News Release IMPACT Silver Corp. IMPACT Silver 2011 Exploration Review and 2012 Outlook

Similar documents
FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

GOLDPLAY OUTLINES FIVE NEW EXPLORATION TARGETS AT THE SAN MARCIAL PROJECT IN MEXICO

AZUCAR MINERALS COMMENCES DRILLING AT THE EL COBRE PROJECT, MEXICO

TRENCHING AT LAS DOLORES EXTENDS STRIKE LENGTH TO OVER 1,000 METRES, INTERSECTING

V Sample from C.O.D vein 15 metres southwest of V

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

ANTLER GOLD EXPLORATION UPDATE, WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

GOLD REACH (GRV) ANNOUNCES A 141% INCREASE IN INDICATED AND 91% INCREASE IN INFERRED RESOURCES AT SEEL

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

Probe Metals Continues to Expand Gold Zones At Val-d Or East

NEWS RELEASE DRILLING BEGINS AT THE CERRO CASCARON GOLD AND SILVER PROJECT IN MEXICO

(TSXV: GPLY, OTCQB: GLYXF

Dalradian Provides Update on Norwegian Exploration Programs

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

Marathon Announces Discovery of New High-Grade Gold Zone in Marathon Area and Sprite Zone Drilling Results, Valentine Lake Gold Camp

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

Spruce Ridge Resources Ltd Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) , Fax: (519)

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

VR SAMPLES 58.3 g/t GOLD AND 809 g/t SILVER AND STAKES NEW PROPERTY TO EXPAND ITS DANBO PROPERTY EPITHERMAL GOLD TREND IN NEVADA

Sept 20, 2012 TSX Venture Exchange Tier 1 Trading Symbol: OK

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

Goldplay President and CEO Marcio Fonseca commented

Orford Completes Phase 1 Exploration Program and Generates High-Quality Drill Targets on its Carolina Gold Properties

ANTLER GOLD HIGHLIGHTS NEW GOLD-IN-SOIL ANOMALIES, CENTRAL NEWFOUNDLAND

Great Atlantic Rock Samples Return up to 5.8 oz. / ton Gold Golden Promise Property in Central Newfoundland

NEWS RELEASE August 10, 2017

Saville Resources Inc. Completes Review of Work on the Niobium Claim Group, Quebec

Pacific Empire Minerals Provides Copper King RC Drilling Results

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

INFILL DRILLING EXPANDS MINERALIZATION IN HIGH-GRADE GOLD-COPPER CORE AT SOUTHWEST DISCOVERY ZONE TURQUOISE HILL PROJECT, MONGOLIA

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:

ET and and and

Highlights from the four holes announced in this news release include:

GOLDEN MINERALS IDENTIFIES HIGH GRADE GOLD AND SILVER VEINS AT YOQUIVO

Drill hole DC12B575 cut 4.0 m true width of Veta del Contacto averaging 709 g/t silver and 2.12% lead.

July Exploring for Canadian Gold in the Rainy River District of Ontario

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

LME m averaging 0.65 g/t Au and 0.32% Cu, or 1.19 g/t Au Equiv LME m averaging 0.64 g/t Au and 0.11% Cu, or 0.

Advance To Present Pictures of Drill Core From Recent Drilling of Tabasquena Epithermal Vein

ATON RETURNS 22.2 METRES OF 2.77 GRAMS PER TONNE GOLD EQUIVALENT FROM HAMAMA WEST; VISIBLE GOLD DISCOVERED AT BOHLOG

NEWS RELEASE NOVEMBER 28th, 2017 Trading Symbols: TSX-V: AMZ; OTCQX: AXDDF

August 20, 2018 SBB NR SBB TSX

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

NEWS RELEASE August 8, 2018

Surface Trenching Highlights. Santos Target. To (m) Width (m) Au (g/t) Comment. (m) Santos (1)-includes internal dilution

SilverCrest Expands Babicanora High Grade Footprint to 600 metres; New High Grade Vein Discoveries Highlight District Scale Potential

U3O8 Corp. reports results of infill drilling at Aricheng C in the Kurupung Project, Guyana

Drilling Extending Mineralization in La Mina North Zone

NEWS RELEASE. Evrim and Harvest Gold Complete Drilling at Cerro Cascaron

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

EXCELLON ANNOUNCES LA PLATOSA EXPLORATION RESULTS: HIGH GRADES CONTINUE TO EXTEND MANTO SULPHIDES DRILL HOLE ENCOUNTERS SOURCE ENVIRONMENT INDICATORS

Drilling Extending Mineralization in La Mina North Zone

New Drilling Program Commences at Mutiny s Deflector Deposit

NEWS RELEASE July 26, 2018

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

Orford Intersects 41.1 m Grading 1.36 g/t Au at Jones Keystone Project in North Carolina

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia

AbraPlata defines gold-rich zone with up to 16.7g/t Au over 10.6m in the basement at its Diablillos property in Argentina

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

NEWS RELEASE. Evrim announces initial drilling results at Cuale Gold Project in Mexico

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

Cautionary Statements

36 Holes drilled in an approximate 100 meter by 100 meter grid covering an area of 1,000 meters long by 400 meters depth

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

NEWS RELEASE. Evrim announces additional drilling results at Cuale Gold Project in Mexico

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

NEWS RELEASE. Evrim commences drilling at Cerro Cascaron gold and silver project with partner Harvest Gold

Toachi Mining Inc. Identifies High Priority Exploration Targets

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

May 17, Two holes explored the extension at depth of the historic Sta Rosa vein

Coeur Mining Provides Exploration Update

EXPLOR INTERSECTS MULTIPLE COPPER ZONES GRADES UP TO 3.65% CU OVER 5.35 METERS ON THE CHESTER COPPER PROPERTY

NEWS RELEASE LATEST EXPLORATION PROGRAM CONTINUES TO DEMONSTRATE NARANJILLO AS A HIGH GRADE SILVER HOST

COMPASS GOLD: SOIL GEOCHEMICAL SURVEY IDENTIFIES INTENSE GOLD ANOMALIES COINCIDENT WITH CRUSTAL-SCALE FAULTS ON SANKARANI PERMIT

Hole ID From (m) To (m) Interval (m) Au (g/t) Ag (g/t) AuEq (g/t)* Zn (%)

Diamond Drilling confirms depth potential for mineralisation at Mrima Hill.

Pershing Gold Hits Highest Grade Gold to Date in Relief Canyon with Grams per Tonne (3.618 Ounces per Ton) Intercept

GOLDPLAY ANNOUNCES SIGNIFICANT SILVER VALUES OF UP T0

NEWS RELEASE Ocean Park Ventures Identifies Large Multi-Structure Sulfide Mineralized System Trapper Gold Project, British Columbia

Scadding Property Sudbury District, Ontario

CARACARA SILVER INC. PLANNING DRILL PROGRAM AT PILUNANI ZINC-LEAD PROJECT IN PERU

NEWS RELEASE. March 22, 2017

Sherlock drilling returns best intercept to date of 0.63% Cu and 7.45 g/t Ag over m

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

ANTLER GOLD DRILLS GRAMS PER TONNE GOLD OVER 5.35 METRES AT THE WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

GOLDEN MINERALS DISCOVERS ADDITIONAL HIGH GRADE VEINS AT SANTA MARIA RESULTS UP TO 1.88 g/t Au and 648 g/t Ag

MARCH 2018 AUU-TSX-V 1

A B C PAD A HIGHLIGHTS

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

Transcription:

News Release IMPACT Silver Corp. For release: January 23, 2012 Trading Symbol: IPT: TSX.V IMPACT Silver 2011 Exploration Review and 2012 Outlook IMPACT Silver Corp. ( IMPACT ) is pleased to provide a summary of its 2011 exploration program at the Royal Mines of Zacualpan Silver District ( Zacualpan ) and the adjacent Mamatla Mineral District ( Mamatla ) in Mexico. IMPACT has over five years of consistently profitable operations, with 2011 being a record breaking year for revenues and earnings. Exploration in 2011 focused on the open-pit Capire Silver Mine Development Project, the Huatecosco Gold-Silver Project and multiple high-grade silver zones in Zacualpan including the Oscar Silver Vein Corridor, the Chontalpan Silver Project and the Golondrinas Silver Project. IMPACT s continued success of significantly expanding its mining operations and its exceptional discovery rate of four new mines in the past five years is attributed to a systematic and persistent approach to mining exploration. IMPACT controls two large adjacent mineral districts in Mexico, Zacualpan and Mamatla, which comprise 623 square kilometers and include three operating silver mines, the 500 tonnes-per-day ( tpd ) Guadalupe Processing Plant and the new open-pit Capire Mine Development Project. 2011 Exploration Review IMPACT s exploration increased significantly in 2011 as a result of an expansive program focused on both surface and underground drilling. Total drilling for 2011 surpassed the proposed 25,000 meters to 29,481 meters, up 68% from 17,520 meters drilled in 2010. Underground drilling totaled 3,010 meters, a 37% jump from 2,197 meters in 2010, and surface and resource drilling grew to 26,471 meters, up 73% from 15,323 meters in 2010. IMPACT explored multiple targets in 2011 including the Oscar, Huatecosco, Capire, Chontalpan, Golondrinas, Cerro Cuates, San Pablo Norte and Condesa areas. Field work included extensive geological mapping, trenching, soil sampling, prospecting, the re-opening of many old mine workings and their systematic sampling. Surface drilling was conducted on a number of project areas, as detailed in the following summary. Oscar Vein Corridor Drilling Highlights The Oscar Vein Corridor ( Oscar ), located 2.5 kilometers east of the Guadalupe Processing Plant, is a series of high-grade silver veins linking the past producing Cuchara Silver mine and the Santa Lucia Silver Zone. The 2011 Oscar drill program was conceived to test a series of sub parallel high-grade silver veins that represent the faulted extension to the Santa Lucia veins. Earlier drill results for the Santa Lucia included 466 g/t silver across 3.2 meters (see IMPACT News Release dated December 16, 2009). Previous drilling at the Oscar returned values of 2,820

g/t silver, 7.83 g/t gold, 3.48% lead and 7.83% zinc over 0.30 meters (see IMPACT News Release dated January 25, 2007). The drill results from the 2011 Oscar program include many high-grade silver intersections, as indicated in the table below: 2011 Oscar Project Drill Results Drill Drill From To Intersection Silver Gold Lead Zinc Hole Section (m) (m) (m) (g/t) (g/t) (%) (%) Z11-35 18+50N 79.88 81.20 1.32 156 0.00 0.0 0.2 And 145.90 146.25 0.35 2,860 0.35 1.6 4.6 Z11-36 18+50N 203.30 205.63 2.33 109 0.11 1.0 1.6 Z11-37 18+50N 183.95 189.20 5.25 108 0.19 0.2 0.4 Including 183.95 186.08 2.13 178 0.40 0.4 0.8 Z11-38 18+50N 97.72 103.70 5.98 197 0.02 0.2 0.5 Including 100.47 100.92 0.45 1,310 0.11 1.3 4.0 Z11-39 19+00N 62.15 63.70 1.55 285 0.01 0.2 0.3 Z11-40 19+00N 59.45 61.45 2.00 165 0.01 0.1 0.4 And 120.25 124.75 4.50 136 0.08 0.3 0.9 Including 120.25 120.80 0.55 414 0.16 0.4 1.8 Z11-41 19+00N 72.35 74.05 1.70 64 0.00 0.1 0.6 Including 72.35 72.55 0.20 246 0.02 0.3 3.4 Z11-42 19+50N 32.40 39.90 7.50 76 0.09 0.2 0.6 Including 32.40 34.55 2.15 162 0.28 0.6 1.5 Z11-43 19+50N 5.05 6.18 1.13 69 0.01 0.1 0.2 Z11-44 19+50N 51.80 82.45 30.65 291 0.01 0.1 0.4 Including 51.80 59.25 7.45 780 0.02 0.4 1.1 Including 51.80 52.10 0.30 6,730 0.20 1.5 8.0 Including 55.50 55.95 0.45 4,240 0.06 2.1 6.8 Including 64.60 70.40 5.80 398 0.03 0.2 0.4 Including 68.25 68.95 0.70 1,290 0.06 0.2 1.3 And 139.45 146.80 7.35 244 0.07 0.5 0.9 Including 140.45 144.45 4.00 380 0.08 0.7 1.3 Z11-45 18+00N 118.30 118.60 0.30 530 0.02 0.2 0.2 And 130.20 132.50 2.30 119 0.00 0.1 0.4 Including 130.20 130.80 0.60 362 0.01 0.4 1.2 Z11-46 17+50N 92.10 97.75 5.65 1,007 0.07 0.5 1.1 Including 96.70 97.75 1.05 4,580 0.26 1.7 4.0 And 108.95 111.70 2.75 1,128 0.51 0.9 1.4 Including 109.70 110.80 1.10 2,630 0.40 0.8 2.2 And 135.65 137.60 1.95 111 0.01 0.1 0.5 Including 135.65 135.95 0.30 537 0.05 0.5 3.1 Z11-47 17+50N 116.60 122.40 5.80 122 0.01 0.1 0.2

The final phase of the drilling program is currently underway at Oscar, which will determine the orientation and continuity of silver grades in the veins. Upon receiving and interpreting the final drill results, the IMPACT mine development team will determine the feasibility of mine production in the combined Oscar-Santa Lucia area utilizing the existing mining infrastructure at the adjacent historic Cuchara Mine. Huatecosco Gold-Silver Project In 2011, IMPACT commenced drilling on the Huatecosco Gold-Silver Project ( Huatecosco ) located 9.5 kilometers south of the Guadalupe Processing Plant. The Huatecosco vein is one of the dominant veins in the Zacualpan Silver-Gold District. It is a large northwest trending structure with an inferred strike length of 16 kilometers. This vein, along with a number of others located in the southern and western portions of the Zacualpan District, contains elevated gold values in addition to the silver mineralization that is characteristic of the District. The 2011 Huatecosco drill program was designed to test a series of gold-silver-lead-zinc-copper soil anomalies located in the extreme southeast portion of this structure. The first anomaly drilled was the Huatecosco Central Zone, which contained a collection of old mine workings and returned significant drill results, as indicated in the table below: 2011 Huatecosco Central Zone Drill Results Drill Drill From To Intersection Gold Silver Lead Zinc Hole Section (m) (m) (m) (g/t) (g/t) (%) (%) Z11-15 26+50 92.55 98.00 5.45 1.19 59 1.42 1.95 including 92.55 94.05 1.50 3.82 149 4.10 3.80 Z11-16 26+50 156.95 159.20 2.25 0.98 83 0.14 0.26 Z11-17 27+00 54.51 59.25 4.74 3.44 118 0.59 0.81 including 55.08 57.40 2.32 2.29 217 0.97 1.19 Z11-18 27+00 91.05 96.17 5.12 0.72 53 0.81 0.71 Z11-19 26+00 110.55 117.40 6.85 1.60 159 0.22 0.30 including 114.65 117.40 2.75 3.53 321 0.43 0.57 Z11-20 26+00 167.90 178.20 10.30 3.97 49 1.69 2.62 including 167.90 172.50 4.60 6.96 84 2.89 5.11 Z11-23 26+50 344.90 347.23 3.15 0.96 26 0.28 1.52 The Huatecosco Pedro Zone, located 300 meters northwest of the Huatecosco Central Zone, is marked by a second gold-silver-lead-zinc-copper soil anomaly, and is also host to an abundance of old mine workings. Recently completed soil sampling two kilometers further northwest on the structure indicated the presence of two stronger soil anomalies, which are scheduled for drilling in 2012. Initial drill results from the Huatecosco Pedro Zone returned a number of significant assays, as listed in the table below:

2011 Huatecosco Pedro Zone Drill Results Drill From To Interval Gold Silver Lead Zinc Hole (m) (m) (m) (g/t) (g/t) (%) (%) Z11-33 183.55 192.6 9.05 0.48 62.96 0.62 2.02 Including 186.35 187.8 1.45 1.4 61.69 1.4 4.75 Z11-34 228.25 233.05 4.8 0.15 50.66 1.55 6.39 Including 231.95 232.4 0.45 0.16 123 4.01 23.6 Z11-48 351.7 355.8 4.1 5.22 30.1 0.69 1.78 Including 353.75 354.5 0.75 25 50.1 0.49 1.59 Z11-50 197.8 201.3 3.5 0.45 108.13 1.85 2.7 Including 200.45 201.3 0.85 1.25 220 3.58 6.45 Definition drilling is continuing at both the Huatecosco Central and Huatecosco Pedro Zones to fully delineate these zones. When the drilling results have been received and interpreted, IMPACT s mine planning team will determine the feasibility of mine production at the Huatecosco Gold-Silver Project. Capire Silver Mine Project The open-pit Capire Silver Project represents a new production center in a new mining district and an opportunity that, upon successful completion of the proposed exploration and development program, would propel IMPACT to become a multimillion ounce silver producer. The Capire Project, located in the Mamatla District, is 16 kilometers southwest of IMPACT s active mining operations in Zacualpan. In February 2011, the updated NI 43-101 compliant Measured and Indicated Mineral Resources was announced and totaled 7.2 million ounces silver, 30,446 ounces gold, 95.6 million lbs zinc and 37.2 million lbs lead (see IMPACT News Release dated February 1, 2011). IMPACT recently announced the construction of the Capire Mine and pilot plant had commenced, with first concentrate shipments scheduled for late 2012 (see IMPACT News Release dated January 11, 2012). Subsequent to the mineral resource announcement, IMPACT completed 6,698 meters of drilling to expand the Capire zone to the north, east and southeast (see IMPACT News Releases dated May 24, 2011 and August 17, 2011). Highlights from this expansion drilling are included in the table below: 2011 Capire Project Drill Results DRILL FROM TO INTERVAL SILVER GOLD LEAD ZINC COPPER HOLE (m) (m) (m) (g/t) (g/t) (%) (%) (%) C11-24 58.50 63.50 5.00 304 4.51 1.52 3.05 0.49 Including 59.50 61.50 2.00 661 10.83 3.06 6.05 1.06 C11-26 96.05 102.65 6.60 212 0.37 1.24 2.79 0.22 Including 100.65 102.65 2.00 496 0.77 2.34 4.99 0.48 C11-27 61.00 75.00 14.00 49 0.20 0.57 1.44 0.09 Including 65.00 69.00 4.00 93 0.33 1.07 2.27 0.12 C11-28 58.00 60.00 2.00 240 0.34 1.54 4.99 0.20

C11-29 78.25 82.35 4.10 122 0.52 0.79 2.04 0.18 C11-30 54.90 56.90 2.00 136 0.17 0.43 1.04 0.07 C11-36 74.70 83.50 8.80 83 0.18 0.50 1.25 0.11 Including 82.00 83.50 1.50 298 0.54 1.61 3.48 0.32 C11-38 95.50 103.00 7.50 53 0.14 0.45 1.13 0.09 Including 97.00 98.00 1.00 166 0.48 1.53 3.02 0.31 C11-39 54.50 56.00 1.50 206 0.77 1.14 2.14 0.17 C11-41 119.40 122.00 2.60 99 0.21 0.97 2.38 0.12 Including 119.40 120.45 1.05 152 0.31 1.29 3.34 0.19 C11-42 111.80 112.30 0.50 1,160 3.74 3.86 8.83 0.65 C11-50 21.35 24.40 3.05 139 2.95 0.52 1.02 0.26 Including 22.85 24.40 1.55 256 5.62 0.97 1.82 0.49 The Capire Zone remains open for further expansion, with additional drilling planned for 2012. Chontalpan Silver Project The IMPACT exploration team drilled an additional ten holes as they embarked on the second phase of the Chontalpan drill program in 2011. The second phase of the drill program was designed to further delineate two zones of silver mineralization on trend with the historic Chontalpan Mine, located five kilometers southeast of the Guadalupe Processing Plant. Significant drill results included 4.38 meters grading 116.5 g/t silver (see IMPACT News Release dated June 7, 2011). Previous drill results include 2.14 meters of 402.6 g/t silver (see IMPACT New Release dated September 15, 2010). Drilling is now complete and IMPACT s mine planning team is currently studying the feasibility of developing these zones into small producing mines that may augment production from IMPACT s principle mining operations in the Zacualpan District. Golondrinas Silver Project In 2011, IMPACT added four exploration holes at the Golondrinas Project, located three kilometers southeast the Guadalupe Plant. Drill results included 2.84 meters grading 132.3 g/t silver (see IMPACT News Release dated June 7, 2011). Previous drill results from 2010 included 1.03 meters of 1,045 g/t silver (see IMPACT News Release dated October 19, 2010). Additional drilling is planned for the northern portion of the Golondrinas area where a number of high-grade silver intersections were discovered in 2010 (see IMPACT News Release dated November 10, 2010). Zacatecas Silver Project In 2010, IMPACT completed the purchase of a 200 tpd processing plant in the Zacatecas Silver District, in addition to the previously purchased 10 mineral concessions with no underlying royalties (see IMPACT News Release dated March 23, 2010). In 2011, IMPACT optioned its Zacatecas assets to Defiance Silver Corp. (DEF: TSX.V) in return for cash and a major share position (see IMPACT News Release dated September 12, 2011). Defiance Silver plans to refurbish the plant and commence commercial production with mineral feed from the IMPACT concessions and the past producing San Acacio mine, which is presently under option.

Early Stage Exploration IMPACT employs highly qualified field crews who are dedicated to early stage exploration in the two mineral districts. During 2011, the soil sampling team collected over 15,000 samples on the Coronas Grid in Zacualpan at 25 meter intervals on lines spaced 100 meters apart. This soil grid connects the Noche Buena mine area with the Huatecosco and Cerro Cuates areas. Examination and evaluation of a multitude of prominent anomalies continues with geological mapping, prospecting and the opening of old mine workings. The IMPACT exploration team is currently conducting a comprehensive vein interpretation for the entire Coronas Grid area to identify future drilling targets. Soil sampling and prospecting has also commenced north of the Oscar-Cuchara area, and geological mapping, rock sampling and opening of old mine workings is ongoing in the San Pablo Norte and Santa Efigenia areas in Zacualpan. Data Compilation Since 2004, IMPACT has been constructing a state-of-the-art computerized Geographic Information System (GIS) database. At the core of this database is information pertaining to over 2,500 old mine workings and prospects representing almost 500 years of mining history in the Zacualpan and Mamatla Districts. For several years the GIS database has been the main engine for generating and prioritizing new drill targets. In 2010, the GIS database reached a critical mass of data that lead to the use of enhanced methods for in-depth data analysis and the modeling of geology and exploration targets. 2012 Outlook Exploration continued at a high level into 2012, and initial plans are to rapidly move the Capire Silver Project into production, assess possible production at Oscar for 2013 and continue aggressive drilling and field work on priority targets among the approximately 2,500 compiled prospects in the Zacualpan and Mamatla Districts. IMPACT s next mine planned to come on-stream is the open-pit Capire Silver Project, scheduled for pilot plant production in late 2012. IMPACT announced the commencement of construction at Capire upon successfully receiving the final permits necessary to begin mining activities in early 2012 (see IMPACT News Release dated January 11, 2012). Construction activities currently underway include site preparation work, pre-stripping and tailings pond development, and installation of the 200 tpd pilot plant. Arrangements for the initial silver-lead-zinc concentrate shipments to the smelter are organized for late 2012. After successful drilling at the Oscar Silver Project in 2011, additional drilling is continuing to complete definition of the zones in 2012, after which the silver-rich Oscar-Santa Lucia zones will be given to the IMPACT mine development team for feasibility and mine planning with an aim for potential production in 2013. The IMPACT exploration team drilled two significant targets in the gold-rich Huatecosco trend in 2011, which will be assessed for potential mine development in this new gold-copper-silver camp. 2012 will see the IMPACT team continue to aggressively explore this emerging zone. With a track record of successful exploration, rapid mine development and more than 2,500 old mine workings in the GIS database, IMPACT s long term growth strategy is to become a mid-tier

multimillion ounce silver producer with multiple production centers each fed by multiple mines. The construction of a second production center at Capire in 2012 is the next important step to fulfilling this vision. IMPACT s strong cash position and consistently positive cash flow allows for accelerated growth through aggressive exploration and potential accretive acquisitions. George Gorzynski, P.Eng, Vice President and Director of IMPACT Silver, and Brian V. Hall, P.Geo., both Qualified Persons under the meaning of Canadian National Instrument 43-101, are responsible for the technical information in this news release. The Capire mineral resource estimates in this news release were taken from a technical report (posted on www.sedar.com ) by Claus G. Wiese, P.Eng, I-Cubed LLC, an independent professional engineer. IMPACT Silver Corp. is a silver focused mining and exploration company operating in Mexico with a producing silver operation at the 423 square kilometer Royal Mines of Zacualpan Silver District, the adjacent 200 square kilometer advanced Mamatla Silver District including the Capire Mine Development Project, and an option agreement for a major share position in Defiance Silver Corp. (DEF: TSX-V) in return for IMPACT s 200 tpd mill and mineral concessions in the Zacatecas Silver District. Additional information including maps of IMPACT s projects can be found on the company website at www.impactsilver.com. On behalf of the Directors of IMPACT Silver Corp., Frederick W. Davidson President & CEO For further information, please contact: Meghan Brush, Investor Relations (604) 681 0172 or inquiries@impactsilver.com Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. Forward-Looking Statements This IMPACT News Release may contain certain forward-looking statements and information relating to IMPACT that is based on the beliefs of IMPACT management, as well as assumptions made by and information currently available to IMPACT management. Such statements reflect the current risks, uncertainties and assumptions related to certain factors including but not limited to, without limitations, exploration and development risks, expenditure and financing requirements, title matters, operating hazards, metal prices, political and economic factors, competitive factors, general economic conditions, relationships with vendors and strategic partners, governmental regulation and supervision, seasonality, technological change, industry practices, and one-time events. Should any one or more risks or uncertainties materialize or change, or should any underlying assumptions prove incorrect, actual results and forward-looking statements may vary materially from those described herein. IMPACT does not assume the obligation to update any forward-looking statement.