Deutscher Wetterdienst

Similar documents
Developing ICON Data Assimilation and Ensemble Data Assimilation

Deutscher Wetterdienst

Deutscher Wetterdienst

State of the art of wind forecasting and planned improvements for NWP Helmut Frank (DWD), Malte Mülller (met.no), Clive Wilson (UKMO)

operational status and developments

Application and verification of the ECMWF products Report 2007

Centre report - DWD. 27 th WGNE meeting Oct. 2011, Boulder. M. Baldauf, M. Lange, H. Frank, G. Zängl, B. Früh (DWD)

Ensemble Kalman Filter Algorithmic Questions

Swedish Meteorological and Hydrological Institute

Update on the KENDA project

Deutscher Wetterdienst

Optimal combination of NWP Model Forecasts for AutoWARN

ICON. Limited-area mode (ICON-LAM) and updated verification results. Günther Zängl, on behalf of the ICON development team

Improving the use of satellite winds at the Deutscher Wetterdienst (DWD)

Model Output Statistics (MOS)

The convection-permitting COSMO-DE-EPS and PEPS at DWD

Application and verification of ECMWF products 2016

DWD report. 30 th WGNE-meeting March 2015, NCEP, Washington. Michael Baldauf, Günther Zängl, Michael Buchhold, Roland Potthast

The DRIHM Portal: architecture, design principles and issues.

Annual WWW Technical Progress Report. On the Global Data Processing and Forecasting System 2004 OMAN

PP COLOBOC. Status Report

COSMO / CLM Training Course

Application and verification of ECMWF products 2009

SPECIAL PROJECT PROGRESS REPORT

Calibration with MOS at DWD

Hellenic National Meteorological Service (HNMS) GREECE

JOINT WMO TECHNICAL PROGRESS REPORT ON THE GLOBAL DATA PROCESSING AND FORECASTING SYSTEM AND NUMERICAL WEATHER PREDICTION RESEARCH ACTIVITIES FOR 2016

ICON. The Icosahedral Nonhydrostatic modelling framework

A hierarchy of one- and two-moment microphysical parameterizations in the COSMO model

NinJo. Deutscher Wetterdienst. System Overview and Usage for Aviation Meteorology at DWD. Stephan Schmidt, Michael Rohn, Dirk Heizenreder

Comparison of ICON- and COSMO-EU forecast quality

Exascale I/O challenges for Numerical Weather Prediction

Report on stay at ZAMG

Nonlinear Bias Correction for Satellite Data Assimilation using A Taylor Series Polynomial Expansion of the Observation Departures

The Ensemble-MOS of Deutscher Wetterdienst

On Ensemble and Particle Filters for Numerical Weather Prediction

Variational soil assimilation at DWD

Development and applications of regional reanalyses for Europe and Germany based on DWD s NWP models: Status and outlook

STATISTICAL MODELS and VERIFICATION

COLOBOC Project Status

Application and verification of ECMWF products 2016

Recent developments in severe weather forecasting at the DWD

ECMWF Web re-engineering project

Application and verification of ECMWF products 2015

ECMWF Computing & Forecasting System

Synergie PC Updates and Plans. A. Lasserre-Bigorry, B. Benech M-F Voidrot, & R. Giraud

User's Guide for the NMM Core of the Weather Research and Forecast (WRF) Modeling System Version 3. Chapter 4: WRF-NMM Initialization

Implementation of global surface index at the Met Office. Submitted by Marion Mittermaier. Summary and purpose of document

Experiences from implementing GPS Radio Occultations in Data Assimilation for ICON

Verification of ECMWF products at the Deutscher Wetterdienst (DWD)

An Overview of HPC at the Met Office

Drought forecasting methods Blaz Kurnik DESERT Action JRC

JOINT WMO TECHNICAL PROGRESS REPORT ON THE GLOBAL DATA PROCESSING AND FORECASTING SYSTEM AND NUMERICAL WEATHER PREDICTION RESEARCH ACTIVITIES FOR 2007

A diagnostic interface for ICON Coping with the challenges of high-resolution climate simulations

Application and verification of ECMWF products: 2010

Recent activities related to EPS (operational aspects)

NHM Tutorial Part I. Brief Usage of the NHM

The European Wind Profiler Network CWINDE Problems and Prospects

István Ihász, Hungarian Meteorological Service, Budapest, Hungary

Consortium for Small- Scale Modelling

JOINT WMO TECHNICAL PROGRESS REPORT ON THE GLOBAL DATA PROCESSING AND FORECASTING SYSTEM AND NUMERICAL WEATHER PREDICTION RESEARCH ACTIVITIES FOR 2006

Assimilation of radar reflectivity

Use of satellite winds at Deutscher Wetterdienst (DWD)

Project AutoWARN. Automatic Support for the Weather Warning Service at DWD

Deutscher Wetterdienst. Consortias Progress in the Interoperability Programme

LAM-EPS activities in RC LACE

Use of satellite soil moisture information for NowcastingShort Range NWP forecasts

SPECIAL PROJECT PROGRESS REPORT

JOINT WMO TECHNICAL PROGRESS REPORT ON THE GLOBAL DATA PROCESSING AND FORECASTING SYSTEM AND NUMERICAL WEATHER PREDICTION RESEARCH ACTIVITIES FOR 2007

Operational and research activities at ECMWF now and in the future

Optimizing the energy consumption and operational availability of point heaters using weather forecasts

Scalability Programme at ECMWF

Chile / Dirección Meteorológica de Chile (Chilean Weather Service)

interpreted by András Horányi Copernicus Climate Change Service (C3S) Seasonal Forecasts Anca Brookshaw (anca.brookshaw.ecmwf.int)

Forecast solutions for the energy sector

SLOVAKIA. Slovak Hydrometeorological Institute

Regional Climate Centre Network (RCC) in RA VI as a GFCS contribution

Integrated Electricity Demand and Price Forecasting

QualiMET 2.0. The new Quality Control System of Deutscher Wetterdienst

Application and verification of ECMWF products 2012

Deutscher Wetterdienst

William H. Bauman III * NASA Applied Meteorology Unit / ENSCO, Inc. / Cape Canaveral Air Force Station, Florida

MSC HPC Infrastructure Update. Alain St-Denis Canadian Meteorological Centre Meteorological Service of Canada

A Revised Version of the Cloud Microphysical Parameterization of COSMO-LME

Deutscher Wetterdienst. German Climate Services - A contribution to the Global Framework for Climate Services (GFCS) Tobias Fuchs and Paul Becker

WRF Modeling System Overview

TIGGE-LAM archive development in the frame of GEOWOW. Richard Mladek (ECMWF)

History of the partnership between SMHI and NSC. Per Undén

HErZ TB4 Climate Monitoring and Diagnostics

COSMO WG3b: Activity Review

ICON-ESM MPI-M s next-generation Earth system model

Application and verification of ECMWF products 2010

Collaborative WRF-based research and education enabled by software containers

10 th COSMO / CLM / ART Training Course Theory and Application

Migration from TAC to BUFR for TEMP observations

Forecasting of volcanic ash for the Norwegian airspace

WRF Modeling System Overview

Impact of sea surface temperature on COSMO forecasts of a Medicane over the western Mediterranean Sea

LAMEPS activities at the Hungarian Meteorological Service. Hungarian Meteorological Service

Application and verification of ECMWF products in Croatia - July 2007

Transcription:

Deutscher Wetterdienst NUMEX Numerical Experiments and NWP-development at DWD 14th Workshop on Meteorological Operational Systems ECMWF 18-20 November 2013 Thomas Hanisch GB Forschung und Entwicklung (FE) Deutscher Wetterdienst, Offenbach, Germany

Getting a Model from Research to Operations NWP models at DWD in 2013 The way to GME 20km Idea / Scientific plan... Development... New operational NWP model NUMEX NWP models at DWD in 2015

Numerical Weather Prediction at DWD in 2013 Forecast of Total Cloud Cover: GME (above) COSMO-DE (below) COSMO-DE Δx = 2.8 km COSMO-EU Δx = 7 km GME Δx = 20 km 0. 00 0 50 0 10 00 15 00 20 00 25 00 30 00 35 00 40 00 3

Numerical Weather Prediction at DWD in 2013 Ensemble forecast system COSMO-DE-EPS with 20 members 'physics' pertubations Δx = 2.8 km 8 times a day Forecast time: 27h Available: 2h after observation time 11 22 33 44 55 IFS IFS GME GME GFS GFS BC-EPS BC-EPS GSM GSM 4

Numerical Weather Prediction at DWD in 2013 Operational timetable of the DWD model suite with dataflow 6

From Decision to Operational Reality Management Stand-Alone Tests Assimilation Suite Tests Coordination Pre-Operational Operational 7

Management Tasks Coordination Group NWP (KG-NWV) defines tasks of NWP development here: increase the resolution of GME from 30 km to 20 km (GME30L60 GME20L60) objective: better forecast results Research department requirements for model development changes of the dynamics of the NWP-model: advection of QR and QS changes of the physical parameterisation new invariant / climatological datasets changes of the structure of output fields (size: 2.25, grid point position land / sea, icosahedral and regular) 8

From Decision To Operational Reality Management Stand-Alone Tests Assimilation Suite Tests Coordination Pre-Operational Operational 9

Stand Alone Test Test cases of the new model version idealized test start from interpolated analysis performance on the compute server full resolution full output full model physics Is it possible to run the new model within the operational schedule? 10

From Decision To Operational Reality Management Stand-Alone Tests Assimilation Suite Tests Coordination Pre-Operational Operational 11

Assimilation Suite Tests NUMEX: run the complete data assimilation cycle with forecasts add the new resolution to: scripts (backward compatibility to old model resolutions) data handling within databases (new data types) timings of storing and reading the data ( size = factor 2.25) forecast runs with postprocessing and verification pay attention to cutoff times of operations influence on the regional models COSMO-EU and COSMO-DE forecast quality 12

From Decision To Operational Reality Management Stand-Alone Tests Assimilation Suite Tests Coordination Pre-Operational Operational 13

Coordination Tasks Working group NWP (AG-NWV) presentation of the new development to potential users Migration Workgroup all business units (leadership: operations & research department) meetings with increasing frequency (monthly weekly) determine all tasks influenced by the model change (migration list) regular reports on progress define migration dates pre-operational run = Parallel Suite operational run (proposal - management of DWD has to agree) 14

From Decision To Operational Reality Management Stand-Alone Tests Assimilation Suite Tests Coordination Pre-Operational Operational 15

Pre-Operational Tasks Parallel Suite complete data assimilation cycle of GME, COSMO-EU, COSMO-DE, COSMO-DE-EPS and WAVE forecasts of all NWP models starting at 00 and 12 UTC complete set of databases operational environment (SMS, time critical, ) all data are available for users to run extended tests with postprocessing routines test data can be delivered to customers automatically 16

Operational timetable of the DWD model suite with dataflow 17

Parallel suite of the DWD NWP models 18

From Decision To Operational Reality Management Stand-Alone Tests Assimilation Suite Tests Coordination Pre-Operational Operational 19

Operational Tasks Operational run switch the operational suite to GME20L60 now fitted into the operational timetable (no delay compared to GME30L60) old version GME30L60 switched to parallel suite parallel run of both systems for one month products delayed compared to the operational products 20

From Decision To Operational Reality Management Stand-Alone Tests Assimilation Suite Tests Coordination Pre-Operational Operational 21

NUMEX What is NUMEX? testbed for all operational changes of the NWP routine at DWD general run-time system for DWD-NWP-models runs on different architectures (NEC, IBM, Cray,...) terminal-based interface runs on HPC and workstations NUMEX monitor as GUI 22

NUMEX What is it used for? all new NWP-developments have to be implemented into NUMEX before becoming operational - GME20L60, COSMO-DE-EPS, GME-SMA, ICON, KENDA,... new HPC-system NWP system will be migrated via NUMEX many internal and external projects - ICON, COSMO development, EweLINE, ORKA, AirPort, dissertations special non-operational, but nearly real-time running NWP-models - COSMO-ART (volcanic ash runs during Eyjafjallajökull eruption) - Fukushima Daiichio nuclear disaster - Olympic games 23

NUMEX Main Parts MOX User interface - create experiments - manage experiment - software: ksh Control file Masterjob Basic interface to NUMEX Execution of an experiment - strucured ascii file - decribes one experiment completely - read the control file - special experiment user - software: ksh, perl, batch system 24

A NUMEX Job Control file Masterjob SHELL batch interpolation preparation lm_2_lmk lk_pan data FORTRAN batch database int2lm namelist data namelist eps_anc batch database ` batch database forecast production lmk prodeps_lmk data namelist lm_f90 data database namelist prodgene 26

Numerical Weather Prediction at DWD in 2015 Global model ICON ICON zooming area Europe COSMO-DE (-EPS 40) Grid spacing: 13 km Grid spacing: 6.5 km Grid spacing: 2.2 km Layers: 90 Layers: 54 Layers: ~ 80 Forecast range: Forecast range: Forecast range: 174 h at 00 and 12 UTC 78 h at 06 and 18 UTC 1 grid element: 173 km 2 78 h at 00, 06, 12 and 18 UTC 27 h at 00, 03, 06, 09, 12, 15, 18, 21 UTC 1 grid element: 43 km 2 plus one zooming area (military use) 1 grid element: 5 km2 27

Numerical Weather Prediction at DWD in 2015 Summary ICON global: 13km ICON Europe (zooming area): 6.5km COSMO-DE and COSMO-DE-EPS: 2.2km, 40 members KENDA - Ensemble Data Assimilation (COSMO-DE): 2.2km VarEnKF Ensemble Data Assimilation (ICON): 13km New HPC system Cray XC30 Megware Linux Cluster 28

Thank you for your attention! Any questions? 31