred 12.1 56.0 8.2 4.6 0.085 6.2 *Delta Indicated 111.8 56.3 7.9 3.9 0.100 6.8 *Delta Measured 101.0 56.4 10.5 5.1 0.054 2.8 *Eagle Inferred 173.4 54.0 9.5 5.0 0.076 7.7 *Eagle Indicated 119.5 55.0 9.3 4.8 0.074 6.4 Badger Inferred 8.7 57.5 6.3 3.4 0.092 7.3 Paragon Inferred 21.7 58.0 6.6 3.9 0.080 5.5 Anvil Inferred 82.4 53.6 11.4 5.8 0.050 4.9 Total Inferred 472.6 54.7 10.2 5.0 0.067 5.7 Total Indicated 343.7 55.5 8.9 4.5 0.083 6.2 Total Measured 101.0 56.4 10.5 5.1 0.054 2.8 TOTAL 917.3 55.2 9.7 4.8 0.072 5.6 Table 3 Pilbara Iron Ore Project Global Resource, by deposit. * Upgraded as part of current Resource Estimate. Figure 2 Schematic cross-section showing simplified geological interpretation. 3

The Company is still working on the conversion of Delta BID material from Indicated to Measured status through additional geological interpretation. This will be completed in Q1 2012 and will require no further drilling. Flinders is very confident that a significant proportion of the Delta BID will be converted to Measured status. Ongoing Exploration & Going Forward The updated Resource Estimate announced today further underpins the Company s confidence in progressing the development of the Pilbara Iron Ore Project. The 2011 drill program being undertaken by Flinders has been completed. Faster than expected drill rates resulted in the drilling program finishing ahead of schedule and under budget. Highly encouraging Direct Shipping Ore (DSO) BID zones have been intersected in several places on the flanks of the valleys. These zones are at or near surface and outside the Mineral Resource which is the subject of today s announcement. Follow up BID drilling will continue to take place following the execution of Native Title agreements by Flinders, anticipated in Q4 2011. Detailed mapping over the tenement - expected to be completed in Q4 2011 - will provide a basis for the focus of further investigation and drilling during the first half of 2012. GARY SUTHERLAND MANAGING DIRECTOR 14 November 2011 For further information please contact: Gary Sutherland Ph: 08 8132 7950 or 0419 851 608 Email: gsutherland@flindersmines.com Duncan Gordon Investor relations, Ph: 08 8232 8800 or 0404 006 444 Email: dgordon@adelaideequity.com.au QUALIFYING STATEMENTS JORC compliance The information that relates to the drilling data and geological interpretations is based on information compiled by Mr N Corlis (who is a Member of The Australian Institute of Geoscientists) and Dr G McDonald (who is a member of the Australasian Institute of Mining and Metallurgy). Mr Corlis and Dr McDonald are employees of Flinders Mines Limited. The information that relates to the Mineral Resource Estimate has been compiled by Mr Paul Blackney of Optiro Pty Ltd. who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Blackney, Mr Corlis and Dr McDonald have sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity that they are undertaking to qualify as a Competent Persons as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Blackney, Mr Corlis and Dr McDonald consent to the inclusion of matters based on their information in the form and context in which it appears. Forward-looking statements This release may include forward-looking statements. These forwardlooking statements are based on Flinders Mines Limited s expectations concerning future events. Forward-looking statements are subject to risks, uncertainties and other factors, many of which are outside the control of Flinders Mines Limited and the Company makes no undertaking to subsequently update or revise the forward-looking statements made in this release to reflect events or circumstances after the date of this release. 4

14 November 2011 Our Ref: J_1304_G Mr Nicholas Corlis General Manager Business Development Flinders Mines Ltd Level 1, 136 Frome Street Adelaide SA 5000 Dear Nicholas DECLARATION AND STATEMENT OF CONSENT OF OPTIRO Optiro Pty Ltd (Optiro) declares that the tabulation of Mineral Resources presented by Optiro for Flinders Mines Limited s (FMS) Pilbara Iron Ore Project (PIOP) has been prepared in accordance with the Australasian Code for Reporting of Identified Mineral Resources and Ore Reserves, 2004 (the JORC Code). Optiro consents to being named in any ASX and Media Release and to the inclusion in ASX and Media Releases of a reference to an updated resource statement prepared by Optiro subject to and conditional upon an express statement appearing in the ASX and Media Release in substantially the same form as the following: The regional geology that encompasses the PIOP is characterised by late Archaen-Lower Proterozoic age sediments of the Mount Bruce Supergroup which form part of the Hamersley Province. The Mount Bruce supergroup is wedged between the Archaen granitoid basement complexes of the Yilgarn and Pilbara blocks and it comprises of the Fortescue, Hamersley and Turee Groups which are overlain by remnants of the Wyloo Group. Overall the Hamersley Group metasediments, including the Banded Iron Formation (BIF) units, are described as moderately flat dipping along the northern boundary outcrops and increases in complexity to the south. The Banded Iron Formations (BIFs) of the Hamersley group are the most widespread and known to contain the highest iron content in the stratigraphic record. The Eagle, Champion and Delta deposits of the PIOP are all located within tenement E47/882 which is dominated by the Brockman Iron formation known to host large bedded Iron deposits (BID) in other regions of the Hamersley Ranges. The project area consists of large channel systems which comprise of significant tonnages of detrital and channel iron deposits (DID and CID). The channels may host accumulations of iron rich gravels distal from any hard-rock iron mineralisation. The DID is characterised by hematite rich mineralisation that has been eroded from surrounding banded iron formation, and is mainly composed of detrital material of pisolithic or fragmental types. Underneath the DID units lies the Dales Gorge Member of the Brockman Iron Formation. CID mineralisation has been identified between the DID and BID mineralisation in some parts of Delta and Eagle deposits The mineralogy of the mineralisation found at the PIOP is mainly related to weathering of certain stratigraphic units. The vitreous goethite of the BID units appears to be related to the goethitic shales that have been reported underlying the DID units and the weathered hematite rich BIF units.

DECLARATION AND STATEMENT OF CONSENT OF OPTIRO Optiro has prepared Mineral Resource estimates for the Delta, Eagle and Champion deposits which comprise part of the PIOP. These updated and revised Mineral Resource Estimates have been reported above a 50% Fe cut-off grade in the following tabulation. The resources have been classified into Measured, Indicated and Inferred categories according to the 2004 JORC Code based on confidence in the geological and grade continuity of the deposits as demonstrated by the exploration data and associated quality control protocols. The Mineral Resource Estimates prepared by Optiro are based on drillhole data and geological interpretations provided by FMS. The recent drillhole data includes significant amounts of additional drilling which was completed after the previous resource estimates were undertaken. This drilling added 1,154 reverse circulation (RC) holes for a total of 58,920 m. This drilling infilled the existing drill grid with much of the Delta deposit now tested by drilling on a nominal grid of 50 m by 50 m. The drillhole grid at Eagle and Champion is wider spaced with the recent work closing the grid spacing to nominally 100 m by 125 m in many parts of these deposits. FMS has processed the quality control data associated with the 2011 drilling campaign and the results obtained demonstrate that the RC sampling has achieved good grade accuracy and precision across all the elements estimated in the model. The 2011 drilling also included eight HQ diamond core holes that twinned existing RC holes at locations within each of the three deposits. The results of this test suggest that the sampling of RC and diamond core samples provides compatible assay results. Based on this quality control data and past work completed during previous resource estimates, Optiro considers the drillhole data to be of appropriate quality to participate in the Mineral Resource updates presented in this statement and to support the Mineral Resource categories assigned to the estimates. Optiro has reviewed the geological interpretation whilst compiling the Mineral Resource Estimates and considers the interpretations to fairly represent the drillhole data and surface mapping available for the deposits to an accuracy commensurate with the classifications applied using the guidelines in the 2004 JORC Code. Optiro has compiled Mineral Resource Estimates using the supplied geological domains which are based on lithology and grade conditions to constrain the limits of mineralised zones. The geological interpretation discriminates between Bedded Iron Deposits (BID), Channel Iron Deposits (CID) and Detrital Iron Deposits (DID). The DID is divided into four horizons representing a range of grade and material type conditions. In general terms, the DID iron grade is lowest near surface and highest at depth. The DID contains the majority of the mineralisation. The BID tends to form along the walls of the valleys that are now infilled by CID and BID. The CID is located at the bottom of the valleys and is covered by the DID, which is, in turn, covered by variable thicknesses of recent cover. For grade estimation purposes, additional domains were added to upper part of the DID to improve control of the estimation process and within the CID to discriminate larger clay pods. Grades were estimated into model blocks which were either 100 me by 100 mn by 6 mrl (Eagle and Champion) or 50 me by 50 mn by 6 mrl (Delta). The smaller block size at Delta is supported by the closer spaced drilling in this deposit. Domain boundaries were represented by sub-blocks that were no smaller than 10 me by 10 mn by 2 mrl. Iron (Fe), silica (SiO 2 ), alumina (Al 2 O 3 ), phosphorus (P), loss on ignition (LOI), titanium (TiO 2 ), and sulphur (S) grades were all estimated using ordinary kriging of two Page 2

DECLARATION AND STATEMENT OF CONSENT OF OPTIRO metre downhole sample assays. All of the geological domains described above were treated as hard grade boundaries during the estimation process. Average bulk density factors were assigned to each geological domain. These factors were based on samples collected from the PIOP deposits for the more important mineralisation domains or were derived from factors from neighbouring deposits with similar geological conditions. The deposits have been tested by drilling on nominal 50 m by 50 m, 50 m by 100 m, 100 m by 125 m and wider grids. These grid conditions, combined with geological confidence and the quality control standards achieved have been used to divide the deposits into Measured, Indicated and Inferred Mineral Resource categories as defined by the JORC Code. Measured Mineral Resources were assigned to the DID where it is tested by drilling on a nominal 50 m by 50 grid. This only occurs within the Delta deposit. The geological confidence in the CID and DID was considered to be lower due to poorer geological continuity, leading to these deposits being assigned as Indicated Mineral Resources under the same drilling conditions at Delta. At all deposits, a nominal 100 m by 125 m drill grid spacing was considered adequate to assign DID, CID and BID to an Indicated Mineral Resource category. All DID, CID and BID tested by wider drill grid spacings was assigned to an Inferred Mineral Resource category. All unmineralised BIF was assigned to an Inferred category irrespective of the local drill spacing or the degree of grade extrapolation. The Mineral Resource tabulation attached below presents the Mineral Resources for the Delta, Eagle and Champion deposits as they have been assigned to the confidence categories defined in the JORC Code. Yours sincerely OPTIRO Paul Blackney MAusIMM, MAIG Principal Page 3

DECLARATION AND STATEMENT OF CONSENT OF OPTIRO FLINDERS MINES LIMITED Pilbara Iron Ore Project Delta, Eagle and Champion Mineral Resource, November 2011 Reported above a 50% Fe cut-off Classification Deposit Mt Fe SiO 2 Al 2 O 3 P S LOI TiO 2 Measured Indicated Inferred Deposit Totals Delta 101.0 56.39 10.50 5.10 0.054 0.017 2.79 0.56 Eagle 0.0 Champion 0.0 Total 101.0 56.39 10.50 5.10 0.054 0.017 2.79 0.56 Delta 111.8 56.30 7.89 3.87 0.100 0.019 6.81 0.43 Eagle 119.5 55.02 9.26 4.82 0.074 0.013 6.41 0.49 Champion 112.4 55.17 9.65 4.91 0.075 0.016 5.48 0.61 Total 343.8 55.49 8.94 4.54 0.083 0.016 6.23 0.51 Delta 12.1 55.97 8.16 4.64 0.085 0.027 6.25 0.52 Eagle 173.4 54.01 9.53 5.01 0.076 0.009 7.68 0.47 Champion 61.1 55.62 10.10 4.61 0.069 0.021 4.70 0.56 Total 246.6 54.50 9.60 4.89 0.075 0.013 6.87 0.49 Delta 224.8 56.33 9.07 4.46 0.078 0.019 4.97 0.49 Eagle 293.0 54.42 9.42 4.93 0.075 0.011 7.16 0.48 Champion 173.5 55.33 9.81 4.81 0.073 0.018 5.21 0.59 Grand Total 691.3 55.27 9.40 4.75 0.076 0.015 5.96 0.51 The information in this Public Report that relates to Mineral Resources is based on, and accurately reflects, information compiled by Mr. Paul Blackney of Optiro Pty Ltd, who is a Member of The Australasian Institute of Mining and Metallurgy. Mr. Blackney has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr. Blackney consents to the inclusion in the report of the matters based on the information in the form and context in which it appears. Page 4