Fusion Nuclear Science - Pathway Assessment

Similar documents
Fusion Development Facility (FDF) Mission and Concept

Overview of Pilot Plant Studies

Mission Elements of the FNSP and FNSF

Studies of Next-Step Spherical Tokamaks Using High-Temperature Superconductors Jonathan Menard (PPPL)

Neutron Testing: What are the Options for MFE?

Technological and Engineering Challenges of Fusion

Steady State, Transient and Off-Normal Heat Loads in ARIES Power Plants

Physics of fusion power. Lecture 14: Anomalous transport / ITER

ARIES ACT1 progress & ACT2

Design concept of near term DEMO reactor with high temperature blanket

Possibilities for Long Pulse Ignited Tokamak Experiments Using Resistive Magnets

Utilization of ARIES Systems Code

A SUPERCONDUCTING TOKAMAK FUSION TRANSMUTATION OF WASTE REACTOR

Spherical Torus Fusion Contributions and Game-Changing Issues

PHYSICS OF CFETR. Baonian Wan for CFETR physics group Institute of Plasma Physcis, Chinese Academy of Sciences, Hefei, China.

EU PPCS Models C & D Conceptual Design

Fusion Nuclear Science (FNS) Mission & High Priority Research

Compact, spheromak-based pilot plants for the demonstration of net-gain fusion power

Role and Challenges of Fusion Nuclear Science and Technology (FNST) toward DEMO

Safety considerations for Fusion Energy: From experimental facilities to Fusion Nuclear Science and beyond

Der Stellarator Ein alternatives Einschlusskonzept für ein Fusionskraftwerk

Aiming at Fusion Power Tokamak

Nuclear Fusion and ITER

Impact of High Field & High Confinement on L-mode-Edge Negative Triangularity Tokamak (NTT) Reactor

DEMO Concept Development and Assessment of Relevant Technologies. Physics and Engineering Studies of the Advanced Divertor for a Fusion Reactor

STELLARATOR REACTOR OPTIMIZATION AND ASSESSMENT

Critical Gaps between Tokamak Physics and Nuclear Science. Clement P.C. Wong General Atomics

Design window analysis of LHD-type Heliotron DEMO reactors

Status of the Concept Design of CFETR Tokamak Machine

Fusion Nuclear Science and Technology (FNST) Strategic Issues, Challenges, and Facilities on the Pathway to Fusion DEMO

for the French fusion programme

Transmutation of Minor Actinides in a Spherical

A FUSION DEVELOPMENT FACILITY BASED ON THE SPHERICAL TORUS

Yuntao, SONG ( ) and Satoshi NISHIO ( Japan Atomic Energy Research Institute

Concept of Multi-function Fusion Reactor

GA A23168 TOKAMAK REACTOR DESIGNS AS A FUNCTION OF ASPECT RATIO

First Workshop on MFE Development Strategy in China January 5-6, 2012

Developing a Robust Compact Tokamak Reactor by Exploiting New Superconducting Technologies and the Synergistic Effects of High Field D.

Electrical Resistivity Changes with Neutron Irradiation and Implications for W Stabilizing Shells

Studies of Lower Hybrid Range of Frequencies Actuators in the ARC Device

Systems Code Status. J. F. Lyon, ORNL. ARIES Meeting April 26, 2006

THE OPTIMAL TOKAMAK CONFIGURATION NEXT-STEP IMPLICATIONS

Implementation of a long leg X-point target divertor in the ARC fusion pilot plant

ITER operation. Ben Dudson. 14 th March Department of Physics, University of York, Heslington, York YO10 5DD, UK

Tritium Transport Modelling: first achievements on ITER Test Blanket Systems simulation and perspectives for DEMO Breeding Blanket

The Path to Fusion Energy creating a star on earth. S. Prager Princeton Plasma Physics Laboratory

Issues for Neutron Calculations for ITER Fusion Reactor

Fusion/transmutation reactor studies based on the spherical torus concept

Advanced Tokamak Research in JT-60U and JT-60SA

Conceptual Design of CFETR Tokamak Machine

Perspective on Fusion Energy

Tritium Safety of Russian Test Blanket Module

Smaller & Sooner: How a new generation of superconductors can accelerate fusion s development

Fusion Nuclear Science Facility (FNSF) Divertor Plans and Research Options

Toward the Realization of Fusion Energy

Materials for Future Fusion Reactors under Severe Stationary and Transient Thermal Loads

Basics of breeding blanket technology

DEMO diagnostics and impact on controllability

Magnetic Confinement Fusion-Status and Challenges

THE EVALUATION OF THE HEAT LOADING FROM STEADY, TRANSIENT AND OFF-NORMAL CONDITIONS IN ARIES POWER PLANTS*

Fusion Development Facility (FDF) Divertor Plans and Research Options

Seminar Chengdu, China Southwestern Institute of Physics (SWIP)

Mohamed Abdou. Keynote Presentation at ISFNT-9, Dalian, China, October 12, Binhai Road (Beach Road), Dalian

Overview of IFMIF-DONES and testing of materials for DEMO

Which Superconducting Magnets for DEMO and Future Fusion Reactors?

Provisional scenario of radioactive waste management for DEMO

Summary Tritium Day Workshop

Aspects of Advanced Fuel FRC Fusion Reactors

Mission and Design of the Fusion Ignition Research Experiment (FIRE)

Neutronics analysis of inboard shielding capability for a DEMO fusion reactor

Sh ield Performance and Magnet Protection in Thick Liquid Wa lconcepts. Mah moud Youssef UCLA

THE DIII D PROGRAM THREE-YEAR PLAN

FT/P3-14. Extensive remote handling and conservative plasma conditions to enable fusion nuclear science R&D using a component testing facility

Improved RF Actuator Schemes for the Lower Hybrid and the Ion Cyclotron Range of Frequencies in Reactor-Relevant Plasmas

SMALLER & SOONER: EXPLOITING NEW TECHNOLOGIES FOR FUSION S DEVELOPMENT

Results of Compact Stellarator engineering trade studies

Elements of Strategy on Modelling Activities in the area of Test Blanket Systems

Physics and Engineering Studies of the Advanced Divertor for a Fusion Reactor

Fusion nuclear science facilities and pilot plants based on the spherical tokamak

Progress on developing the spherical tokamak for fusion applications

Tokamak Divertor System Concept and the Design for ITER. Chris Stoafer April 14, 2011

Impact of H&CD Technology on DEMO Scenario Choice (Impact of DEMO Scenario on Choice of H&CD Technology)

Consideration on Design Window for a DEMO Reactor

US-Japan workshop on Fusion Power Reactor Design and Related Advanced Technologies, March at UCSD.

OV/2-5: Overview of Alcator C-Mod Results

ITER Participation and Possible Fusion Energy Development Path of Korea

1. Motivation power exhaust in JT-60SA tokamak. 2. Tool COREDIV code. 3. Operational scenarios of JT-60SA. 4. Results. 5.

D- 3 He HA tokamak device for experiments and power generations

Exhaust scenarios. Alberto Loarte. Plasma Operation Directorate ITER Organization. Route de Vinon sur Verdon, St Paul lez Durance, France

The Spherical Tokamak as a Compact Fusion Reactor Concept

THERMAL ANALYSIS OF A SOLID BREEDER TBM UNDER ITER OPERATIONAL CONDITIONS. A. Abou-Sena, A. Ying, M. Youssef, M. Abdou

Imposed Dynamo Current Drive

ARIES-AT Blanket and Divertor Design (The Final Stretch)

MHD. Jeff Freidberg MIT

Burn Stabilization of a Tokamak Power Plant with On-Line Estimations of Energy and Particle Confinement Times

Adaptation of Pb-Bi Cooled, Metal Fuel Subcritical Reactor for Use with a Tokamak Fusion Neutron Source

3.12 Development of Burn-up Calculation System for Fusion-Fission Hybrid Reactor

Demountable Superconducting Magnet Coils

A Hybrid Inductive Scenario for a Pulsed- Burn RFP Reactor with Quasi-Steady Current. John Sarff

Plasma Wall Interactions in Tokamak

Transcription:

Fusion Nuclear Science - Pathway Assessment C. Kessel, PPPL ARIES Project Meeting, Bethesda, MD July 29, 2010

Basic Flow of FNS-Pathways Assessment 1. Determination of DEMO/power plant parameters and requirements, over an appropriate range to represent conservative to aggressive. Roll these back to where we are. 2. Systems level analysis of possible missions in the pathway to DEMO/power plant. 3. Identification of critical R&D needs, with initial assessment of how to address the needs (but more detailed assessment to follow this exercise).

1. Identify DEMO/power plant parameters and requirements, over an appropriate range to encompass conservative to aggressive visions For example, ARIES-I ( N < 3) to ARIES-RS/AT ( N < 5.5) for the tokamak This will include plasma physics and engineering/technology This will necessarily include parameters that are representing a number of additional hidden parameters, for example, FW lifetime > 3-5 years, which is driven by reasonable replacement times, represents nuclear damage limits, plasma interaction limits, and must provide the proper mechanical and thermal behavior over this life. Critically examine assumptions used in power plant visions, are these feasible projections with R&D. Tentative identification of missions in the FNS pathway, determined by evolution of critical parameters on the path toward DEMO (for example neutron damage, plasma duration, duty cycle/availability, etc.)

A short listing of power plant parameters derived for the ReNeW effort on high performance steady state plasmas These used ARIES-1 to ARIES-AT as a range of target parameters

2. Systems level analysis of missions along the FNS path to a DEMO/power plant Operating space approach to systems analysis is used, which scans a number of parameters and provides a number of viable operating points, allowing one to examine sensitivities. Smallest or cheapest or conservative or aggressive or other features can be isolated. Approach has a physics component and an engineering component (and also a costing if necessary) component. The viable physics points can represent conservative to aggressive plasmas. The engineering component will reflect aggressive and conservative assumptions, engineering limits, and the device mission through constraints and other criteria. Identifying a range of possible facilities for a given mission, impact of broader or narrower mission on device definition, plasma performance assumptions required and their sensitivities, sensitivity to engineering/ technology assumptions, motivations for R&D, etc.

Step by step view of devices or phases of FNSF (this is for illustration purposes) Neutron fluence/damage/gas production mission elements Plasma duration and performance Duty cycle... BPX/ ITER Last pre-demo device DEMO Device/ mission 0.3 MW-y/m 2 Few J 2.5% 2-9 MW-y/m 2 2 weeks 30% 10-20 MW-y/m 2 1-6 months 30-50% 6x20 MW-y/m 2 1 year 75-90% This is the point where gaps are assessed and must be minimized Extrapolations must be acceptable to scientists, licensing group, utilities Predictive simulations of performance extrapolation must be in place

What does a given device or phase infer? Is this a device or a phase of a facility? What is the timeframe for R&D to support these elements? Pre-requisite R&D vs in operation R&D Break-in FDF-like Break-in nuclear phase, <N w > ~1-3 MW/m 2 Plasma duration 10 min 2 weeks Duty cycle 1-5%, 0.06 MW-yr/m 2 to Duty cycle 30%, 8.9 MW-yr/m 2 Tritium breeding (breeder choices, tritium removal, TBR, n-multiplier, ) Plasmas that are 100% non-inductive (no disruptions, weak nominal transients, f BS vs f CD, conservative parameters required for mission ) Plasma materials interaction issues (dust production, material surface degradation and transport, ) Qualified structural materials and coolant/breeder compatibility (ferritic steel up to 20 dpa?, He coolant, stationary breeder, ) Maintenance/replacement strategies ( as simple as possible, construct device remotely, )

More on Systems Analysis Systems analysis flow physics engineering build out/cost Plasmas that satisfy power and particle balance Inboard radial build and engineering limits Top and outboard build, and costing Scan several plasma parameters to generate large database of physics operating points Screen physics operating points thru physics filters, engineering feasibility, and engineering filters Surviving feasible operating points are built out and costed, graphical display of parameters (COE)

More on Systems Analysis, cont d Physics calculation, produces large database of solutions directly read by engineering module Power balance Particle balance Peripheral physics (bootstrap current, current diffusion time, etc.) Scan several variables (R, A, Bt, q 95, β N, T profile, n profile, n/n Gr, Q, κ, δ, η CD, τ p* /τ E, impurities) Engineering calculation, filters solutions Plasma and radiated powers Peak heat flux on divertors Power balance (thermal, electric, thermal conversion) Inboard radial build FW, blanket, shield TF coil Bucking cylinder PF coil Outboard/divertor build and costing

More on Systems Analysis, cont d Input A = 4.0 δ = 0.6 κ = 2.0 α n = 0.47 α T = 0.96 τ p* /τ E = 10 η CD = 0.3 Filtered 0.8 < Q eng < 1.2 Scanned Bt = 5-9 T β N = 0.03-0.06 q 95 = 3.2-4.6 n/n Gr = 0.5-1.0 Q = 10-30 R = 2.5-7.0 m f Ar = 0.1-0.3% Assumptions FW radiation peaking = 1.5 Divertor radiation fraction = 0.75 q FW, peak < 1 MW/m 2 (q FW,peak > 0.75 W/m 2 reject heat) q div,peak < 12 MW/m 2 (q div,peak > 8.0 W/m 2 reject heat) λ power from Fundamenski Neutron energy mult = 1.1 Thermal conv efficiency = 0.3 Wall plug H/CD efficiency = 0.4 Pumping = 3% of thermal power Subsystems = 4 % of themal power CS flux to rampup Ip only Δ SOL = 7 cm Δ FW,blnkt,shld = 1.0 m Bt max, Bp max = 14 T SC coils An example from the Pilot Plant study Output Regions of parameter space with viable solutions

3. Collection of critical R&D needs, with initial assessment of how to address the needs (but more detailed assessment to follow this exercise) Identify rollback parameters that point to required R&D Identify sensitivities from systems analysis that justify R&D Identify potential facilities to address R&D (test stands, fission reactors, a fusion device, etc.) Initial estimate of time required to reach needed information from R&D Can we see an international opportunity to access this R&D Are there existing programs in the US, outside of FES, that we could leverage off of or collaborate with to access the R&D Is there a sequence of risk and R&D completeness trade-offs?

R&D in support of devices or phases (need several VGs for this) Nuclear effects on materials (how long does this actually take?) IFMIF is most perfect imperfect neutron source, but. Other facilities that simulate damage Other facilities that accelerate damage Qualifying ferritic steels versus material/alloy development Material fabrication influence on nuclear performance (W) Breeding blanket (virtually all missions short of the BPX & high Q require breeding) Breeders Tritium behavior in Li compound, within confining structures, Liquid metals and interface/compatibility Overall design of blankets for nuclear, mechanical, thermal and breeding functions Advancing low temperature SC (Nb 3 Sn) beyond ITER magnet to reduce size and raise j/b operating space

R&D in support of devices or phases (need several VGs for this) Plasma duration Stationary plasma configurations Disruption free operation 100% non-inductive current operation Minimization of nominal transients (like ELMs) Plasma duty cycle, long pulses and short down time between pulses Plasma material interface Heat transport Particle transport Material evolution Test stands, present tokamaks, and longer pulse tokamaks Reliability, availability, maintenance Remote handling Simplicity to enable rapid replacement Combining long life breeding blanket and test module functions

Deliverables (digging deeper to identify quantitative parameter targets, missions that meet these targets, and R&D to support the missions) Quantitative characterization of DEMO/power plant requirements to the extent possible (including qualitative where necessary). Identification of missions along the FNS pathway to DEMO. Operating space systems level analysis of possible devices/facilities to address missions, with identified sensitivities to assumptions and constraints. A list of R&D needs to support the missions, within their timeframes, and the path to DEMO/power plants overall.