THIRD GENERATION SYSTEM PROTECTION SCHEME PROJECT FOR ZEYA HYDRO POWER PLANT

Similar documents
Module 6 : Preventive, Emergency and Restorative Control. Lecture 27 : Normal and Alert State in a Power System. Objectives

EXCITATION CONTROL OF SYNCHRONOUS GENERATOR USING A FUZZY LOGIC BASED BACKSTEPPING APPROACH

Transient Stability Assessment of Synchronous Generator in Power System with High-Penetration Photovoltaics (Part 2)

EE 451 Power System Stability

Mitigating Subsynchronous resonance torques using dynamic braking resistor S. Helmy and Amged S. El-Wakeel M. Abdel Rahman and M. A. L.

B.E. / B.Tech. Degree Examination, April / May 2010 Sixth Semester. Electrical and Electronics Engineering. EE 1352 Power System Analysis

Chapter 3 AUTOMATIC VOLTAGE CONTROL

Computer Applications in Electrical Engineering

7. Transient stability

Study of Time Correlation Between Lightning Data Recorded by LLS and Relay Protection

Reliability of Bulk Power Systems (cont d)

Mitigation of Distributed Generation Impact on Protective Devices in a Distribution Network by Superconducting Fault Current Limiter *

1. Introduction. Keywords Transient Stability Analysis, Power System, Swing Equation, Three-Phase Fault, Fault Clearing Time

Minimization of Shaft Torsional Oscillations by Fuzzy Controlled Braking Resistor Considering Communication Delay

The Mathematical Model of Power System with Thyristor Controlled Series Capacitor in Long Transmission Line

Keywords: Superconducting Fault Current Limiter (SFCL), Resistive Type SFCL, MATLAB/SIMULINK. Introductions A rapid growth in the power generation

Chapter 9: Transient Stability

OVER CURRENT RELAYS PROTECTIVE COORDINATION IN DISTRIBUTION SYSTEMS IN PRESENCE OF DISTRIBUTED GENERATION

ECE 585 Power System Stability

Power System Security. S. Chakrabarti

11.1 Power System Stability Overview

Performance Of Power System Stabilizerusing Fuzzy Logic Controller

Proceedings of the 13th WSEAS International Conference on CIRCUITS

SYNCHRONOUS GENERATOR s ROTOR INVESTIGATION OF A HYBRID POWER SYSTEM INCLUDING A.G.

Railway Research. Study of Superconducting Fault Current Limiter Device in a AC Railway System. 1. Introduction. International Journal of

Power System Stability and Control. Dr. B. Kalyan Kumar, Department of Electrical Engineering, Indian Institute of Technology Madras, Chennai, India

Emergency response system for electric power systems

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Interconnection for Wind Energy ) Docket No. RM

Section 5. TADS Data Reporting Instruction Manual DRAFT Section 5 and Associated Appendices With Proposed Event Type Numbers

Journal of Physics: Conference Series. Related content PAPER OPEN ACCESS

1. Explain the various methods of methods of grounding. In power system, grounding or earthing means connecting frame of electrical equipment (non-cur

RESULTS OF ON-GRID OPERATION OF SUPERCONDUCTOR DYNAMIC SYNCHRONOUS CONDENSER

Automatic Control of the Concrete Mixture Homogeneity in Cycling Mixers

ECE 422/522 Power System Operations & Planning/Power Systems Analysis II : 8 - Voltage Stability

Issued August DATA SHEET. 3VT3 MCCB up to 630 A

DYNAMIC RESPONSE OF A GROUP OF SYNCHRONOUS GENERATORS FOLLOWING DISTURBANCES IN DISTRIBUTION GRID

Evaluation of the risk of failure due to switching overvoltages of a phase to phase insulation

The Mathematical Model of Power System with Static Var Compensator in Long Transmission Line

Correlation between Lightning Impacts and Outages of Transmission Lines. H-D. BETZ Nowcast GmbH Munich Germany

Field-Circuit Coupling Applied to Inductive Fault Current Limiters

AP1000 European 7. Instrumentation and Controls Design Control Document

ECE 522 Power Systems Analysis II 3.3 Voltage Stability

EE2351 POWER SYSTEM OPERATION AND CONTROL UNIT I THE POWER SYSTEM AN OVERVIEW AND MODELLING PART A

Performance Evaluation and Review of System Protection Scheme Design with the help of Synchrophasor Measurements

B1-1. Closed-loop control. Chapter 1. Fundamentals of closed-loop control technology. Festo Didactic Process Control System

OUT-OF-STEP DETECTION BASED ON ZUBOV S APPROXIMATION BOUNDARY METHOD

IJSER. 1. Introduction

Request Ensure that this Instruction Manual is delivered to the end users and the maintenance manager.

Worked Example for the Calculation of Earthing Current and Electric Shock Hazard Potential Difference in a Rod and Grid Earthing System

Cascading Outages in Power Systems. Rui Yao

Coordinated Variable Structure Switching in Smart Power Systems: Attacks and Mitigation

Power System Stability GENERATOR CONTROL AND PROTECTION

System Impact Assessment Addendum #2 Greenfield & St. Clair Energy Centres

Mathematical Modeling and Dynamic Simulation of a Class of Drive Systems with Permanent Magnet Synchronous Motors

POWER SYSTEM STABILITY AND CONTROL

Dynamic simulation of a five-bus system

Fault Current Limiters

Transient Stability Analysis of Single Machine Infinite Bus System by Numerical Methods

Energy saving in electromechanical equipment with power coefficient correction. Dimitris Al. Katsaprakakis Aeolian Land S.A.

Issued August DATA SHEET. 3VT5 MCCB up to 1600 A

KINGS COLLEGE OF ENGINEERING Punalkulam

POWER SYSTEM STABILITY

Minimax Approximation Synthesis in PSS Design by Embedding

Superconducting Fault Current Limiters

1 Unified Power Flow Controller (UPFC)

INTRODUCTION TO THE PROBLEMS OF ANALYSIS AND CONTROL OF ELECTRIC POWER SYSTEMS

Analysis of Very Fast Transients in EHV Gas Insulated Substations

Harmonic Modeling of Networks

Commissioning and Testing of AVR and PSS

Cryogenic and Electrical Test Results of a 30 M HTS Power Cable

SUBJECT TO CHANGE WITHOUT NOTICE

An improved voltage-collapse protection algorithm based on local phasors

3VT4 Molded Case Circuit Breakers up to 1000 A

Research Paper ANALYSIS OF POWER SYSTEM STABILITY FOR MULTIMACHINE SYSTEM D. Sabapathi a and Dr. R. Anita b

Faults on Electrical System. A Research

Transients on Integrated Power System

Effects of Capacitor Bank Installation in a Medium Voltage (MV) Substation

Adaptive under frequency load shedding using synchrophasor measurement

Varius SUMMARY OF MODELS OF HRC FUSE-LINKS

Multi-Objective Optimization and Online Adaptation Methods for Robust Tuning of PSS Parameters

Comparative Study of Synchronous Machine, Model 1.0 and Model 1.1 in Transient Stability Studies with and without PSS

Final Exam, Second Semester: 2015/2016 Electrical Engineering Department

16 Appendix 16 Electrical Research Association Report

ECE 422/522 Power System Operations & Planning/ Power Systems Analysis II 3 Load Modeling

Varius SUMMARY OF MODELS OF HRC FUSE-LINKS. Type PVA10 / PV10 PV14 PV22 Rated current I n up to 32 A up to 63 A up to 125 A Rated voltage U n

The Study of Overhead Line Fault Probability Model Based on Fuzzy Theory

Modeling of Power System Components During Electromagnetic Transients

Selecting the current rating for equipment

Fault Calculation Methods

1. Wind turbines are designed to operate within specified design criteria. Often the operating environment extends beyond these limits and causes

A Computer Application for Power System Control Studies

NORDIC AND BALTIC GRID DISTURBANCE STATISTICS 2015

GENERATOR INTERCONNECTION APPLICATION

DESIGNING POWER SYSTEM STABILIZER WITH PID CONTROLLER

Transient Stability Assessment and Enhancement Using TCSC with Fuzzy Logic Controller

1SDC007004D0201. Discrimination tables

Gentle synchronization of two-speed synchronous motor with asynchronous starting

Power System Stability Enhancement Using Adaptive and AI Control

QUESTION BANK ENGINEERS ACADEMY. Power Systems Power System Stability 1

Instruction. Vacuum Circuit Breaker Operator Module. Type 3AH 4.16kV to 38kV. Power Transmission & Distribution

Transcription:

THIRD GENERATION SYSTEM PROTECTION SCHEME PROJECT FOR ZEYA HYDRO POWER PLANT Andrey GROBOVOY Power System Emergency Control Laboratory Ltd. - Russia andrey.grobovoy@ieee.org Elena DEDUKHINA Zeya Hydro Power Plant - Russia dea@zeya.vostok.elektra.ru Vitaly KOSTERIN Far East Interconnected Power System Control Centre - Russia kvi@oduv.elektra.ru Nikolay LIZALEK Siberian Electric Power Research Institute - Russia sibniie@online.nsk.su INTRODUCTION The paper focuses on very seldom exploited measure, which is used to counteract instability in power systems, known as dynamic braking or braking resistor. The aim of the paper is to provide complementary information regarding the dynamic braking devices which are exploited in the Russian Far East interconnected power system over 0 years. The experience of dynamic braking application there earnestly shows its extraordinary profitability. However, the destination of dynamic braking there is different in comparison with the conventional concept of using it. In this case, dynamic braking must be used in order to make possible the following: to make transmission line automatic reclosing which will be successful due to the fact that the angle between vectors of voltages at the receiving and sending ends will not run up inadmissible value; to apply unloading of turbine instead of generator rejection in the cases when a decrease of the transmission system power flow is expected in the post-contingency conditions, while current actual power of generators exceeds advisable value; to execute automatic choosing of moments of insertion and moments of tripping of braking resistors in the conditions when generator rejection may be exceeded because of unpredictability of the result of automatic reclosing action; to accomplish an automatic coordination of dynamic braking under faults when it is necessary to apply dynamic braking controls at the two largest hydro power plants of the Russian Far East Interconnected Power System. The information about the Zeya Hydro Power Plant (1330 MW, 6x5 MW) dynamic braking has been given in [1]. The information regarding possible operation factors of the Bureya Hydro Power Plant (010 MW, 6x335 MW) dynamic braking device has been given in []. There are several dynamic braking control devices. Their possibilities will be discussed in the following section. ZEYA POWER PLANT DYNAMIC BRAKING Dynamic resistor plant The scheme of the Zeya Hydro Power Plant generator dynamic braking is shown in Figure 1. 3 1 Figure 1 - Dynamic braking scheme: (1) generator, () speed sensor, (3) control device, (4) disconnector, (5) braking resistors, (6) SF6 circuit breaker In former times, 5 years ago, these circuit breakers were very progressive equipment. Even now they fulfill their functions. The circuit breakers were intended for singlestage dynamic braking but they have characteristics which permitted using them for multiple dynamic braking. Main engineering data of the circuit breaker consist in the following [1]: arc-suppressing substance is SF 6 during multiple dynamic braking a minimum duration of inserted state is 0.1-0.3 s, and minimum duration of disconnected state is 0.5 s; 4 5 6 ECL_Grobovoy_A1 Session 3 Paper No 54-1 -

nominal voltage of breaker is 15.75 kv; nominal current of breaker is 7 ka; quantity of the consecutive commutations is limited by the pressure of air in the pipe of the drive. These events occur no more than 3 times. One of six circuit breakers of the Zeya Hydro Power Plant generator dynamic braking is shown in Figure. An important part of dynamic braking controls is the resistor plant. The engineering data of the first generation of resistor plant of this power station has been given in [1]. Now, after the recent reconstruction, each 54-MW resistor plant of every generator consists of three 18-MW resistors (one resistor per phase). Each of the resistors contains five parallel columns with two resistor elements in each column. In addition three columns (they have white cover in the figure) may be exploited in order to increase the dynamic braking power. The resistor element is a cylinder, 1 m in height and 0. m in diameter approximately. The braking resistor of the Zeya Hydro Power Plant generator dynamic braking is shown in Figure 3. Control devices Being, at the present time, the largest hydro power plant of the Russian Far East Interconnected Power System, the Zeya Hydro Power Plant is an overwhelmingly important object for the power system emergency control structure. Having dynamic braking as one of the measures of system protection scheme (SPS), this power station is constantly attracting the attention of engineers. From the beginning of utilizing, started about twenty five years ago, the Zeya Hydro Power Plant s SPS was behavior-assumption type, which uses pre-fault calculation to determine the needed control actions. The functions consisted in generator rejection, remote load shedding, and dynamic braking. The dynamic braking has been performed as occurring once using relay scheme as well as other controls. There were provided three different durations of dynamic braking. Each of them was selected depending on the strength of pre-fault conditions and fault intensity. Imperfection of such approach to selection of control action is well known. Therefore, subsequently, about 1987, the control law has been modified and the dynamic braking became "multiple". It became possible because of application of an electronic control device which used the local information about parameters of generator transient. Next, in 1991, the electronic control device has been replaced by a microprocessor controller, which also used the local information of transient of the generator during the first braking resistors energizing in order to determine the necessity and amount of generators rejecting. In addition the teleautomatic SPS "pre-fault calculation" type was put into operation. New SPS has replaced the relaybased control system. The dynamic braking control law has been described in [1] and [4]. It is the following: U = sign ( ω + k m δ ) (1) Here, U is the control function; ω and δ are the rotor speed and the integral of the function ω (t ) respectively; m is a scale coefficient; k is a coefficient defined as: 1, if sign ( ω ) < 0 sign ( δ ) > 0 J α k= () 0, if sign( ω ) 0 sign( δ ) 0 J > α The braking resistor is intended for insertion duration of no more than 3 seconds. After that it demands preventive measures to be taken. Usually, the duration of insertion during multiple dynamic braking very seldom exceeds 1 second. Here, α is a setting value determined at the stage of the control device tuning, J is a parameter calculated by a special electronic scheme. The algorithm can be described as follows: ( > 0) ( 0) ( > J ), if J = (3) J m e t τ, if < 0) ( < 0) ( ECL_Grobovoy_A1 Session 3 Paper No 54 - -

Here, J m = is calculated at the moment when ( = 0) ( > 0) ( > J) The control law (1) - (4) allows taking into account the specific features of the dynamic braking controls' circuit breaker and the transmission system performance under disturbance. Figures 4 and 5 illustrate the principle of the controls. Signal from speed sensor Triggering Special sensor Calculator Control module duration of cooling numbers of insertion Triggering duration of functioning "OR " 1 insert cut off (4) The control device which implements the above control law and logic of selecting coefficient k was put into operation in 1987. The control device is shown in Figure 6. At the present time the device is still used as a stand-by one. The electronic control device was replaced by the microprocessor controller in 1991. The controller of dynamic braking is shown in the same figure. In addition to the algorithm of the above control device, it is executing extra functions of generator rejection. The generator rejection occurs in the first cycle of the dynamic braking when resistors are inserted already. Here is the main condition for generator rejection [1]: > 0 The condition (5) is checked every time when a generator is rejected. Such way of step-by-step generator rejections is admissible only under applied dynamic braking that permits avoiding superfluous generator rejection and remote load shedding. (5) Breaker s auxiliary contact resource of insertion 0. sec delay Figure 4 Structure of control device: control (1), and monitoring () modules meeting the condition: ω <0 δ meeting the condition: ( ω +kδ)<0 ω U t d ω d ω J а) modification of k Setting In addition, the "pre-fault calculation" type centralized teleautomatic SPS has been put into operation. The new SPS has replaced the relay-based control system. PROJECT OF THE THIRD GENEATION SPS b) Figure 5 - а ) mechanism of determination of insertion moments; b) mechanism of selecting coefficient k δ - integral of speed, ω - speed, U control function, J subsidiary parameter t Now it is evident that a modernization of the Zeya Hydro Power Plant's SPS is needed. The existing controls must be replaced by new SPS which can be described as the behavior-prediction SPS of post-fault calculation type. The prospective third generation SPS may have very multifarious and unusual characteristics. It is caused by new approaches to organization of emergency control system of the Russian Far East Interconnected Power System. The main decisions of the project that have been done lately will be discussed in this section. ECL_Grobovoy_A1 Session 3 Paper No 54-3 -

Transmission system model There are two reasons for starting the modernization of the Zeya Hydro Power Plant's SPS. The first of them consists in an obsolescence of the controllers' elements and the control center s equipment. The second reason is the building of the Bureya Hydro Power Plant (010 MW, 6x335 MW) that will be located not far from the Zeya Hydro Power Plant. The energy of these power stations will be transferred to consumers through the same transmission lines. In case of beginnings of a fault on the line, both power plants' SPS must be used to counteract instability of the transmission system. The Bureya Hydro Power Plant will be equipped by similar dynamic braking. Thus, a task of coordination of two SPS appears. The problem has been discussed in [3] and [4]. Some new approaches to organization of the emergency control system consist in the following. framework of the concept, consists in using Fuzzy set theory in order to coordinate dynamic braking at the Zeya and Bureya Hydro Power Plants. Using the well known system MATLAB/Simulink, a comparison of several control laws has been made. Four control laws have been examined: two of them have been made on the basis of classic theory of automatic regulation, the other two - on the basis of Fuzzy set theory. The results of the investigation are shown in Figure 8. Using the system (1) - (4) and the sigmoid membership The scheme of transmission system which will come into being on completion of constructing the Bureya Power Plant may be very approximately presented as is shown in Figure 7. P N =900 MW; P=700 МW; P N =1340 МW; P=900 МW; G3 P N =7000 МW; P=4800 МW; G1 T1 L1 T3 L6 W1 W W3 W7 G5 G T T5 T6 T7 T8 W4 W5 W6 L7 P N =450 МW; P=400 МW; L L3 T4 L4 L5 P N =670 МW; P=50 МW; G4 Figure 7 - Scheme of the transmission system: G1 G5 - generators; T1 - T4 - transformers; T5 - T8 - autotransformers; W1 - W7 transmission lines; L1 - L7 - loads; P N nominal (P current) generator capacity Here, the generators G1 and G are models of the Zeya Hydro Power Plant, and generators G3 and G4 are ones of the Bureya Hydro Power Plant. The total length of the 500 kv transmission lines W1, W and W3 is about 1000 km. These transmission lines are shunted by the 0 kv ones labeled W4, W5, W6. The direction of energy transfer is from the generators G1-G4 to G5 that is equivalent of the receiving part of the interconnected power system. The most loaded transmission line is W3. Taking into account that the total power of G1-G4 is approximately equal to the power of G5, one can image the difficulties of emergency control in the power system. Fuzzy set theory exploitation Exactly therefore a new conception of emergency control has been suggested for the Russian Far East Interconnected Power System [1-4]. One of the suggestions, within the functions, one can write the rules connecting input and output variables in accordance with the Mamdani system: ECL_Grobovoy_A1 Session 3 Paper No 54-4 -

andj = zero, thenk = zero if δ = positiveandj, = small, thenk= big andj = aver, thenk = aver andj = big, thenk = small if δ = negative, thenk = zero In the exploration, another approach to selection of input variables and membership functions has been made. The Sugeno's system and membership functions, such as Z and S-function, were used. In this case, if J will be input, and K will be output variable, then one can write: ifj = low, thenk =1 ifj = high, thenk = 0 Figure 8 illustrates the results of dynamics simulation under different control laws. One can see a slight difference between the Sugeno algorithm, Mamdani system and existing control laws. However, it is needed to mark a slight difference that is observed under very strong conditions (the margin of stability limit is 5%). If this value is 15% or 0%, one can see a large difference, but these cases have not been shown in the paper. It is important to say that the calculating experiments have been executed in the conditions when generator rejection and remote load shedding have been applied simultaneously with dynamic braking. If a minimum of remote load shedding will serve as the criterion of optimality, in the majority of the considered cases with different stability margins, the law obtained with the use of the Mamdani system is better. Nevertheless, in any cases, the main goal of the emergency control has been achieved - the Zeya and Bureya Power Plants' dynamic braking coordination takes place. Main thesis of the project The discussion regarding the necessary type of the Bureya Power Plant's dynamic braking is still in progress. There are two suggestions concerning the type of circuit breaker of dynamic braking. It may be thyristor or mechanical breaker. In any case, fuzzy set theory permits choosing of duration of dynamic braking. This is especially true for the Zeya Hydro Power Plant's dynamic braking because of mechanical type of circuit breakers. Therefore, one of the main theses of the controls modernization project at the Zeya Hydro Power Plant is the suggestion to exploit fuzzy set theory. Taking into account the actual state of the control equipment, the suggestion to replace the existing dynamic braking controller by six controllers (one per each generator) has been made. Thus, the control system must be made as a three-level structure. The first level represents the control devices of dynamic braking. The second level represents a computation device for choosing control actions such as generation rejection and remote load shedding. The third level represents high-performance computers which are capable to implement a technology of neural networks in order to form the control action for long-term hydro turbine unloading. Figure 9 illustrates one of possible SPS s for the Zeya Hydro Power Plant [3]. CONCLUSION A three-level structure of this SPS permits part-continuous method of modernization of the existing emergency control system of the Zeya Hydro Power Plant. The first phase of work is already started. It consists in replacement of the existing obsolete SPS by controllers of Compact PCI standard. The second phase will deal with PLC s of the lower level intended for dynamic braking. At last, the third stage will deal with the equipment intended for information transfer from the regional control centre in order to accomplish the conception of power system emergency control, discussed in the following references. REFERENCES Redundancy ring 100 Mbit/s CANbus PLC CPCI Cluster Firewire Communication server Data transferring Telemonitoring, telemetering, contingency detecting, and control orders transferring Figure 9 Configuration of SPS: CPCI is Compact PCI and PLC is programmable logic controllers [1] A. A. Grobovoy, Russian Far East Interconnected Power System Emergency Stability Control, Proceedings 001 IEEE Summer Power Meeting, pp. 84-89. [] A. A. Grobovoy and N. N. Lizalek, Multiple dynamic brake and power system emergency control, Proceedings POWERCON 98, IEEE International Conference on Power System Technology, vol., pp. 1351-1355. [3] А. A. Grobovoy, N. N. Lizalek, V. P. Patsev, V. K. Sukhoparov, S. P. Tishchenko and A. V. Khorokhov Power Systems Centralized and Decentralized Emergency Stability Control, Proceeding. CIGRE International Conference on Power Systems, ICPS 001, pp. 458-463. [4] A. A. Grobovoy, V. I. Kosterin, N. N. Lizalek, and Y.A. Vorobyov, Impact of Perspective Technologies upon Control Structure of the Russian Far East Interconnected Power System, Proceedings ECNEA 00, pp. 409-40. [5] A. Grobovoy, E. Dedukhina, N. Lizalek, V. Kosterin, V. Patsev, O. Shepilov, Y. Vorobyov, Several approaches to control action choosing in the Russian Far East interconnected power system, presented to CIGRE Symposium, Shanghai, 003. ECL_Grobovoy_A1 Session 3 Paper No 54-5 -