Sediment management in the Danube River Basin. Igor Liška ICPDR

Similar documents
Management of Sediment Quality and Quantity in the Danube River Basin

Sediment project proposal. EUSDR PA4 SG meeting June 9 th Dr. László KARDOSS

Danube Sediment Management Restoration of Sediment Balance in the Danube A still ongoing project preparation

Restoration of the Sediment Balance in the Danube River DanubeSediment. Sándor Baranya, BME

Danube Sediment Management - Restoration of the Sediment Balance in the Danube River th RBM EG Meeting

DriDanube project. DriDanube Drought Risk in the Danube Region Project co-funded by European Union funds (ERDF, IPA)

The SedAlp Project: WP6: INTERACTION WITH STRUCTURES

Improvement of navigation conditions on the Danube (Calarasi-Braila and Lower Danube) - Ecological concerns?

Liliana Pagliero June, 15 th 2011

Strategies for managing sediment in dams. Iwona Conlan Consultant to IKMP, MRCS

DANUBEparksCONNECTED WP 3 WILDisland

Carpathians Unite mechanism of consultation and cooperation for implementation of the Carpathian Convention

The Imperative of Sediment Management Concepts in River Basin Management Plans

Flood mapping in the Danube RBD. Igor Liska ICPDR Secretariat

Report from the SedNet Round Table Discussion November Sediment Management an essential element of River Basin Management Plans

Fact sheet: Glacial rivers (all Europe)

ICZM and MSP in the Black Sea Region

MEMORANDUM OF UNDERSTANDING FOR THE ESTABLISHMENT OF A CARPATHIAN INTEGRATED BIODIVERSITY INFORMATION SYSTEM

Annex I. Common criteria for the choice of Protected Marine and Coastal Areas that could be included in SPAMI list

Technical Review of Pak Beng Hydropower Project (1) Hydrology & Hydraulics and (2) Sediment Transport & River Morphology

Historical development of erosion control works (more than 100 years) Wild torrent management is essential for the existance of human in alpine areas

2SEA. Requirements Report SOILS2SEA DELIVERABLE NO. 1.2

EUSAIR on sea topics from Slovenian perspective

Mississippi River and Tributaries Project Mississippi River Geomorphology and Potamology Program

EBRO DELTA WORK PLAN

Economic and Social Council

low turbidity high turbidity

Strengthening the cooperation in the region: Carpathian, Tisa,, Danube and Black Sea areas

Special Public Notice

15 th PEG GIS Meeting Report

Influence of the Major Drainages to the Mississippi River and Implications for System Level Management

WORKSHOP #2 Modelling and sediment transfers. Bucharest 07 October 2015

Where a licence is displayed above, please note the terms and conditions of the licence govern your use of this document.

CASE STUDY BINGA, PHILIPPINES

Katarina Holubova & Franz Steiner. Joint efforts for cross-border restoration of the Morava river

Recent developments in the ICPR sediment management activities in the Rhine basin

SCOPE OF PRESENTATION STREAM DYNAMICS, CHANNEL RESTORATION PLANS, & SEDIMENT TRANSPORT ANALYSES IN RELATION TO RESTORATION PLANS

Remaining Capacity in Great Lakes Reservoirs

Closing the knowledge cap in Sediments and Fisheries

Pilot-Project Project Bad Deutsch Altenburg:

CASE STUDY BINGA, PHILIPPINES

Technical note about the monitoring of hydromorphological restoration/management of the Drava River in Slovenia

Work Packages. RECROS Project development workshop. Prague, 30 th April 2015

GTU. Shantilal Shah Engineering College, Bhavnagar

AD HOC DRAFTING GROUP ON TRANSNATIONAL ORGANISED CRIME (PC-GR-COT) STATUS OF RATIFICATIONS BY COUNCIL OF EUROPE MEMBER STATES

Sustainable management of sediment resources: sediment management at the river basin scale

HELSINKI COMMISSION Baltic Marine Environment Protection Commission

Wetland Programmes. Biodiversity assessments in determining wetland conservation priorities: a catchment approach. Dr. Piet-Louis Grundling

Mekong Sediment from the Mekong River Commission Study

CONFERENCE STATEMENT

How Do Human Impacts and Geomorphological Responses Vary with Spatial Scale in the Streams and Rivers of the Illinois Basin?

Dam Removal Analysis Guidelines for Sediment

The Danube River. Hydrological Connectivity and Human Influence. By: Pat O Connell, Pat Wilkins, Tiana Royer, and Kevin Gaitsch

24.0 Mineral Extraction

GEOCHEMISTRY RESEARCH GROUP projects & research

QUIZ. Wanted: Knowledge about the Danube 1. The questions for the children are based on the different chapters in the handbook

Current LCLUC challenges in SCERIN: Assessing Ecosystem Function and Processes

THE WATER FRAMEWORK DIRECTIVE - Stage of the implementation in Romania. National Administration Apele Romane / Romanian Waters

Maritime Spatial Planning in the Baltic Sea Region

The ESPON Programme. Goals Main Results Future

Licca Liber - the free Lech

SedNet: the evolving, European Sediment Network

Assessment of Lake Forest Lake Sediment Trapping Efficiency and Capacity. Marlon R. Cook Groundwater Assessment Program Geological Survey of Alabama

Natura 2000 in the marine environment: state of implementation and next steps

Sediment management: a european perspective. Piet den Besten Centre for Water Management Rijkswaterstaat, Netherlands

and the Myanmar economy World Water Day, 2018

STUDY GUIDE FOR CONTENT MASTERY. Surface Water Movement

Land Use and Land cover statistics (LUCAS)

WMO/WWRP FDP: INCA CE

CASE STUDY NATHPA JHAKRI, INDIA

Aquaculture Spatial Planning: The case of Greece

Flood Risk Reduction Strategies and the Early Warning Systems for Alerting the Population in Western Balkan Countries Presentation

Maritime Spatial Planning: Transboundary Cooperation in the Celtic Seas Looking Ahead

FOREST RESEARCH INSTITUTE, DEHRADUN

Scheepvaart en ecologische doelstellingen

Birch Creek Geomorphic Assessment and Action Plan

Project EuroGeoNames (EGN) Results of the econtentplus-funded period *

WHO EpiData. A monthly summary of the epidemiological data on selected Vaccine preventable diseases in the WHO European Region

River basin management in a transboundary context: Norwegian experience

Your web browser (Safari 7) is out of date. For more security, comfort and the best experience on this site: Update your browser Ignore

Use of benthic invertebrate biological indicators in evaluating sediment deposition impairment on the Middle Truckee River, California

SedAlp presentation Lyon, June 22 nd 2015

CASE STUDY NATHPA JHAKRI, INDIA

MODELS AND TOOLS FOR GOVERNANCE OF

Natura 2000 and spatial planning. Executive summary

Access to MRM deposits in European countries and associated territories. Case Study: Aggregates plans and their future:

Deposition and Resuspension of Sediments in Near Bank Water Zones of the River Elbe

BURGAS CASE STUDY: LAND-SEA INTERACTIONS. Dr. Margarita Stancheva

THE CONTEXT. Facts about Water, Erosion & Sedimentation

In-channel coarse sediment trap Best Management Practice

BURGAS CASE STUDY: LAND-SEA INTERACTIONS

mountain rivers fixed channel boundaries (bedrock banks and bed) high transport capacity low storage input output

INTEGRATED HEAVY RAIN RISK MANAGEMENT

WORK PACKAGE 2: SEDIMENT MANAGEMENT AT THE RIVER BASIN SCALE

Image processing and substrate measurements for habitat mapping and modelling

COUNCIL OF THE EUROPEAN UNION. Brussels, 2 May /14 CULT 68

Annex 29. Sediment Transport with the Danube River Flow and Sedimentation Rates along the Danube- Black Sea Navigation Route

Navigable maritime and river waterways in the seaside - Danube Delta area and the connected rural development

THE SANDS ARE RUNNING OUT

Swift Creek Sediment Management Action Plan (SCSMAP)

Transcription:

Sediment management in the Danube River Basin Igor Liška ICPDR

Danube River Protection Convention 29 June 1994, Sofia (Bulgaria) Protection of water & ecological resources Sustainable use of water Reduce nutrients & hazardous substances Manage floods & ice hazards ICPDR coordinates implementation of EU Water Framework Directive & EU Floods Directive

Contracting Parties Germany Austria Czech Republic Slovakia Hungary Slovenia Croatia Bosnia & Herzegovina Serbia Montenegro Romania Bulgaria Rep. of Moldova Ukraine European Union

Coordination Mechanisms MK R O B G Cooperation ME MD AL RS U A D E ICPDR AT C H SI IT C Z H U S K PL B H A R Co-operation at sub-basin level: e.g. Sava

ICPDR Delegations of Contracting Parties ICPDR Secretariat IMGIS EG Information Management & Geographical Information Public System Participation PP EG Flood EG Flood Protection MA EG Monitoring & Assessment APC EG PM EG Accident Prevention/Control RBM EG ad hoc S EG Pressures & Measures ad hoc Strategic River Basin Management Task Groups

Stakeholder Involvement: 22 Observers

Sediments in WFD implementation WFD Art. 5 Report 2004 Sediment deficit in the Danube due to damming and regulation works reported. It stimulated further discussion on sediments in DRB. Sediment Issue Paper 2006 Prepared by HU, RO and AT in cooperation with the Secretariat. Addressed both quality and quantity. The issue of sediment deficit remained open.

2006 paper: Damming & sediment transport Sediment accumulation in dams - extraction needed Gravel extraction 15 000 m 3 /a in Abwinden Asten dam. 325 million tons of sediment accumulated in the Iron Gate between 1972 and 1994 filling 10% of the reservoir capacity. Reduced sediment discharge leads to riverbed erosion Danube downstream Vienna - riverbed erodes at a rate of 2.0 3.5 cm/year. Downstream the Freudenau dam addition of 160 000 m 3 bed load per year is required. Significant erosion downstream the Iron Gate.

2006 paper: Sediment balance Sediment deficit in the Danube due to damming and regulation works. 80 70 60 50 40 30 20 10 0 1900 1950 1980 2000 SPM in Issacea in million tons/year No deficit of suspended solids reported in the upper Danube.

Mercury in Sediments Danube Tributaries JDS4R - Kachlet JDS96L - Vilkova 4 3,5 3 2,5 2 1,5 1 0,5 [µg/g] 3000 2500 2000 1500 1000 500 0 0 River-km

Sediments & ecology The bottom sediments of lakes, streams, groundwaters and wetlands host an enormous diversity of biota (more than 100,000 benthic invertebrate species, 10,000 species of algae and more than 20,000 species of protozoans and bacteria). Species richness of freshwater sediment biota varies considerably between wetlands (locally up to 1500 invertebrate species), lakes and streams (locally approximately 80 1000 species) and ground waters (locally 0 150 species).

WFD implementation RBM Plan 2009 Sediments addressed as other issue (not SWMI). Sediment chapter was based on the 2006 Issue Paper and on the WWF report on Assessment of the balance and management of sediments of the Danube waterway. Sediment balance of most large rivers within the DRB can be characterised as disturbed or severely altered. Hydropower plants in the upper Danube catchments trap almost 80-90% of the sediment bed load. One third of the suspended load retained in the upper Danube while in the lower Danube the transport of suspended load currently reaches only 30% of the original amount recorded.

RBM Plan 2009 Conclusions & way forward There is an increasing discrepancy in the DRB between sediment surplus in reservoirs and retention basins of torrent control works and sediment deficit in the remaining free-flowing sections. In combination with river channelisation, this leads to river bed degradation and a loss of morphodynamic structures with associated problems concerning ecological status. To propose appropriate measures for improving the above mentioned situation, a sediment balance for the DRB has to be developed, including identification of possible consequences due to climate change (e.g. glacier retreat). Availability of sufficient and reliable data on sediment transport is a prerequisite for any future decisions on sediment management in DRB.

RBM Plan 2009 Conclusions & way forward Attention should be given to ensuring the sediment continuum (improving existing barriers and avoiding additional interruptions). Additional investigations are needed to identify the significance of sediment transport on the Danube basin-wide scale. River regulation works (e.g. to increase transport capacity) contribute to river bed degradation. River restoration is of key importance for reducing degradation and improving morphodynamics, necessary for achieving good ecological status. Dredging contributes significantly to the bed load deficit. It is therefore recommended that commercial extraction of sediments be prevented and that material dredged for maintenance be inserted back into the river.

WFD implementation Discussion on the integration of sediment management into RBM was held on an international level Recommendations to be made for a better inclusion of relevant sediment issues in future RBMPs.

Navigation Ship traffic causes waves, which can disturb the reproduction habitats of fish, benthic invertebrates, other biota as well as de-root aquatic plants and also cause an unnatural suspension of fine sediments, leading to reduced light for plant and algae growth. For the preservation/conservation of the ecological integrity of the Danube River, the basic needs is balanced sediment budget. natural disturbances (e.g. floods, droughts) and associated sediment transport variations are among the key elements that constitute the basis for the highly dynamic nature of riverine landscapes and their biodiversity.

Joint Statement adopted by Danube Commission, ISRBC and ICPDR

Hydropower Wikipedia/GFDL

Hydropower Process ongoing within the ICPDR: in close cooperation with the hydropower sector and all relevant stakeholders a broad discussion is ongoing with the aim of developing guiding principles on integrating environmental aspects in the use of existing hydropower plants, including a possible increase of their efficiency, as well as in the planning and construction of new hydropower plants

Recent developments EU Danube Strategy PA4 Example of project - To carry out an assessment for restoration of the sediment balance in the Danube. Transboundary solutions need to be found for the problem of riverbed incision and the lack of sediment. Co-ordination within the framework of the Strategy will help ensure identification and implementation of best solutions. This is also an important project in relation to flood prevention.

ICPDR Sediment Project Project proposal on Danube Sediment Management Assessment for Restoration of Sediment Balance in the DRB was drafted by AT, HU, RO RS, SK and DE and the Secretariat and submitted to the SEE Programme call in November 2011; The project received the Danube Strategy Letter of Recommendation due to its high relevance for the implementation of Priority Area 4 of the Strategy; In October 2012 the ICPDR Secretariat was informed by the project lead that the Danube Sediment Management project was officially rejected.

Project partners Lead Partner: Budapest University of Techonology (BME) AT: BOKU (co-lead), UBA, BMLFUW HU: BME, VITUKI, VKKI, ÉDUKÖVIZIG RO: NIMH, Apele Romane RS: Institute Jaroslav Černi SK: VUVH DE: BfG OBS: ICPDR, ISRBC, BEW

Project Work Packages WP 0 WP 1 WP 2 WP 3 WP 4 WP 5 Project preparation Project management Communication / Dissemination & PP Data collection, analysis and harmonization Composition of a sediment balance Pressure and impact analysis WP 6 Solutions for improving sediment transport and establishing a dynamic balance in the DRB (inputs to the programme of measures)

Future steps ICPDR asked the lead countries together with the Secretariat based on the existing project proposal to work towards a revised project proposal to be submitted with other stakeholders (i.e. hydropower, navigation) to a future call of an adequate funding program seeking close cooperation with the RBM EG, other relevant EGs, the EUSDR (Pillar B, PA1a and PA2) and other potential stakeholders involved in sediment management; ICPDR concluded that a sound knowledge base is needed before the sediment issue paper of 2006 can be updated.