Endeavour extends Karma mine life to +10 years as North Kao infill drilling adds 262koz of reserves

Similar documents
ENDEAVOUR INCREASES ITY S INDICATED RESOURCE BY 65% SINCE FEASIBILITY STUDY

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE

Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

Table 1 Updated Mineral Resource Tabulation for the Vertikalny Deposits of the Mangazeisky Property. Contained Metal Ag (koz)

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

ASANKO GOLD ANNOUNCES ENCOURAGING INITIAL DRILL RESULTS FROM NEW EXPLORATION TARGET

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

Orezone s Bomboré Gold Project Reaches World Class Size

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project.

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

Comparison Between July 2012 Technical Report and December 2012 Mineral Resource Statement July 2012 December 2012 Percentage Difference.

Brookfield Place Tel: (416) Bay Street, Suite 3630 Fax: (416) FOR IMMEDIATE RELEASE February 7, 2012

Detour Gold Reports Drilling Results from Lower Detour

Table 1: Mineral Resources at Costerfield, Inclusive of Mineral Reserves as of December 1, 2018 and December 31, 2017.

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura

Sept 20, 2012 TSX Venture Exchange Tier 1 Trading Symbol: OK

Fission s Initial Resource Totals at PLS: 79.6M lbs Indicated and 25.9M lbs Inferred

BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Probe Metals Continues to Expand Gold Zones At Val-d Or East

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

Monument Announces Significant Intercepts Assay Results at Buffalo Reef/Felda

MINERAL RESERVE AND MINERAL RESOURCE STATEMENT PROVEN AND PROBABLE MINERAL RESERVES

News Release. Infill Drilling Program

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

NEWS RELEASE TSX-V Ticker: SWA 23 April 2013 SWA.WT SARAMA RESOURCES EXTENDS HIGH-GRADE MINERALISATION AT MM PROSPECT IN BURKINA FASO

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO

Goldcrest Resources Ltd.

Mineral Resource Estimate Comparison at 3 g/t Au cut-off

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

BELO SUN ANNOUNCES INFERRED RESOURCE ESTIMATE OF 356,600 OUNCES GRADING 2

SARAMA RESOURCES INCREASES INFERRED MINERAL RESOURCES TO 2.1 MILLION OUNCES GOLD AT THE SOUTH HOUNDÉ PROJECT IN BURKINA FASO

- 2 - TABLE 1. INDICATED AND INFERRED GOLD AND SILVER RESOURCES. All Indicated

MINERAL RESERVE AND MINERAL RESOURCE STATEMENT

Teranga Gold s Golden Hill Drill Results Include More High-Grade Gold at Multiple Prospects

Teranga s Golden Hill Drill Program Intersects High-Grade Gold and Expands Mineralized Zones at Peksou and Ma Prospects

News Release B2Gold Announces Updated Higher Grade Gold Resource at Wolfshag Zone, Otjikoto Mine, Namibia

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

Orezone Bomboré Drill Program Continues with Positive Results

Highlights from the four holes announced in this news release include:

Kalana Main Diluted Mineral Resource Estimate Above a 0.9 g/t Au Cut-off Grade 1,2

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

Form F3 MATERIAL CHANGE REPORT

Coro Reports a Significantly Increased Resource Estimate for the Marimaca Claim

Xtra-Gold Announces Initial NI Resource Estimate at its Kibi Gold Project in Ghana, West Africa

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

SISSINGUE MINERAL RESOURCE UPGRADE TENGRELA GOLD PROJECT, IVORY COAST

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

MILLENNIUM MINERALS LIMITED

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

Fission Increases Indicated Resource; Doubles Inferred Resource

Coeur Mining Provides Silvertip Exploration Update

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

NEWS RELEASE. Foran Mining Intersects High Grade Zinc at McIlvenna Bay. Results expand area of known mineralization

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

Initial resource estimate provides a solid base from which to grow Golden Hill, and confirms premise that key prospects offer substantial upside

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

Rubicon Updates Mineral Resource Statement for the Phoenix Gold Project And Evaluates Strategic Alternatives

Goldplay President and CEO Marcio Fonseca commented

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

IAMGOLD REPORTS HIGH-GRADE DRILL INTERSECTIONS FROM ITS 2017 DRILLING PROGRAM ON THE DIAKHA DEPOSIT, SIRIBAYA PROJECT IN MALI

ASX ANNOUNCEMENT 21 MARCH 2011

KIRKLAND LAKE GOLD REPORTS STRONG GROWTH IN MINERAL RESERVES AND MINERAL RESOURCES

News Release TSX:RMX NYSE AMEX:RBY November 29, 2010

2016 Annual Mineral Reserve and Resource Statement

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

27 March 2018 TSX-V: AZR AZARGA METALS INCREASES INFERRED RESOURCE FOR UNKUR WITH UPDATED MINERAL RESOURCE ESTIMATE

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

Cora Gold Limited / EPIC: CORA.L / Market: AIM / Sector: Mining

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

GOLDEN STAR DOUBLES INFERRED MINERAL RESOURCES AT WASSA UNDERGROUND GOLD MINE

BGM ANNOUNCES MINERAL RESOURCE UPDATE AT BARKERVILLE MOUNTAIN TO SUPPORT BONANZA LEDGE OPERATIONS

KIRKLAND LAKE GOLD EXPANDS NEW HIGH-GRADE ZONE BELOW TAYLOR MINE, REPORTS MINERALIZED EXTENSIONS ALONG STRIKE AND AT DEPTH

PRESS RELEASE NEW MINERAL RESOURCE UPDATE AT PRAIRIE CREEK MINE. Measured + Indicated and Inferred Resource Tonnages Increased

First Cobalt Extends Iron Creek 100 Metres Downdip in Central Area

ASX/Media Announcement

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

1 The Prospectus can be obtained on the Company s website at or on SEDAR at

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

Change +492, , , ,000 Note: (1) Values are rounded to nearest thousand which may cause apparent discrepancies.

Wesdome Announces Interim Mineral Resource Estimate for Kiena Mine Complex and Continued Drilling Extends Kiena Deep A Zone Along Plunge

Fura Gems Inc. FURA ANNOUNCES MAIDEN MINERAL RESOURCE ESTIMATE FOR THE COSCUEZ EMERALD MINE, A FIRST FOR THE COLOMBIAN EMERALD SECTOR

Teranga Gold Third Quarter 2016 Exploration Update

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

Transcription:

NEWS RELEASE - TSX:EDV February 23, 2017 Endeavour extends Karma mine life to +10 years as North Kao infill drilling adds 262koz of reserves North Kao Highlights: North Kao infill drilling confirms the continuity of the previous inferred resource and improves the grade profile 314koz of resources amenable to heap leach processing converted to indicated status Indicated resource grade up 53% over the previous inferred grade to 1.22 g/t Au 262koz were subsequently converted to reserves, extending Karma s mine life to beyond 10 years The North Kao mineralized structure remains open to the north and the potential exists for additional sub-parallel zones Following the success at North Kao, the 2017 exploration campaign will focus on other near-mill targets, such as Rambo West and Yabonsgo Abidjan, February 23, 2017 Endeavour Mining Corporation (TSX:EDV)(OTCQX:EDVMF) is pleased to announce that the infill drill program at its North Kao deposit, located at its Karma Gold Mine in Burkina Faso, has confirmed the continuity of the previous inferred resource, resulting in a maiden indicated resource of 314,000 ounces amenable to heap leaching and a subsequent conversion of 262,000 ounces to reserves. Sébastien de Montessus, President & CEO, stated: When we acquired Karma last year we were confident in its exploration potential and our ability to quickly extend its mine life. Following the conversion of resources at North Kao to reserves, Karma now meets our strategic portfolio criteria of having a minimum life of 10 years and ability to produce at an AISC below $850/oz. Looking ahead, our 2017 program will focus on the Rambo West and Yabonsgo near-mill targets, which we believe could further improve the mine s outlook. The North Kao deposit is located within 10 kilometers of the current processing plant. Its main mineralized zone stretches over 1.4 kilometers along strike and remains open to the north. The evolution of its reserves and resources amenable to heap leaching (comprised of oxide and transition material), is summarized in the table below. Table 1: North Kao Reserve and Resource (Heap Leaching) December 31, 2015 December 31, 2016 On a 100% basis. Resources shown inclusive of Tonnage Grade Tonnage Grade reserves (only oxide and transition material shown) (Mt) (Au g/t) (Mt) (Au g/t) Probable Reserves - - - 7.1 1.16 262 Indicated Resources (including reserves) - - - 8.0 1.22 314 Inferred Resources 16.4 0.80 423 0.1 1.10 5 Notes provided in Section About the Mineral Reserves and Resources of this Press Release. www.endeavourmining.com 1

Infill Drilling Program An infill drilling program was completed in 2016 with the objective of upgrading the existing inferred resources to the indicated category. The program comprised 68 core holes (7,571 meters) and 488 reverse circulation holes (39,554 meters). The sections were spaced by 50 meters, with 35 meters between holes. As shown in Figure 1 below, the main mineralized zone at North Kao can be followed for up to 1.4 kilometers along strike, located structurally above the mineralized zone of Kao Main, whereas multiple (up to 7 subparallel) zones were crossed in the narrow portion of the intrusion to the north. The mineralized structure remains open to the north within the sediments with potential for additional subparallel zones within the Kao intrusion. Figure 1: North Kao Infill Drilling Program (Showing Mineralization is Open to the North) Most of the mineralization occurs in the Kao Intrusion, a 2.5 kilometer long by 1.6 kilometer wide pluton of felsic composition with local porphyritic facies and centimetric aplitic veins. A minor portion occurs within clastic sediments (siltstones and argillites with andalousite porphyroblasts) close to the contact of the intrusion as it becomes narrower to the north. The mineralization is associated with northwest-trending, shallow to moderately east-dipping, anastomosed deformation and alteration zones. Alteration in the fresh rock consists of diffuse albite-carbonate-sericite-pyrite and more focused quartz-albite-carbonate veining with sericitic arsenopyrite-rich seams. www.endeavourmining.com 2

As shown in Figure 2 below, the infill drill holes targeted the base of the transition and/or the top of the bedrock, which ranges from approximately 60 meters below surface in the southern part of the grid to approximately 110 meters in the northern part. Figure 2: North Kao Cross-Section Upcoming Exploration Program: More Near-mill Targets In 2017, a $4 million exploration program totaling approximately 30,000 meters has been planned to drill near-mill targets such as Rambo West and Yabonsgo, as shown in the map below. Figure 3: Karma Near-mill Exploration Targets www.endeavourmining.com 3

About the Mineral Reserves and Resources The mineral reserve and resource estimate for the North Kao deposit is reported in accordance with the National Instrument 43-101 and has been estimated using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines. The mineral resource estimate is classified as indicated and inferred as defined by the CIM. Mineral resources which are not mineral reserves did not have demonstrated economic viability. The estimate of mineral reserve may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. The effective date of this mineral reserve and resource estimate is December 31 st, 2016, with a comparison over the previous estimate provided in the tables below. Tonnage (Mt) Table 2: North Kao Reserve Evolution As at December 31, 2015 As at December 31, 2016 Grade Tonnage Grade (Au g/t) (Mt) (Au g/t) On a 100% basis Oxide - - - 6.7 1.14 246 Transitional 0.4 1.38 16 Sulphide - - - - - - Total - - - 7.1 1.16 262 Table 3: North Kao Resource Evolution As at December 31, 2015 As at December 31, 2016 On a 100% basis. Resources shown inclusive of reserves Tonnage (Mt) Grade (Au g/t) Tonnage (Mt) Grade (Au g/t) Oxide Indicated Resources - - - 7.4 1.21 286 Inferred Resources 14.2 0.79 360 0.1 1.05 5 Transitional Indicated Resources 0.6 1.37 28 Inferred Resources 2.2 0.89 63 0.0 1.92 1 Sulphide Indicated Resources - - - 3.3 1.34 143 Inferred Resources 31.4 1.23 1,239 1.8 1.51 88 Total Indicated Resources - - - 11.3 1.26 456 Inferred Resources 47.8 1.08 1,662 2.0 1.48 93 Notes for the December 31, 2016 Reserve and Resource estimates provided in Section About the Mineral Reserves and Resources of this Press Release. Mineral Reserve estimates follow the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") definitions standards for mineral resources and reserves and have been completed in accordance with the Standards of Disclosure for Mineral Projects as defined by National Instrument 43-101. Reported tonnage and grade figures have been rounded from raw estimates to reflect the relative accuracy of the estimate. Minor variations may occur during the addition of rounded numbers. The December 31, 2015 Reserve and Resource estimates have been sourced from latest NI 43-101 TR titled «Updated feasibility study (GGI, GGII, Kao, Rambo & Nami deposits) and a Preliminary Economic Assessment (North Kao Deposit) for The Karma Gold Project Burkina Faso, West Africa», available on Sedar. The disclosure of a mineral reserve and resource statement for the North Kao deposit is not deemed material to Endeavour as a whole. Therefore, the Company will not be filing a technical report in respect of this mineral resource estimate. North Kao Resource Modeling The statistical analysis, geological modelling and resource estimation were prepared by Kevin Harris, CPG. Mr. Harris is Endeavour Mining s Group Resource Manager and a Qualified Person as defined by NI 43-101. The North Kao resource model was developed in the Geovia Surpac 3Dmodeling software using all the available geology information from 123 diamond drill holes totalling 18,445 meters, and 589 reverse circulation drill holes totalling 53,784 meters completed between 2007 and 2016. The geological model and assay data guided the mineralisation model. A total of 34 mineralized domains were interpreted and modelled into 3D wireframes within Geovia Surpac modeling software. The mineralized zones have an average strike of 345 o azimuth dipping 30 o NE. The drill holes gold assays were composited to 1.0 meter intervals within the mineralized wireframes and capped at 10 g/t Au. www.endeavourmining.com 4

Spatial analysis of the gold mineralization using variograms indicated a good continuity of the grades along strike and down dip of the mineralised zones. Gold grades were interpolated using inverse distance squared estimation methodology constrained by the mineralized domains. Density values of the oxidized material vary from 1.4 to 2.7 based on weathering material type while the fresh rocks density values vary from 1.6 to 2.9 based on rocktypes. The mineral resource was modelled using a 3D block model built in Geovia Surpac. Measures were conducted to validate the accuracy of the estimate, including swath plots comparison and visual review on sections. In order to establish the reasonable prospects for eventual economic extraction, the Mineral Resources were constrained within a Whittle-optimized $1,500 pit shell, as is reported at a 0.20 g/t gold cutoff grade. A large portion of the previously reported Sulphide inferred resource has been declassified as the Mineral Resources were constrained within a Whittle-optimized $1,500 pit shell in addition to the low confidence due to the wide drill spacing. No additional infill drilling is planned on the sulphide material as it is not considered economical with the current processing facility. North Kao Reserve Estimation The quantifying of modifying factors, Whittle optimization and pit design preparation was done by/under direct supervision of Michael Alyoshin, MEng, MAusIMM CP (Min), MIMMM, CEng, EUR ING. Mr. Alyoshin is Endeavour Mining s Corporate Chief Mining Eng., Strategic Projects and a Qualified Person as defined by NI 43-101. This estimation is of Pre-Feasibility Study level of accuracy and, therefore, satisfies CIM requirements to mineral reserve reporting. The majority of the costs parameters used in Whittle optimization are based on actual, geotechnical/ recovery information used in optimization and subsequent mine design mostly sourced from latest NI 43-101 Technical Report titled Updated feasibility study (GGI, GGII, Kao, Rambo & Nami deposits) and a Preliminary Economic Assessment (North Kao Deposit) for The Karma Gold Project Burkina Faso, West Africa and operational experience. Mining dilution of 22% at 0g/t was estimated using 1 meter grade shells. The parameters used for the Reserve and Resource estimation are described below: Table 4: North Kao Reserve and Resource parameters Reserves Resources Gold price $1,250/oz $1,500/oz Cut-off grade Oxide: 0.56 g/t ; Transition: 0.68 g/t ; Sulfide: 0.50 g/t 0.20 g/t Recovery rate Oxide: 90%; Transition: 75% www.endeavourmining.com 5

Qualified Persons This press release has been reviewed and approved by Adriaan Attie Roux, Pr.Sci.Nat, Endeavour s Chief Operating Officer, a Qualified Person under NI 43-101. About Endeavour Mining Corporation Endeavour Mining is a TSX-listed intermediate gold producer, focused on developing a portfolio of high quality mines in the prolific West-African region, where it has established a solid operational and construction track record. Endeavour is ideally positioned as the major pure West-African multi-operation gold mining company, operating 5 mines in Côte d Ivoire (Agbaou and Ity), Burkina Faso (Karma), Mali (Tabakoto), and Ghana (Nzema). In 2016, it expects to produce between 600koz and 640koz at an AISC of US$860 to US$905/oz. Endeavour is currently building its Houndé project in Burkina Faso, which is expected to commence production in Q4-2017 and to become its flagship low-cost mine with an average annual production of 190koz at an AISC of US$709/oz over an initial 10-year mine life based on reserves. The development of the Houndé project is expected to lift Endeavour s group production +900kozpa and decrease its average AISC to circa $800/oz by 2018, while exploration aims to extend all mine lives to +10 years. Contact Information Martino De Ciccio VP Strategy & Investor Relations +33 (0)1 70 38 36 95 mdeciccio@endeavourmining.com DFH Public Affairs in Toronto John Vincic (416) 206-0118 x.224 jvincic@dfhpublicaffairs.com Brunswick Group LLP in London Carole Cable, Partner +44 7974 982 458 ccable@brunswickgroup.com Endeavour Mining Executive Office Bureau 76, 7 Boulevard des Moulins, Monaco 98000 This news release contains "forward-looking statements" including but not limited to, statements with respect to Endeavour's plans and operating performance, the mineral resource and reserve estimate, the timing and amount of estimated future production, costs of future production, future capital expenditures, and the success of exploration activities. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "expects", "expected", "budgeted", "forecasts", and "anticipates". Forwardlooking statements, while based on management's best estimates and assumptions, are subject to risks and uncertainties that may cause actual results to be materially different from those expressed or implied by such forward-looking statements. Accordingly, readers should not place undue reliance on forward-looking statements. Please refer to Endeavour's most recent Annual Information Form filed under its profile at www.sedar.com for further information respecting the risks affecting Endeavour and its business. www.endeavourmining.com 6