ASX Release and Media Announcement 27 September Central Eyre Iron Project 2011 Stage VI Drilling Programme Completion

Similar documents
GAWLER IRON PROJECT PROGRESS UPDATE

New Drilling Program Commences at Mutiny s Deflector Deposit

EXCELLENT FIRST DRILL RESULTS FROM WELD RANGE

For personal use only

For personal use only

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

For personal use only

ASX/MEDIA RELEASE 25 November EMERGENT CONFIRMS MAJOR JORC RESOURCE UPGRADE TO 561Mt FROM PREVIOUS 127Mt AT BEYONDIE IRON PROJECT

Drilling Program Commences on Iron Oxide Copper Gold Targets

High-grade Copper and Gold Discovered at Productora

Malachite Resources Limited ABN

MAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL MILLION TONNES

ASX:LEG 18 July 2011 ASX Announcement DRILL ASSAYS UPGRADE IRON RESULTS. Drill assays from Melombo North confirm encouraging iron grades and

High-grade Gold in First Drilling Undertaken at Productora South

Aurora Tank Gold Drilling Update

For personal use only

Ovoot Coking Coal Project (100%)

High Grade Gold Intercepts at Bangaba

P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

For personal use only

African Energy Resources Limited

High Grade Gold Drill Results Extend Buccaneer

Deep Yellow Revises Resource Estimate at INCA Uranium Deposit in Namibia

For personal use only

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

For personal use only

ROE HILLS COBALT AND GOLD DRILLING ADVANCES

Bass Metals records further positive drill results & progress at 3 prospects.

Co-O MINE MINERAL RESOURCE UPDATE

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

For personal use only

For personal use only

For personal use only

SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT

KINGSTON RESOURCES LIMITED

LATEST RESULTS FROM RC DRILLING

MARCH 2010 QUARTERLY REPORT

GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT,

ASX RELEASE ACTIVITY UPDATE SPARGOVILLE PROJECT WA MINING AND EXPLORATION

ASX RELEASE / MEDIA RELEASE 2,810 ppb gold in shallow auger samples Four new parallel zones defined up to 1500m in strike

For personal use only

EXPLORATION SUCCESS AT COYOTE GOLD MINE

TWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE

MANGANESE DISCOVERY AT KONONGO PROJECT

Exploration targets identified to increase Browns Range Project s mine life

ASX Announcements & Media Release

FIVE RIGS DRILLING AT KARLAWINDA

For personal use only

NEW COBAR-STYLE COPPER DISCOVERY IN NSW

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

SHAY GAP DETRITAL IRON ORE PROJECT RECONNAISSANCE SAMPLING SHOWS HIGHGRADE POTENTIAL

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project

Sipa Resources Limited ABN

Haoma Mining NL DALTONS-MT WEBBER DEPOSIT; UPGRADE TO INDICATED RESOURCE CATEGORY FOR MAIN SOUTHERN ZONE

Spectacular uranium assays from rock sampling. at FYI s Yarlarweelor project in Western Australia

Helix Resources Limited A.C.N Incorporated in Western Australia

MAJOR EXPLORATION PROGRAMME TO COMMENCE AT ROSEBY

For personal use only

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE

COARSE GRAINED MAGNETITE DISCOVERED NORTH OF YORK

DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT

CENTAURUS EXPANDS JAMBREIRO STUDY WORK AS A RESULT OF EXCELLENT RESULTS IN SOUTH EAST EXTENSION ZONE

New High Grade Lode Discovered at Wagtail South

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

For personal use only

Option agreement with Randgold set to commercialise Massigui Gold Project

For personal use only

FIRST RESULTS FROM RC DRILLING AT KONONGO

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead.

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development

Further Extensions to the Netiana Lodes at Balogo, Burkina Faso

Drilling Commences at Telfer West Gold Project

FURTHER DRILLING SUCCESS AT BARLEE GOLD PROSPECT

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project

Airborne EM Survey Confirms Multiple VMS Targets at Collerina

Auger Drilling Progress Report - Moktedu Trend Prospect 5km Gold Trend Confirmed Along Strike from 3.5Moz Deposit

For personal use only

HIGHLIGHTS. Drilling intersects wt% recovered DTR concentrate grading 69.8% Fe, including 27 metres in excess of 21% DTR.

AGM Geology Presentation. 30th November 2016

News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY

COMPLETION OF PHASE 1 DRILLING AT TITIRIBI PROJECT IDENTIFIES ADDITIONAL SIGNIFICANT COAL INTERCEPTS

ASX ANNOUNCEMENT. Spectacular radiometric results at Mad Gap Project and East Kimberley Joint Venture

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

The Manager Companies ASX Limited 20 Bridge Street

MAIDEN URANIUM RESOURCE PROOF OF CONCEPT

ASX announcement 16 May 2016

Encouraging drill results from Paroo Range

For personal use only

ASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM

For personal use only

INFERRED MINERAL RESOURCE AND CONCEPTUAL EXPLORATION TARGET UPDATE Mt FORREST IRON

New Zone of High Grade Gold Discovered at Balogo

For personal use only

Developing the +1.2Moz Pilbara Gold Project

Hampton Hill Mining NL

Ausgold awarded EIS grant for Jinkas deep drilling

2017 as at 30 June 2017 Project Tonnes HM HM SL OS HM Assemblage Tonnes HM HM SL OS HM Assemblage

New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso

Transcription:

ASX Release and Media Announcement 27 September 2011 Central Eyre Iron Project 2011 Stage VI Drilling Programme Completion Iron Road Limited (Iron Road, ASX: IRD) is pleased to advise that Stage VI drilling at the Central Eyre Iron Project (CEIP) is complete. CEIP Summary The Stage VI drilling programme investigates the western extension of Murphy South. A total of 64 holes were drilled for 26,884m with processing of diamond core on track to meet the mineral resource estimation deadline. Geotechnical drilling programme for 1,890m has commenced over the same area. Indications are that a mineral resource estimate of considerable size and tonnage will be defined additional to the current 1.01Bt already identified at Murphy South. Progress to date Hole Type Metres Completed (m) Holes Completed (No.) RC (pre-collar- all complete) 5,078 64 Diamond (tail- all complete) 21,806 64 A Murphy South Stage VI B C D E F G H I J KEY Completed drill hole Scale 500m Stage V drill hole traverse Stage V Geotech drill hole Figure 1 Plan view of Central Eyre Iron Project (CEIP) Murphy South Stage VI Resource drilling programme. All drill holes are complete and shown in white.

The exploration target for Murphy South (western extension), across the 10 traverses designed for the Stage VI drilling programme, is 500-800Mt magnetite gneiss 1. The Stage VI drilling programme comprises 64 diamond drill holes for 26,884m. Crosssections of traverses A, B, C, D, E, F, G, H, I and J are presented below. The geology intersected in all traverses is consistent with interpretations from inversion modelling of high resolution aeromagnetic surveys. A general thickening of the sequence occurs eastwards. Figure 2 (A) Section 559130mE Figure 3 (B) Section 559330mE 1 Refer to exploration targets notes on page 8 P a g e 2

Figure 4 (C) Section 559530mE Figure 5 (D) Section 559730mE P a g e 3

Figure 6 (E) Section 559930mE Figure 7 (F) Section 560130mE P a g e 4

Figure 8 (G) Section 560330mE Figure 9 (H) Section 560530mE P a g e 5

Figure 10 (I) Section 560730mE Figure 11 (J) Section 560930mE P a g e 6

Figure 12 Processing of diamond core ENDS P a g e 7

For further information, please contact: Andrew Stocks Shane Murphy or Sarah Browne Managing Director Iron Road Limited FD Tel: +61 8 9200 6020 Tel: +61 8 9386 1233 Mob: +61 (0)403 226 748 Mob: +61 (0)420 945 291 / +61(0)439 841 395 Email: astocks@ironroadlimited.com.au Email: shane.murphy@fd.com.au Or visit www.ironroadlimited.com.au Iron Road s principal project is the Central Eyre Iron Project, South Australia (Figure 11). The wholly owned Central Eyre Iron Project is a collection of three iron occurrences (Warramboo, Kopi & Hambidge) with an exploration potential of 2.8-5.7 billion tonnes magnetite gneiss*. * Coffey Mining (Iron Road Limited ASX announcement 01 September 2009). The information in this report that relates to Exploration Results and exploration targets at Murphy South is based on and accurately reflects information compiled by Mr Larry Ingle who is a fulltime employee of Iron Road Limited and a Member of the Australasian Institute of Mining and Metallurgy. Mr Ingle has sufficient experience relevant to the style of mineralisation and type of deposits under consideration and to the activity, which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Ingle consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Figure 13 - South Australia project location map The information in this report that relates to exploration targets at the Central Eyre Iron Project is based on and accurately reflects information compiled by Mr Albert Thamm, Coffey Mining, who is a consultant and advisor to Iron Road Limited and a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Thamm has sufficient experience relevant to the style of mineralisation and the type of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Thamm consents to the inclusion in the report of the matters based on his information in the form and context in which it appears on 31 August, 2009 in West Perth. *The potential quantity and grade of an exploration target is conceptual in nature since there has been insufficient work completed to define the prospects as anything beyond exploration target. It is uncertain if further exploration will result in the determination of a Mineral Resource, in cases other than the Boo-Loo and Murphy South prospects. P a g e 8